._._ _ _ _. . _ _ . _ . _ . _ . _ _ . . _ . _ _ _ . _ . . _ .__ _- __ __.._ __._ _ _ _ _ __ _ _._ m._ _m i AP600 DOCUMENT COVER SHEET

TDC
IDS: 1 S 4 Form 58202G(5/94)[t\xxxx.wpf:1x] ~

AP600 CENTRAL FILE USE ONLY

00S8.FRM RFSe
RFS ITEM s:

j AP600 DOCUMENT NO. REVISION NO. ASSIGNED TO

GWGLO22 6 Page 1 of _.L.  !

ALTERNATE DOCUMENT NUMBER: WORK BREAKDOWN #: 3.1.2 I

DESIGN AGENT ORGANIZATION: Westinghouse

. TITLE: AP600 Probabilistic' Risk Assessment l

ATTACHMENTS: DCP 'e/REV. INCORPORATED IN THIS DOCUMENT j REVISION:

CALCULATION / ANALYSIS

REFERENCE:

l ELECTRONIC FILENAME ELECTRONIC FILE FORMAT ELECTRONIC FILE DESCRIPTION 1

J i

(C) WESTINGHOUSE ELECTRIC CORPORATION 1995.

O WESTINGHOUSE PROPRIETARY CLASS 2 TNe document contems inhameson propnetary e Wesenghouse Elecirte Corporeson; it le outmtInd in conedence end is to be used solely for the purpose for which it le fumiehed and retumed upon request. The document and such informaton le not to be reproduced, transmitted, disciceed 4

or used otherwise in whole or in part without prior wntion authorizaeon of Wesenghouse Electric Corporeson, Energy Systems Business Urut.

subpect to the legende contesned hereof.

O WESTINGHOUSE PROPRIETARY CLASS 2C TNe document is the property of and contenne Proprietary informeson owned by Wesenghouse Elecetc Corporeton and/or its subcontractors and suppliers it is trenamitted to you in conadence and trust, and you agree to treet this document in strtet accordance wNh the terms and condssons of the agreement under whsch it wee provided to you.

@ WESTINGHOUSE CLASS 3 (NON PROPRIETARY)

COMPLETE 1 IF WORK PERFORMED UNDER DESIGN CERTIFICATION QR COMPLETE 2 IF WORK PERFORMED UNDER FOAKE.

1 @ DOE DESIGN CERTIFICATION PROGRAM - GOVERNMENT LIMITED RIGHTS STATEMENT [See page 21 Copynght statement A license le reserved to the U.S. Govemment under contact DE AC03 906Ft8406.

O DOE CONTRACT DELIVERABLES (DELIVERED DATA)

Subtect to specsted onceptone, dieciosure of this dele is restrteted unel September 30,1996 or Deeegn Corteceton under DOE contract DE AC03-90$F18495, whschover le later.

EPRI CONFIDENTIAL: NOTICE: 1 3 2 30 4 5 CATEGORY: A 1 B C D E F 2 O ARC FOAKE PROGRAM - ARC LIMITED RIGHTS STATEMENT (See page al Copyright statement A license is reserved to tie U.S. Govemment under contract DE FCO2-NE34267 and subcontract ARC-93-3 SC-001.

O ARC CONTRACT DELIVERABLES (CONTRACT DATA)

Subsect to specAed excepsons. *=eaa- e of this date is reatncted under ARC S@ contract ARC-93-3 SC 001.

ORIGINATOR SIGNATURE /DATE

(

y //-/fA f f AP600 RESPONSIBLE MANAGER REK ATE

. A-. SIGN 0A1 Ay / /y APP -1ROAL App,ov. of in. r.epons.ie - s.gn nee in. docum.nne compi.to. as re.ma rev we er. co,r,.me. seceen.c is annened and documenne reisesed for use.

9511270064 PDR 951117 ADOCK 05200003 PDR

AP600 DOCUMENT COVER SHEET Page3 Form 58202G(5/94) LIMITED RIGHTS STATEMENTS DOE GOVERNMENT UMITED RIGHTS STATEMENT 4

(A) These data are subtrwtted wie limted rights under government contract No. DE-AC03 90SFt 8495. These data may be reproduced and used by the government with the express hmrtanon that they will not, without wntten permssion of the contractor, be used for purposes of manufacturer nor esclosed outside the government; except that the govemment may disclose these data outside the govemment for the following purposes, if any, provided that the govemment makes such disclosure subject to prohibition against further use and disclosure: .

(1) This ' Proprietary Data' may be disclosed for evaluation purposes under the restrictions above.

(11) The ' Proprietary Data' may be disclosed to the Electnc Power Research Instrtute (EPRI), electnc utility representatives and their 4

direct consultants, excluding direct commercial competitors, and the DOE National Laboratones under the prohibitions and

' restnctions above.

(B) TNs notice shall be marked on any reproduction of these data, in whole or in part.

ARC UMITED RIGHTS STATEMENT: ,

TNs proprietary data, furnished under Subcontrcct Number ARC 93-3-SC 001 with ARC may be duplicated and used by the govemment and ARC, subt ect to the lirrstations of Article H-17.F. cf that subcontract, with the express lirnstabons that the proprietary data may not be disclosed outside the govemment or ARC, or ARC's Class 1 & 3 members or EPRI or be used for purposes of manufacture without prior permssion of 2

the Subcontractor, except that further disclosure or use may be made solely for the following purposes:  ;

TNs proprietary data may be disclosed to other than commercial compettors of Subcontracer for evaluation purposes of this subcontract under

! the restnction that the propftetary data be retained in confidence and not be further disclosed, and subaect to the terms of a non-disclosure

agreement between the Subcontractor and that organization, excluding DOE and its contractors

^

DEFINITIONS CONTRACT /DEUVERED DATA - Consists of documents (e.g. specifications, drawings, reports) which are

generated under the DOE or ARC contracts which contain no background proprietafy data, EPRI CONFIDENTIALITY / OBLIGATION NOTICES l 1 NOTICE 1
The data in thes document is sutNct to no confidentaley obegenone.

NOTICE 2: The data in this document is proprietary and confidental to Westinghouse Electric and/or its Contractors, it is forwarded l to recipient under an obagation of Confidence and Trust for limited purposes only. Any use, we to unautortzedjersons, or copying of I 4

tNs document or parts thereof is prohtnted except as agreed to in advance by the Electric Power Reesarch inettute (EPRI) and W )

4 Electric Corporason, Recipient of thle data has a duty to inquire of EPRf and/or Westinghouse as to the uses of the information herein i that are permetted. 1 NOTICE 3: The data in this document is propnetary and confidental to Wesenghouse Electric and/orits Contractors. Itis forwarded 1 J to recipient under an obilgaton of Con 6dence and Trust for use only in evaluason tasks authortzed by the Electric Power Research I j instrtute (EPRI). Any use, dieciosure to unauthortzed persons, or copying Ne document or parte thereof is prohetnted except as agreed to ln '

, advance by EPRI and Wesenghouse Electric Corporason. Recipient of th e data has a duty to inquire of EPRI and/or Wesenghouse as to the uses of the informaton contained herein met are permrtted. TNe document and any cop 6es or excerpts thereof that may have been generated are to be retumed to Wesenghouse, directly or through EPRI, when requested to do so.

