ML20111B388

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Request for Addl Info Re Deletion of Standby Liquid Control Sys Pump Min Flow Requirements from TSs Section 3/4.1.5
ML20111B388
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/08/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9605140394
Download: ML20111B388 (8)


Text

._ __ . ._ ___ ._ ._.

station support Department

'". 10 CFR 50.90 :

PECO NUCLEAR now Nuclear Group Headquarters A Unti or PECO EMRGY ,

i:

May 8,1996 I Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 j 'U. S. Nuclear Regulatory' Commission

Attn
- Document Control Desk

! Washington, DC 20555 L .

?

^

SUBJECT:

Umerick Generating Station, Units 1 and 2 Response to Request for Additional Information Regarding Technical Specifications Change Request No. 94-49-0 Gentlemen:

Attached ls our response to your Request for Additional Information (RAI),  ;

" discussed in our telephone conversation on April 23,1996 regarding the  ;

i deletion of the Standby Uquid Control System (SLCS) pump minimum flow

t. requirements from Technical Specifications Section 3/4.1.5, at Limerick
Generating Station (LGS), Units 1 and 2. This proposed change is the subject -1 lL of Technical Specifications Change Request No. 94-49-0 which was forwarded to you by letter dated June 5,1995.

i ,

[ This information is being submitted under affirmation, and the required affidavit is enclosed.

if you have any questions, please do not hesitate to contact us.

. Very truly yours, 5 b d./dayo,p,.

G. A. Hunger, Jr. ~

Director - Ucensing .

~ Attachment 140073  :

~ Enclosure

['

'w cc: T. T. Martin, Administrator, Region I, USNRC (w/ attachment / enclosure)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment / enclosure) _j

. R. R. Janati, PA Bureau of Radiological Protection (w/ attachment /enclousre)

.9605140394 960500 PDR .ADOCK 0500o352 3 )

'P- PDR i ~%v g l

. OOMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF CHESTER  :

D. B. Fetters, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the attached response to the NRC Request for Additional Information concerning Technical Specifications Change Request No.

l

, 94-49-0 which proposes to remove the minimum flow rate requirement for the Standby Liquid Control System pumps from Technical Specifications Section 3/4.1.5, at Umerick Generating Station, Units 1 and 2, Facility Operating Ucense Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his

knowledge, information and belief.

L a .

e y $

Vice President Subscribed and sworn to before me this 7^ day of 1996.

o-Mnean,niihnn

'Nola~rtA Scal n . hetr My Commission Expires May 17, 999 f.bmbor,I'ennsy'varua Association of Nc?m

Docket Nos. 50-352 50-353 License Nos. NPF-39 l

NPF-85

^

RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)

LIMERICK GENERATING STATION, UNITS 1 AND 2 (Per Telecon dated April 23,1996)

TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94-49-0 i

~

i Question 1 i

1 Provido a copy of the document from the Inservice Testing (IST) Program for Umerick Generating Station (LGS) Units 1 and 2, that shows the minimum flow requirement and the surveillance test frequency fcr the Standby Liquid Control System (SLCS) pumps

- surveillance testing.

Response 1 j The following excerpts from the LGS IST Program are provided herein. l l

- LGS Unit 1 and Common, Specification ML-008, Revision 4, dated 12/29/94, "lST Table - Pumps", page no. 4

- ASME Boiler and Pressure Vessel Code, Section XI, " Inservice Testing of Pumps,1986 Edition, IWP-3200-lWP-3400, page no. 247 l

- LGS Test Procedure No. ST-6-048-230-1, Revision 09, "SLC Pump, Valve and Flow Test", page nos.1,16 and 44 Question 2

! Provide a statement regarding the number of SLCS pumps at LGS Units 1 and 2. l Response 2 The SLCS consists of three redundant pumps and injection vah'e loops per unit. Only one of the three SLCS pumps is needed to meet the SLCS design basis described in LGS Updated Final Safety Analysis Report (UFSAR) Section 9.3.5.1. Two pumps are required to meet the requirements of the Anticipated Transients Without Scram .

