ML20115D264

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1992 for Joseph M Farley Nuclear Plant,Units 1 & 2
ML20115D264
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/30/1992
From: Hill R, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210200317
Download: ML20115D264 (9)


Text

_ _ _

ru nenu m one

.' PO'.t Offce Box 1295

,acomny,,

E' min 7cm, Alltuma 35201 lelephane PDS 668 b(L66 Ka

}  ;. o. wooo,,, Southern Nudear Operating Company hNNI$ october 15, 1992 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Coramission ATTN: Document Control Desk Washington, D. C. 20555 Joseph H. Farley Nuclear Plant Unit I and 2

. Morithlv Operatina Data.Recorts Gentlemen:

Attached are the September 1992 Honthly Operating Reports for Joseph H.

Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

(-N nds,\

Jy . Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell l

931o30030 920930 ' 93 PDR ADOCK 05000340 Q R PDR 'g

/

I,l 1 .

l

\

l 2 l i JOSEPH M. FARLEY NUCLEAR PLANT I UNIT 1 NARRATIVE SUItMARY OF OPERATIONS

September, 1992

.,!- i l The unit was taken off line at 2307 on September 25, for the cycle 11-12 j refueling outage.

i

There were no other unit shutdowns or major power reductions during the-month j of September.

i The following major safety-related maintenanco was performed during toe month

1. Miscellaneous corrective and prevcntiv+ maintenance was performed  ;

on the diesel generators.

{

4

2. Local leak rate tests (LLAT) wero performed on 43 of 118 j containment penetrations and 21 of 43 eltetrical penetration.

3.

! The A, B and C loop main steam safeties i ere tested.

l 4. Various safety related check _ valves and motor eperated val, a were

! inspected.

1 I

t 1

i

-l i

i l

5 4  ;

i l 3 '. l 1

i i

i ~

j- 1 L i 4

i.

- l

! l

1 I

4

},

2

t OPERATING DATA REPORT i

DOCKET No. 50-348 DATE October 6, llc BONE (b5)BT 56 ,

OPERATING STATUS Notes

1. Unit Name: Joseph M. Farley - Unit 1
2. R porting Period: 1) Cumulative data since Seotem0er 1992 12-1-77, date of
3. Licensed Thermal Power ( M t): 2,652 commercial operation.
4. Nameplate Pt. ting (Gross We): 860
5. Design Electrical Rating (Net Me): 829
6. Maximum Dependable Capacity (Gross N e): 855.7
7. Maximum Dependable capacity (Net m e): 812.0 _

B. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, '~

Give Reasons: N/A

9. Power Level To Which Restricted, If Any (Nct Ne): N/A

~

10.R:asons For Restrictions, If Any: N/A _

'Ihis Month Yr-to-Date cumulative

11. Hours In Reporting Period 720.0 6,575.0 130,031.0
12. Number Of Hours Reactor Was Critical 599.4 6,45T 4- 102,365.3
13. Reactor Reserve Shutdown llours 0.0 0.0 3,650.C
14. Hours Generatot On-Line 599.1 6,454.1 100,718.4
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (WH) 0.0 0.0~

_1,564,342.1 17,035,888.5 258,440,512.6

17. Gross Electrical Energy Generated (tMI) 500,420.0 __5,484,566.0 83,269,346.0
18. Net Electrical Energy Generated (!MI) 470,288.0 5,201,648.0 78,616,446.0
19. Unit Service Factor 93.2 98.2
20. Unit Availability Factor 77.5 83.2 98.2 77.5
21. Unit Capacity Factor (Using MDC Net) 80.4 97.4
22. Unit Capacity Factor (Using DER Net) 74.7 78.8 95.4

~

72.9

23. Unit Forced Outage Rate 0.0 0.T 6.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, September 25; 1992, approximately 54 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 11/19/92
26. Units In Test M.atus (Prior to Commerciel Operation): Forecast Achieved INITIAL CRITICALITY 08/06/i7 08/09/77 INITIAL ELECTRICITY 08/20/77 08/10/77-COMMERCIAL OPERATICN 12/01/77 12/01/77 Form 2/34

DOCKET No. 50-348 q

UNIT 1 DATE October 6, 1992 COMPLETED BY R. D. Hill TELEPHONE (205)899-5156 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL 4 (MVe-Net) (MVe-Net)