NOTICE 4: The data in tNs document is proprietary and conndental to Wesenghouse Electric Corporation and/or its Contractors. It is beina revoeied in confidence and trust only to Employees of EPRI and m certain contractors of EPR1 for limned evakaaton tasks authortzed by EPRf.

Any use, esclosure to unauthonzed persons, or copy 6ng of INe document or parts thereof te proNbsted. TNs Document and any copies or excerpts thereof mat may have been generated are to be retumed to Wesenghouse, direcey or through EPRI, when requested to do so.

NOTICE 5: The data in tNs document le p and confidental to Wesenghouse Electric Corporacon and/or its Contractors. Access to tNs data is given in Confidence and Trust at osenghouse facillees for limned evaluason tasks ase6gned by EPRt. Any use, disclosure to unauthorued persons, or copytng of he document or parte thereof to proNtWeed Nemer e le document nor any excerpte morefrom are to be removed from Wesenghouse faciitees EPRI CONFIDENTIALITY / OBLIGATION CATEGORIES t'

CATEGORY *A* -(See DeNvered Data) Consiste of CONTRACTOR Foreground Data that le contained in an issued reported.

CATEGORY '8* -(See Deevered Data) Consiste of CONTRACTOR Foreground Data that le not contamed in an issued report, except for computer programs.

CATEGORY 'C'- Consiste of CONTRACTOR Background Data except for corguter programe CATEGORY *D* - Coneasts of computer programe developed in the course of p+b,4,g the Work.

CATEGORY *E' - Consects of computer programe developed prior to me Effeceve Date or aner me Effeceve Date but outade the scope of the Work.

1 CATEGORY *F* - Conesets of adrrwirstratrve plans and admnetraeve reports O

j s LIST OF FIGURES (Cont.)

Firure No. Title h 52-16 Safety Injection Line Break Event Tree . . . . . . . . . . . . ..... .......52-137 i 52-17 Steam Line Break Downstream of MSIVs Event Tree . . . . . . . . . . . . . . .52-138 52-18 Steam Line Break Upstream of MS1Vs Event Tree . . . . . . . . . . . . . . . . . .52-139 l l

52-19 Stuck Open Secondary Side Safety Valve Event Tree . . . . . . . . . . . . . . . . .52-140 52-20 Small LOCA Event Tree . . . . . . . . . . . . . . . . . . . . . ...............52-141 I

52-21 RCS Leak Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52-142 1

52-22 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .52-143 ,

52-23 Loop During Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .52-144 l 54-1 LOSP During Hot / Cold Shutdown (RCS Filled) Eve st Tree . . . . . . . . . . . . .54-281 54-2 Loss of RNS Initiator Dudng Hot / Cold Shutdown (RCS Filled) Event Tree . .54-282 54-3 loss of CCW/SW Initiator During Hot / Cold Shutdown (RCS Filled)

Eve nt Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-28 3 54-4 LOCA/RNS Pipe Rupture During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-284 54-5 LOCA/RNS-V024 Opens During Hot / Cold Shutdown (RCS Filled)

Eve nt Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-285 l 54-6 Overdraining of Reactor Coolant System During Drnindnwn to Mid-Loop . . .54-286 l p' 54-7 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-287 Q 54-8 54-9 Loss of RNS Initiator (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-288 Loss of CCW/SW Initiator (RCS Drained) Event Tree ................54-289 54-10 LOCA/RNS-V024 Opens (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . .54-290 54-11 Accumulator Injection (Dilution Scenario) Event Tree . . . . . . . . . . . . . . . . .54-291 54-12 Shutdown Transient Case SD1B2 RCS Pressure vs. Time . . . . . . . . . . . . . .54-292 54-13 Shutdown Transient Case SD1B2 Mass Flow Rate vs. Time . . . . . . . . . . . .54-293 54-14 Shutdown RNS Break Case SD3A (3500 gpm) . . . . . . . . . . . . . . . . . . . . . .54-294 54-15 Shutdown RNS Break Case SD3A2 (2000 gpm) . . . . . . . . . . . . . . . . . . . .54-295 54-16 Shutdown RNS Break Case SD3A3 (1000 gpm) . . . . . . . . . . . . . . . . . . . . . 54-2%

54-17 Shutdown Plant Damage State Substate Event Tree for LP-ADS . . . . . . . . . .54-297 54-18 Shutdown Plant Damage State Substate Event Tree for LP-1 A . . . . . . . . . . .54-298 54-19 Shutdown Plant Damage State Substate Event Tree for LP-3D . . . . . . . . . .54-299 54 ~ Shutdown Plant Damage State Substate Event Tree for LP-3BR , . . . . . . . . .54-300 54 Shutdown Plant Damage State Substate Event Tree for LP-3BE . . . . . . . . . .54-301 56-1 Flood Zones and Barriers Plan at 66 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-93 56-2 Flood Zones and Barriers Plan at 8 2 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-95 56-3 Flood Zones and Barriers Plan at 96 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-97 56-4 Flood Zones and Barriers Plan at-100*-0" & 107'-2" . . . . . . . . . . . . . . . . . . . 56-99 56-5 Flood Zones and Barriers Plan at 1 17 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 101 56-6 Flood Zones and Barriers Plan at 135 '-3" . . . . . . . . . . . . . . . . . . . . . . . . . . 56- 103 Revision: 5 E6 zu m July 21,1995 XCiij m:W4acrev5\lofiwp:1b

LIST OF FIGURES (Cont.)

Figure No. Title fage a j 56-7 Flood Zones and Barriers Plan at 160'-6" & 153'-0" . . . . . . . . . . . . . . . . . .56-105 56-8 Flood Zones and Barriers Plan at 160'-6" & 180'-0" . . . . . . . . . . . . . . . . . .56-107 56-9 8-in. Bre Main Rupture at-Power Event Tree . . . . . . . . . . . . . . . . . . . . . . .56-109

)

56-10 8-in. Fire Main Rupture during liot/ Cold Shutdown Event Tree . . . . . . . . . .56-110 i 56-11 8-in. Fire Main Rupture during RCS Drained Conditions Event Tree . . . . . . .56-111 59-1 AP600 PRA Core Darnage for Internal Initiating Events at Power . . . . . . . .59-103 59-2 AP600 Core Damage Frequency Contributions . . . . . . . . . . . . . . . . . . . . . .59-104 Included in Appendix A are Figures A-1 through A-197 O'

Nove r 15,1995 m'_ [ Westinghouse mAap600prakocrev6Tjo(6,wpf:lb xCiV

l m

t

7

!O i

l i

j Simplified Passive Advanced Light l Water Reactor Plant Program AP600 Probabilistic Risk Assessment i

lO 1

i l

i l Prepared for i

j U.S. Department of Energy i San Francisco Operations Office

! DE-AC03-90SF18495 t

l

@ ise-

.ppuvosev6VW6.*P :lb f

% i

a. _

r l l l n '

TABLE OF CONTENTS (Cont.)

