Notice of Violation from Insp on 960721-0831.Violation Noted:Unit 1 Nis IR Channel Compensating Voltage for NI-35 Was Adjusted by Plant Technicians,Being Below Scale & SR Counts Were Less than 100 Cps
ML20128J958
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/27/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20128J933 List:
References
50-348-96-07, 50-348-96-7, 50-364-96-07, 50-364-96-7, NUDOCS 9610100240
Download: ML20128J958 (2)


Text

. ,

NOTICE OF VIOLATION Southern Nuclear Operating Company Docket Nos. 50-348 and 50-364 Farley Nuclear Plant. Units 1 and 2 License Nos.: NPF-2 and NPF-8 During a NRC inspection conducted on July 21 through August 31, 1996, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions." NUREG-1600, the violation is listed below:

Technical Specification (TS) 6.8.1.a requires that applicable written procedures recommended in Appendix A of Regulatory Guide 1.33. Revision

2. dated February 1978, shall be established, implemented, and maintained. Regulatory Guide 1.33. Appendix A. Section 8.b. recommends that specific procedures for surveillance tests should be written for reactor protection system and permissives - tests and calibrations.

Step 5.4 of the Precautions and Limitations of FNP-0-IMP-228.4. Nuclear Instru::,entation System Intermediate Range Compensating Voltage  !

Adjustment, states that compensating voltage should not be adjusted when i plant power descends below the intermediate range scale and source range level is below 100 to 500 counts per second (cps). Step 5.3 also states that once compensating voltage has been adjusted after a shutdown, it should not need readjustment unless the detector characteristics have ,

changed.  !

,,ccv  ;

Contrary to the above, on May 4.1996, t'he Unit 1 nuclear instrumentation system (NIS) intermediate range channel compensating  !

voltage for NI-35 was adjusted by plant technicians even though it was '

below the bottom scale and source range counts were less than 100 cps.

A similar event occurred on January 14. 1995, during the adjustment of Unit 1 NIS intermediate range channel NI-36.

This is a Severity Level IV violation (Supplement I).

1 Pursuant to the provisions of 10 CFR 2.201. Southern Nuclear Operating Company is hereby required to submit a written statement or ex)lanation to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Jesk. Washington, DC 20555, with a copy to the Regional Administrator. Region II. and a copy to the NRC Resident Inspector, Farley Nuclear Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

Your respose may reference or include previous docketed correspondence, if l the correspon&nce adequately addresses the recuired response. If an adequate reply is not received within the time specifiec in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper Enclosure 1 9610100240 960927 j PDR ADOCK 05000348 '

G PDR J

Notice of Violation 2 should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Because your res)onse will be placed in the NRC Public Document Room (PDR). to the extent possi)1e. it should not include any personal privacy. )roprietary, or safeguards information so that it can be placed in the PDR witlout redaction. However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR. and provide the legal basis to support your request for withholding the information from the public.

i l

Dated at Atlanta. Georgia this 27th day of September 1996 i

a I

1 l

l.

i i

i s

Enclosure 1