Canasav Plant Post Ofhce Box 620 Fulton, Missouri 65261 EuVWPa"c E February 12,1996 Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop PI-137 Washington,DC 20555 ULNRC-3324 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JANUARY 1996 The enclosed Monthly Operating Report for January 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

R. D. Affolter Manager, Callaway Plant RDA/HDB/MAH Enclosure 9602220090 930131 PDR ADOCK 05000483 R PDR a 220027 162-y

ULNRC-3324 Februpry 8,1996

. Page 2 cc: Mr. L. J. Callan ,

Regional Administrator l U.S. Nuclear Regulatory Commission .

^

Region IV l 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Resident Inspector Ms. Kristine M. Thomas (2 copies) 4 Licensing Project Manager, Callaway Plant i Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, DC 20555 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter

Shaw, Pittman, Potts, & Trowbridge 4

2300 N. Street N.W.

Washington, DC 20037 I

I I

DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DATE: 2/8/96 COMPLE'mD BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 4

PART A - OPERATIONS

SUMMARY

The plant operated at approximately 100 % for the entire month of January with the following exceptions:

On 01/15/96, at i1:51, the turbine was shut down to replace the valve stem and plug in tiu: 'B' Main

. Feedwater Regulating Valve, AE-FCV-0040, due to a reduction in feedwater flow, On 01/18/%, at 13:00, power was reduced to 91.3% to replace the 'B' Heater Drain Tank Pump scal, On 01/20/96, at 07:15, power was reduced to 94.5% to replace the 'A' Heater Drain Tank Pump seal and repair valve AFLV0071 A, and On 01/20/96, at 22:00, power was reduced to 95.5% to replace the 'B' Heater Drain Tank Pump seal.

I PART B -PORY AND SAFETY VALVE

SUMMARY

None.

l l

l l

l l

Page1of4

, i .

~

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-483 ,

UNIT: Callaway Unit 1 l DATE: 2/8/96 i COMPLETED BY: M. A. Holmes I TELEPHONE: 314/676-8842 l FAX: 314/676-8562

\

c MONTH JANUARY 1996 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL pfy (MWe-Net) pfy (MWe-Net) 1 1.173 17 1.147 2 1.174 18 1.141 3 1.178 19 1.165 4 1.177 20 1.161 5 1.178 21 1.151 6 1.179 22 1.166 7 1.179 23 1.170 8 1.174 24 1.172 9 1.171 25 1.174 10 ,

1.167 26 1.170 11 1.163 27 1.173 12 1.168 28 1.174 13 1.168 29 1.174 14 1.166 30 1.175 15 902 31 1.177 16 529 Page 2 of 4 l

i

- I '

  • PART D OPERATING DATA REPORT

, . DOCKET NO.: 50-483

  • UNIT NAME: CALLAWAY UNIT 1 i DATE: 2/8/% )

M. A. Holmes  ;

COMPLETED BY: '

TELEPHONE: 314/676-8842 FAX: 314/676-8562 OPERATING STATUS:

(JAN) (YTD) (CUM)

1. REPORTING PERIOD: )

GROSS HOURS IN REPORTING PERIOD: 744 744 97,429.5 l

2 CURRENTLY AITTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): !!25 DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): 100 %
4. REASONS FOR RESTRICrlON(IF ANY):

THIS MONTH YR TO DATE CUMULATIVE j 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 85,869.5 4 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0

7. HOURS GENERATOR ON-LINE 729.0 729.0 84,370.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED 2,562,335 2,562,335 285,521,053 (MWH
10. GROSS ELECTRICAL ENERGY GENERATED 878,280 878,280 97,399,134 (MWH) i 11. NET ELECTRICAL ENERGY GENERATED 839,390 839,390 92,662,762 (MWH)
12. REACTOR SERVICE FACTOR 100 100 88.1 I
13. REACTOR AVAILABILITY FACTOR 100 100 88.1
14. UNIT SERVICE FACTOR 98.0 98.0 86.6
15. UNIT AVAILABILITY FACTOR 98.0 98.0 86.6
16. UNIT CAPACITY FACTOR (Using MDC) 100.3 100.3 84.5
17. UNIT CAPACITY FACTOR (Using Design MWe) -  %.3  %.3 81.2 2 18. UNIT FORCED OUTAGE RATE 2.02 2.02 2.34

+ 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, D ATE, AND DURATION OF EACH):

Refueling Date: 10/05/96 Duration: 42 days 20, IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

S PART E -

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO.: 50-483 UNIT NAhE: CALLAWAY UNIT I -

DATE: 2/8/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 REPORT MONTH: JANUARY 1996 METHOD OF TYPE SHUTTING DOWW F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS 1 960115 F 15 A 1 SEE

SUMMARY

BELOW

SUMMARY

On 01/15/96, at 1131, the turbine was shut down to replace the valve stem and plug in the 'B' Main Feedwater Regulating Vake, AE-FCV-0040, due to a reduction in feedwater flow.

REASON METHOD A: EQUIPMENTFAILURE(EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

H: OTIER(EXPLAIN)