BECO-96-018, Submits Long Term Program Semiannual Rept for Facility

From kanterella
(Redirected from ML20100M620)
Jump to navigation Jump to search
Submits Long Term Program Semiannual Rept for Facility
ML20100M620
Person / Time
Site: Pilgrim
Issue date: 02/29/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-96-018, BECO-96-18, NUDOCS 9603050439
Download: ML20100M620 (33)


Text

-~ .. .- .. .-. - - . - _ - - ,

.J i

Boston Femann Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 E. T. Boulette, PhD F " 9. 1996 Senior Vice President - Nuclear BE o b 018 f

i  !

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ,

F License DPR-35 4 Docket 50-293 LONG TERM PROGRAM: SEMI-ANNUAL REPORT l This letter provides the semi-annual Long Term Program (LTP) update in accordance with Boston '

2 Edison letter dated May 7,1994, " Plan for the Long Term Program - Pilgrim Nuclear Power Station"

- Section V.A. (BECo letter 2.94.066). Attachment 1 includes the Schedule A and B regulatory items. ,

Attachment 2 includes commitment descriptions, progress since the last update, and summaries of changes if applicable.

In addition to Schedule A and B items, we are implementing plant betterment modifications and activities These additional items, identified in Schedule C, are included in Attachment 3. Schedule C items are outside the regulatory scope of the Long Term Program and are exempt from the license conditions imposed on Schedule A and B items. ,

f Changes in status since our last submittal are marked by revision bars in the right margins of i

Attachment 2.

i The current schedule for converting Pilgrim's Technical Specifications to Standard Technical I Specifications is 1998 and is shown in Schedule C. We will provide a more detailed schedule in our next update.

QomDieted Items f

. Protection Against Malevolent Use of Vehicles Schedule Revisions i

e RHR Fuel Pool Cooling Intertie Valve Modification poc58 ,

9603050439 960229 '

i:

PDR ADOCK 05000293 1 R PDR- l i

i BOSTON EDISON COMPANY

.. }

U. S. Nuclear Regulatory Commission

Ptege 2 -

i l

New items j 4

o Bulletin 95-02: RHR Strainers l l,

I If you have any questions on the contents of this report, please direct these to Marie Lenhart of our i Regulatory Affairs Department, at (508)830-7937. l m,

. A j E. T. Boulette, PhD Attachments nas/LTP!W  !

cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - 1/II  ;

Office of Nuclear Reactor Regulation  ;

Mail Stop: 14D1

. U. S. Nuclear Regulatory Commission f 1 White Flint North '

11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region i 475 Allendale Road King of Prussia, PA 19406 .

Senior NRC Resident inspector ,

t Pilgrim Nuclear Power Station i t r

I s

p

toes 1997 tsse 1sso acce

_.JAA F t3AA_tu 122J J A2sAoAN A Dd,J_tF ABB AA AMA J J A2 2810 NA AD J F t3 2A AAUA A22J J A 25AO NAD A J 2AM F AA RS A A JA.J2 AAS AO A NA D J F DA 2A Q O,xJ_

l REFUELING OUTAGE RFO #11 -

RFO #12 d SCHEDULE A MAINTENANCE RULE ( LTP S 584)

SCHEDULEB GL 8742 SEISMIC VER!FICATION PROGRAM ( LTP M10)

GL 89-10 MOV TESTING & SURVEILLANCE-PHASE 2 (LTP M87)

GL M42 THERMAL HYDRAUUC (LTP # 504)

GL 39-13 SALT SERVICE WATER PIPING (LTP M73)

_"_ RHR FPC INTER-TtE VALVE MODS. (LTP # 568)

SEVERE ACCIDENT MANAGEMENT (LTP s 489)

Bulletin 9542 RHR Strainers

~I i m0XG "XRY 3: 10 GRAY l Page1 BOSTON EDIS0N - NUCLEAR ORGANIZATION  !

i

~~ '

ATTACHMENT 2 Paste index for LTP Schedule A and B ltems LTP . LTP Page Schedule . Number Title Number A '584 Maintenance Rule - 1

-4 A 681 Protection Against Malevolent Use of Vehicles (10 CFR Part 73.55(c))

i B 377 Neutron Flux Monitoring 5 B 567 Seismic Verification Program (GL 87-02) 7 ,

i B- 255, Salt Senice Water System Piping (GL 89-13) 11 l 473 B 487 Safety Related MOV Testing (GL 89-10) 14 8 489 Severe Accident Management Program 20 B. 504 Thermal-Hydraulic Instability-Hardware Fix (GL 94-02) 21 B 568 RHR-FPC Intertie Valve Modification 23 B 669 IGSCC - Core Shroud (GL 94-03) 24 j

.- -- South Weymouth Naval Air Station 26 l B -- Bulletin 95-02 RHR Strainers 27-l 3

-l ATTACHMENT 2 SCHEDULE A M AINTENANCE RULE (LTP #584)

Commitment Description  !

l 10CFR50.65 " Requirements for Monitoring the Effectiveness ofMaintenance at Nuclear Power Plants " was issued as a final rule on July 10,1991 (Reference 1). Licensees are  ;

required to have in place by July 10,1996, a program capable of monitoring the overall J continuing effectiveness of their maintenance programs to ensure that safety related and ,

certain non-safety related structures, systems, and components are capable of performing their J intended functions; failures of non-safety related equipment will not occur which could prevent the fulfillment of safety related functions; and failures resulting in scrams and unnecessary actuations of safety related systems are minimized.

The rule has a five year implementation schedule with supporting regulatory guide development and promulgation expected within the first two years. This schedule allows three years for licensee development beyond the time that final guidance is expected to be available.

(BECo IADB RL 95.0001) l References 1, Federal Register Vol. 56 No.132, dated July 10,1991 Commitment Historv/ Progress ,

Progress and Summary of Changes - March 1991 to August 1991 f

. A program for ensuring compliance with the maintenance rule is being developed and will be provided in the next regular report for the LTP.

Progress and Summary of Changes - August 1991 to February 1992

  • Our implementation approach for the maintenance rule consists of two major aspects:

i e A program to monitor the performance of specified structures, systems and components

(SSCs) against established goals, and e Use of the reliability centered maintenance (RCM) concept to upgrade the Station's Preventive maintenance program.
  • Development of our monitoring program is evolving in concert with the guidance documents being established by NUMARC and the NRC. The NUMARC guidance is being established to address four areas: selection of SSCs to be covered by the rule; goal i setting and performance monitoring; demonstrating eqolpment functionality by inherent SSC characteristics or by appropriate preventive mamtenance; and the removal of plant systems from service without affecting overall plant safety. We understand the NRC guidance will describe acceptable methods for Licensees to monitor the overall continuing ,

effectiveness of their maintenance activities, while offering flexibilities in establishing goal  !

setting, monitoring, and preventive maintenance activities.  !

e The RCM program commenced in January 1992 with the formal establishment of an RCM team. The EPRI " Work Station" RCM software was selected for use in RCM system analysis. RCM team training on this software and RCM methodology was completed in  !

January 1992.  !

Page1of27  !

I ATTACHMENT 2 (Continued)

SCHEDULE A i e The RCM program scope identifies and prioritizes 47 plant systems, each requiring approximately 16 weeks of work. A number of systems will be worked in parallel.

Completion of the identified program scope is scheduled for May 1994. )

Progress and Summary of Changes - March 1992 to August 15,1992

  • PNPS is continuing with a preventive maintenance program upgrade utilizing RCM methodology. An additional system has been added to the RCM 3rogram scope bringing the total number of systems to 48. The analysis of three systems las been completed. The  !

- identification of SSCs within the scope of the maintenance mle is underway and scheduled for completion in 1992.

Progress and Summary of Changes - August 15,1992 - Febmary 15,1993

  • The overall project continues on schedule. The RCM analysis of fourteen systems has been completed. The preliminary list of SSCs within the scope of the maintenance rule has been developed and issued for comment. A tailored collaboration with EPRI has been established and is in progress to develop a "Living PM Proy, ram" to assist in the programmatic aspects of the maintenance rule implementation plan.

