BSEP-96-0181, Provides Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment

From kanterella
(Redirected from ML20111C880)
Jump to navigation Jump to search
Provides Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment
ML20111C880
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 05/10/1996
From: Campbell W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0181, BSEP-96-181, IEB-96-002, IEB-96-2, NUDOCS 9605170073
Download: ML20111C880 (6)


Text

. . . - _ .- , . - - . - ~. - - - - . - . - . ,

r .

CP&L Carolina Power & Light Company William R. Campbell PO Box 10429 Vice President Southport NC 28461-0429 Brunswick Nuclear Plant SERIAL: BSEP 96-0181 MAY 101996 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62 NRC BULLETIN 96-02, " MOVEMENT OF HEAVY LOADS OVER SPENT FUEL, OVER FUEL IN THE REACTOR CORE, OR OVER SAFETY-RELATED EQUIPMENT" t

I Gentlemen:

The purpose of this letter is to provide Carolina Power & Light Company's (CP&L) 30-day

response to NRC Bulletin 96-02, " Movement of Heavy Loads Over Spent Fuel, Over Fuel in l The Reactor Core, or Over Safety-Related Equipment." Enclosure 1 provides a summary of j the results of CP&L's evaluation of the bulletin. Enclosure 2 provides a list of the regulatory l commitments contained in the response. i l l Please refer any questions regarding this letter to Mr. Mark Turkal at (910) 457-3066.

i Sincerely, William R. Campbell GMT/

l

Enclosures:

i

1. Response i 2. List of Regulatory Commitments p

l 4mohib pIO" AOoh OI $4 l

Tel 910 457 2496 Fox 910 457 2803 fgII

/

-jg

- . - .=.

Document Control Desk BSEP 95-0181/ Page 2 William R. Campbell, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, and agents of Carolina Power &

Light Company.

Am AL?1G $lotary (Seal)

My commission expires: k ,z (qg4 cc: U. S. Nuclear Regulatory Commission ATTN.: Mr. Stewart D. Ebneter, Regional Administrator 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Units 1 and 2: i U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike Rockville, MD 20852-2738 The Honorable H. Wells Chairman - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 l

l L- _ _

, . ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 NRC BULLETIN 96-02, MOVEMENT OF HEAVY LOADS OVER SPENT FUEL, OVER FUEL IN THE REACTOR CORE, OR OVER SAFETY-RELATED EQUIPMENT On April 11,1996, the NRC issued Bulletin 96-02, " Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment." Carolina Power &

Light Company (CP&L) has evaluated the practices applicable to the Brunswick Steam Electric Plant, Units 1 and 2 per Bulletin 96-02. A summary of the results are as follows:

NRC Reauested Action i

Review plans and capabilities for handling heavy loads while the reactor is at power (in all l modes other than cold shutdown, refueling, and defueled)in accordance with existing \

regulatory guidelines. Determine whether the activities are within the licensing basis and, if necessary, submit a license amendment request. Determine whether changes to Technical Specifications wiH be requiredin order to allow the handling of heavy loads (e.g., the dry l storage canister shield plug at:d associated lifting devices) over fuel assemblies in the spent fuel pool.

NRC Reauired Resoonse 1 For licensees planning to implement activities involving the handling of heavy loads over spent fuel, fuelin the reactor core, or safety-related equipment within the next 2 years from the date of this buHetin, provide the foHowing:

A report, within 30 days of the date of this buHetin, that addresses the licensee's review of its plans and capabilities to handle heavy loads while the reactor is at power (in au modes other than cold shutdown, refueling, and defueled) in accordance l with existing regulatory guidelines. The report should also indicate whether the activities are within the licensing basis and should include, if necessary, a schedule for submission of a license amendment request. Additionally, the report should indicate whether changes to Technical Specifications wiH be required.

CP&L Resoonse As requested by NRC Bulletin 96-02 dated April 11,1996, Carolina Power & Light Company (CP&L) has reviewed the plans and capabilities of the Brunswick Steam Electric Plant, Units 1 and 2 relative to the handling of heavy loads while the reactor is at power.

The review included the May 18,1984, NRC letter on Control of Heavy Loads (Phase 1) for the Brunswick Steam Electric Plant, Units 1 and 2, with enclosed Technical Evaluation Report. No unresolved issues regarding the handing of heavy loads per NRC Bulletin 96-02 i

El-1

were noted. The results of the review indicated that CP&L's Brunswick Plants are conforming to the NRC Generic Letter (unnumbered) dated December 22,1980, the supplement issued February 3,1981 (Generic Letter 81-07) regarding NUREG-0612,

" Control of Heavy Loads at Nuclear Power Plants," the clarification of Generic Letter 81-07 issued December 19,1983, and the Updated Final Safety Analysis Report. The NRC letter dated June 28,1985, Completion of Phase 11 of " Control of Heavy Loads at Nuclear Power Plants" NUREG-0612, considered Phase il completed based on the improvements in heavy loads handling obtained during the implementation of Phase 1. The review identified that the current procedure controlling the handling of heavy loads did not contain a requirement to perform an engineering evaluation for heavy load lifts that deviate from safe load paths.