Section . Title Page 54.6 Success Criteria ................ .. ... ... ..... ..... .5441 54.6.1 MAAP4 Code Analysis for Shutdown Success Criteria . . . ..... . 54 42 54.6.2 MAAP4farameter File . . . . . . . . . . . ...... .. ..... . 54-42 54.6.3 MAAP4 Input Phnnges . ... .............. ... ... . . 54-43 54.6.4 Definition of MAAP4 Cases From Event Trees .... . ... . . . 54-45 54.6.5 Results From MAAP4 Analyses . . . . . ... . . .. . 54-46 54.7 Common Cause Analysis . . . . . . . ............. ... . . . .. . 54-47 54.8 Human Reliability Analysis . . . . . . . . . . . . . . . . . . . . ... ..... . 54-47 54.8.1 Operator Actions Calculated . . . . . . . . . . . . . . . . . . ...... . .54-47 54.8.2 Conditional Human Error Probabilities . . . . . . ... .. . . . . . . 54-5 3 i 1

54.9 Fault Tree Quantification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-53 l 54.10 Level 1 Core Damage Frequency Quantification . . . . . . . . . . . . . . . . . . . . . 54-56 54.10.1 Core Damage Qnantification Method . . . . . . . . . . . . . . . . . . . . . . . 54-56 54.10.2 Quantification inputs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-58 54.10.3 Level 1 Shutdown Core Damage Frequency Results . . . . . . . . . .. 54-59 54.11 Shutdown and Low-Power Release Category Quantification . . . .. ... . 54-59 54.11.1 Level I/ Level ; PRA Interface . . . . . . . . . . . . . . ... ... .. . 54-60

(~

54.11.2 Containment E ent Tree Quantification . . . . . . . . . . . . . . .

54.11.3 Shutdown and .aw-Power Containment Event Tree

. 54-63 Quantification Results Summary . . . . . . . . ................ 54-65 54.12 Shutdown Assessment importance and Sensitivity Analyses . . . . . . . ... . 54-66 54.12.1 Importance Analyses for Core Damage at Shutdown . . . . . . . . . . . 54-67 54.12.2 Other Sensitivity Analyses for Shutdown Core Damage . . . . .. . .54-73 54.13 Summary of Shutanwn Level-1 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-75 54.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ ... . . . . . 54-81 CHAFIER 56 PRA IN'IERNAL FLOODING ANALYSIS . . . . . . . . . . . . . . . ..... . . . 5 6- 1 56.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ..... .... .. 56-1 56.1.1 Definitions . . . . . . . . . . . . ..... ... ............... . 56-1 56.2 Methodology . . . . . . . . . . . . . . . . . . . . ....................... . 56-1 56.2.1 Summary of Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . .. 56-1 56.2.2 Information Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 56-2 56.2.3 Initial Screening Assessment ................ . . . . . . . . . . 5 6-3 56.2.4 Detailed Screening A*wement . . . . . . . . . . . . . . . . . . . . ... . . 5 6-4 56.2.5 Identification of Flood inAred Initiatmg Events . . . . . . . . . . . . . 5 6-6 56.2.6 Initiating Event Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-7 56.3 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-7 56.3.1 General Floodmg Analysis Assmoptions and Fneinarring Judgments . 56-7 56.3.2 AP600-Specific Assumptions . . ........... .......... . . 5 6-9 56.4 Information Collection . . . . . . ....... ..... .. .... . . . . . . . . . . . 5 6- 1 1

(*

Revision: 5 YO tem 6.

xxxy July 21,1995 m:W4ocrev5%c5.wpf:1b

1 a- '

Wau -

TABLE OF CONTENTS (Cont.)

Section Title _P,, age 56.4.1 PRA-Modeled Equipment and Locations . . . . . . . . . . . . . . . . . . . . 56-11 56.4.2 Identification of Areas for Flooding Evaluation . . . . . . . . . . . . . . . . 56-11 56.5 At-Power Operatio ns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-12 56.5.1 Initial Screening Assessment ...................... . . . . . 56-12 56.5.2 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 12 56.5.3 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-28 56.5.4 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-32 56.5.5 Quantification of At-Power Flood-Induced Events . . . . . . . . . . . . . 5 6-39 56.6 Shutdown Operations . . . . . . . . . . . . . . . . . . . . . . . . . . ............ . 56-41 56.6.I Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-41 56.6.2 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-42 56.6.3 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-43 56.6.4 Shutdown Quantification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-48 56.7 Seismically Induced Flooding . .............................. .. 56-51 56.8 Flooding Hazards During Refueling Outages . . . . . . . . . . . . . . . . . . . . . . . 56-52 56.9 Flooding Sensitivity Study . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . 56-52 56.9.1 Flooding Human Error Probabilities Sensitivity Study . . . . . . . . . . . 56-52 56.10 Summary of Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-5 3 CHAPI'ER 58 WINDS, FLOODS, AND OTHER EXTERNAL EVENTS 58.1 Introduction . . . . . . . . .......................... . . . . 58-1 58.2 External Events Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58-1 58.2.1 Severe Winds and Tornadoes . . . . . . . . . . . . . . . . . . . . 5 8-1 58.2.2 External Floods . . . . . . . . . . . .................... 58-2 58.2.3 Transportation and Nearby Facility Accidents . . . . . . . . . . 58-2 58.3 Co nclusio n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 8-3 58.4 References . . . . . . . . . . . . . . .................. . . . . . . . 58 3 CHAPTER 59 PRA RESULTS AND INSIGHTS 59.1 I ntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9- 1 59.2 Use of PRA in the Design Process . . . . . . . . . . . ... . . . . . . . . 59-3 59.2.1 Stage 1 - Use of PRA During the Early Desip Stage . . . . . 59-4 59.2.2 Stage 2 - Preliminary PRA . . . . . . . . . . . . . .. . . . . . . 59-5 59.2.3 Stage 3 - AP600 PRA Submittal to NRC (1992) . . . . . . . . . 59-7 59.2.4 Stage 4 - PRA Revision 1 (1994) . . . . . . . . . . . . . . . . . . 59 7 59.2.5 Stage 5 - PRA Revisions 2-6 (1995) . . . . . . . . . . . . . . . . 59-8 59.3 Core Damage Frequency from Internal Initiating Events at Power . . . 59-9 59.3.1 Dominant Core Damage Sequences . . . . . . . . . . . . . . . . . 59-11 59.3.2 Component Importances for At-Power Core Damage Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-35 Nov r 15,1995 _ 3 Westingh00Se u:WaMocrev64cc6.wpf:lb xxxyj l

I

\

l O TABLE OF CONTENTS (Cont.)