Progress and Summary of Changes - February 15,1993 - July 31,1993

  • The project is on schedule. A total of 23 system RCM analyses are complete. The Maintenance Rule Project plan is written, an implementation procedure is written, and three pilot systems have been completed.  ;

Progress and Summary of Changes - August 1,1993 - January 31,1994

. This project is on schedule. A total of 36 system RCM analyses are complete. We have started the production mode of operation with 4 Maintenance Rule systems complete.

Progress and Summary of Changes - February 1,1994 - July 31,1994

  • A total of 40 RCM system analyses are complete. There are 12 Maintenance Rule System Evaluations Complete.
  • Pilgrim has been accepted by the NRC as a volunteer pilot rule inspection plant. The pilot ,

inspection is scheduled for the week of December 9,1994.

Progress and Summary of Changes - July 31,1994 - Januany 31,1995 e RCM The RCM system analysis has been completed. There have been 47 analysis completed.

PM package planning for RCM recommendations is ongoing.

. Maintenance Rule Thineen Maintenance Rule System Evaluations were completed before the December 94 l NRC Pilot Inspection. As a result of the Pilot inspection these 13 evaluations are being reformatted. Two additional evaluations have been completed. Procedure changes and Page 2 0f 27

  • . i ATTACHMENT 2 (Continued)

SCHEDULE A l

)

ge,neration of new procedures to support the ongoing aspect of the Maintenance Rule are -

bemg pursuco.  ;

Progress and Summary of Changes - February 1,1995 - July 31,1995 The Maintenancs Rule project is in the production phase. We have completed 21 systems and we are completing approximately two system: a week. Currently we are on schedule.  :

i l

Progress and Summary of Changes - August 1,1995 - January 31,1996 This project remains on schedule. We have 10 systems to be completed.  :

B f

i f

f P

Page 3 of 27

ATTACHMENT 2 (Continued)

SCHEDULE A

?30TECTION AGAINST MALEVOLENT USE OF VElllCLES -10CFR PART 73.55(C)-

(LTP#681)

Commitment Description On August 1,1994, (59 FR 38889), the NRC promulgated a new rule,10 CFR Part 73.55(c)(7), that requires nuclear power plants have measures to protect against the use of a land vehicle as a means to gain unauthorized proximity to vital areas and to protect against a vehicle bomb.

. By Febntary 28,1995 licensees must submit a letter that provides a summary description of their planned vehicle control measures and the results of the vehicle bomb analysis.

(Complete) e Completion of modifications by February 28,1996 (I ADB RL95.0019.02) (Complete) l

  • Submit final as-built drawing (IADB RL 95.0019.01)(Complete) l References 1.) NRC letter dated 7/19/94. ,

i 2.) Final Rule-10 CFR Part 73.55(c)(7),59 FR 38889, dated 8/1/94 3.) BECo letter 95.018, dated 2/10/95.

4.) BECo letter 96.012, dated 2/21/96 l l Commitment IIistory/ Progress Progress and Summary of Changes - July 31,1994 to January 31,1995 Reference 3 provides our plans for rule compliance, Due to its safeguards classification, no summary description is provided in this LTP update. Our planned completion date for rule implementation and completion of modifications is February 28,1996.

Progress and Summary of Changes - February 1,1995 - July 31,1995 Design complete, bid package assembled, anticipate start of construction in September 1995.

Progress and Summary of Changes - August 1,1995 - January 31,1996 Construction is complete. The as-built drawing was submitted under a separate cover I (Reference 4). This item is complete and will be removed from future LTP submittals.

i I

i Page 4 of 27 l

ATTACHMENT 2 (Continued)

SCHEDULE B NEUTRON FLUX MONITORING (LTP #377)

Commitment Description Generic Letter 82-33 required utilities to report on implementation of Regulatory Guide 1.97.

Boston Edison, and some other utilities with Boiling Water Reactors, took exception to requirements related to neutron flux monitoring systems. Subsequently, the BWR Owners Group submitted NEDO-31558 that proposed alternate criteria for neutron flux monitoring. NRC issued a safety evaluation and accepted the NEDO-31558 criteria in Reference 1.

In Reference 2, the NRC requested utilities to review the neutron flux monitorin'g instrumentation against the NEDO-31558 to determine whether the installed system meets the criteria and to submit a letter to the NRC with the results of the review.

Boston Edison's reply (Reference 3) identified that Pilgrim Station met the criteria of NEDO-31558 with certain clarifications and exceptions.

Our exception concerned the requirements for uninterruptible power supplies (Criterion 5.2.8 of NEDO-31558). Boston Edison took exception and provided a basis for the acceptability of the present Pilgrim Station design (Reference 3) We are taking no funher action on this item.

In Reference 3, Boston Edison committed to perform an analysis of the ATWS conditions in the drywell for comparison with NMS design specifications. We further stated we would be working with other BWR owners on this issue.

(BECO IADB RC95.0011) l References

1) NRC Letter dated .lanuary 13,1993 from A. Boyer to C.L. Tully, BWR Owner's Group
2) NRC letter dated August i1,1993, Reg Guide 1.97, BWR Neutron Flux Monitoring (TAC M77660)
3) BECo letter 93-136 dated October 21,1993 Commitment IIistory/ Progress Progress and Summary of Changes - August 1,1993 - January 31,1994 As planned, Boston Edison hasjoined with several other BWR owners through the BWR Owners Group to sponsor an analysis to determine the ATWS environment and to compare the calculated temperatures with design specifications. The BWROG task is underway and expected to be l complete in approximately 6 months. We will provide an update on the analysis and its results in the next LTP update at which time we expect to be able to identify what, if any, additional efforts will be required.

Progress and Summary of Changes - February 1,1994 - July 31,1994 As planned Boston Edison supplied various input data on plant parameters to GE for their i.se in  ;

modeling the containment and plant systems for the ATWS analysis. (Three other utilities tre also j participating in the task and are supplying corresponding data.) <

GE and the BWROG now expect to complete the ATWS analysis and issue the preliminary repon to sponsoring utilities in early December,1994.

1 Page 5 of 27  !

ATTACHMENT 2 (Continued)  !

SCHEDULE B . . !

We will provide an update on the analysis and its results in the next LTP update. By that time, if the  !

analysis has been available for sufficient time, we expect to be able to identify what, if any, additional j efforts will be required.  ;

Progress and Summary of Changes - August 1,1994 - January 31,1995  :

I We continued to supply input data to General Electric and to coordinate with the BWROG and j other participating utilities on various questions regarding the analysis. GE has not, however, ,

issued their report. we now expect a report in late April,1995. We will provide further information  !

in the next LTP update and should then be able to identify what further action will be taken.

l Progress and Summary of Changes - February 1,1995 - July 31,1995  ;

Boston Edison has received and reviewed the draft f'nal report from GE of their analysis to  ;

determine the ATWS environment for neutron monitoring equipment. From our review, we  !

expect to require testing to demonstrate that one or more components (cables, connectors) are  ;

adequate for the ATWS conditions. We plan to have test results by the end of 1996.  !

If testing and analysis are unable to demonstrate the adequacy of the affected components, .

replacements will be scheduled for a future refueling outage.  !

Progress and Summary of Changes - August 1,1995 - January 31,1996 l Boston Edison received the fmal report from GE of the analysis to determine the ATWS l environment for neutron monitoring equipment. The report is based on the Dresden Plant and envelopes Pilgrim and 3 other plants with similar piping configurations.

NEDO-31558 requires a plant-specific evaluation of ATWS environments in comparison with  !

design specifications to assure NMS system performance. Qualification to design basis ,

environmental standards required by RG 1.89 is not necessary.  !

r Several design specifications and vendor Certificates of Compliance have been reviewed. This preliminary review concludes the temperature specifications for the components were higher than  :

ATWS temperatures We are currently performing a review of the cable connectors. A simple l temperature test may be required to assure that these connectors will meet the ATWS  ;

environment. Test results are expected to be complete by the end of 1996.  !

i l

Page 6 of 27 l

ATTACHMENT 2 (Continued)

SCHEDULE B SEISMIC VERIFICATION PROGRAM (G. L. 87-02)(LTP #410,567)

Commitment Description  !

