ULNRC-03273, Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 1

From kanterella
(Redirected from ML20098C806)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 1
ML20098C806
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/30/1995
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-03273, ULNRC-3273, NUDOCS 9510100329
Download: ML20098C806 (6)


Text

?

Callaway Plant

.Y','* ', Post Office Box 620

)*' Fulton. Missouri 65251.

'4 Union ct** ' l"'

Etucruic 33 U.S. Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 ULNRC-03273 Gentlemen:

DOCKET NUMBER 50-483 l CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SPEPTEMBER 1995 The enclosed Monthly Operating Report for September 1995 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

R. D. AfTolter '

Manager, Callaway Plant RDA/RTI/HDB/MAII/cmw Enclosure cc: Distribution attached 1000So i

.D510100329 950930

/

/- M i PDR ADOCK 05000483 y'

- R .. ,_ - -

PDR ._ l-

U j . ,1.

6

. cc distribution for ULNRC-03273 i

with enclosures Mr. L. Joe Callan Regional Administrator ,

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. L. R. Wharton (2 copies) - ,

Licensing Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, D.C. 20555 ,

Manager, Electric Department Missouri Public Service Commission

- P. O. Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter -

Shaw, Pittman, Potts & Trowbridge 2300 N. Street N.W.

Washington, D.C. 20037-NRC Resident Inspector i

i s <

)

l 1

al ,,_:.

c DOCKET NO.: ~ S0-483 ')

UNIT NAME: CALLAWAY UNIT I DA'IE: 10/6/95 COMPIEIED BY: M. A. Holmes "IELEPHONE.: 314/676 4842

- FAX: 314/676-8562- .

PART A - OPERATIONS

SUMMARY

The plant operated at approximately 98.5% for the month of September due to steam -

generator low pressure limitations after chemical cleaning with the following exceptions:

On 9/15/95 at 0700, power was reduced to 97.3% for the performance ofInstmment and Control (I&C) surveillances.

On 9/29/95 at 0600, power was reduced to 97.8% for the performance ofI&C surveillances.

PART B - PORY AND SAFETY VALVE

SUMMARY

None.-

4

+' q I

a J

t i

I Page 1 of 4 -

4 a

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-483 UNIT- Callaway Unit 1 DATL 10/6/95 COMFLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 MONTH: SEPTEMBER 1995 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL PA,y (MWe-Net) pfy (MWe-Net) .

I 1.135 17 1.146 2 1.139 18 1.148 3 1.132 19 1.147 4 1.130 20 1.151 5 1.131 21 1.154 6 1.133 22 1.159 7 1.138 23 1.156 8 1.148 24 1.154 9 1.148 25 1.151 10 1.148 26 1.150 11 1.145 27 1.148 12 1.138 28 1.141 13 1.135 29 1.134 14 1.137 30 1.137 15 1.135 31 16 1.138 Page 2 of 4

l

, PART D 1

~

. OPERATING DATA REPORT DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 DATE: 10/6/95 .

COMPLETED BY: M. A. Holmes l TELEPHONE: 314/676-8842 FAX: 314/676-8562 OPERATING STATUS:

(SEP) (YTD) (CUM)

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 720 6,551 94,476.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 100 %
4. REASONS FOR RESTRICTION (IF ANY)

THIS MONTH yR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 720 5,428.6 83,135.3
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON-LINE 720 5,369.6 81,651.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED 2,524,783 18,464,978 276,021,741 (MWH)
10. GROSS ELECTRICAL ENERGY GENERATED 862,180 6,272,557 94,124,325 (MWH)
11. NET ELECTRICAL ENERGY GENERATED 822,873 5,969,371 89,539,913 (MWH)
12. REACTOR SERVICE FACTOR 100.0 82.9 88.0
13. REACTOR AVAILABILITY FACTOR 100.0 82.9 88.0
14. UNIT SERVICE FACTOR 100.0 82.0 86.4
15. UNIT AVAILABILITY FACTOR 100.0 82.0 86.4
16. UNIT CAPACITY FACTOR (Using MDC) 101.6 81.0 84.2
17. UNrr CAPACITY FACTOR (Using Design MWe) 97.6 77.8 80.9
18. UNIT FORCED OUTAGE RATE 0.0 0.61 2.14
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date: 10/05/96 Duration: 42 days 1

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

. . . . - . - . - - . .. . . . _ - =. . ..

.g.

. .9 PART E '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNOc 50-483 UNrr NAME. CALLAWAY UNTT 1 DATE: 10Vd95 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 REPORTMONTH: SEPTEMBER 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECrlVE NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS

SUMMARY

REASON METHOD A EQUIPMENTFAILURE(EXPLAIN) 1: MANUAL B. MAINr.ORTEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN) l E: OPERATORTRAINING ANDLICENSEEXAMINATION j F: ADMINISTRATION  !

i G: OPERATIONALERROR(EXPLAIN) l H: OTHER(EXPLAIN) l 1

Page 4 of 4

_ _ _ _ .