1 805 17 702 2 804 18 713 3 801 _ 19 806
4 804 20 807

! 5 804 21 806 6 803 22 804 7 804 23 805 8 805 24 812

, 9 803 25 667 .-

10 803 26 0 11 804 27 0 12 _

805 28 0 i

13 805 29 0 i

t 14 809 30 0 15 808 31 16 767 INSTRUCTIONS '

on this format, list the average daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole megavatt.

t l

l

-^

UNIT SMUTDOWh5 AND POWER REDUCTIONS DCCKET NO. Jj)-?M ,

UNIT NAME J. M. P ast E Y - L'N ! T 1 .

DATE October 6. 199?

COM;tETED ST P. O. Mitt REPORT MONTH SEPTEMBER TELEPHONE (205)309-5156 l l l l l lMETHODOF lLICEWSEE l j l CAUSE 1 C0kRECT!YE l

., l lDURATICW l lSHUTT1kG } EVENT l SYSTEM lCouPONEgi l ACTION TC l l l I S l REPORT # l CODE' l CODE 5 PREVENT sECuartkCE l

'lNO. lDATE l TYPE l(HOURS) l PEASON2lDOWN ACTOR l

..........................................................'1 ..................................................... .................... ... .................

l002 -l W0925 l 5 l* 120.9 l C l 1 l N/A l N/A g N/A lAt 2307, on 9-25-92 the unit a s taken off tine forl l -l j , -l l l l l ltheCycle11-12refuelingcutage. l l l l 1 l I i i l i I I ~l i  ! I i l l I l- I l i i i i i I i l i i l i i l I i l i i l- 1 I I i l l l 1 1 1 I l

'l i i I i i i I i I  !

-l I- I i i i i l I i 1 1 i 'l I I I i  ! l I- 1 I I i  ! I I I I I I i i i l- I l I l- 1 I I I i i l- 1 I i 1 1 1 I I i i i 1 1 I I I i i i l- 1 I i  !- 1  ! I I I I I  ! 1 i- 1 I I I I: 14 i i  ! i i i i  ! -l i I i

.I I I 1 1 I I I i  !- I-1- I-  ! I I I I I I I I l I. 1 i .I I i i I it i l I l I I I I I I I I I i i i I 'l I I i . l

.1- 1 1 11- 1 1 1 1 I l- 1 I I I I I 'l I i l I i

! I .1 l' l- I l- I I I I I:F Forced 2 Reason: 3 Method: ' Exhibit G-Instructions

~ S: Scheduled A-Equipment failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refaling 3-Automatic Scram. ' Event Report (LER) File (NUREG-D-Regulatcry Restrictiert - 4-Other (Explain) ,0161)

E-Operator Training 8.i.icense Examination F-Administrative 5 Exhibit I -Same Source G-Operational Error thpicin)

(9/77). M-Other (Explain)

1, .

-I 4

j -

j 1

i i

l JOSEPH M. FARLEY NUCLEAR PLANT i UNIT 2 3 NARRATIVE

SUMMARY

OF OPERATIONS.

] September,'1992 4

{ At 0000 on Sept- Jer 19, reactor power was reduced to 15 percent for steam generator. chemical contaminate flushing. The-unit returned to 100 percent i power on September 21 at 2110.

There were no unit shutdowns during the month September.

4 . . .

j The following major safety related maintenance wrs performed during the months b

I l- 1. Miscellaneous correctiveEand preventive maintenance was performed on the diesel generators-and the B10 sequencer.

'2. Corrective maintenance was performed on an Agastat-relay in the I power supply to.the "C" containment. post-LOCA air mixing fan.-

i l

4 i

e i

i -

'E

+

}-

I 4

t

.=a  ;  : -.a .--.-.:-.... - .- -

OPERATING DATA REPORT DOCKET NO. 50-364 DATE October 6, 1992 COMPLETED BY R. D. Hill

TELEPHONE (205)899-5156 OPERATING STATUS
etes
1. Unit Name: Jcseph M. Parley - Unit 2 1) Cumulative data since
2. Reporting Period: September 1992 -