The NRC's fmal Supplemental Safety Evaluation Report (SER) on Revision 2 of the Generic Implementation Procedures (GIP-2) for A-46 was issued via Generic Letter 87-02, Sup 31ement 1, on May

, 2? 1992 (Reference 4). B) September 21,1992, each licensee was required to responc to the SER -

stating whether they intend to follow the GIP-2 guidance, provide a schedule for implementation of the GlP including submission of a report summarizing the results of the A-46 review, and provide information on the procedures and criteria used to generate the in-structure response spectra used for A-46 implementation. Evaluation of equipment is to include (a) adequacy of equipment anchorage; (b) functional capability of essential relays; (c) identification of potential outliers and deficiencies; and (d) seismic systems interactions.

In our response (Reference 5), we committed to implement GIP-2 in its entirety and provided a .

description of the procedures and criteria used to generate the in-structure response spectra. A schedule of GIP-2 implementation and submission of a summary report was deferred to the February 1993 LTP ,

semi-annual update (provided below).

In Reference 6, the NRC issued a Safety Evaluation Report (SER) approving our response. The SER assumed a commitment on BECo's part to implement the GIP-2 in its entirety and noted our in-structure response spectra should be treated as median-centered. We affirmed the NRC assumption to be correct in Reference 7 and clarified our continued commitment to implement the seismic verification program at i

Pilgrim Station through the GIP-2 and its subsequent revisions.

Our schedule for completion of the GIP and submission of a summary report is scheduled for 6/30/96.

This schedule is consistent with the 3-year completion recommended in SSER Section IL4.2.3 that specifies commencement of the 3-year period will begin when one of the following conditions is met:

  • Receipt of staff approval of the in-structure response spectra to be used to resolve the USI A-46 (i.e. Reference 6).  ;

. 60 days following the licensee's initial submittal of acceptable procedures and criteria in generating those in-structure response spectra.

(BECo IADB RL 95.0003) l References l

1) NRC Letter dated February 19,1987, GL 87-02
2) BECo Letter 88-145, dated October 11,1988, Response to GL 87-02
3) NRC Letter dated June 7,1989, Acknowledgment of BECo Response
4) NRC Letter dated May 22,1992, Generic Letter 87-02, Supplement 1,
5) BECo Letter 92-109, dated September 21,1992, Response to GL 87-02, Supplement 1
6) NRC Letter dated November 18,1992, SER of PNPS Response to GL 87-02, Supplement 1
7) BECo Letter 93-019, dated February 11,1993, Additional Information Regarding NRC SER of PNPS Response to GL 87-02, Supplement 1
8) BECo Letter 94-16 dated February 9,1994, Additional Response to GL 87-02, Supplement 1
9) NRC letter dated June 17,1994, Re-evaluation of Approval for Developing Floor Response Spectra for the Resolution of USl A-46.

Page 7 of 27 J

I 1

'*~ '

  • ATTACHMENT 2 (Continued)~

r  ;;

SCHEDULE B  ?

l.

Commitment Historv/Proqtress i f Progress and Summary of Changes 2 March 1989 to February 1990

- A. Develop safe shutdown equipment list - Schedule Revised )'

. B. - Recreate original seismic design basis documentation - Schedule Revised '

C. Training and commence walkdown of accessible areas - Schedule Revised ,

.1 The schedule for performing these three items was revised from Cycle 8 to Cycle 9 as a result of our ,

re-assessment of the work to be performed for this seismic issue, with respect to the generic work '  ;

scope for other similar existing and emerging seismic issues. By incorporating the similarities of l work scope for each of the below listed issues into one set of physical activities, we can best optimize -

our resources. Other seismic issues include: ,

  • Seismic Design Basis (USI A-40) l
  • = Eastern Seismicity and Seismic Design Margins  ;
  • External Events (seismic) for Individual Plant Examinations  :

Progress and Summary of Changes - February 1990 to November 1990 j

  • A revised schedule for implementation of the seismic verification program will be developed i after issuance of the NRC SER resolving the GIP open issues.  !

- Progress and Summary of Changes - December 1990 to February 1991

>- e No changes from the previous report period. l Progress and Summary of Changes - March 1991 to August 1991 l

  • - A schedule for implementation of the seismic verification program will be developed after  ?

issuance of the NRC SER resolving the GIP open issues.  ;

Progress and Summary of Changes - August 1991 to February 1992 l

  • A schedule for implementation of the seismic verification program will be developed after issuance of the N'RC SER resolving the GIP open issues.

. Progress and Summary of Changes - March 1992 to August 15,1992

  • Reference 4, issued the final NRC SER (SSER No. 2) resolving the GIP open issues and superseded all arevious NRC SER documents. A response containing the following ,

r

- information wi.1 be made by September 21,1992-e A statement wheth'er we commit to use both the SQUG commitments and the implementation I guidance provided in GIP-2 as supplemented by the SSER N'o. 2 for the resolution of USI A- l 46, t e' A plant-specific schedule for the implementation of the GIP and submission of a report f summarizmg the results of the USI A-46 review.

.{

e Detailed description of the procedures and criteria used to generate the in-structure response spectra..  ;

-I l

Page 8 of 27 -f J

ATTACHMENT 2 (Continued)

SCHEDULE B Progress and Summary of Changes - August 16,1992 - February 15,1993

. Three BECo personnel and a contractor have completed the GIP Seismic Walkdown and Evaluation SQUG Training Program. l

  • A safe shutdown equipment list has been developed and is undergoing final review and approval.
  • A portion of the seismic walkdowns began in MCO #9. On-line walkdowns continue during operating cycle 9. ' Outage walkdowns are planned for RFO 9 with any further on-line portions in operating cycle 10. Remaining off-line portions will be done in MCO 10 and RFO 10.

. At BECo's request, a meeting was held in our Braintree offices on September 3,1992, in which we presented our intended approach to A-46 resolution and solicited NRC feedback prior to preparing our Generic Letter 87-02 response letter.

Progress and Summary of Changes - February 16,1993 - July 31,1993

  • Walkdowns scheduled for RFO 9 were completed and other walkdowns are continuing while on-line. The goal is to minimize the impact of performing walkdowns during an outage where safe and practicable.
  • Relays associated with the safe shutdown equipment list are being assessed via a full circuit analysis. This is a task being worked by Engmeering and Operations. I
  • The majority of the SSEL equipment and relay evaluations are expected to completed by RFO ,
10. I 4

. Cable tray walkdowns have been completed and the evaluations are expected to completed by RFO 10. j 1

  • Four more engineers have completed the SQUG Walkdown Screening and Seismic Evaluation Training Course (Total of 7 engineers now certified).

Progress and Summary of Changes - August 1,1993 - January 31,1994

  • Remaining SSEL walkdowns have been planned and scheduled for MCO #10.
  • Relay evaluations are nearing completion. Discussions between engineering and operations concerning essential relay designation is progressing.
  • A letter requesting a review of our A-46 plan has been sent (Ref. 8). We have completed an initiative that demonstrates the conservatism of the PNPS design basis spectra. This would justify it to be classified as a " conservative design" spectra for A-46 implementation.

. Documentation packages are being assembled to support close-out.

Progress and Summary of Changes - February 1,1994 - July 31,1994

  • Final SSEL walkdowns are scheduled for MCO #10.
  • Seismic Evaluation Work Sheets for SSEL components are progressing.

Page 9 of 27

i

~

  • ATTACHMENT 2 (Continued) l i

SCHEDULE B  !

e NRC approved PNPS classification as a " conservative design" spectra for A-46 i implementation above 4Hz. j e Relay qualification has been initiated.  !

Progress and Summary of Changes - August 1,1994 - January 31,1995 e Final SSE walkdowns are scheduled for RFO # 10 t

e Relay qualification is progressing {

e ' We have rescheduled the report submittal date to 6/96. Greater than 90% of the walkdowns are complete. However, completion has been slowed by the temporary reassignment of uniquely qualified personnel to support significant emergent issues, e.g., the extended main  ;

generator forced outage, and the core shroud repair preparation. l Progress and Summary of Changes - January 31,1995 - August 1,1995 f l

e SSEL walkdowns are now completed.

e Relay qualification is approaching completion i i

e Seismic Evaluation Work Sheets (SEWS) development is nearing completion.  ;

i e Final' report will be started in the 4th quarter. Submittal in June 1996 remains unchanged.

