BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2

From kanterella
(Redirected from ML20115J123)
Jump to navigation Jump to search
Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2
ML20115J123
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 06/30/1996
From: Harrison F, Hicks G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B09-13510C, B9-13510C, BSEP-96-0253, BSEP-96-253, NUDOCS 9607240008
Download: ML20115J123 (11)


Text

. .

1 CP&L uummeuumulemme f

Caronna Power & Ught Company l P.O. Box 10429 .  !

Southport, NC 28461-0429 July 15,1996 I i

SERIAL: BSEP 96-0253  !

FILE: B09-13510C U. S. Nuclear Regulatory Commission -l ATTENTION: Document Control Desk 8 Washington, DC 20555  ;

e BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 [

DOCKET NOS. 50-325 AND 50-324 i LICENSE NOS. DPR-71 AND DPR-62 i MONTHLY OPERATING REPORT  :

'I Gentlemen: l In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant, i Units 1 and 2, Carolina Power & Light Company (CP&L) submits the enclosed report of operating i statistics and shutdown experience for the month of June 1996. Also in accordance with {

Techn' cal Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the .i month f ollowing the calendar month covered by the report. [

Piease refer any questions regarding this submittal to Mr. Mark Turkal at (910) 457-3066.

l

-:- . f  !

i l

Hicks l Manager- Regulatory Affairs i Brunswick Nuclear Plant  ;

i WRM/wrm j Enclosures  !

T

/ -!

9607240008 960630

, [N PDR ADOCK 05000324  !

R PDR  !

t i

,e - - - , , , , - - - - . , . . _ . - - - - - , , . .

Document Control Desk BSEP 96-0253 / Page 2 cc: U. S. Nuclear Regulatory Commission ATTN.: Mr. Stewart D. Ebneter, Regional Administrator 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Units 1 and 2:

U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike Rockville, MD 20852-2738 The Honorable H. Wells Chairman - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510

l. .

I ENCLOSURE 1

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT 1

~

l l

4 n-s I

.~ .

CP&L CO -

PLANT PERFORMANCE DATA SYSTEM PAGE 1 l

-.RUN DATE 07/03/96 APPEEDIX B - AVERAGE DAILY POWER LEVEL RPD39-000  ;

RUN TIME 08:59:18 BRUNSWICK UNIT 1  :

DOCKET NO. 050-0325 '

' COMPLETED BY FRANCES HARRISON  :

TELEPHONE . (910) 457-2756 l l

! JUNE 1996 I i DAY AVG. DAILY POWER LEVEL ' DAY AVG. DAILY' POWER LEVEL l (MWE-NET) (MWE-NET)  ;

i' 1 795 17 787 l 2 795 18 787 l l .

I 3 -795 19 788 l l 788 4 793 20  :

l 5 793 21 .787 6 791 22- 783 7 790 23 779 i 8 788 24 783 ,

l 9 789 25 782

~10 789 26- 786 i

, i 11 788 27 788 l

l 12 788 28 788 13 788. 29 471  !

14 788 30 573 f l- 15 772 16 653 l

l 1.16 - 8 4

i l

l4 i

1- _ _ , _ , . . _ - , _ . - - - - - _ . .

'CP&L CO' PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 07/03/96 OPERATING DATA REPORT RPD36-000 RUN TIME 08:59:19 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES
2. REPORTING PERIOD: JUNE 96
3. LICENSED THERMAL POWER (MWT) : 2436
4. NAMEPLATE RATING (GROSS MWE) : 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 791.0
7. MAX DEPENDABLE CAPACITY (NET MWE) : 767.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED 77 ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 4367.00 169079.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 4201.46 107594.20
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 720.00 4165.31 103516.48
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1704389.30 9868553.66 229227124.49
17. GROSS ELEC. ENERGY GEN. (MWH) 566930.00 3302200.00 75408980.00
18. NET ELEC. ENERGY GENERATED (MWH) 551138.00 3215638.00 72592356.00
19. UNIT SERVICE FACTOR 100.00 95.J8 61.22
20. UNIT AVAILABILITY FACTOR 100.00 95.38 61.22
21. UNIT CAP. FACTOR (USING MDC NET) 99.80 96.00 54.80
22. UNIT CAP. FACTOR (USING DER NET) 93.24 89.69 52.29
23. UNIT FORCED OUTAGE RATE .00 4.62 13.75
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

SHUTDOWN OVER THE NEXT SIX MONTHS: October 5, 1996 Refueling Outage '35 days

35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9 t

.CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2  !

,RUN'DATS 07/03/96 APPENDIX B - AVERAGE DAZLY POWER LEVEL RPD39-000

-RUM TIME 08:59:18 BRUNSWICK UNIT 2 l

DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 l JUNE 1996 )

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL .;

(MWE-NET) (MWE-NET)- l

?

i 1 783 17 777  !