Section Title _Page 59.3.3 System Importances for At-Power Core Damage . . . . . . . . 59-35 59.3.4 System Failure Probabilities for At-Power Core Damage . . 59-36 59.3.5 Common Cause Failure Importances for At-Power Core Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 6 59.3.6 Human Error Importances for At Power Core Damage . . . 59-36 59.3.7 Sensitivity Analyses Summary for At-Power Core Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 8  ;

59.3.8 Summary of Important Level 1 At-Power Results . . . . . . . 59-39 59.4 Severe Release Frequency for Internal Initiating Events at Power . . . 59-43 59.4.1 Containment Response and Plant Risk Results . . . . . . . . . 59-43 59.4.2 Sensitivity Analyses for Containment Response . . . . . . . . 59-45 59.5 Core Damage and Severe Release Frequency from Events at )

S hutdo w n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-46 59.5.1 Summary of Shutdown Level 1 Results . . . . . . . . . . . . . . 59-46 59.5.2 Large Release Frequency for Shutdown and Low-Power Events ....................................59-51 59.5.3 Shutdown Results Summary . . . . . . . . . . . . . . . . . . . . . 59-52

^

( 59.6 Core Damage and Severe Release Frequency from External and

\ Other Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-52 59.6.1 Results of Internal Flooding Assessment . . . . . . . . . . . . 59-52 59.7 Overall Plant Risk Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 3 1 59.8 Plant Features Important to Reducing Risk . . . . . . . . . . . . . . . . . . . 59-54 59.8.1 Reactor Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-55 59.8.2 Systems Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-5 6 59.8.3 Instrumentation and Control Design ... . . .. . . . . . . . . 59-59 1

59.8.4 Plant Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.5 Plant Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.6 Contamment Design . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.9 PRA Input to the Design Certification Process . . . . . . . . . . . . . . . 59-66 59.9.1 PRA Input to Reliability Assurance Program . . . . . . . . . . 59-66 59.9.2 PRA Input to ITAACs . . . . . . . . . . . . . . . .. . . . . . . . . 59-66 i 59.9.3 PRA Input to Tech Specs . . . . . . . . . . . . . . . . . . . . . . . 59-66 l 59.9.4 PRA Input to MMI/ Human Factors / Emergency Response Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.5 PRA Input to COL Action Items . . . . . . . . . . . . . . . . . . . 59-67 APPENDIX A MAAP4 ANALYSIS TO SUPPORT SUCCESS CRITERIA A.1 I ntroductio n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 1 A.1.1 MAAP4 Overview and Limitations . .......................A-1 A.I.2 MAAP4 Model for AP600 ............................... A-1

(

l g Revision: 6 YD mer November 15,1995 m:\ap600Lpra\tocrev6\ toc 6.wpf:lb XXXvil

==

TABLE OF CONTENTS (Cont.)

0 Section Title P_ age, A.1.3 Core Damage Definition .................................A-4 A.1.4 Analysis Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 A.2 Initiating Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 A.2.1 Medium Loss of Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . A-7 A.2.2 Intermediate Loss of Coolant Accident ....................... A-9 A.2.3 Small Loss of Coolant Accident . . . . . . . . ................. A-10 A.2.4 Steam Generator Tube Rupture . . . . . . . . . . . . . . . . . .......... A-11 A.2.5 Transient . . . . . . ............... .................... A-12 A.3 Break Size Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-14 A.4 ADS Success Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 15 A.4.1 Automatic Depressurization for RNS Operation . . . . . . . . . . . . . . . . A-17 A.4.2 Manual Depressurization for RNS Operation . . . . . . . . . . . . . . . . . . A-17 A.4.3 Automatic Depressurization for RNS Gravity Drain . . . . . . . . . . . . . A-20 A.4.4 Manual Depressurization for In-Containment Refueling Water Storage Tank Gravity Drain . . . . . . . . . . .... .. A-22 A.5 Accumulator and Core Makeup Tank Success Criteria . . ....... ... .. . A-26 A.6 Passive Residual Heat Removal Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-27

! A.7 Normal Residual Heat Removal and In-Containment Refueling Water Storage Tank Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A 28 A8 Sensitivity Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.1 System Interaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 i

A.8.2 Containment Isolation . . . . . . . ..... .... .......... .... A-31 A.8.3 Passive System Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-32 A.9 MAAP4 Results . . . . . . . . . . . . . . . . . . . . . . . ........ . ........ A-34 A.9.1 Medium Loss-of-Coolant Accident ......................... A-34 A.9.2 Intermediate Loss-of-Coolant Accident ............... ...... A-39 4

A.9.3 Small Loss-of-Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . A-43

A.9.4 Steam Generator Tube Rupture . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46 A.9.5 Transient . . ..... ............... . . . . . . . . . . . . . . . . . . A-4 9 A.10 References . . . . . . . ................... . . . . . . . . . . . . . . . . . . . . . A-5 2 J

4 ov r 5,1995 - W95tingt10US0 e

u:bp600ipraiocrev64cc6.wphlb xxxviij

.. ~ - . . - _ - - - . - . - - . - - - - - - - . - - - . - . - - - . - - - - .

1, j __

LIST OF TABLES (Cont.)

Table No. . Title Page 54-41 Fault Tree RNT2 Success Criteria Sununary . . . . . . . . . . . . . . . . . . . . . . . .54-158 54-42 Fault Tree RNP2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . .54-159 54-43 Loss of CCS/SWS,During Shutdown Initiating Event Fault Tree CSWF2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-160 54-44 Fault Tree CCTS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . .54-161 54-45 Fault Tree CCPS Success Criteria Summary . . . . . .............. . '.54-162 54-46 Fault Tree SWTS Success Critena Summary . . . . . . . . . . . . . . . . . . . . .54-163 i 54-47 Fault Tree SWPS Success Criteria Summary . . . . . . . . . . . . .... . ..54-164 l 54-48 Fault Tree VLHS Success Criteria Summary . ................... .54-165 j 54-49. AC & DC Fault Trees Success Criteria Summnry . . . . . . . . . . . . . . . . . .54-166 54-50 Fault Tree ADQLTS Data Summary . . . . . . . . . . . . . . . . . . . . . .... .54-180 54-51 Fault Tree ADE.TS Data Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-181 54-52 AP600 Shutdown Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 182 i 54-53 ADS Success Criteria for Shutdown Conditions . . . . . . . . . . . . . . . . . . . .54-183 54-54a Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADTS, ADLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 1 85 54-54b Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADS S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 186 54-54c Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 187 54-54d  %-e of Events for MAAP4 Cases Supporting ADS Success Criteria ADIE and ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-188 54-54e Sag-e of Events for MAAP Cases Supporting ADS Succesc Criteria ADNS................................................ .54-189 54-55 Conunon Cause Failure Evaluated for ShiWMwn . . . . . . . . . . . . . . . . . . . . .54-190 54-56 AP600 %dMwn Assessment HEP Smnmary Results . . . . . . . .........54-191 54-57 Dep-i y Level Evaluation Summary for Shutdown Assentment . . . . . . . . 54 200 54-58 ShinMwn Master Data Bank . . . . . . . . . . . . . . . . . . . . . . . . .... . . . .54-204 54-59 List of Basic Events and their Descriptions (Shutdown Model . . . . . . . . . . .54-220 54-60 AP600 %dewn Annancment Level 1 Accident hqw Quantification Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-228 54-61 List of Dominnat Sequences (At Shutdown) . . . . . . . . . . . . . . . . . . . . . ..54-229 54-62 List of Dommant Cutsets (At Shutdown) . . . . . . . . . . . . . . . . . . . . . . . . . .54-233 54-63 Shutdown Initiating Event Importances . . . . . . . . . . . . . . . . . . . . . . . . . . .54-244 54-64 Basic Event liepun.r :es Using Risk-Decease Measure (At Shuthwn) . . . . .54-245 54-65 Basic Event Isipewr.:es Using Risk Increase Measure (At Shutdown) . . . . .54-251 54-66 AP600 Containment Event Tree Nodal Questions . . . . . . . . . . . . . . . . . . . .54-257 54-67 AP600 Release Category Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-25 8 54-68 Summary of %sMwn and Low Power Accident Classes . . . . . . . . . . . . .54-259 54-69 AP600 Shutdown and Low Power Plant Damage Substate Frequencies . . . . .54-260 g Revision: 5 Y6 Iraath,,,

ly July 21,1995 mAap600$rskrev$% iwpf:Ib

_ _ _ _ ~

LIST OF TABLES (Cont.)

