Provides Complete Version of TS Upgrade Program (Tsup) & List of Deferred Tsup SRs
ML20101C626
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/13/1996
From: Jamila Perry
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17187A352 List:
References
JSP-LTR-96-0035, JSP-LTR-96-35, NUDOCS 9603190096
Download: ML20101C626 (4)


Text

. >- ,4 , , < . - -

1 C<nnmonwealth Edi'.on Company l Dresden Generating $tation 6W North Dresden Road Morris, IL NH50 Tet si s 9 u-2920 i

March 13,1996 l l

i JSP Ltr. #%-0035 l U. S. Nuc' gulatory Commission I Attn: De.. s.at Control Desk Wa Magran. D.C. 20555

Subject:

Dresden Nuclear Power Station Units 2 and 3 l Complete Version of Technical Specification Upgrade Program (TSUP) and List of Deferred Surveillance Requirements NRC Docket Nos. 50-237/249 l

References:

a) J.S. Perry to U3NRC, dated, March 1,1995 (Comed supplement to TSUP cleanup) b) P.Piet to USNRC dated, November 14,1995 (Comed submittal for TSUP cleanup) c) J. Schrage to USNRC, dated September 1,1995 (Comed submittal for TSUP Sec 6.0 for Dresden)

The purpose of this letter is to provide a complete version of the TSUP pages that reflect the current configuration of Dresden Station and to specify surveillance requirements that will not be current at upon full implementation. The attached listing reflects all previously approved Sections for the TSUP project and includes any additional changes identified in the Referenced letters.

Each previous change to the TSUP pages, up to and including the Referenced submittals, Ins received both on-site and off-site review, in accordance with station procedures. In addition,

. Dresden has performed additional, supplemental reviews of the TSUP pages to determine their adequacy and accuracy. Therefore, to the best of my knowledge and belief, the information contained therein is true and correct. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

180102

.u...ro._re _ . ,,

t 3 9603190096 960313 I PDR ADOCK 05000237 j 1 P PDR A i:nicom Company

i i

U.S. NRC March 12,1996 Comed also requests that implementation the surveillances listed in Attachments B be delayed until the next refuel outage for the effected unit. These surveillances are relatively new, require significant detailed analyses to create, add marginal benefits to safety and require the reactor to be in a shutdown condition to perform. Making these surveillances current prior to TSUP implementation will force shutdown of the units and delay realization of the other benefits needed for successful operation.

Comed requests that the NRC staff review and approve the attached TSUP pages as well as approve the deferral of the performance of surveillances specified herein by April 21,1996 in order to ensure that an orderly implementation of the project can be completed. If there are any further questions, please contact the Dresden Regulatory Assurance Supenisor, P. G. Holland.

Sincerely,

, tephen ON ce-President BWR Operations Attachments: A: Technical Specification Upgrade Program Pages - Complete Listing B: List of deferred surveillance requirements cc: H. J. Miller, Regional Administrator - RIII J. F. Stang, Project Manager - NRR C. L. Vanderniet, Senior Resident Inspector - Dresden Office of Nuclear Facility Safety - IDNS l

.nt.o,ut..no,s.io.. t..pr l

1 ATTACHMENT A  ;

Technical Specification Upgrade Program Dresden Nuclear Power Station Deferred TSUP Surveillance Requirements F

Surveillance Requirement 4.1.A.2 RPS Logic System FunctionalTest >

. Surveillance Requirement 4.2.A.2 Primary & Secondary Containment Logic System Functional Tests Surveillance Requirement 4.2.J.2 Feedwater Pump Trip Logic Syster Cunctional Test ,

Surveillance Requirement 4.6.F.1.b Relief Valve Logic System Functional Test Surveillance Requirement 4.9.A.9 Simultaneous Diesel Generator Start Surveillance Requirement 4.9.A.10 Diesel Storage Tank Cleaning (Unit 3 and Unit 2/3 only) 1 \

l 1

i l

l I

c \teup\ cleanup \closecut.wpf l

(

l

' i l j l l l

l i

i f ATTACHMENT B l

l Technical Specification Upgrade Program Pages - Complete Listing i Dresden Nuclear Power Station i

l l

1 i

I i

l l

l c \tsup\ cleanup \ closeout.wpf l

l l

l

,