! i l* 2 784 18 777 l

!- 3 784 19 778 1

i 4 783 20 778 l 5 783 21 777

6 781 22 775 7- 779 23 774 -

. t

! 8 778 24 774 5 1

i j 9 780 25 685

10 780 26 773 i 1

{ 11 779 27 778 1 ,

12 779 28 778  !

t i 13 779 29 778 i

14 779 .,_

.30 777 f

4 15 777 j 16 777 1

i i

1 1

a j

1.16 - 8 l

1

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2

.RUN'DATE 07/03/96 OPERATING DATA REPORT RPD36-000 RUN TIME .08:59:19 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: JUNE- 96
3. -LICENSED THERMAL POWER (MWT) : 2436
4. NAMEPLATE RATING (GROSS MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 6.-MAX DEPENDABLE CAPACITY (CROSS MWE): 782.0
7. MAX DEIENDABLE CAPACITY (NET MWE): 754.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

-THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 4367.00 181103.00
12. NUMBER OF HOURS REAC'IOR CRITICAL 720.00 3369.92 116685.62
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 3257.53 111135.24 i
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 1
16. GROSS THERMAL ENERGY GEN. (MWH) 1746477.53 6980303.43 239165308.80
17. GROSS ELEC. ENERGY GEN. (MWH) 574170.00 2289145.00- 77357866.00
18. NET ELEC. ENERGY GENERATED (MWH) 558301.00 2207576.00 74256793.00
19. UNIT SERVICE FACTOR 100.00 74.59 61.37
20. UNIT AVAILABILITY FACTOR 100.00 74.59 61.37
21. UNIT CAP. FACTOR (USING MDC NET) 102.84 67.04 52.54
22. UNIT CAP. FACTOR (USING DER NET) 94.45 61.57 49.94
23. UNIT FORCED OUTAGE RATE .00 4.91 11.03
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

1 1

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE 01 . ART UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

l COMMERCIAL OPERATION -------- --------

1.16 - 9

1 4

i ENCLOSURE 2 j BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324 ,

, LICENSE NOS. DPR-71 & DPR-62 i UNIT SHUTDOWN AND POWER REDUCTION REPORT - JUNE 1996 i

i 1

) i 3

i l

1 I i

a l

f i

, 1 i  !

i l I

1 l

l J

I

-l I

- l l

..--..__m . _ _ _ . - - - - - - - - - - - - - - - - - - - - .

00CKET NO. 050-0325 UNIT NAME Brunswick I

  • DATE July 1996 COMPLETED BY Frances Harrison ,

TELEPHONE 910-457-2756 e UNIT SHUTlXENS AND POWER REDUCTIONS. ,

ret %RT MONTH June 1996 METHOD OF LICENSEE  !

DURATION SHUTTING EVENT SYSTEM COMFONENT CAUSE & CORRECTIVE ACTION TO ,

NO. DATE TYPE (1) (HOURS) REASON (2) DOWN REACTOR REPORT NO. CODE (4) CODE (5) PREVENT RECURRENCE (3)  ;96-018 960615 5 .00 8 5 NA RC CONROD Power reduction to 70% for j rod improvement and miscellaneous hotside  ;

maintenance. .!96-019 960622 5 .00 8 5 NA RC CONROD Power reduction to 90% for control rod operability I testing.

t 96-020 960629 F .00 B .5 NA RC FUELXX Downpower to 65% for Flux Tilt Testing then to 60% i power to allow perfonnance of scram time testing. '

sampling for fuel leaker and special backwashes on B-S waterbox debris filter.

1: Ing 2: Reason 3: Method 4: System Code: 5. Comeonent Code I F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for I 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data  !

B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER l C- Refueling 4- Continuations Report (LER) file from file from IEEE l D- Regulatory 5- Load reductions IEEE Standard 805-1983 Standard 803A-1983, restriction 6- Other per NUREG-1022. per NUREG-1022. -

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operational error (explain)

H- Other (explain)

~

DOCKET NO. 050-0324 .

UNIT NAME Brunswick II

  • DATE July 1996 i COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTI0t6 REPORT MONTH June 1996 i METHOD OF LICENSEE DURATION SHUTTING EVENT SYSTEM CWPONENT CAUSE & CORRECTIVE ACTION TO [

NO. DATE TYPE (1) (HOURS) REASON (2) DOWN REACTOR REPORT NO. CODE (4) CODE (5) PREVENT RECURRENCE l (3)  !

% -018 960615 5 .00 A 5 NA CB PUMPXX Power reduction to 44% due to tripping of recirc. Ptsrp '

due to lightning strike r r

1 1: Igg 2: Reason 3: Method 4: System Code: 5. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data i B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE <

D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983, t restriction 6- Other per NUREG-1022. per NUREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Adninistrative G- Operational error (explain)

H- Other (explain)

L v

i

. . . - . _ . . - - - .---__u - . - . - - _ - - _ - - - - . - . - - . _ - _ . - _ . - - - _ . _ _ _ - - . - - - - - - - . _ _ . - - - - - - - - - -- - - , - - - - - . - - - --------m ,~e. , ' . ~ . . ,~ ,e+. , +.- m-

- - - - .. . .. ~ . - - - _ _ .

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 NRC DOCKET NOS. 50-325 AND 50-324  :

OPERATING LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments. '

Committed Commitment date or outage *

1. None N/A i

l l

l l

I I

\

l