y OPERATLNG DATA REPORT DOCKET NO. 50-269 DATE _03-15-85 COMPLETED BY J A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

, 3,- Unit Name: Oconee'1- Notes I 2. Reporting Period: February 1. 1985-Februnrv 28. 1985 Year-to-date and cumulative

2568 capacity factors are calcu-
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross'31We): 934 lated using a weighted
5. Design Electrical Rating (Net $1We): 886 . average for maximum
6. Maximum Dependable Capacity (Gross MWe): 899 dependable capacity.
7. Maximum Dependable Capacity (Net MWe): 860 8.' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

' 9. Power Level To Which Restricted. If Any (Net MWe): nem a

10. Reasons For Restrictions,If Any:

1 This Month Yr. to.Date Cumulative

. I1. Hours In Reporting Period 672.0 1 416.0 101 905.0

12. Number Of Hours Reactor Was Critical 672.0 1 413.2 73 406.2
13. Reactor Reserve Shutdown Hours -- --

$ 14. Hours Generator On Line 672.0 1 407.6 70 111.6-

15. Unit Reserve Shutdown Hours -- --- ---

16c Gross Thermal Energy Generated (MWH)- 1 694 424' 3 591 309 16R 465 073

589 730

= .17. G<oss Electrical Energy Generated (MWH) 1 248 310 58 584 990

564 231~
18. Net Electrical Energy Generated (MWH) . 1 193 476 55 525 762

~ 19. Unit Service Factor 100.0 99.4 68.8 3 20. Unit Availability Factor 100.0 99.4- 68.8

21. Unit Capacity Factor (Using MDC Net) 97.6 on.n -61.2
22. Unit Capacity Factor (Using DER Net) 94.8 95.1 61.5

'23. Unit Forced Outage Rate 0.0 0.6 15.8

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
  • 4 None
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast '

Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

, hh$

g.

!69 PDR ei p6

\ \

, . = -

,g ,4.'

w =

.ji ; AVERAGE DALLY UNIT POWER LEVEL DOCKET NO. 50-269 UNIT Oconee 1 -

DATE na/ts/as COMPLETED BY J. A. Reavis TELEPHONE. 704-373-7567 -

1

-MONTH'- -Febkuarv.-1985'

' DAY .'- AVERAGE DAILY )POWER LEVEL '

DAY AVERAGE DAILY POWER LEVEL

'(MWe-Net) (MWa-Ne t) 1- '864 17 758 L2
, 864 18- 756 3-. 864 19' 749 4' 864 20 748 L5 863 21 841

-61 863 22 859 7 863 23 863

< 8. 863 24 863 9- 863 25 862

'10 g63- . 26 - 861

' 1 1. 863 27 861

~12L 864 28 861

[

!13 863 29 ---

14. 863 30 ---

'15 790 31' ---

16- - 750

, ~lNSTRUCTIONS

.On' this. format, : list the average ~ daily unit power level in HWe-Net for each day in the: reporting month.- Compute to the nearest whole megawatt.

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. so-269 ~

UNIT NAME oconee 1 DATE 3/1s/8s REPORT MONTH February 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

O e g ju License y Cause & Corrective 37 "c uSE a g No. Date ~. gh g. ,g g c Event ,&r, gm, Action to F

R o~he ce ta!

zmo Report # ai No g;

Prevent Recurrence uo 3-p 85-02-15 F --

A --

HH PUMPXX Repair Leak on Heater Drain Pump 1 2 3 4 Reason: Method: Exhibit G - Instructions S Sc e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NLREG-0161)

E-Operator Training f License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source II-Other (Explain)

(O /7 71

DOCKET NO: 50-269 UNIT: oconee 1 DATE: 3/15/85 NARRATIVE

SUMMARY

Month: February, 1985 The unit operated at 100% during most of the month except to make repairs on a heater drain pump on February 15th.

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: .0conee Unit 1 ,
2. Scheduled next refueling shutdown: March 1986 ,
3. Scheduled restart following refueling: May 1986 ,
4. Will refueling or resumption of operation thereaf:er require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s)/Afor submitting proposed licensing action and supporting information: N ,
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 999* .

8. Present licensed fuel pool capacity: 1312 ,

Size of requested or planned increase: .

9. Projected date of l'ast refueling which can be accommodated by present licensed capacity: August 1991 ,

Date: March 15, 1985 DUKE POWER COMPANY ,

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 and 2'

I, <

H- -

' j.jg .

n .-

.: l' l'

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 03-15-55 COMPLETED BY JA- Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:~ OC "*
  • 2 '
2. Reporting Period: February 1. 1985-February 28, 1985 Year-to-date and cumulative
3. Licensed Thermal Power (MW ): 2568 capacity factors are calcu-4.' Nameplate Rating (Gross MWe): 934 lated using a weighted S. : Design Electrical Rating (Net MWeI: 886 average for ma & um .

