Revised Monthly Operating Rept for Mar 1996 for Millstone Power Station,Unit 1
ML20132D742
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/31/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200094
Download: ML20132D742 (2)


Text

.,

OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period March 1996 I Notes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to
4. Licensed Thermal Power (MWt): 2011 reflect Forced Outage
5. Nameplate Rating (Gross MWe): '662 beginning 12/13/95 @ 0000
6. Design Electrical Rating (Net MWe): 660 due to 10CFR50.54(f) letter
7. Maximum Dependable Capacity (Gross MWe): 670
8. Maximum Dependable Capacity (Net MWe): 641
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, if any (Net MWe): 0
11. Reasons For Restrictions,if Any: NRC Category ll Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 2184.0 221400.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) -2355.0 ,

-7575T 101062375.0

20. Unit Service Factor 0.0 0.0 75.2
21. Unit Availability Factor 0.0 0.0 75.3

~

22. Unit Capacity Factor (Using MDC Net) -0.5 -0.5 69.7
23. Unit Capacity Factor (Using DER Net) _

-0.5 -0.5 69.1

24. Unit Forced Outage Rate *100.0 *100.0 *12.8
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report

~

26. If Unit Shutdown At End Of Report Period. $stimated Date of Startup: T

' o be determined

27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200094 961216" PDR ADOCK 05000245 R PDR

. _ . _ , . _ _ _ _ _ . _ . _ . _ _ _ _ _ _ . . . . . _ . _ . . ~ ~ - - - . . _ . - . . . - . .- . - _ . _ _ _ _ _ . . . . _ . _ _ . - . . . _

,,.' i

' UNIT SHUTDOWNS AND POWER REDUCTIONS . , ,

DOCKET NO. 50-245 , ;' l UNIT NAME Millstone Unit 1 l DATE 12/12/96 I

COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: March 1996 2

2 No. Date Type' Duration Reason Method of License System Compnent Cause & Corrective l'

Shutting Event Code Code Action to (Hours) 3 Down Reactor Report # Prevent Recurrence 95-10C 951213 F 744 D 4 N/A N/A N/A NRC Category Il facility; design basis verification for  !

response to NRC pursuant  ;

t i to 10CFR50.54(f).

RFO activities continue.

' F: Forced 2 Reason 3

Method

  • IEEE Standard 805-1984, i S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram -

Nuclear Pouer Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" '

E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)  :

5 F- Administrative 6 - Other (Explain) IEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related j Facilities - Component i Function identifiers" ,