Table No. Title _Page 54-70 AP600 Shutdown and Low-Power Plant Damage Substate Conditional Probabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-261 54-71 AP600 Shutdown and Low-Power Containment Event Tree Quantification Results - Release Category Frequencies (Per Reactor-Year) . . . . . . . . . . . . .54-262 54-72 Release Category IC Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-263 54-73 Release Category ICP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . ..54-264 54-74 Release Category XL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-265 54-75 Release Category BP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-266 54-76 Release Category CI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-267 54-77 Release Category CI-C Dominant Sequences . . . . . . . . . . . . . . . . . . . . . .54-268 54-78 Release Category CFE Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-269 54-79 Release Category CFE-C Dominant Sequences . . . . . . . . .............54-270 54-80 Release Category CFI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-271 54-81 Release Category CFL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-272 54-82 Release Category CFV Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-273 54-83 Core Damage for Intemal Initiating Events at Shutdown - Risk Decrease ...54-274 54-84 Core Damage for Internal Initiating Events at Shutdown - Risk Increase . . . .54-275 54-85 Shutdown Common Cause Irnportance - Risk Decrease . . . . . . . . . . . . . . . .54-276 54-86 Shutdown Common Cause Importance - Risk Increase . . . . . . . . . . . . . . . .54-277 l 54-87 Shutdown Human Error Risk Importance - Risk Decrease . . . . . . . . . . . . .54-278 54-88 Shutdown Human Error Risk Importance - Risk Increase . . . . . . . . . . . . . .54-278 54-89 Shutdown Component Importance - Risk Decrease . . . . . . . . . . . . . . . . . . .54-279 54-90 Shutdown Component Importance - Risk Increase . . . . . . . . . . . . . . . . . . . .54-279 54-91 Operator Actions for Sensitivity Cases 7 and 8 . . . . . . . . . . . . . . . . . . . . . .54-280 56-1 AC and Non-class !E DC Equipment Locations . . . . . ....... . . . . . . . . 5 6-5 5 56-2 AP600 Building Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-5 7 56-3 Flooding Analysis Initial Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . 56-59 56-4 At-Power Detailed Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-63 56-5 At-Power Flooding-Induced Core Damage Frequency Quantification Summary Results . ........................ . . . . . . . . . . . . . . . . 5 6-68 56-6 Shutdown Flooding-Induced Core Damage Frequency Quantification Summary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-72 56-7 At-Power Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6 -77 56-8 Shutdown Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . .. 56-87 59-1 Internal Initiating Event Core Damage Frequency Contribution by Initiating E ve nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9 -6 8 59-2 Internal Initiating Events at Power Dominant Core Damage Sequences . . . . . . 59-69 59-3 Sequence 1 - Safety Injection Line Break Dominant Cutsets (SI-LB-02) . . . . . 59-71 Revision: 6 ENEL O

November 15,1995 rat ==l% Westingh00Se maagoogawevek 6.wpetb Ivi

m --

/~N

\')

LIST OF TABLES (Cont.)

Table No. Title ,P_ age 59-4 Sequence 2 - ATWS Dominant Cutsets (ATWS-1-07) . . . . . . . . . . . . . . . . . 59-72 59-5 Sequence 3 - ATWS Dominant Cutsets (A'IWS-28) . . . . . . . . . . . . . . . . . . . 59-73 59-6 Sequence 4 - Large LOCA Dominant Cutsets (LLOCA-03) . . . . . . . . . . . . . . 59-75 59-7 Sequence 5 - Safety Injection Line Break Dominant Cutsets (SI-LB-03) . . . . . 59-76 59-8 Sequence 6 - Intermediate LOCA Dominant Cutsets (NLOCA-04) . . . . . . . . . 59-78 59-9 Sequence 7 - Intermediate LOCA Dominant Cutsets (NLOCA-06) . . . . . . . . 59-79 59-10 Sequence 8 - Reactor Vessel Rupture Cutset .............. ......... 59-80 59 11 Sequence 9 - Large LOCA Dominant Cutsets (LLOCA-04) . . . . . . . . . . . . . . 59-81 59-12 Sequence 10 - Intermediate LOCA Dominant Cutsets (NLOCA-16) . . . . . . . . 59-83 59-13 Sequence 11 - Medium LOCA Dominant Cutsets (MLOCA-04) . . . . . . . . . . . 59-85 59-14 Sequence 12 - RCS Leak Dominant Cutsets (RCSLK-04) . . . . . . . . . . . . . . . 59-87 59-15 Sequence 13 - Medium LOCA Dominant Cutsets (MLOCA-05) . . . . . . . . . . . 59-89 59-16 Typical System Failure Probabilities, Showing Higher Reliabilities for Safety S yste ms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-91 59-17 Relative Distribution of Human Error Probabilities Illustrating the Use of Generally High Failure Probabilities .......................... .. 59-92 59-18 Summary of Level 1 At-Power Importance and Sensitivity Analysis Results . . 59-93

(

\

59-19 59-20 Summary of Sensitivity Analysis Results for Containment Response . . . . . . . 59-96 Summary of Total AP600 Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-97 59-21 Comparison of AP600 PRA Results to Risk Goals . . . . . . . . . . . . . . . . . . . . 59-98 59-22 Site Boundary Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . 59-99 59-23 Site Boundary Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . .59-100 59-24 Population Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-101 59-25 Population Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-102 A-1 Actuation and Trip Signals Used in AP600 MAAP4 Analyses . . . . . . . . . . . . A-53 A-2 RCS Pressure Requirements for LOCA Categories . . . . . . . . . . . . . . . . . . . . . A-54 1 A-3 Break Size Definition, No ADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 5 A-4 Summary of ADS Success Criteria Definitions Supported by MAAP4 Analyses ............................................ . . . . . A-56 A-5 SLOCA Cases for ADS Manual Actuation (NRHR Operation) . . . . . . . . . . . . A-5 7 )

A-6 Automatic ADS Success Criteria for IRWST Gravity Drain, No PRHR . . . . . . . A-57 A-7 Transient Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-57 ,

A-8 NLOCA Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-58 l A9 Approximate Times that NRHR is Credited in MAAP4 Analyses . . . . . . . . . . . A 58 A-10 System Assumptions for MAAP4 Medium LOCA Cases . . . . . . . . . . ... .. A-59 A-11 Sequence of Evente for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . . A-63 A-12 System Assumptions for MAAP4 Intermediate LOCA Cases . . . .......... A-67 i' A-13 Sequence of Events for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . A-71 A-14 System Assumptions for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . A-76 1

l C Revision: 6 3 Westkigh00S6 g::b November 15,1995 lyii m46% a -6% w:tb

. . - - . _ = . . .. -_ . . . . - . - .

