ML20117N608

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20117N608
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/16/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML20117N598 List:
References
NUDOCS 9609190310
Download: ML20117N608 (1)


Text

.

. i

! 81*

i. I l ..

l INDUSTRIAL PRETREA'INENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date:7/16/96 i Perry, Ohio 44081 Laboratory: Electro Analytical )

Date of Sample: 7/2 to 7/3/96 Time of sample: 09:15 Sample Location: Sewage Pump Station Name of Sampler:Beckler Laboratory Address: 7118 Industrial Park Blvd.

Mentor, OH 44060 Date of Analysis: 7/3 to 7/9/96 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 7/8/96 900 mg/L l BOD Composite 405.1 7/8/96 480 mg/L TSS Composite 160.2 7/9/96 150 mg/L Silver Composite 272.1 7/9/96 <.011 mg/L Mercury Composite 245.1 7/9/96 c.50 ug/L pH Grab 150.1 7/3/96 6.9 s.u.

Oil / Grease Grab 413.1 7/9/96 12 mg/L Gravimetric )

i I certify under penalty of law that I have personally examined and I am  !

familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information i contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

9/9 [94 Sr. Vice President - Nuclear

- Signafurl I Date Title  :

1 L

9609190310 960913 '

PDR ADOCK 05000440 R PDR l

_