Progress and Summary of Changes - August 1,1995 - January 31,1996 I e Seismic Evaluation Work Sheets (SEWS) are complete.  !

e Relay qualification assessment essentially complete.

  • Assessment of" potential outliers" initiated.

i e Development of documentation and final report is progressing and the submittal is planned for 5 June 1996.  !

Page 10 of 27 J

ATTACliMENT 2 (Continued)

SCHEDULE B GENERIC LETTER 89-13. SALT SERVICE WATER SYSTEM (LTP #255,473)

Commitment Description Generic Letter 89-13 required licensees to review and evaluate the adequacy of the service water system and all safety related heat exchangers. The review identified a number of enhancements to the PNPS programs and procedures. As a result. BECo committed via Reference 2 to the following:

e Prior to end of RFO #8, modify the RBCCW heat exchanger test procedures to include an analytical model to calculate RBCCW heat exchanger performance at test and design l conditions (complete). Conduct tests with modified procedures during Cycle 9. (Complete) e Prior to end of RFO #9, modify the RIIR heat exchanger test procedures to include an analytical model to calculate RHR heat exchanger performance at test and design conditions Conduct tests with modified procedures during Cycle 10.(Complete)

. Develop a regular maintenance / test program on heat transfer capability of the remaining heat exchangers by RFO #9. (Complete) e Conduct a Single Failure Analysis for the RBCCW subsystem by end of RFO #8. (Complete) 4 e Prior to end of RFO #8, upgrade the licensed operator training module to include a loss of all service water. (Complete) e Complete SWOPI Items by the end of RFO 11. (BECo IADB RC 95.0053, SW95.XXXX) l Credit was also taken in Reference 2 for the SSW piping inspection and replacement program already undenvay at Pilgrim which, henceforth, will be integrated as part of our Generic Letter 89-13 implementation efforts.

References

1) Generic Letter 89-13. " Service Water System Problems Affecting Safety-Related Equipment"
2) BECo letter 2.90.047, dated April 2,1990, " Response to Generic Letter 89-13" Commitment Historv/ Progress Progress and Summary of Changes - March 1990 to November 1990

. The licensed operator training module upgrade is complete.

. There are no changes to the other above-described commitments and schedules.

Progress and Summary of Changes - December 1990 to February 1991

  • A single failure analysis of the RBCCW subsystem has been performed.

. There are no changes to the other above-described commitments and schedules.

Progress and Summary of Changes - March 1991 to August 1991 e RBCCW heat exchanger test procedures have been modified to include an analytical model to calculate RBCCW heat exchanger performance at test and design conditions.

Page11 of27

ATTACHMENT 2 (Continued)

S_CHEDULE B i

e In addition, activities associated with SSW alping inspection and replacement are being integrated under our GL 89-13 effort. Furt 1er inspections of the SSW piping will be scheduled  !

during each planned mid-cycle or refueling outage of sufficient duration. It remains our intention to replace SSW piping when the inspection of piping shows that to be necessary.

Progress and Summary of Changes - August 1991 to Febmary 1992

. Efrorts to enhance the Salt Service Water System are proceeding as indicated in our response to Generic Letter 89-13. There are no changes to the above-described commitments.

Progress and Summary of Changes - March 1992 to August 15,1992

  • A decision was made to replace the buried SSW piping with corrosion-resistant titanium. Five Plant Design Change Packages were prepared to facilitate replacement of the pipe.

Construction of a pipe vault at the intake structure is in progress. Replacement activities will continue through MCO9 and RF09. Above ground pipmg will be routinely examined by non-destructive technology (typically UT) and will be replaced as required. Efrorts to enhance the SSW system are proceeding as mdicated above.

Progress and Summag of Changes - August 15,1992 - February 15,1993 e There are no changes to the GL 89-13 (LTP 473) commitments described above.

. We are currently installing replacement SSW underground piping (LTP 255) in preparation for system tie in RFO #9 (4/93). To support this effort, during MCO 9 (10/92) we replaced spool pieces in the Auxiliary Bay and Screen House. We also plan to replace the remainder of the Intake Structure and Auxiliary Bay above ground inlet piping and tie in the new inlet loop buried piping in RFO #9.

Progress and Summary of Changes - February 15,1993 - July 30,1993

  • RBCCW Heat Exchanger testing was completed on schedule in cycle 9. The RHR Heat Exchanger Test Procedure and Analytical Model was completed on schedule in RFO 9. The Heat Exchanger Maintenance and Test Program for Heat Transfer Capability was also completed on schedule in RFO 9. There are no changes to the remaining GL 89-13 (LTP 473) commitments described above.
  • Replacement of the SSW piping (LTP 255) was completed on schedule in RFO 9. Through RFO 9,250 feet of above ground rubber lined carbon steel piae has been replaced. In addition, 430 feet of buried rubber lined carbon steel pipe has been rep aced with Titanium pipe.

Augmented ISI of above ground rubber lined carbon steel pipe was also completed on schedule in RFO 9. Future ISI will be captured under LTP 473. LTP 255 is completed.

Progress and Summary of Changes - August 1,1993 - January 31,1994

. There are no changes to the remaining GL 89-13 commitments described above. In summary, RHR heat exchanger tests will be conducted with modified procedures during Cycle 10.

Ongoing inspections of the Salt Service Water System have been incorporated mto our ISI program.

Progress and Summary of Changes - Februay 1,1994 - July 31,1994 e There are no changes to the remaining GL 89-13 (LTP 473) commitments described above.

Page 12 of 27

. _ . . - - . . - - . - . - -- _.-- -. - - ..- --.- ~ . - . .

1 g ,

ATTACHMENT 2,(Continued)  ;

j i

-' SCHEDULE B j i

Progress and Summary of Changes--August 1,1994 - January 31,1995 e We performed an extensive self-assessment of the Salt Service Water System and our response i to GL 89-13 (Reference 2). We are in the process of developing a plan to address issues and -  ;

) enhancements identified in the self-assessment. j e RHR heat exchanger tests were conducted with modified procedures during Cycle 10. l Ongoing inspections of the Salt Service Water System have been incorporated into our ISI ,

l program.  ;

Progress and Summary of Changes - February 1,1995 - July 31,1995 f

  • We are implementing a comprehensive set of enhancements identified in the Salt Service Water System self assessment (SWSOPI). We plan to implement most of the enhancements prior to j j the end of 1995, and all of these enhancements are currently scheduled for completion by the  :

end of RFO-l 1.

Progress and Summary of Changes - August 1,1995 - January 31,1996 We are currently on schedule to complete the SWOPI items by the end of RFO 11. ,

p l

4 i l

1  ;

s t

t I

k 4

4 5

k 4

k i

?

u 1

4 e

I Page 13 of 27 ,

ATTACHMENT 2 (Continued)

SCHEDULE B GENERIC LETTER 89-10. SAFETY-RELATED MOV TESTING AND SURVEILLANCE (LTP #487)

Generic Letter 95-07. Pressure Locking and Thermal Binding of Safety-Related, Power-Operated Gate Valves Commitment Description Generic Letter 89-10 (Ref.1) expands the scope of the motor operated valve program required by NRC Bulletin 85-03 and its Supplement, to include additional testing, inspecting, and maintenance for all safety-related motor operated valves.

In our Reference 2 response to the Generic Letter, we committed to develop a program to enhance the maintenance, analysis, and testing already being conducted on MOVs at Pilgrim. The Generic Letter calls for the development of this program within 1 year or one refueling outage from the date of the letter, whichever is later. For BECo, this schedule translates to RFO #8. Our plan was to begin a design basis review of MOVs in the first quarter of 1991 and to begin testing in RFO #9.

Based on resource constraints in 1990, we revised the design basis review schedule to commence in the last quarter of 1991. This revision continues to support our commitment to begin testing in RFO

  1. 9 and supports our program development schedule. We anticipate the testing will require three refueling outages, based on the extent of known scope. Additional scope determinations as a result of NUMARC and BWROG involvement will be factored into our final scope and schedule as appropnate.

Reference 6 requested Licensees to perform a plant specific safety assessment to determine ifgeneric safety assessments performed by the NRC staff and the BWR Owners' Group are applicable. If MOVs are discovered with potential deficiencies of greater significance than the HPCI, RCIC, and RWCU MOVs, planned activities to address the generic letter were to be re-prioritized accordingly.