1

=~w:--

j i

0 h  ;

LIST OF TABLES (Cont.)

Table No. Title g A-15 Sequence of Events for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . . A-84 A-16 System Assumptions for MAAP4 Steam Generator 1bbe Rupture Cases . . . . . . A-92 A-17 Sequence of Events for MAAP4 Steam Generator Tube Rupture Cases . . . . . . . A-94 l A-18 Summary of System Assumptions for MAAP4 Transient Cases . . . . . . . . . . . . A-96 A-19 Sequence of Events for MAAP4 Transient Cases . . . . . . . . . . . . . . . . . . . . . A-100 i

i I

2 i

O Revision: 6 November 15,1995 m:Wherev6Not6.wpf:lb jyjij h_ [ W65tingh00S8

BElBM i

a-s LIST OF FIGURES (Cont.)

Finure No. Title .P. age 52-16 Safety Injection Line Break Event Tree . . . . . . . . . . . ....... ... ...52-137 52-17 Steam Line Break Downstream of MSIVs Event Tree . . . . . . . . . . . . . . . . .52-138 52-18 Steam Line Break Upstream of MSIVs Event Tree . . . . . . . . . . . . . . . . . . .52-139 52-19 Stuck Open Secondary Side Safety Valve Event Tree . . . . . . . . . . . . . . . . .52-140 52-20 S mall LOCA Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52-141 52-21 RCS Leak Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52-142 52-22 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .52-143 52-23 Loop Dunng Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .52-144 54-1 LOSP During Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .54-281 54-2 Loss of RNS Initiator During HotK'old Shutdown (RCS Filled) Event Tree . .54-282 54-3 Loss of CCW/SW Initiator During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 8 3 54-4 LOCA/RNS Pipe Rupture During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 84 54-5 LOCA/RNS-V024 Opens During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 85 54-6 Overdraining of Reactor Cowant System During Draindown to Mid-Loop . . .54-286 54-7 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-287 54-8 Loss of RNS Initiator (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-288 54-9 Loss of CCW/SW Initiator (RCS Drained) Event Tree ............... .54-289 54-10 LOCA/RNS-V024 Opens (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . .54-290 54-11 Accumulator Injection (Dilution Scenario) Event Tree . . . . . . . . . . . . . . . . .54-291 54-12 Shutdown Transient Case SD1B2 RCS Pressure vs. Time . . . . . . . . . . . . . .54-292 54-13 Shutdown Transient Case SDIB2 Mass Flow Rate vs. Time . . . . . . . . . . . .54-293 54-14 Shutdown RNS Break Case SD3A (3500 gpm) . . . . . . . . . . . . . . . . . . . . . .54-294 54-15 Shutdown RNS Break Case SD3A2 (2000 gpm) . . . . . . . . . . . . . . . . . . . . .54-295 1 54-16 Shutdown RNS Break Case SD3A3 (1000 gpm) . . . . . . . . . . . . . . . . . . . . . 54-2% l 54-17 Shutdown Plant Damage State Substate Event Tree for LP-ADS . . . . . . . . . .54-297 54-18 Shutdown Plant Damage State Substate Event Tree for LP-1 A . . . . . . . . . . .54-298 54-19 Shutdown Plant Damage State Substate Event Tree for LP 3D . . . . . . . . . . .54-299 54-20 Shutdown Plant Damage State Substate Event Tree for LP 3BR . . . ......54-300 4 54-21 Shutdown Plant Damage State Substate Event Tree for LP 3BE . . . . . . . . .54-301  !

l 56-1 Flood Zones and Barriers Plan at 66 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-93 i 56-2 Flood Zones and Barriers Plan at 82 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-95 1 56 3 Flood Zones and Barriers Plan at 96 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-97 56-4 Flood Zones and Barriers Plan at 100'-0" & 107'-2" . . . . . . . . . . . . . . . . . . . 56-99 )

56-5 Flood Zones and Barriers Plan at 1 17 *-6" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 101 1 56-6 Flood Zones and Barrier' Plan at 135 ' 3" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 103  ;

l g Revision: 5 EWt' July 21,1995 xcili mw600,nw=mt5..pt:tb

i LIST OF FIGURES (Cont.)

Figure No. Title g 56-7 Flood Zones and Barriers Plan at 160'-6" & 153'-0" . . . . . . . . . . . . . . . . . 56- 105

$6-8 Flood Zones and Barriers Plan at 160'-6" & 180'-0" . . . . . . . . . . . . . . . . . .56-107 56-9 8.in. Fire Main Rupture at-Power Event Tree . . . . . . . . . . . . . . . . . . . . . . .56-109 56-10 8-in. Fire Main Rupture during Hot / Cold Shutdown Event Tree . . . . . . . . . 5 6- 1 10 56-11 8-in. Fire Main Rupture during RCS Dralned Conditions Event Tree . . . . . . .56-111 59-1 AP600 PRA Core Damage for Internal Initiating Events at Power . . . . . . .59-103 59-2 AP600 Core Damage Frequency Contributions . . . . . . . . . . . . . . . . . . . . . .59-104 Included in Appendix A are Figures A-1 through A-197 9

1 Revision: 6 01 November 15,1995 w_ T Westirighouse m:WVocrev6Tkthpf:lb xCiv l

'O l Simplified Passive Advanced Light Water Reactor Plant Program AP600 Probabilistic Risk Assessment Prepared for U.S. Department of Energy San Francisco Operations OfHee

DE-AC03-90SF18495 O

@~ es__

m:\ap600kpraiocrev6Voc6.wpf:Ib

t i

1

(- .

j- TABLE OF CONTENTS (Cont.)

