CR-3 License Transfer SE Corrected Cover Letter
ML20101G582
Person / Time
Site: Crystal River  Duke energy icon.png
Issue date: 04/10/2020
From: John Hickman
Office of Nuclear Material Safety and Safeguards
To: Hobbs D
Crystal River, FL
J HICKMAN DUWP
Shared Package
ML20101G579 List:
References
Download: ML20101G582 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 10, 2020 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - TRANSFER OF LICENSED AUTHORITY FROM DUKE ENERGY FLORIDA, LLC TO ADP CR3, LLC

Dear Mr. Hobbs:

By letter dated April 1, 2020 (Agencywide Documents Access and Management System Accession No. ML20069A028), the Nuclear Regulatory Commission (NRC) issued an Order consenting to the transfer to ADP CR3, of DEFs licensed authority under Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3) and the general license for the CR-3 independent spent fuel storage installation (ISFSI) to possess, maintain, and decommission CR-3 and its ISFSI.

Following issuance of the Order consenting to the transfer, several minor errors were identified in the associated safety evaluation. A corrected copy of the safety evaluation is being provided for your records. The areas of edit are marked by change bars.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. The ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.

T. Hobbs Should you have any questions regarding this letter, please contact me at 301-415-3017 or via e-mail at John.Hickman@nrc.gov.

Sincerely, John B. Hickman, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-302 and 72-1035

Enclosure:

Safety Evaluation cc: w/enclosures: Crystal River ListServ

ML20101G579 *via Email OFFICE DUWP DUWP DUWP NAME JHickman BWatson* JHickman DATE 4 / 10 / 2020 4 / 10 / 2020 4 / 10 / 2020