(ATWS) Rule (10 CFR 50.62), if a pump is found to be inoperable, there is no impact l on the shutdown capability, and reactor operation can continue during repairs. This l ensures that SLCS is a highly reliablo system at LGS Units 1 and 2. l

SPEC. E-iet

  • REVI'22CSE 4 PUur TABIA IST TABLE - PttrFS PAGE 550.4 LIMERICK OWNERATING STATIOtt - UlrIT 1 & COtesoel DhTE 12/29/94 ,

PUNP TEST - RELIEF

  • PUMP NAIEE Oft DESCRIPTIO0t ID 900. P&ID COORD. PhltASETERS REQUEST R m ts OPRR-4 IWP-4490.

STANDBY LIQtTID CONTROL (SLC) 1AP299 N-48 (SET 1) E-5 Pi', D/P. Q, V, L/P OpftR1. OPftR-3 *CAICURATED IEELET PetBSSURE (TEIT 5.1.1)- ROTATIESG SPEED W N 'T PRR IWP-4400.

STANDBY LIQUID COtf7ROL (SLC) ISP200 N-4 0 (SBT 1) - C- 5 Pi*. D/P. Q. V. L/P' OPital. OPftR-3

  • CALCULATED INLET PetBSSURE (TEXT

. 5.1.1) ROTATING SPEED RIEEEPT PER IWP-4400.

STANDSY LIQUID CONTROL (SLC) 1CF209 N-49 (SET 1) B-5 Fi*, D/P. Q. Y, L/P OPRR1, OPRA-3 *CAZ4ULATED INLET PRESSUltE (TEIT 5.1.1) ROTATIleG SPEED RIERSPT PEft 41WP-4409.

i t

e s

, 1 -,# - - - - - - ---

_ _ m__ t-_--_ m _

1986 Edition INSERVICE TESTING OF PUMPS IWP 3300-IWP-3400

( TABLE IWP-3100-2 -

ALLOWABLE RANGES OF TEST QUANTITIES Alert Range Required Action Range

[ Note (1)] [ Note (111 Test Quantity Acceptable Range Low Values High Values Low Values High Values P, (Note (2)] (Note (2)] [ Note (2)] [ Note (2)] [ Note (2)]

AP 0.93-1.02 A P, 0.90-0.93 A P, 1.02-1.03 A P, < 0.90AP, >1.03AP, 0 0.94-1.020, 0.90-0.940, 1.02-1.030, < 0.900, >1.030, V when 0 $ V,5 0.5 mils 0-1 mil None 1-1.5 mils None > 1.5 mils V when 0.5 mils < V, s 2.0 mils 0-2 V, mils None 2 V,- 3 V, mils Nor e > 3 V, mils V when 2.0 mils < V, s 5.0 mils 0-(2 + V,) mils None (2 + V,)-(4 + V,) mits None > (4 + V,) mils V when V, > 5.0 mils 0-1.4V, mils None 1.4 V,- 1.8 V, mils None > 1.8V, mils T. [ Note (3)] [ Note (3)] [ Note (3)] [ Note (3)] [ Note (3)]

NOTES:

(1) See IWP 3230.

(2) P, shall be within the limits specified by the Owner in the record of tests (IWP-6000).

(3) T, shall be within the limits specified by the Owner in the record of tests (!WP-6000).

IWP 3200 ANALYSIS OF RESULTS and that the pump will still fulfill its function. A new IWP 3210 ALLOWABLE RANGES OF ""

INSERVICE TEST QUANTITIES hen test shows deviations greater than al.

The allowable ranges of inservice test quantities in lowed (see Table IWP-3100-2), the instruments in-relation to the reference values are tabulated in Table volved may be recalibrated and the test terun-IWP 3100-2. If these ranges cannot be met, the Owner shall specify in the record of tests (IWP-6000) the reduced range limits to allow the pump to fulfill its function, and those limits shall be used in lieu of the IWP 3300 SCOPE OF TESTS ranges given in Table IWP 3100-2.

Each inservice test shall include the measurement and observation of all quantities in Table IWP 3100-1 except bearing temperatures, which shall be measured IWP-3220 TIME ALLOWED FOR ANALYSIS during at least one inservice test each year.

OF TESTS All test data shall be analyzed within 96 hr after completion of a test.