Notification within 30 days of receipt of Supplement 3 was required verifying a plant-specific safety assessment was performed and identifying whether there were MOVs with deficiencies of greater safety significance than in the HPCI, RCIC, and RWCU systems. An additional notification within 120 days of receipt was also requested to provide the criteria reflecting operating experience and the latest test data applied in determining whether deficiencies exist in the HPCI, RCIC, and RWCU MOVs.

In our Reference 7 letter, we concluded the subject valves in the HPCI, RCIC, and RWCU systems were capable of performing their safety ftmetion to provide containment isolation in the event of a line break outside containment. This submittal provided our 30 and 120 day response to the generic letter and precluded having to perform a plant specific safety assessment. We also committed in Reference 7 to conduct diagnostic testing on the Reactor Water Cleanup (RWCU) MO-1201-2 valve during RFO #8. We expanded our planned RFO #8 testing to include 2 additional valves: RWCU MO-1201-5 and Closed Cooling Water MO-4010A.

The NRC issued a Request for Additional Information (RAI) (Reference 10) after reviewing our Reference 7 and 8 responses to GL 89-10 Supplement 3. BECo responded to the RAI on August 29,1991 (Ref. I1).

During the week of March 9-13,1992, the NRC conducted an inspection of the PNPS GL 89-10 MOV program. As a result of this inspection Boston Edison committed to resubmit the GL 89-10, Supplement 3, response and accelerate the schedule for priority 1 valves to have the GL 89-10 actions completed by the end of RFO 10.

RFO 10 is scheduled for 1995. The remaining safety-related valves will be completed by the end of RFO #11.

(BECo IADB RL95.005) l Page 14 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B References

1) Generic Letter 89-10, dated June 28,1989 [
2) BECo Letter 90-13, dated January 15,1990
3) NRC Letter dated June 7,1990, Response to Generic Letter 89-10
4) NRC Letter dated June 13,1990, Supplement 1 to Generic Letter 89-10
5) NRC Letter dated August 3,1990, Supplement 2 to Generic Letter 89-10
6) NRC Letter dated October 25,1990, Supplement 3 to Generic Letter 89-10  ;
7) BECo letter 90-158 dated December 17,1990
8) BECo Letter 91-022, dated February 26,1991 4
9) NRC Letter dated April 1,1991 Meeting Summary BECo/NRC
10) NRC Letter dated June 24,1991, RAI regarding GL 89-10 Supplement 3 ,

1l) BECo Letter 91-111, dated August 29,1991

12) NRC Letter dated February 18,1992, Closure of GL 89-10, Supplement 3
13) NRC Letter dated February 12,1992, Generic Letter 89-10 Supplement 4
14) NRC Letter dated June 3,1992, Inspection 50-293/92-80 Motor Operated Valve Inspection.
15) NRC Letter dated May 5,1992, Motor Operated Valve Inspection at PNPS (NRC Inspection 4 Report 50-293/02-80).
16) BECo Letter 92-044, Revision to GL 89-10, Supplement 3, Response
17) NRC Letter dated June 28,1993, GL 89-10 Supplement 5 ,
18) BECo Letter 93.135, dated October 21,1993, Response to GL89-10, Supplement 5
19) BECo Letter 94.005, dated January 7,1994, Update to GL89-10, Supplement 3 Response
20) NRC Letter dated April 19,1994, GL 89-10, Supplement 5
21) Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-

, Operated Gate Valves (BECo #1.95.131)

22) BECo Letter 95,108, dated October 16,1995,60-Day Response to Generic Letter 95-07
23) BECo Letter 96.013, dated February 23,1996,180-Day Response to Generic Letter 95-07 Commitment History /Frorress 3

Progress and Summary of Changes - February 1990 to November 1990

  • Begin a design basis review of MOVs is on schedule for first quarter of 1991.

',

  • Begin testing is on schedule for RFO #9 (completion within 3 refueling outages).

e 30 day notification in accordance with Generic Letter 89-10, Supplement 3 is planned for submittal by December 13,1990. ,

j e 120 day notification efforts are planned for submittal by March 13,1991.

Progress and Summary of Changes - December 1990 to February 1991

  • The schedule for commencement of design basis reviews of MOVs is being changed from the first quarter of 1991 to the last quarter of 1991. This schedule revision continues to support our commitment to begin testing in RFO #9.

. Begin testing is on schedule for RFO #9 (completion within 3 refueling outages).

. 30 day and 120 day notifications are complete.

  • 3 safety related valves are on schedule for 1

4 Page 15 of 27

l

' ^

ATTACHMENT 2 (Continued) .l SCHEDULE B t Progress and Summary of Changes - March 1991 to August 1991 [

t e- Commencement of design basis reviews of MOVs is on schedule for the last quarter of 1991.  !

j e Begin testing is on schedule for RFO #9 (completion within 3 refueling outages).

e- Diagnostic testing of MO-1201-2,1201-5, and 4010A was conducted during RFO #8. In  ;

~

addition to this testing, we completed diagnostic testing on the remaining GL 89-10 Supplement 3 MOVs (4 valves) and on anot her 10 safety related MOVs. l e Development of a Program Plan is complete. l Progress and Summary of Changes - August 1991 to Febmary 1992

] f i *- Design basis reviews ofMOVs continue to support our commitment to begin testing in RFO #9.  ;

L

  • Testmg is on schedule to begin in RFO #9 (completion within 3 refueling outages). L e Procedures are in preparation describing design basis review methodology, control of switch ,

settings, and degraded voltage analysis. Additionally, a Nuclear Organization Procedure  :

i estabhshing our MOV program is in final review. ,

4 e The schedule for static testing of MOVs has been accelerated and some testing will be done .

i

. during our mid-cycle outage prior to RFO #9.

.. MOVs tested using MOVATS test equipment were reviewed and have been retested using more l

< accurate diagnostic test equipment or been reviewed to ensure there is sufficient margin.  !

2 i

- Progress and Summary of Changes - March 1992 to August 15,1992 l e Design basis reviews ofMOVs continue to support our commitment to begin testing in RFO #9.
  • Testing is on schedule to begin RFO #9.

!

  • GL 89-10 activities will be completed for priority 1 valves by the end of RFO #10.  ;

e Reference 16 submitted a revision to GL 89-10, Supplement 3, response (Reference 8).  !

e. Nuclear Organization Procedure 92M1 " Motor O perated Valve Program" has been approved.

j e Procedures describing design basis review method ology and control of switch settings are {

i approved. Draft procedures for degraded voltage of motors are being revised to include temperature effects on available torque. Additional procedures are being developed as  !

i necessary, i e  :

l Progress and Summary of Changes - August 15,1992 - February 15,1993  !

  • Design basis review is on schedule to support commitment to complete Priority I valves by l 4

RFO #10. ,

[ e Static testing was performed during MCO 9.

4 e New state of the art test equipment was purchased that provides direct stem torque and thrust ,

measurements.

I

  • Significant MOV testing, maintenance, and inspections scheduled for RFO 9.

f Progress and Summary of Changes - February 15,1993 - July 31,1993 b e . Design Basis Reviews (DBR) and Diagnostic Testing are on schedule to complete Priority I

, MOVs (55 valves) by RFO 10. DBR and Testing related to the remaining Safety Related (SR) i MOVs (35 valves)is also on schedule and is expected to be completed by RFO 11.

  • Significant MOV testing, maintenance and inspections were completed in RFO 9. Maintenance  ;

and inspections were conducted on 56 SR MOVs. Diagnostic Testing was completed on 21 SR ,

MOVs. I I

i Page 16 of 27

i ATTACHMENT 2 (Continued)

-l SCHEDULE B e- Through RFO 9,46 out of a total population of 90 SR MOVs have been set up via diagnostic testing techniquesc Through RFO 9,29 of 55 Priority I MOVs have been set up via diagnostic

- testing techniques. 'i e MOV testing, maintenance, and inspections are scheduled to continue in MCO 10, including the first phase of Dynamic Testing.

