Confirms Change in Date for Submittals of Rept Summarizing Results of A-46 Review
ML20115H234
Person / Time
Site: Pilgrim
Issue date: 07/12/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR LTR-2.96-068, LTR-2.96-68, NUDOCS 9607220280
Download: ML20115H234 (2)


Text

_. . _ _ _ - -

E' 7

2 9

Boston Edison Pdgren Nuclear Power Staten Rocky Hal Road Plyrnouth. Massachusetts 02360 E. T. Boulette, PhD Senor Vice President - Nuclear July 12, 1996 BECo Ltr. #2.96- 068 l

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 l

Revision of A-46 Submittal Date L This letter confirms the change in the date for submittal of the report summarizing the results of our A-46 review. The report submittal date is changed from June 30,1996 to September 30, 1996. As discussed with Mr. Alan Wang, Pilgrim NRC Project Manager, this change is needed to finalize aspects of the safe shutdown equipment list and associated outlier relays based upon the validation exercises with our operations group and simulator review. Also, as suggested by Mr.

l Wang, our summary report will include a schedule for resolution of any outliers including a basis for the appropriateness of the schedule.

4+

E. T. Boulette, PhD ETBUDK\pkk\radmisc\a46ltr I

cc: Mr. Alan B. Wang, Project Manager Project Directorate I-1 / p.

Office of Nuclear Reactor Regulation <

l l' Mail Stop: 14B2 iTY l U. S. Nuclear Regulatory Commission k 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 l

9607220290 960712 PDR ADOCK 05000293

, P PDR 1

l

i'

'.- DCC Desk Page 2 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station