BECO-LTR-96-014, Forwards Rev 11C to Pilgrim Nuclear Power Station PNS Colr

From kanterella
(Redirected from ML20106G481)
Jump to navigation Jump to search
Forwards Rev 11C to Pilgrim Nuclear Power Station PNS Colr
ML20106G481
Person / Time
Site: Pilgrim
Issue date: 02/27/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20106G485 List:
References
BECO-LTR-96-014, BECO-LTR-96-14, NUDOCS 9603050197
Download: ML20106G481 (1)


Text

m-

., ,e l

Boeton Edlieon Pilgnm Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 l

i d

E. T. Boulette, PhD Senior Vice President - Nuclear February 27, 1996 BECo Ltr. #96-014

U.S. Nuclear Regulatory Commission Attention
Document Control Desk Washington, DC 20555 l

l Docket No. 50-293 I 3 cense No. DPR-35 Core Operatina Limits Reports j- The attached revision of Pilgrim's Core Operating Limits Report is submitted in accordance with 1 the requirements of Pilgrim's Technical Specification 6.9.A.4.d.

Revision #11C provides cycle-specific limits for operating Pilgrim during the remainder of cycle

  1. 11, and reflects Technical Specification Amendment #165 issued by the NRC on January 23,
1996.

CMwt2Nc-E. T. Boulette, PhD 1

ETB\PMK\pkk\ rap 96icorelmit

Attachment:

Pilgnm Nuclear Power Station Core Operating Limits Report 4

cc: Mr. R. Eaton, Project Manager l Division of Reactor Projects - 1/11 Mail Stop.14D1 U. S. Nuclear Regulatory Commission i 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nucl2ar Regulatory Commission Region i 475 AINndale Road King of Prussia, PA 19406 Senior Resident inspector Pilgnm Nuclear Power Station 9603050197 960227 PDR A!Yl.0K 05000293 '

hk V

P PDH \

L