U-602571, Monthly Operating Rept for March 1996 for CPS

From kanterella
(Redirected from ML20107D615)
Jump to navigation Jump to search
Monthly Operating Rept for March 1996 for CPS
ML20107D615
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/31/1996
From: Demark W, Lyon M
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L30-96(04-04)LP, L30-96(4-4)LP, U-602571, NUDOCS 9604180383
Download: ML20107D615 (5)


Text

l e

l lihnois Power Cornpany Chnton Power Station P.O. Box 678 Chnton, IL 61727 Tel 217 935-8881 PGWER t'-6 2571 L30-96 (04 - 04)-LP 8E.100c l April 4, 1996 10CFR50.36 l

l Docket No. 50-461 l

'I.S. Nuclear Regulatory Commission Ducuruent Control Desk Wanington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 l Facility Operating License NPF-62  !

March 1996 Monthly Ooeratine Report  ;

i

Dear Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending March 31, 1996.

Sincerely yours, Michael W. L n Director - Licensing UED/csm Attachment cc: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department of Nuclear Safety 18004C l

l l

9604180393 960331 PDR ADOCK 05000461 F,;

R PDR ,

l v I

l .

J l

, Attachmsnt 1 )

l to U-602571 l Page 1 of 4 i

t I

4 i

I

\

l l

! l 1

1 1 1

i l

l CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES ,

1 Month March 1996 1

1 None l

l i

l l

l 1

! l i

I i l

i l

i t

. . . . . . . .. . . . . . ~ . . . . - . . . . _ - .... . . - . - . . _ . - - . . - . . _ _ = _ . ~ . -

l .

. Attachasnt 1 to U-602571 Page 2 of 4  !

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461

' UNIT Clinton 1 DATE 03/31/96 COMPLETED BY W. E. DeMark TELEPHONE (217) 935-8881 X3537 MONTH March 1996  !

DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 931 . _ _ 17 792 2 932 18 934 3 931 _ 19 934 4 933 _ 20 935 5 933 21 934 6 931 22 935 7 930 23 936 8 929 24 933 9 931 25 932 10 930 26 933 11 934 27 934 12 935 28 935 13 936 29 936 l 14 935 30 937 .

15 934 31 935 16 935 A

- + r v

^

. Attechm:nt 1 to U-602571 Page 3 of 4 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT C1h. ton 1 DATE 03/31/96 COMPLETED BY W. E. DeMark TELEi' HONE (217) 935-8881 X3537 OPERATING STATUS

1. REPORTING PERIOD: _Harch 1996 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2f9/i MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-Net): 231
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Epque
4. RRASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL... 744.0 2.184.0 57.005.1
6. REACTOR RESERVE SHUTDOWN HOURS......... 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE................, 744.0 2.184.0 53.752.1
8. UNIT RES ERVE SHUTDOWN HOURS . . . . . . . . . . . . 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH).. 2.142.666 6.306.466 144.316.717
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 719.448 2.101.174 47.662.326
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 691.082 2.017.289 45.402.650
12. REACTOR SERVICE FACTOR................. 100.0% 100.0% 79.8% ,

l

13. REACTOR AVAILABILITY FACTOR............ 100.0% 100.0% 79.8% 1 l
14. UNIT SERVICE FACTOR... ........... .... 100.0% 100.0% 73.4% l
15. UNIT AVAILABILITY FACTOR.. ....... ... 100.0% 100.0% 73.4% j
16. UNIT CAPACITY FACTOR (Using MDC)....... 99.9% 99.3% 66.7%  !
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.6% 99.0% 66.5%
18. UNIT FORCED OUTAGE RATE................ 0.0% 0.0% 8.1%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH): I None
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

r 4

AttcshaJAt 1 ,

to U-602571 .

Page 4 of 4 .

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-461

  • UNIT Clinton 1 DATE 03/31/96 COMPLETED BY W. E. DeMark TELEPHONE (217) 935-8881 X3537 REPORT MONTH March 1996 i

, METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS None I

(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training 5 License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual 5 cram, 3-Automatic Scram, 4-Other (explain)

_ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- _ _ _ _ _ . . _ . _ _ _ _ __ _ -