1

6. Maximum Dependable Capacity (Gross MWe): 899 _ dependable capacity.

- 7. Maximum Dependable Capacity (Net MWe): _

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):- M=

= 10. k<asons For Restrictions,if Any:

.. This Month Yr..to Date Cumulative

' i1. Hours In Reporting Period . 672.0 1 416.0 91 825.0

- 12. Number Of Hours Reactor Was Critical 490.8 1 234.8 67 332.2

13. Reactor Reserve Shutdown Hours --- --- ---
14. Hours Generator On.Line 485.7 1 229.7 66 173.9
15. Unit Reserve Shutdown Hours - --- --- ---
16. Gross Thermal Energy Generated (MWH) - 1 096 727 2 990 901 - 157 759 206~

.L 17. Gross Electrical Energy Generated (MWH) qui 77n -1 005 030 53 732 946

18. Net Electrical Energy Generated (MWH) 345 026 958 683 51 068 216
19. Unit Service Factor 72.3 86.9 72.1
20. Unit Availability Factor 72.3 86.9 72.1

' 21. Unit Capacity Factor (Using MDC Net) 59.7 78.7 64.5 22.' Unit Capacity Factcr (Using DER Net) 58.0 76.4

23. Unit Forced Outage Rate 62.8 0.0 0.0 14.4 24.' Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:

' Currently Refueling

25. If Shut Down At End Of Report Perind. Estimated Date of Startup: April 24, 1985
26. Units in Test StatunPrior to Commercial Operationi:

Forecast Achiewd INITIA L CRIT'CA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION

. (0/771

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-270 UNIT Ocnnee 2 DATE nt /1 s /As COMPLETED BY .J.A. Reavis TELEPHONE -704-373-7567-MONTH February, 1985 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t)

'l 701 17 701 2 .~ 700- 18 701 3 701 19 697 4' 698 20 699 5 729 21 75 6 822 22 ---

-7 821 23 ---

8 769 24 ---

9 702 25 ---

10 7nt 26 ---

11 702 27 ---

-12 701 28 ---

13 700 29 ---

14 701 30 ---

15 701 31 ---

16 701 lNSTRUCTIONS On this format, -Ilst the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO. 50-270 -

UNIT NAME oconee 2 DATE 3/1s/85 REPORT N) NTH February 1985 COMPLETED BY J. ' A. Reavis

___ TELEPHONE 704-373-7567 iO c o my License y Cause & Corrective

. 32 "a m3E

  • g No. Date  %

$ o-

%h 5E

-S E

yye

%5$

Event h

Ei g

53 Action to H cr zeo Report # mo uo Prevent Recurrence 2-p 85-02-01 S -

H -

RC FUELXX Core Conservation 3p 85-02-05 S --

A -

CH HTEXCH Steam Generator High Level 4-p 85-02-08 S --

H -

RC FUELXX Core Conservation 1 85-02-21 S 186.27 C 1 RC FUELXX End of Cycle 7 Refueling Outage 1 2 3 4 Reason: Method: Exhibit G - Instructions SS e uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NLREG-0161)

E-Operator Training G License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source Il-Other (Explain)

- (Q /77)

b DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 3/15/85 NARRATIVE

SUMMARY

Month: F=hrnarv iges The unit ran most of the month at 854 to extend core life in order to bring the unit out for its and of cycle 7 refueling outage on a weekend. The unit began its refueling outage on February 21, following 439 days of continuous operation, establishing a world record. .

MONTHLY REFITELING INFORMATION REQUEST

1. Facility name: Oconee Unit 2 ,
2. Scheduled next refueling shutdown: Currently Refueling .
3. Scheduled restart following refueling: .

- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A ,
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 177 .

4, (b) in the spent fuel pool: 999 .

l

8. Present licensed fuel pool capacity: 1312 .

. Size of requested or planned increase: .

. 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .

, i DUKE POWER COMPANY Date: March 15, 1985 .

i Name of

Contact:

J. A. Reavis Phone: 704-373-7567 s we, - , e- - ,n , ,. ,- ,,---,.,,.rvc., ,,.,,,,,,_g--,,-,,..,,v,,,,,,.ww.e-n.,.,_mm.,,,mn,

Q ,

4 OPERATLNG DATA REPORT DOCKET NO. 50-287 DATE _ 03-15-85 CO31PLETED BY J.A. Reavis TELEPHONE . 704-373-7567 OPERATING STATUS L

1. Unit Name: oconee 3. Notes
2. Reporting Period: Fahrunrv 1. 19R5-Fahrtinrv 9R. tor 5 Year-to-date and cumulative
3. Licensed Thermal Power (31Wt): 2568 capacity factors are calcu-

' 4. Nameplate Rating (Grosi31We):

~

934 lated.using a weighted

. 5. Design Electrical Rating (Net alWe): 886 average for maximum 6.'.\taximum Dependable Capacity (Gross 31We): 899 dependable capacity.

7. Slaximum De'pendable Capacity (Net alwe): 860
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net alwel:
10. Reasons For Restrictions. If Any

This .\lonth Yr..to.Date Cumulative

- II. Hours In Reporting Period 672.0 1 416.0 89 472.0 12.' Number Of Hours Reactor Was Critical 672.0 1 416.0 64 646.6

13. Reactor Reserve Shutdown Hours . ---

.14. Hours Generator On.Line 672.0 1 416.0 63 474.1

15. Unit Reserve Shutdown Hours -~
16. Gross Thermal Energy Generated (31WH) . 1 713 930 3 626 399 155 423 440
17. Gross Electrical Energy Generated (31WH) ' 593 420 1 249 250 53 674 184
18. Net Electrical Energy Generated (31WH) 569 560 1 198 505 51 119 878
19. Unit Service Factor 100.0 100.0 70.9
20. Unit Availability Factor. 100.0 100.0 70.9
21. Unit Capacity Factor (Using .\lDC Net) 98.6 98.4 66.3

. 22. Unit Capacity Factor (Using DER Net) 95.7 95.5 64.5

23. Unit Forced Outage Rate 0.0 0.0 14.1
24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date,and Duration of Each):

Refueling - August 16, 1985 - 9 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status t Prior to Commercial Operation): Forecast
  • Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY CO.\l%1ERCIA L OPER A TION 9

(9/77)

.M AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 UNIT 'Oconee 3 DATE n1/is/8s COMPLETED BY _J.A. Reavis TELEPHONE _ 704-373-7567 MONTH February -1985 l' DAY l AVERAGE DAILY POWER LEVEL DAY l- AVERAGE DAILY POWER LEVEL (MWe-Ne t)

(MWe-Ne t) 1 848 17 849

'2 - sag 18 849 3 aan 19 na9 4

a49 20 aag 5 'naa 21 nan 6 848 22 846 7 848 23 847 8 848 24 848

-9 848 25 847 to ato 26 a4g 11 849 27 848 12 849 28 848

' 13 . 848 29 ---

14 849 30 ---

15 829 31 ---

. 16' gag

- INSTRUCTIONS On this format, in the reporting month. list the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.

O ii.,..-,. - - . .. .

. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 .

UNIT NAME oconee 3 DATE 3/is/8s REPORT MONTH rownmrv ions COMPLETED BY J. A. neavis TELEPHONE 704-373-7567 "s_

O e gj License y cause & Corrective 32 gy "cg n c& *

  • Action to flo. Date . ;y Event ,&r, g F

EE R o- 8 a:

%2b zmo Report # RE mo SE Prevent Recurrence uo 3-p 85-02-1s S --

B --

CC VALVEX Turbine Coetrol & Stop Valve Movement pts 1 2 3 4 Reason: Method: Exhibit G - Instructions F c g A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NLREG-0161)

E-Operator Training f iLicense Examination F-Adninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

~

_y,.

9 DOCKET NO: 50-287

' UNIT: Oconee 3 DATE: 3/15/85 NARRATIVE

SUMMARY

Month: February 1985 The unit ran at 1004 throughout most of the month except to perform Turbine Control and stop valve movement PT's on February 15th.

I' l

l

~

i

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 3 ,

2.= Scheduled next refueling shutdown: August 1985 ,

3. Scheduled restart following refueling: October 1985 ,
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision a

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures) .
7. Number of fuel assemblies (a) in the core: 177 ,

(b) in the spent fuel pool: 255 .

~8. Present licensed fuel pool capacity: 875 ,

Size of requested or planned increase: .

^

9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .

DUKE POWER COMPANY Date: March 15, 1985 ,

~ ~

Name of

Contact:

J. A. Reavis Phone:

'I t t OCONEE NUCLEAR STATION Monthly Operating Status Report

~ 1 '. . Personnel Exposure:

For the' month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.- The total l station liquid. release for January has been compared with the Technical Specifications maximum annual dose commitment and-wasiless than 10 percent of this limit.

The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

V