Forwards Rev 96-2 to DPC McGuire Nuclear Site Emergency Plan, Per 10CFR50.54(q).Summary of Changes & Bases for Determination Provided as Attachment 1
ML20115F283
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 07/15/1996
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115F284 List:
References
NUDOCS 9607170187
Download: ML20115F283 (8)


Text

11 I s

Duke tcwer Cornpany McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078 DUKEPOWER July 15, 1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20666

Subject:

McGuire Nuclear Station Docket Nos. 50-369, 50-370 License Nos. NPF-9, NPF-17 Emergency Plan Change #96-2 Ref.: January 6, 1984 letter from Darrell G. Eisenhut of NRC to Hal B. Tucker of Duke Power Company Enclosed for NRC Staff use and review is Revision 96-2 dated July 15, 1996 to the McGuire Nuclear Site Emergency Plan.

This revision is being submitted in accordance with 10 CFR 50.54(q) and does not decrease the effectiveness of the Emergency Plan. A summary of the changes and bases for this determination is provided as Attachment 1. All changes have been specifically highlighted (side-barred) to facilitate the review.

McGuire Nuclear Site is submitting changes to its Emergency Plan to reflect the recent changes to 10CFR50 Appendix E (61 FR 30129, June 14, 1996). This submittal changes the commitment documented in the referenced letter. In this letter, the Commission granted an exemption from the requirements of 10CFR50, Appendix E, Section IV.F, stating that the exercising of the same headquarters support personnel need only be accomplished once per year. Duke Power committed to provide headquarters support personnel for all exercises in which a State Government \

participates on a full scale basis. I Since 1992, the Emergency Response organization has been separate for each site, although some selected headquarters personnel

[hh serve on rosters for multiple sites. The McGuire Emergency Operations Facility staff will participate in all emergency exercises conducted to fulfill the requirements of 10CFR50 Appendix E. The exemption is no longer required.

9607170187 960715 PDR F ADOCK 05000369 pyg neun aynow

e

' duly 15, 1996 U.S. Nuclear Regulatory Commission Page 2 By copy of this letter, two copies are being provided to NRC Region II, Regional Administrator.

Yours Truly, T.C. McMee in TCM/tsb Attachment xc: -w/two copies of attachments S.D. Ebneter Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 w/o attachment V. Nerses, Project Manager, USNRC, ONRR G.F. Maxwell, McGuire Nuclear Site G.A. Copp (EC050)-

E.M. Kuhr (EC050)  :

Electronic Licensing Library (EC050) i E.P. File 1502  !

)

l i

1

!  : l E

l i

! l l

l

\

ATTACHMENT 1 I

i l

The revision is being submitted in accordance with 10CFR50.54(q) and does not decrease the effectiveness of the Emergency Plan. The Plan as revised will continue to meet the requirements of 10CFR50.47 and 10CFR50, Appendix E.  !

50.54q DETERMINATION i

Section J, Protective Response i

1. Page J-1, Section J.l.a-d:  !

3 Changed the reference of the controlling document for site assembly from McGuire Site Directive 280, Site Assembly / Accountability and Evacuation /

Containment Evacuation to RP/0/A/5700/11, Conducting a Site Assembly or Evacuation. Site Directive 280 is being deleted as an Emergency Plan

  • Implementing Procedure. This site directive is being incorporated in a nuclear system directive which will apply to all three (3) Duke Sites. Information needed  !

to implement the Emergency Plan is contained in RP/0/A/5700/11. This procedure  :

will remain as an Emergency Plan Implementing Procedure. i

2. Page J-1, Section J.2:

Changed the reference of the controlling document for site assembly from  !

McGuire Site Directive 280, Site Assembly / Accountability and Evacuation /  ;

Containment Evacuation to RP/0/A/5700/11, for the reasons discussed under i Section J.l.a-d. j

3. Page J-2, Section J.5: l

[

Changed the reference of the controlling document for site assernbly from l McGuire Site Directive 280, Site Assembly / Accountability and Evacuation /  !

Containment Evacuation to RP/0/A/5700/11, for the reasons discussed under i Section J.l.a-d.  !

Section N, Exercises and Drills  !

1. Page N-1, Section N.I.a:

Paragraph 1 is being changed to reflect the change to 10CFR50 Appendix E effective July 15,1996. Paragraph 2 is being revised to the commitment documented in the referenced letter of January 6,1984, as stated in the cover letter.

1

.. i ATTACHMENT 1 '

2. Page N-1, Section N.I.b:

Changed from " year to year" to " exercise to exercise" because exercises will no longer occur yearly. i i

3. Page N-2, Section N.2.b:  ;

f Changed the reference of the controlling document for fire drills from McGuim Site Directive 964, Fire Brigade Organization Training Program to Nuclear System i Directive (NSD) 112, Fire Brigade Organization, Training and Responsibilities. ,

This Site Directive has been incorporated into the Nuclear System Directive which I will apply to all three Duke sites. This NSD was effective June 26,1996.  :

i

4. Page N-2, Section N.2.c: l t

1 Changed annual to biennial to reflect change in exercise frequency.

5. Page N-2, Section N.3: l Changed annual to biennial to reflect change in exercise frequency.  !

Section P, Responsibility for the Planning Effort  ;

i

1. Page P-7, Figure P-2, Page 3 of 4:  ;

Deleted reference to McGuire Site Directive 280 as an Emergency Plan Implementing Procedure for the reasons discussed under Section J.l.a-d.

i i

l l

l i

2

10 CFR 50.54 (a) INITIAL SCREENING CHECKLIST j l

O N/A EPlan Section No.: J. N and P Deletion? O YES DdO 1

O N/A E PI P N o.: MSD 280 Deletion? QiES O NO O N/A Other Document /: Deletion? O YES O NO Form No.

