Forwards Initial SALP Repts 50-456/91-01 & 50-457/92-01 Covering May 1991 Through Sept 1992.Areas of Security & Maint/Surveillance Maintained Category 1 Ratings.Performance Re Emergency Planning Declined to Category 2
ML20128D098
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/25/1992
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20128D102 List:
References
NUDOCS 9212070145
Download: ML20128D098 (3)


Text

,.

"

.* , -

po mo u umtio starts y, 7, ' NUCLE An HEGULATOnY cOMMissl0N ()

n >. nsanon m ( %}

5, i t# / f m noosevett noAo g+e-]}f/j c.te c uvu. ittison m n g,

.....- ev:cim SQ Docket No. 50-456 Docket No. 50-457 s.

(,

Commonwealth Edison Company ATIN: Mr. Cordell Reed Senior Vic.e President Opus West 111 1400 Opus Place Downers Grove, IL 60515

Dear Mr. Reed:

Enclosed for your review, before our schedulea meeting of December 18, 1992, is the Initial SALP 11 Report for the Braidwoed Station, covering the period May 1, 1931 through September 30, 1992.

.

in accordance with NRC policy, I have reviewed the SALP Board Auessment and concur with their ratings. It is my vien that your conduct (,f nuclear activities in connection with the Braidwood facility was good.

Specific areas I would like to highlight are:

1. The areas of maintenance / surveillance, and security retained Category I ratings.

2. lhe areas of plant operations, and safety assessment / quality verification improved with Categt,ry 2.Im) roving ratings. A significant factor in the improved ratings was the statdown risk program, which has resulted in the elimination of shutdown risk associated events during this period.

3. The area of-engineering and technical support improved and was rated Category 2 improving during this assessment period. Improvement was noted in many areas, most notably in the involvement of engineering in day to day operations, monitoring of equipment performance.and maintenance activities. Management challenges will be to address

problems in the motor operated valve program and to sustain improvement '

initiatives.

4. The area of radiological controls retained a Category 2 rating, improvements in the areas of staffing. ALARA trogram, and radiological chemistry laboratory proficiency were offset ay the impact of contaminated areas on operator roundx and worker contamination control practices.

5. Performance in the area of emergency preparedness declined during this period and was rated Category 2. The lower rating was due primarily to

,

training deficiencies caused by the failure to fill the EP trainer L . position in a tiuely manner, and the. failure to identify technical-bdOh(M '

i- 9212070145 921125 PDR

ADOCK 05000456 PDR

[}i'h I v- ,'i

,h(/ -

S

'

,

. . . .

,

'

-

HOV 2 5 *.332 Commonwealth Edison Company 2 At the SALP meeting, you should be prepared to discuss our assessments. The meeting is intended to be a candid cialogue wherein any comments you may have regarding our report are discussed. Additionally, you may provide written comments within 30 days after the meeting. Your comments, a summary of our meeting, and my disposition of your comments will be issued as the final SALP Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the Initial sal.P Report will be placed in the NRC's Public Document Room.

Should you have any questions concerning the Initial SALP Rc sort, we would be pleased to discuss them with you.

Sincerely,

& '

> M I;.Berthavis JtegionalAdministrator Enclosure: Initial SALP 11 Report No. 50-456/92001;S0-457/92001 cc w/ enclosure:

M. Wallace, Vice President.

PWR Operations T. Kovach,' Nuclear Licensing Manager-A. Checca. Nuclear Licensing Administrator K. Kofron, Station Manager A. Haeger, Regulatory Assurance Supervisor DCD/DCB-(RIDS)

OC/LFDCB Resident inspectors, Byron.-

Braidwood.-Zion D. W. Cassel, Jr., Esq.

-Richard Hubbard '

J. W. McCaffrey, Chief, Public Utilities Division Licensing Project Mgr., NRR  :

Robert Newmann, Office of Public ,

Counsel -State of Illinois Center '

INP0; ';

.-

. -. 'r

'

v - , -- , ,, , ,. +

r;

' '

'

. :

.

.

Commonwealth Edison Company 3 Hoy 2 51992  !

.

'

,

Distribution .C_o.nb. ,

'

The Chairman K. C. Rogers, Commissior .r i J. R. Curtiss, Commissi. ,er F. J. Remick, Commission >.ir E. G. de Plangue, Commissioner J.11. Sniezek, DEDR T. E. Hurley, Director, NRR State Liaison Of ficer, State ,

-

of Illinois Chief,RPEB,NRR(2 copies)

J. E. Dyer, NRR Director, Project Directorate Ill- 2 J. -Lieberman, Director, Office of Enforcement-C. D. Pederson, Rill L. L. Cox, Rill (2 copies)

TSS Rill Rill Files R!ll PRR -

i

,

P

-

o a

h

' .k

..

'$

P

.-

o

" -

' '-

i

-

--kw- <- p & y --'0-F p c- 9 vg g m.,

r wm,'- e , w b w