Progress and Summary of Changes - August 1,1991 - January 31,1994 i e Design Basis Reviews (DBR), Diagnostic Testing, Inspections, Maintenance and Modifications are on schedule to support the commitment to complete Priority 1 MOVs (55 valves) by RFO  ;

10. Similar efforts related to the remaining Safety Related (SR) MOVs (35 valves) are also on  !

schedule and are expected to be completed per the current commitment, RFO 11. i e The first phase of Dynamic Testing is on schedule to commence in MCO 10.]The use of an alternative valve and actuator design is under consideration for implementation on a certain population ofMOVs. Candidate MOVs are those which would require significant modifications utilizing typical manufacturer product design and applications. The alternative design has several advantages including a solid-state control system, enhanced repeatability, reduced electrical power demand and a reduced preventative mamtenance frequency. The alternate design would also decrease the probability of potential common mode failure issues and diversify plant design.

. Our response to Generic Letter 89-10, Supplement 5. (Reference 18), indicated actions to be taken to resolve the accuracy issues associated with the use of Liberty Technologies VOTES equipment. The fellowing actions were required:

e Update the VOTES test results using the revised property constants and torque correction factors. This action is complete. Subsequent to this action, Liberty issued Customer Service Bulletin (CSB) 031 that requires review of test results due to a software problem in the VOTES equipment. This new action will be completed and updated by our next LTP submittal.

t

  • Revise Liberty Technologies test results to use a curve fit algorithm and determine extrapolation error. This action is complete. Subsequent to completion, Liberty issued CSB-031 causing a need to review post test results. This new action will be completed and updated by our next LTP submittal.

Progress and Summary of Changes - February 1,1994 - July 31,1994

  • Design Basis Reviews (DBR), Diagnostic Testing, Inspections, Maintenance and Modifications i are on schedule to support the commitment to complete Priority I MOVs (55 valves) by the end of RFO 10. Similar efforts related to the remaining Safety Related (SR) MOVs (35 valves) are  !

also on schedule and are expected to be completed per the current commitment, RFO 11. The  :

work scope applicable to the Priority 1 MOVs includes approximately (90) Inspections, (17)

Overhauls, (48) Static Diagnostic Tests, (36) Dynamic Diagnostic Tests and (52) Modifications.

  • The first phase of Dynamic Testing is on schedule to commence in MCO 10.
  • The use of an alternative valve design, as previously discussed, is being aggressively pursued for implementation on (4) MOVs in RFO 10. The use of an alternative actuator design is also being aggressively pursued for implementation on (1) MOV in RFO 10. The alternate design incorporates GL89-10 ' lessons learned' as well as the most recent EPRI and INEL technical information. Back-up plans are also being developed should new product qualification issues not support our R1 O 10 schedule commitment.

i Page 17 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B Progress and Summary of Changes - July 31,1994 - January 31,1995 e ' Generic Letter 89-10, Safety Related MOV Testing and Surveillance' activities continue on schedule to support the commitment to complete Priority 1 MOVs (55 valves) by RFO 10, with the remaining Safety Reiated (SR) MOVs (35 valves) following per the current schedule commitment, RFO 11.

  • Significant progress was made during the generator forced outage in the Fall of 1994. The forced outage enveloped the original scheduled MCO 10. A total of forty-nine (49) MOVs were worked during the Fall outage. Industry corrective actions and GL 89-10 design changes accounted for thirty-six (36) of the forty-nine (49) activities performed. Activities ranged in complexity from complete actuator replacement / valve disassembly to simple changes in gear ratio and EQ inspections.
  • Valve modifications were completed on three (3) MOVs for the purpose ofinstalling pressure locking relief paths. Potential over-thrust /over-torque conditions were also dispositioned on two MOVs in the RWCU and RCIC systems.
  • The first phase of Dynamic Testing was completed during the Fall outage. Differential pressure diagnostic testing was completed on thirteen (13) MOVs. Static diagnostic testing also continued during this outage with twenty-five (25) MOVs being set using state-of-the-art equipment and industry data.
  • The use of an alternative valve design, as previously discussed, is scheduled for implementation on (4) MOVs in RFO 10. The use of an alternative actuator design is also being aggressively pursued for implementation on (1) MOV in RFO 10. The alternate designs incorporate GL 89-10 ' lessons learned' as well as the most recent EPRI and INEL technical information. Back-up plans are in place to install a conventional design actuator should delivery of the new actuator not support our RFO 10 schedule commitment. Whichever actuator is installed, committed actions will be completed in RF010.

Progress and Summary of Changes - February 1,1995 - July 31,1995

  • The first phase of Generic Letter 89-10, Safety Related (SR) MOV Testing and Surveillance activities (55 Priority I MOVs) was completed on schedule in RFO 10. The remaining Safety Related MOVs (35 valves) will follow per the current schedule commitment, RFO 11.
  • Significant progress was made during RFO 10 (Spring 95). A total of sixty eight (68) SR MOVs were worked during the refueling outage. Industry corrective actions and GL89-10  ;

design changes accounted for forty (40) of the sixty eight (68) activities performed. Activities i ranged in complexity from complete valve / actuator replacement to simple changes in gear ratio l l

and EQ inspections.

  • Valve modifications were completed on five (5) MOVs in RFO 10 for the purpose ofinstalling pressure locking relief paths. This brings the total number of MOV related modifications to eight. No additional MOV modifications related to this issue are expected.
  • During RF010, differential pressure diagnostic testing was completed on thirty five (35)

MOVs. Static diagnostic testing also continued during the RFO with forty (40) MOVs being set using state-of-the-art equipment and industry data.

  • Design basis operation for eight three percent (83%) of Priority 1 gate and globe motor operated valves has been confirmed via differential pressure diagnostic testing. Static diagnostic testing has been performed on all Priority 1 gate and globe motor operated valves (47). l l

l l

1 Page 18 of 27

e ATTACHMENT 2 (Continued)

SCHEDULE B i

e The installation of an alternative valve design (" Sentinel"), as discussed in the previous update, was completed on (4) MOVs in RFO 10. Three of the six GL89-10 Supplement 3 MOVs were replaced with the new design. RF010 test results indicate excellent performance

- characteristics. The use of an alternative actuator design is also continuing to be aggressively

)ursued for future' implementation. The alternate designs incorporate GL89-10 " lessons earned" as well as the most recent EPRI and INEL technical information and thus represent a truly engineered solution to many outstanding design issues.

Progress and Summary of Changes - August 1,1995 - January 31,1996 The sco pe of work ' associated with RFO 11 will be similar in nature and in quantity to that accomplished in RFO 10 (summarized in the previous u )date). Certain Priority I MOV's will again be worked for the purpose of accomplishing stanc ard, preventative maintenance, disposition of emergent generic industry issues, or to inspect for potential degradation for trending or corrective maintenance. The strategy is to complete as much of the scope on line within the scheduled system windows as possible. This strategy optimizes resources and considers ALARA The issue of" Pressure Locking and Thermal Binding.. " with respect to MOVs is essentially complete. Twelve (12) MOVs have been determined to be susceptible to pressure locking and three (3) MOVs have been determined to be susceptible to thermal binding. Physical modifications are complete on eleven (11), procedure changes are planned on four (4), with the remainder being dispositioned via engineering evaluation as not susceptible. Specific details are available in our 180-day response to GL 95-07. (Reference 23) 1 Page 19 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B SEVERE ACCIDENT MANAGEMENT PROGRAM (LTP #489)  ;

Commitment Description Dy letter dated March 24,1995, we informed you that Pilgrim Station intends to implement the formal industry position on severe accident management approved by the Nuclear Energy Institute's Nuclear Strategic Issues Advisory Committee on November 21,1994, from NEI to the Director, Oflice of Nuclear Regulation states that:

Each licensee will:

. Assess current capabilities to respond to severe accident conditions using Section 5 of NEI 91-04, Revision 1," Severe Accident Issue Closure Guidelines."

e implement appropriate improvements identified in the assessment, within the constraints of existing personnel and hardware, on a schedule to be determined by each licensee and communicated to the NRC, but in any event no later than December 31,1998.

Based on previous intert.ctions between NEl and the NRC, we understand the NRC agrees with the need for licensee flexibility in their methods of assessing and establishing severe accident management guidance. Utilizing the associated implementing guidance (contained in NEI report 91-04, Revision 1), our target date for completion of the assessment of severe accident management capabilities and implementation of any identified enhancements is December 31,1997.

