3F0596-01, Forwards Rev 0 of F96-0001, FPC Crystal River Unit 3 Cycle 11 Colr,Referencing Revised Sts. Facility in Final Stages of Refuel 10 & Operating Limits in COLR Will Govern Core Operations at Restart

From kanterella
(Redirected from ML20108C550)
Jump to navigation Jump to search
Forwards Rev 0 of F96-0001, FPC Crystal River Unit 3 Cycle 11 Colr,Referencing Revised Sts. Facility in Final Stages of Refuel 10 & Operating Limits in COLR Will Govern Core Operations at Restart
ML20108C550
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 05/01/1996
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20108C552 List:
References
3F0596-01, 3F596-1, NUDOCS 9605070020
Download: ML20108C550 (1)


Text

s. ~ 0

. ~

I Florida Power COi# ORATION I.1 Iso $or*

1 1

May 1, 1996 3F0596-01 l

l U. S. Nuclear Regulatory Commission  !

Attn: Document Control Desk I Washington, D. C. 20555

Subject:

Core Operating Limits Report, Cycle 11 ,

Dear Sir:

Florida Power Corporation (FPC) is submitting the Crystal River Unit 3 (CR-3)

Core Operating Limits Report (COLR), Cycle 11 in accordance with Improved  :

Technical Specification 5.6.2.18. CR-3 is in the final stages of Refuel 10 and the operating limits in this COLR will govern core operations at restart.

Sincerely,  ;

i G. L. oldt Vice President Nuclear Production GLB/JWT Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager j 060147 DO 9605070020 960501 i PDR ADOCK 05000302 PDR

\.}

P CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power une St

  • Cryste River, Florusa 34428 6708 e 1352) 795 6406 A nonen hogess company