0CAN089604, Informs of Change to Original Schedule for Conversion to Improved STS for Plant

From kanterella
(Redirected from ML20117K671)
Jump to navigation Jump to search
Informs of Change to Original Schedule for Conversion to Improved STS for Plant
ML20117K671
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/29/1996
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
0CAN089604, CAN89604, NUDOCS 9609120084
Download: ML20117K671 (2)


Text

,

i I l.

8

-:r:- ENTERGY IO"S"fE""""'

Rite. CME AR 72301 J Tcl 501658 5000 .l l

August 29,1996 0CAN089604 l U. S. Nuclear Regulatory Commission j j Document Control Desk l Mail Station PI-137 l Washington, DC 20555

Subject:

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Schedule For Conversion To l Improved Standard Technical Specifications Gentlemen:

The purpose of this letter is to inform you of a change to the original schedule for submittal of the Improved Standard Technical Specifications (ISTS) for Arkansas Nuclear One Units 1 and 2. The original schedule projected submittal of the Unit 1 ISTS in the third quarter of 1996. The ANO Unit 2 submittal was projected for the second quarter of 1997. These schedules were provided in ANO's letter dated June 21,1995 (OCAN069502) and were based on the availability of and demands on site resources as evaluated at that time. We intended to have and still desire substantial involvement in the development of the ISTS by the many plant organizations which utilize and are responsible for the content of the technical specifications. The demands on the organization have been more extensive than originally anticipated due to other enhancement efforts focused on improving overall plant performance.

A more recent evaluation of available resources has identified the need to delay the submittal of t!.e ANO Units 1 and 2 ISTS until later next year. Current projections are for the submittal of the ANO-1 ISTS early in the third quarter of 1997 and for the ANO-2 ISTS by the end of 1997 or early 1998. Once submitted resources will be made available to work with the NRC staff to facilitate a timely review.

If you have any questions on our efforts in this area please contact me.

9609120084 960829 PDR ADOCK 05000313 [f C' h' i a P PDR 100041 I

l l *

  • U.S.NRC <

l ,

August 29,1996 GCAN089604 Page 2 I Very truly yours, l

, W1~.

l Dwi t C. Mims I Director, Nuclear Safety I DCM/dej l i

l cc: Mr. Leonard J. Callan Regional Administrator l U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. George Kalman NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 f