(BECo IADB RC 96.0001) l Commitment IIistory/Proeress Progress and Summary of Changes - February 1,1995 - July 31,1995 e Multi-disciplined Task Force and Project Manager assigned to Program.

e Integration with EOP update initiated e Project goals, objectives, schedules, costs, and task ownership approved.

. Detailed task assignments have been made.

  • Continued interaction with the BWROG's Severe Accident Working Group.
  • Detailed reviews of governing guidance documents have been initiated.

Progress and Summary of Changes - August 1,1995 - January 31,1996 e Vendor selected to camplement in-house resources.

  • Continued interaction with the BWROG's Severe Accident Working Group.
  • Data collection to support calculations initiated.
  • The following tasks have been initiated:

e develop Plant Specific Technical Guidelines and Plant Specific Severe Accident Guidelines l

  • evaluate Emergency Response Organization e verify technical guidelines e formulation of desien decisions i

i Page 20 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B BWR TH ERM AI AlYDRA ULIC INSTA HILITIES (GL 94-02) (LTP#504)

Commitment Description The NRC issued this Generic Letter requesting each BWR licensee take appropriate actions to augment its procedures and training for preventing or responding to thermal-hydraulic instabilities in their reactors. Each licensee is to submit a plan describing which long-term stability solution hardware option it has selected and provide a proposed implementation schedule for the necessary modifications.

Boston Edison implemented the Stability Guidelines (Reference 3) coincident with startup from RFO 10. Boston Edison will install Enhanced Option l A as its long-term stability solution.

Milestones are:

  • Submit Tech. Spec. changes for 3rd Qtr/1996 Option l A Modifications
  • NRC approval of Tech. Specs. 3rd Qtr/1997
  • Option 1 A modifications 4th Qtr/1997 implemented at PNPS (BECo IADB RL 95.0016)

References 1.) Generic Letter 94-02, dated 7/11/94. "Long-Term Solutions and Upgrade ofInterim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors" 2.) BECo Response to GL 94-02, dated 9/9/94, BECo Letter No. 94.102.

3.) BWR Owners Group Letter, dated 6/6/94,"BWR Owners Group Guidelines for Stability Interim Corrective Action" Commitment llistory/ Progress Progress and Summary of Changes - July 31,1994 to January 31,1995.

In Reference 2, Boston Edison informed the NRC we would, within design and license constraints, modify procedures and conduct operator training consistent with the guidelines provided in reference 3. These actions will be implemented coincident with startup from RFO #10, currently scheduled to start March 25,1995.

Page 21 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B  ;

Also in Reference 2, BECo stated we are presently planning to install the Enhanced Option l A stability soiution at Pilgrim Station by the end of 1997. The proposed milestones for Option l A were included in reference 2 as follows:

l Milestone Owner Date '

. Submit PNPS specific power / flow PNPS 3rd Qtr/1995 map region boundaries to NRC for i review and approval )

e NRC approval of submitted region NRC 2nd Qtr/1996 boundaries e Submit Tech. Spec. changes for PNPS 3rd Qtr/1996 Option l A modifications e NRC approval of Tech. Specs. NRC 3rd Qtr/1997 e Option l A modifications PNPS 4th Qtr/1997 implemented at PNPS We also stated we are continuing to monitor the Option 3 progress and would inform the NRC via the LTP Update process if Option 3 became a more viable long-term solution for PNPS.

Progress and Summary of Changes - February 1,1995 - July 31,1995 The milestones reported on the last LTP are unchanged except the NRC has indicated at a July 10, .

1995 BWROG meeting that we do not have to separately submit the PNPS specific power / flow MAP region boundaries to the NRC for review and approval. We can submit the boundaries as part of the technical specification package for the hardware modifications. BECo may separately '

l send these proposed boundaries to the NRC in support of requesting approval for our use if such boundaries otter significant relief from the in-place BWROG interim corrective action guidelines.  !

Progress and Summary of Changes - August 1,1995 - January 31,1996 The design of hardware and software modifications is in progress. The project is on schedule.

Page 22 of 27 )

". ATTACHMENT 2 (Continued)

SCHEDULE B RIIR/FPC INTERTIE VAINE MODIFICATION. LTP # 568 Commitment Description Boston Edison requested and obtained code relief on May 18,1995, from having to inspect RHR/FPC Intertie piping during the 2nd ten year inspection interval ending June 30,1995, based on excessive radiation exposure. The relief was based upon a BECo commitment to install a 6 inch manual isolation valve during RFO#11 that would isolate this piping from the code inspection boundary, thereby eliminating the inspection requirement (Reference 2).

(BECo IADB RC 95.0060.03) l Etferences

1. BECo Letter # 95-015, dated February 9,1995
2. NRC Letter dated May 18,1995 Commitment llistory/Proeress Progress and Summary of Changes - July 31,1994 to January 31,1995 Plant Design Change has been prepared, and is scheduled for implementation during RFO#11 Progress and Summary of Changes - February 1,1995 - July 31,1995 In reviewing the ASME Code requirements for the 3rd ISI interval, the 1989 editions of ASME XI deletes the requirement to inspect this particular run of piping, eliminating the need to install the 6" manual isolation valve (no Plant Design Change is required).

The PNPS third ten year inspection interval started on July 1,1995. The ISI Program has been updated in accordance with the 1989 edition of the ASME code as provided by 10CFR50.55a.

The inspection requirements of the 1989 edition of ASME XI, Category C-F-2 in particular, have changed with respect to Class 2 piping ofless than 0.375 inch wall thickness. Previously, a surface examination of circumferential piping welds, visual examination of pipe supports and pressure testing was required. The new code requires only pressure testing which, with the use of Code  ;

Case N-498, can be easily performed. The Intertie piping is M-300 Pipe Class HB (6 inch Sch.40) l with a wall thickness of 0.280 inches. This means there is no longer a reason to install the 6 inch l valve for the purpose ofisolating the RHR/FPC Intertie return piping from the Class 2 code )

inspection boundary. We will submit a revised relief request on this issue. l l

Progress and Summary of Changes - August 1,1995 - January 31,1996 The revised relief request will be submitted by March 31,1996.

Page 23 of 27

ATTACHMENT 2 (Continued)

SCHEDULE B INTERGRANULAR STRESS CORROSION CRACKING OF THE CORE SHROUD (G.L. 94-03)

(LTP #669) j Commitment Description Th.s Generic Letter requires an Inspection or repair of the Core Shroud no later than the next scheduled Refueling Outage.

During RFO 10 (A 3ril 1995) shroud stabilizers will be installed in lieu of an inspection of horizontal welds. These stabi izers will vertically and hterally support replace the circumferencial welds (H-1 through H-10)in the shroud and will be designed to meet the BWR Vessel & Internals Project (BWRVIP) genenc repair criteria. Selected vertical welds, ring segment welds and vessel attachment welds will be mspected to ensure structural adequacy.

i A detailed plan for installing 4 shroud stabilizers and inspecting selected parts of the shroud was submitted to the NRC on January 16,1995.

(BECo IADB RL 95.0012) l References

1) NRC Generic Letter 94-03 dated July 25,1994, Intergranular Stress Corrosion Cracking of Core Shrouds in BWR's (BECo #1.94.152)
2) BECo Letter dated August 27,1994, Response to GL 94-03 Intergranular Stress Corrosion Cracking of Core Shrouds (2.94.090) l
3) BECo Letter dated January 16,1995,2.95.004, Core Shroud Stabilizer Design. l
4) BECo Letter dated March 21,1995,2.95.037, PNPS response to the NRC Staff reguest for additional information concerning the Pilgrim Core Shroud.
5) BECo Letter dated April 14,1995,2.95.048, Additionalinformation concerning our planned I modification of the Pilgrim Core Shroud.
6) BECo Letter dated April 27,1995,2.95.056, Response to Request for Additional Information Regarding the Pilgrim Core Shroud Modification.
7) BECo Letter dated May 3,1995,2.95.060, Commitment letter to provide Inservice inspection j plan by November 9,1o95 and information on XM-19 by August 9,1995.
8) NRC Letter dated February 1,1995, Request for withholding information from Public disclosure.

