ML20127M160

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Rept 50-271/91-99 for Period 910317-920801.SALP Board Noted Superior Performance in Plant Operations,Maint & Surveillance & Emergency Preparedness. Good Performance in Radiological Controls & Engineering
ML20127M160
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 01/22/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20127M163 List:
References
NUDOCS 9301280125
Download: ML20127M160 (3)


See also: IR 05000271/1991099

Text

? .

>

c

JAN 2 21993

Docket No. 50-271

Mr. Warren P. Murphy

Senior Vice President, Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Dear Mr. Murphy:

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

FINAL REPORT FOR VERMONT YANKEE NUCLEAR POWER

STATION FOR TIIE PERIOD MARCII 17,1991 TO AUGUST 1,1992

This letter forwards the final SALP Report (Enclosure 1) for the Vermont Yankee Nuclear

Power Station for the period March 17, 1991 through August 1,1992. The initial report was

forwarded by our October 13,1992 letter (Enclosure 2). The SALP evaluation was discussed

with you and your staff at a meeting held at the Vernon Town Hall located in Vernon, Vermont

on October 29,1992 (see Enclosure 3 for attendees and Enclosure 4 for slides used by the NRC

at the meeting).

This SALP Board noted continued superior performance in the functional areas _ of: Plant

Operations; Maintenance aed Surveillance; and Emergency Preparedness. Good performance

was observed with respect to Radiological Controls (improving trend), Engineering / Technical

Support, and Safety Assessment / Quality Verification. Security performance was evaluated as

acceptable. The performance decline in three of the seven functional areas from the previous

SALP is of concern, in that your self-assessment programs have not been fully effective.

We reviewed your response of November 18,1992 (Enclosure 5) and acknowledge the

improvements either already made or underway, that you have outlined. I encourage you to

continue your efforts in these areas, as well as the on-going self assessment activities emphasized

in your response.

After evaluating your comments on the initial SALP Board Report, we made several changes

to the Security evaluation (Section llI.E). The SALP Board was reconvened on December 14,

1992, and carefully considered your response, but concluded that no change to the rating in this

area was warranted. Our detailed evaluation of your response is attached (Enclosure 6).

Additionally, changes were made to the Safety Assessment / Quality Verification evaluation

(Section III.G) and Engineering and Technical Support evaluation (Section III.F) for the reasons

stated in Enclosure 7. However, the SALP ratings in these two areas remain unchanged. No -

other changes to the initial SALP Report were considered necessary based on your reply.

DR C 71 OFFICIAL BBCORD COPE'

O PDR

. . . . . , . \

- - - -

_ - -

,

.

%

Mr, Warren P. Murphy 2

0 E ,

Your cooperation with us is appreciated.

Sincerely,

C,' ' 1 Crd 3T.

h.ma T. inattui

Thomas T. Martin

Regional Administrator

Enclosures:

1. Final Systematic Assessment of Licensee Performance Report 50-271/91-99

2. USNRC, Region I Letter, T. T. Martin to W. P. Murphy dated October 13, 1992

3. List of Attendees at the October 29,1992 SALP Management Meeting

4 SALP Presentation Slides

5. Letter, Vermont Yankee to T. T. Martin dated November 18,1992

6. Assessment of Additional Security information Provided by Vermont Yankee

7. SALP Board Report Revision Sheet

ec w/encls:

D. Reid, Plant Manager

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

R. Gad, Esquire

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

T, Rapone, Massachusetts Executive Office of Public Safety

The Chairman

Commissioner Rogers

Commissioner Curtiss

Commissioner Remick

Commissioner de Planque

Institute for Nuclear Power Operations (INPO)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (31 copies)

NRC Resident Ins;metor

State of New Hampshire, SLO Designee

State of Vermont, SLO Designec

Commonwealth of Massachusetts, SLO Designee

OFFICIAL RECORD COPY

. __ _ _ - __

,

. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,

.

%r

hir. Warren P. hturphy 3 JAN 2 21993

bec w/ encl:

Region 1 Docket Room (with concurrences and IFS Forms)

J. Taylor, EDO

V. hicCree, OEI'O

J. Lieberman, OE

DRS/EB SALP Coordinator

J. Linville, DRP

E. Kelly, DRP

H. Eichenholz, SRI - Vermont Yankee (w/ concurrences and IFS Forms)

N. Perry, SRI - Yankee Rowe

bl. Conner, DRP (SALP Reporis Only)

J. Douglas, DRh1A (SALP Reports Only)

P. Sears, NRR

W. Butler, NRR

T. h1artin, RA

W. Kane, DRA

C. Hehl, DRP

J. Wiggins, DRP

R. Cooper, DRSS

W. Hodges. DRS

W. Lanning, DRS

C. Anderson, DRS

L. Bettenhausen, DRS

J. Joyner, DRSS

D. Holody, EO

L. Wharton, NRR

SALP Board hiembers

i

@

[

(p

g

r

'fL* T ,

/

RI:DRP  ;

k :NRR H NRR R SS

M u5lw3

V

hely (f I

'

%lnyf,,

Sears

WQ:%ar,\y

Butler Coope

& p,t

j g.;p _

KEichenholz/meo Linvil1'3

12/15/92

("h M

Rl:Di RI:DRA RI:RA

RI:DhP

p.(.nle

H( Iges

NJ Kane hia in

Hehl

pf 3'I lE

OFFICIAL RECORD COPY

/

g 73

A:VY9199.hiEO

hW lA5 02v

x.a w tuv.u. aog2 a