Documents Compliance W/Plant TS 3/4.6.G, Structural Integrity SRs
ML20113C661
Person / Time
Site: Pilgrim
Issue date: 06/27/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.96-060, BECO-2.96-60, NUDOCS 9607020041
Download: ML20113C661 (2)


Text

.. . .-

( 4 7 .

Ow BO6tOWEE M l Pilgrim Nuclear Power Staton i

Rocky Hill Road Plymouth, Massachusetts 02360 l

l E. T. Boulette, PhD Seninr Vice President -- Nuclear June 27, 1996 BECo Ltr. No. 2.96.060 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Reportino of Compliance with Pilarim Nuclear Power Plant Technical Specification 4.6.G " Structural intearity" for Second Ten-Year Inservice Inspection (ISI)

I Proaram Reauirements This letter documents our compliance with Pilgrim Nuclear Power Plant Operating License Technical Specification 3/4.6.G " Structural Integrity" surveillance requirements.

Technical Specification 4.6.G requires the results obtained from compliance with the Second Ten-Year ISI Program be evaluated at the completion of the interval and the conclusions of the evaluation be reviewed with the NRC Accordingly, sn assessment was completed of the Second Ten-Year ISI Program that ended on June 30,1995. The fol lowing two items were identified for resolution:

1. Examination of residual heat removal / fuel pool cooling intertie piping, welds and supports: The relief request and resolutions are discussed in BECo letter #96-034, dated May 30, 1996.

NRC review and approval of the relief request is pending. l

2. Unavailability of documentation related to surface examination of core spray system weld #

14-A-10A: The surface examination documentation could not be located, but the weld underwent VT-2 and UT examinations as required by the ASME code. Since the integrity of 1 L the weld was established by volumetric examinations, the unavailability of the documentation l

was resolved by rescheduling the weld for surface examination during RFO#11.

9607020041 960627 PDR P

ADOCK 05000293 PDR g(O j

h ,~

(

C g

1 DCC Desk Page 2. ,

Upon completion of the above items, the Second Ten-Year ISI Program wiu be complete. This closes the Technical Specification requirement to review with the NRC conclusions of the Second Ten-Year ISI Program evaluation.

If you have any questions regarding the information contained in this letter, please contact Walter Lobo at (508) 830-7940.

e , >

s 1 I

. T. Boulette, PhD p/ts46G. doc cc: Mr. A. Wang, Project Manager 3 Division of Reactor Projects - I/ll i Mail Stop: 14D1 U. S. Nuclear Regulatory Commission i 1 White Flint North l 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 j Senior Resident inspector Pilgrim Nuclear Power Station

)