1, Section . Title ,P,. age s

1 i

54.6 Success Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-41

} 54.6.1 MAAP4 Code Analysis for Shutdown Success Criteria . . . . . . . . . 54-42 54.6.2 MAAP4farameter File . . . . . . . ............... . . . . . . . . 54-42 j 54.6.3 MAAP4 Input Changes . . . . . . . . . . . ........ .......... . 54-43 J- 54.6.4 Definition of MAAP4 Cases From Event Trees ..... . . . . . . . . 54-45

) 54.6.5 Results From MAAP4 Analyses . . . . . . . . ..... . . ...... 54-46

{~ 54.7 Common Cause Analysis . . . . . . . . . . . . . . . . . . . . ......... . . . . . . . 54-47 l 54.8 Human Reliability Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-47

54.8.1 Operator Actions Calculated . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-47 .l
54.8.2 Conditional Human Error Probabilities . . . . . . . . . . . . . . . . . . . . . . 54-53 l 54.9 Fault Tree Quantification . . . . . . . . . . . . . . . . . . ...... .... . . . . . . . 54-53

! 54.10 Level 1 Core Damage Frequency Quanhfication . . . . . . . . . . . . . . . . . . . . . . 54-56  :

l 54.10.1 Core Damage Quantification Method . ... ...... .. .. . . . 54-56 l

! 54.10.2 Quanh fication Inputs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-58 1 54.10.3 Level 1 Shutdown Core Damage Frequency Results . . . . . . . . . . . . 54-59 )

l 54.11 Shutdown and Low. Power Release Category Quantification . . . . . . . . . . . . . . 54-59 i 54.11.1 Level I/Izvel PRA Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-60 i'

  • 54.11.2 Coneal====t E ent Tree Quantification . . . . . . . . . . . . ...... 54-63

! 54.11.3 Shutdown and ' aw-Power Containment Event Tree

Quantification Results Summary . . . . . . . . . . . . . . . . . . . . . . . . 54-65 54.12 Shutdown Assessment importance and Sensitivity Analyses . . . . . . . . . . . . . . 54-66 54.12.1 Importance Analyses for Core Damage at Shutdown . . . . . ..... . 54-67 i 54.12.2 Other Sensitivity Analyses for Shutdown Core Damage . . . . . . . . . . 54-73 i 54.13 Summary of Shindawn Level 1 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-75 j 54.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-81 2

1 6

CHAf'IER 56 PRA INTERNAL FLOODING ANALYSIS . . . . . . . . . . . . . . . .......... 56-1

56.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 1 i 56.1.1 Definitions . . . . . . . . . . . . . . . . . .......................56-1 l 56.2 Methodology . . . . . . . . . . . . . . . . . . . . . ...................... 56-1 56.2.1 Summary of Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-1
56.2.2 Informatnon Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-2
56.2.3 Initia1 Screenmg Maaaament ............................56-3
56.2.4 Detailed Sciwdsg Me,eement . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-4 j 56.2.5 Identification of Flood In& red Initialmg Events . . . . . . . . . . . . . . . 56-6 i 56.2.6 Initiating Event Fr==aciaa .............................56-7

. 56.3 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567

} 56.3.1 General Flooding Analysis Assumptions and Kneiaaermg Judgments . 56-7 AP600-Specific Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-9 56.3 2 56.4 Infmnatian Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 11 1

g Revision: 5 E6 ymm my July 21,1995 n Aap600prauccrev54cc5.wpf:1b i

4

=u TABLE OF CONTENTS (Cont.)

O. l l

Section Title Page, l

56.4.1 PRA-Modeled Equipment and Locations . . . . . . . . . . . . . . . . . . . . 56-11 56.4.2 Identification of Areas for Flooding Evaluation . . . . . . . . . . . . . . . . 56-11 56.5 At-Power Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 12 56.5.1 Initial Screening Assessment ................... . . . . . . . . 5 6- 12 56.5.2 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-12 56.5.3 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-28 56.5.4 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . 56-32 56.5.5 Quantification of At-Power Flood-Induced Events . . . . . . . . . . . . . . 56-39 56.6 Shutdown Operations . . . . . ...................................56-41 56.6.1 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-41 56.6.2 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . 56-42 56.6.3 Calculation of Flood-Induced Initiating Event Frequencies . . . . . .. 56-43 56.6.4 Shutdown Quantification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-48 56.7 Seismically Induced Flooding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-51 56.8 Flooding Hazards During Refueling Outages . . . . . . . . . . . . . . . . . . . . . . . . 56-52 56.9 Flooding Sensitivity Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-5 2 56.9.1 Flooding Human Error Probabilities Sensitivity Study . . . . . . . . . . . 56-52 56.10 Summary of Findings ....... ................................56-53 CHAPTER 58 WINDS, FLOODS, AND OTHER EXTERNAL EVENTS 58.1 Introducti on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..........58-1 58.2 External Events Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58-1 58.2.1 Severe Winds and Tornadoes . . . . . . . . . . . . . . . . . . . . . 58-1 58.2.2 External Floods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 8-2 58.2.3 Transportation and Nearby Facility Accidents . . . . . . . . . . 58-2 58.3 Concl usi o n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 8 -3 58.4 References . . . . ...................................58-3 CHAFTER 59 PRA RESULTS AND INSIGHTS 59.1 Introduction . . . . ...................................59-1 59.2 Use of PRA in the Design Process . . . . . . . . . . . . . . . . . . . . . . . 5 9 -3 59.2.1 Stage 1 - Use of PRA During the Early Design Stage . . . . 59-4 59.2.2 Stage 2 - Preliminary PRA . . . . . . . . . . . . . . . . . . . . . . . 59-5 59.2.3 Stage 3 - AP600 PRA Submittal to NRC (1992) . . . . . . . . . 59-7 59.2.4 Stage 4 - PRA Revision 1 (1994) . . . . . . . . . . . . . . . . . . 59 7 59.2.5 Stage 5 - PRA Revisions 2-6 (1995) . . . . . . . . . . . . . . . . . 59-8 '

59.3 Core Damage Frequency from Internal Ioitiating Events at Power . . . . 59-9 59.3.1 Dominant Core Damage Sequences . . . . . . . . . . . . . . . . 59-11 59.3.2 Component Importances for At-Power Core Damage Frequency . . . . . . . . . ........................59-35 l 1

ov r S,1995 3 M figh00Se u:\ap6005rakocrev6%c6.wpf:lb xxxvi

1

':Z :'_

rn-  ;

k TABLE OF CONTENTS (Cont.) i i

Section Title hge 1

l 59.3.3 System Importances for At-Power Core Damage . . . . . . . . 59-35 l 59.3.4 System Failure Probabilities for At-Power Core Damage . . 59-36 I 59.3.5 Common Cause Failure Importances for At-Power Core i Dam age . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-3 6 59.3.6 Human Error Importances for At-Power Core Damage . . . 59-36 59.3.7 Sensitivity Analyses Summary for At-Power Core l Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-3 8 J

59.3.8 Summary of Important Level 1 At-Power Results . . . . . . . 59-39  ;

59.4 Severe Release Frequency for Internal Initiating Events at Power . . . 59-43 59.4.1 Containment Response and Plant Risk Results . . . . . . . . . 59-43 i 59.4.2 Sensitivity Analyses for Containment Response . . . . . . . . 59-45 59.5 Core Damage and Severe Release Frequency from Events at Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-46 59.5.1 Summary of Shutdown Level 1 Results . . . . . . . . . . . . . . 59-46 59.5.2 Large Release Frequency for Shutdown and Low-Power l Eve nts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-51 59.5.3 Shutdown Results Summary . . . . . . . . . . . . . . . . . . . . . . 59-52

