U-602562, Monthly Operating Rept for Feb 1996 for Clinton Power Station Unit 1

From kanterella
(Redirected from ML20100Q729)
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Clinton Power Station Unit 1
ML20100Q729
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/29/1996
From: Demark W, Lyon M
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L30-96(03-06)LP, L30-96(3-6)LP, U-602562, NUDOCS 9603120107
Download: ML20100Q729 (5)


Text

e Illinois F0wer Company Chnton Power Station

,, , P.O. Box 678 Chr. ion, IL 61727 Tel 217 935 8881 ILLIN 91S ggg U-602562 L30-96(03-06)-LP 8E.100c March 6, 1996 I

e 10CFR50.36 1

Docket No. 50-461 U.S. Nuclear Regulatory Commission  ;

, Document Control Desk l Washington, D.C. 20555 '

Subj ect: Clinton Power Station, Unit 1 Facility Operating License NPF-62 February 1996 Monthly Operatinz Reoort

Dear Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending February 29, 1996.

Sincerely yours,

~>

< /

'b Michael . Lyon Director - Licensing WED/csm Attachment cc: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department of Nuclear Safety 110122 '

9603120107 960229 PDR R

ADOCK 05000461 PDR [J4 )

I

. i Attachmsnt 1 to U-602562 l

, , . ., Page 1 of 4 ,

i l

I CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES l Month February 1996 '

l i

I

'i None l l

l 1

l 4

)

l i

j l

j i

I i

\

i

.w

4 Attachmsnt 1 l to U-602562

., , Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 l DATE 02/29/96 COMPLETED BY W. E. DeMark TELEPHONE (217) 935-8881 X3537 MONTH February 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 922 17 921 2 921 18 918 3 923 19 921 4 922 20 923 l

5 924 21 925 6 925 22 935 7 925 23 937 8 924 24 936 9 925 25 933 J

10 925 26 933 11 900 27 932 12 922 28 929 13 922 29 930 l 14 922 15 922 16 919 l

l

4 l- i .

t Attachasnt 1 -

_ to U 602562

.. . Page 3 of 4 l l

OPERATING DATA REPORT I 1

< l

DOCKET NO. 50-461 l q UNIT Clinton 1 l 5

DATE 02/29/96 COMPLETED BY W. E. DeMark i TELEPHONE (217) 935-8881 X3537 ,

OPERATING STATUS

1. REPORTING PERIOD: February 1996 GROSS HOURS IN REPORTING PERIOD: 5.25.
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2.12lt MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 21Q DESIGN ELECTRICAL RATING (MWe-Net): 211
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Hong.
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL... 696.0 1.440.0 56.261.1  ;
6. REACTOR RESERVE SHUTDOWN HOURS......... 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE................ 696.0 1.440.0 53.008.1
8. UNIT RESERVE SHUTDOWN HOURS............ 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH)... 2.010.550 4.159.455 142.169.706
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 670.455 1.381.719 46.942.885
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 643.469 1.326.207 44.711.568
12. REACTOR SERVICE FACTOR................. 100.0% 100.0% 78.4%
13. REACTOR AVAILABILITY FACTOR............ 100.0% 100.0% 78.4%

4 14. UNIT SERVICE FACTOR.................... 99.4% 99.0% 66.3%

15. UNIT AVAIIABILITY FACTOR. . . . . . . . . . . . . . . 100.0% 100.0% 73 9.1
16. UNIT CAPACITY FACTOR (Using MDC)....... 99.4% 99.0% 66.3%
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.1% 98.7% 66.1%
18. UNIT FORCED OUTAGE RATE....... ........ 0.0% 0.0% 8.2rt i
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,'DATE, DURATION OF EACH): )

None i 1 1

1 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A J

1 1

AttT hment 1 to U-602552 ,

Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS l ,

DOCKET NO. 50-461 .'

UNIT Clinton 1 ,

DATE O2/29/96 '

COMPLETED BY W. E. DeMark TELEPHONE (217) 935-8881 X3537 REPORT MONTH February 1996 METHOD OF TYPE SHUTTING DOWN F: FCRCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS None (1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

_ - - - _ . _ . . - - - - - - _ _ . _ _ . _ _ _ _ _ . - _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ - _ _ _ - _ - ____---_______---_-_4

,