Forwards Revisions to Physical Security Plan, Issue 2, Rev 7, Plant Security Personnel Training & Qualification, Issue 2,Rev 1 & Safeguards Contingency Plans, Issue 2, Rev 0.Encl Withheld
ML20116A244
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/23/1996
From: Walter MacFarland
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607260016
Download: ML20116A244 (2)


Text

Writir G. MacFtrlIr d. IV. PS.

Vs.e President Limerck Generatng Staten v

PECO NUCLEAR esc 0 eae,ov compaav PO Box 2300 A UNir or PECO ENERcy . Sanatoga. PA 19464-0920 610 718 3000 Fax 610 718 3008 Pager 1800 672 2285 #8320 10CFR 50.54(p)

.luly 23,1996 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units I and 2 Submittal of Revisions to the Physical Security Plan issue 2, Rev. 7; Plant Security Persamnel Training and Qualification Plan, issue

2. Rev.1; and Safeguards Contingency Plan, Issue 2, Rev. H.

t

Dear Sir:

This letter submits, in accordance with 10CFR 50.4(b)(4)(iii), four (4) comtroIIed copies of the revised Limerick Generating Station (LGS) Security Plans. The revisions are detailed in the j summary of the Plan revisions.

These revisions are being submitted in accordance with 10CFR 50.54(p)(2), and have been determined not to decrease the elTectiveness of the LGS Physical Security Plan Plant Security Personnel Training and Qualification Plan or the Safeguarts Contingency Plan. The cl.anges to the Physical Security Plan reflect changes associated with the climination of the requirement for armed guards to mair!f ain qualifications in accordance with the lethal Weapons Training i

Act #235 of the Commumecalth of Pennsylvania. The objectives of this training are met or l

exceeded by the required site commitments to ItK'FR 73 Appendix H. The changes to the I Safeguards Contingency Plan reflect PECO Energy and LGS Site Security org:mizational title

. changes.

In accordance with 10CFR 73.21, we request that the enclosed revisions to the LGS Physical Security Plan, Plant Security Personnel Training and Qualification Plan and Safeguards 9607260016 960723 ,

PDR ADOCK 05000352 (

F PDR / p Y

a

. . . . . - - . . . - . . . - _ . - - -~ - - . . . . . . . _ - - . -- - -. - __

l l

l .luly 23,1996 - Page 2 Decket Non. 50-352 50-353 l

License Nos. NPF-39 '

l NPF-RS l Contingency Plan which contain Safeguards Information, he withheld from public disclosure l and protected as described in 10CFR 73.21. These revisions are numbered as follows:

1 Physical Security Plan, July 1996. Issue 2, Rev. 7:

Plant Security Personnel Training and Qualification Plan, July 1996, Issue 2. Rev.1; j Safeguards Contingency Plan, July 1996, issue 2, Rev. 0 l

l l

Very truly yours,

) -

W l LLbw G.hbA l

Attachments cc: T. T. Martin, Administrator, Region I. USNRC (w/att) l N. S. Perry, USNRC Senior Resident inspector, LGS (w/o att) bec: (w/o attachments)

D. M. Smith CH, 63C-3 R. W. Boyce GML5-1 J. B. Cotton CB, 53A-1 )'

G. A. Hunger CH. 62A-1

J. L. Kantner SSB2-4

! M. A. Karney TSCI-2 D. P. LeQuia SMH2-4

PA DER llRP Inspector SSB2-4

, i

(2/ attachments)
R. Z. Kinard PilAPS, SCl-l

}

}

i 1 5

I