IWP-3400 FREQUENCY OF INSERVICE TESTS IWP-3230 CORRECTIVE ACTION (a) An inservice test shall be run on each pump nominally every 3 months during normal plant opera-(a) If deviations fall within the Alert Range of tion. It is recommended that this test frequency be Table IWP 3100-2, the frequency of testing specified maintained during shutdown periods if this can in IWP 3400 shall be doubled until the cause of the reasonably be accomplished, although this is not deviation is determined and the condition corrected. mandatory. If it is not tested during plant shutdown, (b) If deviations fall within the Required Action the pump shall be tested within I week after the plant Range of Table IWP-3100 2, the pump shall be is returned to normal operation.

decir, red inoperative and not returned to service until (b) Pumps that are operated more frequently than the cause of the deviation has been determined and the every 3 months need not be run or stopped for a condition corrected, special test, provided the plant log shows each such (c) Correction shall be either replacement or repair pump was operated at least once every 3 months at the per IWP-3111, or shall be an analysis to demonstrate reference conditions, and the quantities specified were that the condition does not impair pump operability measured, observed, recorded, and analyzed.

i 247

r l . ST-6-048-230-1, Rsv. 09 w/0, Page 1 of 56 l TEST DATE/ TIME SAA/RTB:eer

, GRADE P.M. PECO ENERGY COMPANY LIMERICK GENERATING STATION ST-6-048-230-1 SLC PUMP, VALVE, AND FLOW TEST Test Freq: 3 Months - QB Initiating Events: A.

Tech Spec: 4.0.5 4.6.3.1 4.1.5.b 4.6.3.3 B. Other 4.1.5.c T3.6.3-1 1. Reason 10CFR50.62(C)(4) 2. A/R No.

TEST RESULTS: (Circle SAT or UNSAT Below)

SAT - All Asterisk (*) AND ISI/IST Letter (1) steps completed satisfactorily.

UNSAT - Test Results of one QB more Asterisk (*) QB ISI/IST Letter (I) steps completed unsatisfactorily.

Performed by: . . . . . . . . . . . . . . . . . . . . (Sign /Date/ Time)

Reviewed by (SSV) . . . . . . . . . . . . . . . . . . . . . . . . . . . ( Sig n/D at e )

IMMEDiATE NOTIFICATION OF OPERATIONS SHIFT MANAGEMENT (UNSAT Results Only)

Shift Supervision: ........................ . . . . . . . (Sign)

(Date/ Time)

Corrective Action (if required) . . . . . . . . . . . . . . . . . . . (ETT og A/R - Number)

ADDITIONAL ACTION / TEST COMMENTS (User may add additional pages,if necessary)

Person making entry . . . . . . . . . . . . . . . . . . . . . . . . . (Sig n/Dat e)

l . ST-6-048-230-1, Rav. 09

. Pcgs 16 of 56 l SAA/RTB:eer INITIALS 2

NOTE Satisfactory completion of step 4.6.26 verifies check valve 48-1F033A fully opens.

4.6.26 RECORD 1 AP208, "SLC Pump A" discharge pressure / flow AND VERIFY not less than Tech Spec Min.

FLOW T S MIN PM gpm 41.2 gpm ( * ,1)

PRESSURE T S MIN PM psig 1205 psig ( * ,1) 4.6.27 PERFORM the following at 1 AP208, "SLC Pump A" Local Pump Test Station:

1. PRESS "STOP" pushbutton to Stop "A" SLC Pump.

. 2. PLACE HS-48-108A to " NORMAL."

4 0

~

l~ ST-6-048-230-1, Rev. 09 Page 44 of 56 l SAA/RTB:eer .

Attachment 2 Page 1 of 3 -

PUMP 1 AP208 NOTE Expected ranges correspond with IST ranges STEP PARAMETER TEST RESULT EXPECTED NOT IN REQUIRED NUMBER RANGE REQUIRED ACTION RANGE PM ACTION RANGE (INITIALS)

SYSTEM s 43.66 gpm LO < 38.56 gpm FLOWRATE 4.6.25.2 9pm (1) 11 O

2: 40.23 gpm HI > 44.13 gpm (gpm) 4.6.25.3 Vibration Amplitude MILS s 1.24 MILS (1) > 1.86 MILS 12 (MILS)