ML20112A717

From kanterella
Jump to navigation Jump to search
Informs That Proposed Service Water Sys Operational Performance Inspection Self Assessment Scheduled for July 1996 Has Been Canceled
ML20112A717
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 05/13/1996
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9605210468
Download: ML20112A717 (2)


Text

r-

. :- . ll

.~

v l

'*' ' DukeIbwerCornpany T. C hichfrzxn hicGuire Nuclear Generation Department Vicehesident 12700Hagers ferryRoad(AfG0n'P) (704)8754800 Huntersville, NC28078&985 (704)8754809 Fax DUKEPOWER May 13, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555  :

Subject:

McGuire Nuclear Station Docket Nos: 50-369 and 50-370 H Service Water System Operational Performance Inspection (SWSOPI) l

Reference:

February 29, 1996

-McGuire Nuclear Station SWSOPI Self Assessment Plan l Gentlemen:

The purpose of this letter is to retract the referenced letter which requested a review and approval of the McGuire SWSOPI self-assessment plan.

Raw water systems at McGuire Nuclear Station have had a high reliability rate in recent years and there are no outstanding safety issues. A Self Initiated Technical Audit (SITA) performed in 1993 on the.McGuire raw water systems did not reveal any safety issues and all-identified issues have been addressed.

Therefore, the proposed SWSOPI self assessment scheduled for July 1996 has been canceled.

If you require further information, please contact James'E. Snyder I I

at (704)875-4447.

Very truly yo rs, k

-T. C. McMeekin 200115 Qj ' o 9605210468 960513 PDR ADOCK 05000369 . ,

G _ .

PDR L

l . c' l

l l US Nuclear Regulatory Commission l May 13, 1996 i xc: Mr. S. D. Ebneter Administrator, Region II 1 U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 i Atlanta, Ga. 30323 l

l Mr. Victor Nerses l U.S. Nuclear Regulatory Commission l Office of Nuclear Reactor Regulation (14H25)

Washington, D.C. 20555 l

Mr. Peter Tam U.S. Nuclear Regulatory Commission j Office of Nuclear Reactor Regulation i

\ 'ashington , D.C. 20555 l Mr. George F. Maxwell NRC Senior Resident Inspector l McGuire Nuclear Station l

Mr. Dayne Brown, Chief-i Division of Radiation Protection l P. O. Box 27687 l Raleigh, N. C. 27611-7687 l l 1

l l

4 1

1

.