The requirement for an engineering evaluation was located in the procedure section that only involved use of the Reactor Building Crane. Therefore, the possibility existed for non-routine heavy load lifts to be made without engineering involvement. Administrative actions have been put in place to insure engineering involvement, pending completion of a procedure revision. The review identified no need for changes to the licenses or Technical Specifications to support the handling of heavy loads.

NRC Reauired Resoonse 2 For licensees planning to perform activities involving the hanuling of heavy loads over spent fuel, fuelin the reactor core, or safety-related equipment while the reactor is at power (in all modes other than cold shutdown, refueling, and defueled) and that involve a potentialload drop accident that has not previously been evaluated in the FSAR, submit a license amendment request in advance (6-9 months) of the planned movement of the loads so as to afford the staff sufficient time to perform an appropriate review. l l

I CP&L Resoonse '

The Brunswick Plant currently has no plans to handle heavy loads over spent fuel, fuel in the reactor core, or safety related equipment while the reactor is at power and that involve a potential load drop accident that has not been previously evaluated in the Updated FSAR ar,d the Company's responses to the NRC Generic Letter dated December 22,1980 and NUREG-0612.

It should be noted that CP&L is following a plan for the transfer of spent fuel from the Brunswick Plant to the Shearon Harris Nuclear Power Plant using an IF-300 shipping cask.

The Brunswick Plant has established safe load paths for the shipping cask that avoid movement over spent fuel, fuel in the reactor core, or safoty related equipment. While the Reactor Building crane did not strictly meet the criteria recommended in NUREG-0612 for being single failure-proof, it was presented for consideration as single f ailure-proof in CP&L's November 16,1982 response on the Control of Heavy Loads. This response referenced CP&L's June 18,1976 letter as providing the details for the Reactor Building crane. The Technical Evaluation Report / Safety Evaluation issued by the NRC's letter dated May 18,1984 evaluated CP&L's response in relation to Section 5.1.1 of NUREG-0612 and acknowledged that the Brunswick Plant satisfies these regulatory guidelines, and has an approved single-f ailure-proof crane. In addition, the special lifting device used for the IF-300 El-2

l l

.. l l

I shipping cask provides the necessary redundancy. Section 5.1.4 of NUREG-0612 stipulates that a load drop analysis need not be performed if the Reactor Building crane and associated lifting devices meet single-f ailure-proof guidelines. ,

l The Reactor Building crane with a four point lift system is also used to move the Drywell l head and it's associated shield blocks. A review of the May 18,1984, NRC letter on I Control of Heavy Loads (Phase 1) for the Brunswick Steam Electric Plant, Units 1 and 2, with i enclosed Technical Evaluation Report, and the associated correspondence was conducted and revealed no unresolved issues regarding the handling of heavy loads per NP.C Bulletin 96-02.

NRC Reauired Resoonse 3 1

For licensees planning to move dry storage casks over spent fuel, fuelin the reactor core, or safety-related equipment while the reactor is at power (in all modes other than cold shutdown, refueling, and defueled) include in item 2 above, a statement of the capability of performing the actions necessary for safe shutdown in the presence of radiological source term that may result from a breach of the dry storage cask, damage to safety-related equipment as a result of a load drop inside the facility.

CP&L Resoonse Brunswick Plant currently has no plans to move dry storage casks over spent fuel, fuel in the reactor core, or safety-related equipment while the reactor is at power.

NRC Reauired Resoonse 4 For licensees planning to perform activities involving the handling of heavy loads over spent  !

fuel, fuelin the reactor core, or safety-related equipment while the reactor is at power (in all modes other than cold shutdown, refueling, and defueled), determine whether changes to Technical Specifications will be required in order to allow the handling of heavy loads (e.g.

the dry storage canister shield plug) over fuel assemblies in the spent fuel pool and submit ,

the appropriate information in advance (6-9 months) of the planned movement of the loads for NRC review and approval.

i CP&L Resoonse No changes to Brunswick Plant's Technical Specifications are required. The only applicable limitation for handling heLvy loads in Brunswick Plant's Technical Specifications is Technical l

Specification 3/4.9.7, Crw Travel - Spent Fuel Storage Pool, which Smits ioads over fuel l

assemblies in the spent fuel storage racks to a maximum of 1600 pounds. Brunswick has no plans to operate beyond these limits.

E1-3 l

(

l \

4 i

,, , ENCLOSURE 2 i

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 NRC BULLETIN 96-02, MOVEMENT OF HEAVY LOADS OVER SPENT FUEL, OVER FUEL IN THE REACTOR CORE, OR OVER SAFETY-RELATED EQUIPMENT l

LIST OF REGULATORY COMMITMENTS l

The following table identifies those actions committed to by Carolina Power & Light Company in this document.' Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Committed Commitment date or outage NONE N/A l