Forwards Safety Insp Repts 50-456/85-17 & 50-457/85-18 on 850401-0503.No Noncompliance Noted
ML20129H263
Person / Time
Site: Harris, Braidwood  Constellation icon.png
Issue date: 06/03/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20129H266 List:
References
NUDOCS 8506070531
Download: ML20129H263 (2)


Text

r -

JUN 3 E

Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

'

Gentlemen:

This refers to the routine safety inspection conducted by Mr. L. G. McGregor of this office on April 1 through May 3, 1985, of activities at Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace at the conclusion of the inspectio The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personne No items of noncompliance with NRC requirements were identified during the course of this inspectio In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosure (s) will be placed in the NRC's Public Document Roo $DR ADOCK 05000456 PDR fo\

/ k\

.

-; .

_,

Commonwealth' Edison Company 2 JUN 3 1985 We will gladly discuss any questions you have concerning this inspectio

Sincerely,

,

" Original signed by W. S. Little" W. S. Little, Director Braidwood Project Enclosure: Inspection Report No. 50-456/85017(DRP);

No. 50-457/85018(DRP)

cc w/ enclosure:

' L. Farrar, Director of Nuclear Licensing M. Wallace, Project Manager D. Shamblin, Construction Superintendent J. F. Gudac, Station Superintendent C. W. Schroeder, Licensing and Compliance Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron Phyllis Dunton, Attorney General's Office Environmental Control Division D. W. Cassel, Jr. , Es J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division

.

( M PeINe/kja F&rbd Litkle Rin 05/30/85