7-30 81, dcte of

3. Licensed Thermal Power (M t): 2,652 commercie.1 operation.
4. h meplate Rating (Gross We): 860
5. Design Electrical Rating (Net W e): 829
6. Maximum Dependable Capacity (Gross We): 864.3
7. Maximum Dependable Capacity (Net me): 824.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A ,_
9. Power Level To Which Restricted, If Any (Net MWe): N/A

~ ~ ' ~

10. Reasons For Restrictions, If Any: N/A

'Ihis Month '!r-to-Date cumulative

11. Hours In Reporting Period 720.0 6,575.0 97,944.0
12. Number Of Hours Reactor Was Critical 720.0 4,969.2 82,833.'5
13. Reactor Reserve Shutdown Hours -

0.0 0.0 138.0

14. Hours Generator On-Line 720.0 4,821.0 82,749.5
15. Unit Reserve Shutdown Hourb, 0.0 0.0 0.0
16. Gross Thermal Energy Generated (&H) 1,779,781.1 11,986,715.7 210,946,037.3
17. Gross Electrical Energy Generated (&H) 572,831.0 3,885~,2 3 5. 0 69,181,319.0
18. Net Electrical Energy Generated (&H) 543,261.0 3,664.353.0 ~65,598,415.0
19. Unit Service Factor 100.0 73.3 84.5
20. Unit Availability Factor 100.0 73.3 84.5
21. Unit Capacity Factor (Using MDC Net) 91.6 67.6 81__. 7
22. Unit Capacity Factor (Using DER Net) 91.0 67.2 80.0
23. Unit Forced Outage Rate 0.0 33 4.1
24. Shutdowns Schtsduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut DJan At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81_

INITIAL ELECTRICITY 05/24/81 05/25/81 CCMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30

DOCKET NO. 50-364 UNIT 2 DATE 0ctober 6, 1992 COMPLETED BY R. D. Hill TELEPHONE (205)899-5156 MONTH September DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (MVe-Net) 1 820 17 809 2 819 18 811 3 818 19 201 4 819 20 28 5 818 21 '420 6 815 22 802 ,,

7 817 23 804 8 817 24 812 9 817 25 813 10 816 26 813 11 816 27 810 12 816 28 * *)9 13 817 29 811 14 821 30 820 15 818 31 16 811 INStaUCTIONS, On this format, list the average daily unit pcver level in MVe-Net for each day in the renorting month, compute to the nearest whole megawatt.

4

i UNIT SHb7 DOWNS QCD POWER REDUCTIONS DCCKET No. 50-364

~~

L41T NOME .! . M . F ARLEY *.Cif 2 DATE october 6. 1992 CCMPLETED SY R. D. MILL REPORT MONTH SEDTEMBE R TELEPHONE (2051899-5156 lMETHODOf l LICENSEE l l l CAUSE 1 CORRECTIVE l l l l l l ACil04 TO l l l 'l I l DURATION l ,l SHUTTING l EVENT [ SYSTEM l COMPONENT S

l lREA$0N2 l DOWN REACTORl REPORT 3 # l CODE' l CODE l PREVENT RECURRENCE l l WO.- lDATE l TYPE l (HCL *RS) l69.2 N/A #fA lN/A ) SG lAt 0000 on 9-19 M , reactor power was reduced to (

.l012 l920919 l S l B l l l l l l l l [ ] l15%forsteamgeneratorchemicalcontaminate l l

l 1 1 1 1 1 I I I Iftushir*. I I I i 1 I I I I I I I f

1 I I 'l i I I I I I I I i  ! l i 1 i l I I I I I I I i 1. I I I I i 1 I I I I I I I I 1 i I I I I I i i I I I I I I I I I I I I i I

1 1 I I i i i I I I I i i i l i

.I I I I I I I I I I I I l i 1 . I I I I I i 1. I I I I i

1. I l- .l. I I I I I I 1 l l 1 I .I I I I I I I i I I I i i I i i i l I l

I i l i l i i i i i 1 I

'l 1 1 I I I I I I I I I I I I I I l i I I I I i i i i l I i i 1 I I l- 1 I I I I I I I I I I I I i I i i i I

i i l I l- -l i I I I I

I I I I i 'l i I I I i 7:F Forced 2Reason: hethod: 'Eshibit G-Instructions 5:-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data S-Maintenance or Test 2-Mantal Scrara. Entry Sheets for Licensee C-Refueling 3-Automatic Scrara. Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)