. j

^ i

/

L OPERATING DATA REPORT

'1 I

UNIT NAME Millstone Unit 1 DATE 12/12/96 I l COMPLETED BY G. Newburgh  !

TELEPHONE (860) 444 5730 .'

i OPERATING STATUS l 1. Docket Number 50-245 I

2. Reporting Period June 1996 Notes:
3. Utility Contact G. Newburgh ' Corrected on 12/12/96 to

' 4. Licensed Thermal Power (MWt): 2011 reflect Forced Outage  !

5. Nameplate Rating (Gross MWe): 662 beginning 12/13/95 @ 0000 j
6. Design Electrical Rating (Net MWe): 660 due to 10CFR50.54(f) letter j 7, Maximum Dependable Capacity (Gross MWe): 670
8. Maximum Dependable Capacity (Net MWe): 641 l
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, .

Give Reasons: l N/A l

16IPower Level To Which Restricted, If any (Not MWe): 0

11. Reasons For Restrictions,if Any: NRC Category lll Facility; design basis verification response j pursuant to 10CFR50.54(f).

3 This Month Yr.-To-Date Cumulative  :

}

l - 12. Hours in Reporting Period 720.0 4367.0 223583.0  !

13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9  ;
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 j j
15. Hours Generator On-Line 0.0_ 0.0 166560.7 }

l 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 l

17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0  !
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0  !

l 19. Net Electrical Energy Generated (MWH) -2006.0__ -13701.0 101056250.0  !

30. Unit Service Factor 0.0 0.0 74.5  !
31. Unit Availability Factor 0.0 0.0 74.5 i
23. Unit Capacity Factor (Using MDC Net) -0.4 -0.5 69.1 l
33. Unit Capacity Factor (Using DER Net) -0.4 -0.5 68.4  !
24. Unit Forced Outage Rate *100.0 *100.0 *13.8 .i
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):  ;

' Shutdown for 10CFR50.54F at time of this report l 2'6. If Unit Shutdown At 5iid 6f Report Period, $stimated Date of Startup: To be determined  !

l 37. Units in Test Status (Prior to Commercial Operation): l Forecast Achieved J INITIAL CRITICALITY N/A N/A i INITIAL ELECTRICITY N/A N/A l j COMMERCIAL OPERATION N/A N/A 4

1 9612200104 961216 PDR ADOCK 05000245 R PDR 1

e ., - - - . . . . -

.~

UNIT SHUTDOWNS AND POWER REDUCTIONS , ,-

DOCKET NO. 50-245 ,?^

UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburuh TELEPHONE (8601-444-5730 REPORT MONTH: June 1996 2

No. Date Type' Duration Reason Method of License System Comp'onent Cause & Corrective (Hours) Shutting Event Code' Code Action to Down Reactor' Report # Prevent Recurrence 95-10F 951213 F 720 D 4 N/A N/A N/A NRC Category lit facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

' F: Forced 2 Reason Method

  • IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain)

  • IEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"

_