Title of Document: McGuire Nuclear Site Emeraency Plan Revision No.: 956-2 Procedure Change No.

Synopsis of Change: The McGuire Emeroency Plan has been revised to reflect chanaes to 10CFR50 Accendix E (61 FR 30129. June 14.1996). McGuire Site Directive 280 has been deleted as an Emeraency Plan lmolementina Procedure and references have been revised to reflect the controllina documents for site assembiv and fire drills.

YYES O NO 1. Is the change to any section of the EPlan?

O YES G'NO 1. Is the change to an EPIP which will require a revision to any section of the EPlan?

IYES O NO 1. Is the change to any other emergency related procedure or form which will require a revision to any section of the EPlan? Deletion of MSD 280 J If YES is checked for ANY of the three questions, complete this 10 CFR 10.54 (q) Initial Screening Checklist, AND complete a full 10 CFR 50.54 (q) Review Checklist.

If NO is checked for ALL three questions, complete this 10 CFR 50.54 (q) Initial Screening Checklist only. A full 10 CFR 50.54 (q) review is NOT REQUIRED. The procedure change  ;

should be marked appropriately indicating that the change does not decrease the effectiveness of the EPlan, and processing should continue.

l A full 10 CFR 50.54 (q) Review Checklist OR O IS NOT REQUIRED.

Performed By: /vun I [ 1ab Date: 7,[// /%

Reviewed By: n Date: " d Signature Emergency Planning Manager: brk00a I Naab Date: 7/H /@'

Signature J 1

1 DUKE POWER COMPANY McGUIRE NUCLEAR SITE l 10 CFR 50.54 (q) REVIEW l

Purpose:

Determination of a decrease in the effectiveness of the Emergency Plan in accordance with 10 CFR 50.54 (q) l PIIn

Title:

Procedure

Title:

1 McGuire Nuclear Site Emergency Plan N/A l Procedure No: N/A l Revision No.: 92-6 l Effective Date: 7/15/96 l 10 CFR 50.47 (b) Review Dcts this change relax commitments regarding the following subject areas of 10 CFR 50.47 (b)? l

1. Assignment of ERO responsibilities [ Yes Z No  !
2. Assignment of onshift ERO personnel [ Yes No
3. Arrangement for utilizing State or local resources and staff _ Yes Z No
4. EALs [ Yes 2 No
5. Notifications to offsite agencies. the ERO or the public [ Yes 2 No l
6. Communications between offsite agencies, the ERO or the public [ Yes 2 No '
7. Dissemination of public information [ Yes 2 No
8. Adequacy of emergency facilities and equipment Yes 2 No
9. Methods, systems, and equipment for offsite response to a radiological emergency Yes 2 No
10. Protective Action Recommendations / Determination Yes 1 No
11. Emergency Worker radiological injured personnel _ Yes 2 No
12. Medical services for contamination injured personnel Z Yes 2 No
13. Re-entry / Recovery plans [ Yes No
14. Drills and exercises [ Yes 2 No
15. Radiological emergency response training Yes 2 No
16. Plan development. review and distribution Yes 2 No 10 CFR 50. Appendix E Review Does this change relax commitments regarding the following subject areas of 10 CFR 50. A?pendix E7 (i)(ii)(iii) Emergoney plans as described in the FSAR Yes ZNo (iv) A. Organization for coping with radiological emergencies _

Yes i No (iv) 8. Assessment of radiological emergencies Yes 2 No (iv) C. Classifications. EALs and ERO activation [ Yes 2 No (iv) D. Notification of Federal. State and Icoal agencies and the public Yes 2 No (iv) E. ERFs equipment.and communications [ Yes ZNo (iv) F. Training, drills, and exercises -

Yes 2 No (iv) G. Plans and procedures and surveillance of equipment and supplies Yes 2 No (iv) H. Re-entry and Recovery following an accident [ Yes ZNo Determination per 10 CFR 50.54 (q) -

i Does this change decrease the effectiveness of the Emergency Plan? (if "Yes*, then the O Yes MNo change shall not be impelmented without prior NRC approval)

R:marka i'

  • Commitments are being changed to reflect revision to Appendix E, Section (IV) F and 61 FR 30129.

Documentation of Review and Approval Review Completed By (Signature): g Date:

7/ f Approved By: (Signature) Date:

R,lm / 44 7/n/t 2

~

July 15,1996 MEMORANDUM To: All Holders of the McGuire Emergency Plan

Subject:

Revision 96-2, McGuire Emergency Plan t

Enclosed, please find Revision 96-2 to the McGuire Nuclear Site Emergency Plan. Refer to !

Attachment I to complete the revisions to the manual.

If there are any questions, please call me at 704/875-4662.

Sincerely,  ;

&c 0 Becky Hasty  !

l Emergency Planning Manager McGuire Nuclear Station RLH/tsb

Attachment:

Emergency Plan Revision 96-1 cc: EP File 1502 l

l

Attachment 1 July 15,1996 Page 2 i

SECTION REMOVE PAGFJ INSERT PAGES  :

Coversheet Coversheet, Revision 96-1 Coversheet, Revision 96-2 Section J J-l and J-2 J-l and J-2 [

Section N . N-1 and N-2 N-1 and N-2 Section P P-7 P-7 i