4

9) NRC Letter dated February 24,1995, Request for Additional Information.
10) NRC Letter dated March 14,1995, Request for Additional Information (BECo Letter 1.95.042).

I1) NRC Letter dated April 17,1995 Request for Additional Information (BECo Letter 1.95.066).

12) NRC Letter May 12,1995, Safety Evaluation Regarding Pilgrim Nuclear Power Station Core Shroud Repair.
13) BECo Letter dated July 24,1995,2.95.079, provided additional test data on air cooled XM-19. I Page 24 of 27

. ATTACHMENT 2 (Continu:d) 1 SCHEDULE B Commitment Historv/Proeress Progress and Summary of Changes - Febmary 1,1994 - July 31,1994  ;

~

We submitted a response to the Generic Letter on August 27,1994. j Progress and Summary of Changes - August 1,1994 - January 31,1995 Installa on and inspection plan submitted to NRC, January 16,1995, BECo Letter # 95.004 Progress and Summary of Changes - February 1,1995 - July 31,1995 .

The Core Shroud stabilizers (4) were installed at PNPS during RFO #10. .

In our May 3,1995 letter (Reference 7) we stated we would submit our reinspection plans in November 1995. These plans will be based on the BWR VIP Guidelines that are now expected to ,

be finalized in June 1996. We will provide a status of the reinspection program in our next LTP ,

t update.

Progress and Summary of Changes - August 1,1995 - January 31,1996 Inspection plans for the core shroud and stabilizer hardware will be in compliance with the '

. BWRVIP Guidelines. These guidelines are currently expected to be finalized by June 1996. We will include these inspection plans as part of our standard Jueling outage inspection plan submittal. This plan will be submitted six months prior to the start of the refueling outage.

h i

Page 25 of 27 i

, ATTACHMENT 2 (Continued)

SCHEDULE B SOUTH WEYMOUTH NAVAL AIR STATION Commitment Description We committed to include a status of the possible closure of the South Weymouth Naval Air Station and its impact on Emergency Planning for Pilgrim Station in this Long Term Program Report.

7 he Massachusetts Emergency Preparedness Agency (MEMA) has overall responsibility for Radiological Emergency Response plannmg in the Commonwealth of Massachusetts (BECo IADB RC 95.0059) l References

1) Boston Edison letter dated September 30,1995 (2.95.098) l Commitment History /Proeress Progress and Summary of Changes - February 1,1995 - July 31,1995 A final decision has .10t been made regarding the closure of the South Weymouth Naval Air Station. Formal Congressional approval is not expected until December.

We met with the Massachusetts Emergency Management Agency on August 17th to discuss plans should the federal government close the station.

Progress and Summary of Changes - August 1,1995 - January 31,1996 The South Weymouth Naval Air Station is expected to be officially closed as a naval air base in September 1997. It is our understanding the base will be turned over to the local communities at that time.

Approximately 100 emergency personnel are required to staff the South Weymouth reception center. During 1994 and 1995, approximately 135 Navy, civilian, and local volunteer personnel were trained and assigned to the reception center.

Some emergency personnel are expected to be transferred out of the area when the base closes.

Additional emergency personnel from the surrounding local towns were recruited in October 1995.

Approximately 100 additional personnel were identified as emergency volunteers.

On November 17,1995, and February 7,1996, classroom training was held for both new and existing personnel. On February 24,1996, a training practical at the reception center will be conducted.

Page 26 of 27 u

ATTACHMENT 2 (Continued)

SCHEDULE B

$ULLETIN 95-02: UNEXPECTED CLOGGING OF A RESIDUAL HEAT REMOVAL (RHR)

PUMP STRAINER WHILE OPERATING IN SUPPRESSION POOL COOL MODE Commitment

Description:

Pilgrim has performed testing for the purpose of confirming suppression pool and strainer cleanliness. The testing confirmed strainer cleanliness, and the results were transmitted to the NRC (Reference 3). Pilgrim will inspect the ECCS suction strainers in RFO 11 and will also continue with pool cleaning in that outage.

Future pool cleaning frequency will be based on a plan consistent with generic studies currently on going via the BWROG. Pilgrim completed foreign material exclusion (FME) procedure enhancements on 2/8/96.

(BECo I ADB RL 95.0033) l RVfvfc.llev.5:

1. NRC Bulletin 95-02 dated 10/17/95 (BECo Letter 1.95.165)
2. BECo Response dated i1/16/95 (BECo Letter 2.95.118)
3. BECo 120-Day Response dated 2/13/96 (BECo Letter 2.96.007) l ComnliLn)rnt History / Progress:

Progress and Summary of Changes - August 1,1995 - January 31,1996 ,

Pilgrim has conducted a review of ECCS capability and has determined that the ECCS systems are operable, the strainers are not clogged or degraded, and the suppression pool is free of debris that is or can become suspended and result in strainer clogging. This conclusion is based on previous pool cleaning activities and inspections and verified by representative pump performance testing.

Foreign material exclusion (FME) procedures are in place that should prevent the introduction of matenal with the potential to compromise ECCS capability. Further enhancements to drywell cleanliness practices are planned to reduce the potential for foreign material entering the torus.

Trending in terms of water cleanliness and pump suction pressures are in place and will continue in order to monitor water quality with respect to this issue. Suppression pool cleaning is scheduled for RFO 11. This and subsequent cleaning / inspection are intended to be consistent with BWROG guidance with respect to items such as sludge generation rate and cleanliness criteria.

Pilgrim is active in the BWROG conimittee and intends to participate aggressively in the development of the Utility Resolution Guide (URG) currently being developed by the owners group.

Page 27 of 27

i i

l ATTACHMENT 3 Page1of2 L' ADDITIONAL ITEMS LIST ( SCHEDULE C)*

LTP Title August 1995 Target Schedule Current Status No.

022 Radwaste Betterment End of1997 No Change 108 Setpoint Calculation Project N/A 1998 322 Cooling Water Betterment Ongoing through 1995. Complete 448 Inspect / Replace Lower Core Support Plate Deferred to RFO #11 No Change i Flow Plugs (GE SIL 359) 479 Replace Embrittled GE Cables RFO 10 scope complete. Samples taken for Complete testing and evaluation.

FRN 93-02-12 FRN 93-02-15 ,

FRN 93-02-18 486 Intake Canal Dredging Phase 1,1996, (subject to approvals from No Change EPA & Army Corps of Engineers)

Phase 2,1997 524 Replace Simplex Panels 1998 No Change 528 Radwaste Filter Demin System Turned Over for Interim Operations. Closure 1st quarter Outstanding Item Closure 4th Quarter 95 1996 546 Instmment Recire. Pump Shaft 2/28/96 RFO 11 575 RoofReplacement Ongoing - to be completed in 2000 No Change

. 590 Turbine Building Efiluent Monitoring Partially complete. Final completion Construction complete.

scheduled for 1995 Procedure revisions should be completed by June 1996

  • This list represeau a portion cimajor plant betterments at Pilgtan Station. The total LTP contains additiona! plant betterments, programs / projects, and issues.

MTilnas/LTP/LTPATT3

_ _ - - . ,_ _ _ _ - , __ _ _._..~

ATTACHMENT 3 Page 2 of 2 ..

ADDITIONAL ITEMS LIST ( SCHEDULE C)*

LTP Title August 1995 Tarret Schedule Curitet Status No.

621 3D Monicore Phase 1 Complete. 1996 (Simulator 1997)

Phase 2 by 1st Qtr '96 628 Emergency Preparedness Facility Upgrade NA 1998 646 Gaitronics Mods End 1996 No Change 684 Augmented Offgas System Upgrade Substantial upgrade performed in RFO 10. No Change Additional work planned for RFO 11.

686 Demin Water System Equipment Removal N/A 1996 687 EPIC Upgrade 1996 (Simulator 1997) No Change 690 Electronic Imaging NA 1999 691 Plant Material Condition Upgrade Ongoing - to be completed in 2000 No Change 700 Personnel Contamination Monitor Upgrade N/A 1996 706 Standard Technical Specifications N/A 1998 A This list represents a portion of major plant betterments a; Pilgrim Station. The total LTP contains additional plant bettennents, programs / projects, and issues.

MTUnas/LTP/LTPATT3 ,