(~3 59.6 Core Damage and Severe Release Frequency from External and V Other Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-52 59.6.1 Results of Internal Floodmg Assessment . . . . . . . . . . . . . 59-52 59.7 Overall Plant Risk Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-53 59.8 Plant Features Important to Reducing Risk . . . . . . . . . . . . . . . . . . . 59-54 59.8.1 Reactor Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 5 59.8.2 Systems Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 6 59.8.3 Instrumentation and Control Design . . . . . . . . . . . . . . . . 59-5 9 59.8.4 Plant Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.5 Plant Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.6 Containment Design . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.9 PRA Input to the Design Certification Process . . . . . . . . . . . . . . . . 59-66 59.9.1 PRA Input to Reliability Assurance Program ..... . . . 59-66 59.9.2 PRA Input to ITAACs . . . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.3 PRA Input to Tech Specs . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.4 PRA Input to MMI/ Human Factors / Emergency Response Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.5 PRA Input to COL Action Items . . . . . . . . . . . . . . . . . . . 59-67 APPENDIX A MAAP4 ANALYSIS TO SUPPORT SUCCESS CRITERIA A.1 I ntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 1 A. I .1 MAAP4 Overview and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 A. I.2 MAAP4 Model for AP600 . . . . . . . . . . . . ...................A-1 O

G Egg, Revision: 6 g W m__.. m _d.S8 mga mh November 15,1995 xxxvil maap60&powevatoc6.wpt:tb

_ =

TABLE OF CONTENTS (Cont.)

Section Title g A. I.3 Core Damage Definition .................................A-4 A.I 4 Analysis Method . . . . . . . . . ............................A-5 A.2 Initiating Events . . . . . . . . . . . . . . . . . . . . . . .......................A5 A.2.1 Medium Loss of Coolant Accident ..........................A-7 A.2.2 Intermediate Loss of Coolant Accident ............. . . . . . . . . A-9 A.2.3 Small Loss of Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 A.2.4 Steam Generator Tube Rupture . . . . . . . . . . . . . . . . . .......... A-11 A.2.5 Transie nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 12 A.3 Break Size Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .......... A-14 A.4 ADS Success Criteria ................................. ...... A-15 A.4.1 Automatic Depressurization for RNS Operation . . . . . . . . . . . . . . . . A-17 A.4.2 Manual Depressurization for RNS Operation . . . . . . . . . . . . . . . . . A- 17 A.4.3 Automatic Depressurization for RNS Gravity Drain ...... . . . . . . A-20 A.4.4 Manual Depressurization for In-Containment Refueling Water Storage Tank Gravity Drain . . . . . ....... . . . . A-22 A.5 Accumulator and Core Makeup Tank Success Criteria . . . . . . . . . . . . . ..... A-26 A.6 Passive Residual Heat Removal Success Criteria . . . . . . . . . . . ........... A-27 A.7 Normal Residual Heat Removal and In-Containment Refueling Water Storage Tank Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-28 i A.8 Sensitivity Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.1 System Interaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.2 Containment Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-31 A.8.3 Passive System Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-32 l

A.9 MAAP4 Results . . . . . . . . . . . . . . .............................. A-34 I A.9.1 Medium Loss-of-Coolant Accident .. ...................... A-34 l A.9.2 Intermediate Loss-of-Coolant Accident .. ................... A-39 l A.9.3 Small Loss-of-Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . A-43 A.9.4 Steam Generator Tube Rupture . . . . .......................A-46 A.9.5 Transient . . . . . . ....................................A-49 A.10 References . . . . . . . . . . . . . . ............... . . . . . . . . . . . . . . . . . . A-5 2 Revision: 6 O

November 15,1995 g T Westingfl00Se uAap600;praVocrev6Voc6.wpf:!b XXXViij

i i

4 4

LIST OF TABLES (Cont.)

a.

l Table No. . .T_jgt _Pa,gg 54-41 Fault Tree RNT2 Success Criteria Summary . . . . . . .......... . . . . . 54- 15 8 54-42 Fault Tree RNP2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . .54-159 54-43 _ Loss of CCS/SWS,Dunng ShinMwn Initiating Event Fault Tree CSWF2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-160 54-44 Fault Tree CCTS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . ..54-161 54-45 Fault Tree CCPS Success Criteria Summary . . . . . . . . . . . .. ...... . '.54-162 1 54-46 Fault Tree SWTS Success Cntena Summary . . . . . . . . . . . . . . . . . . . . . . .54-163

) 54-47 Fault Tree SWPS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . 54164 54-48 Fault Tree VLHS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . .54-165 54-49 AC & DC Fault Trees Success Criteria Summary . . . . . . . . . . . . . . . . . . . .54-166 54-50 Fault Tree ADQLTS Data Su==ary . . . . . . . . . ......... . . . . . . . . .54-180 54-51 Fault Tree ADH,TS Data Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-181 54-52 AP600 Shutdown Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-182 54-53 ADS Success Criteria for Shutdown Conditions . . . . . . . . . . . . . . . . . . . .54-183 54-54a Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria i ADTS , ADLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-185 54-54b Saquanca of Events for MAAP4 Cases Supporting ADS Success Criteria ADS S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 186 s54-54c Sa=*=ca of Events for MAAP4 Cases Supporting ADS Success Criteria AD'I3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 1 R7 54-54d Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADLS and ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-188 54-54e  %=-* of Events for MAAP Cases Supporting ADS Success Criteria ADNS ....... ..........................................54-189 54-55 Conunon Cause Failure Evaluated for Shutdown . . . . . . . . . . . . . . . . . . . . .54-190 54-56 AP600 Shutdown A*seeement HEP Snmmary Results . . . . . . . . . . . . . . . . .54-191 54-57 Dap*=daaey Level Evaluation Summary for Shutdown Aa<enament . . . . . . . .54-200 54-58 Shutdown Master Data Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-204 54-59 List of Basic Events and their Desenptions (Shutdown Model) . . . . . . . . . . .54-220 54-60 AP600 mundawn Annaamment Level 1 Accident h==aca?

Quanrificaten Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-228 54-61 List of Dominant Sequences (At mundnwn) . . . . . . . . . . . . . . . . . . . . . . .54-229 54-62 List of Dominant Cutsets (At Shutdown) . . . . . . . . . . . . . . . . . . . . . . . . . .54-233 54-63 Sh*inwn f aitiatias Event importances . . . . . . . . . . . . . . . . . . . . . . . . . .54-244 54-64 Basic Event Isfaiasces Using Risk Decease Measure (At Shutdown) . . . . . 54 245 4 54-65 Basic Event importances Using Risk-Inmease Measure (At Shindown) . . . . .54-251 54-66 AP600 Contmiamaar Event Tree Nodal Questions . . . . . . . . . . . . . . . . . . . .54-257 54-67 AP600 Release Category 9== mary . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-258 54-68 Summary of Shndnwn and Low-Power Accident Classes . . . . . . . . . . . . . .54-259

, 54-69 AP600 Shutdown and Low Power Plant Damage Substate Frequencies . . . . .54-260 Revision: 5 IN July 21,1995

=4600Waam5ksspr.ib IV

_ _ . . - ~. .

1

- I LIST OF TABLES (Cont.)

Table No. Title fage a

54-70 AP600 Shutdown and Low-Power Plant Damage Substate Conditional j Prob abilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-261 54-71 AP600 Shutdown and Low-Power Containment Event Tree Quantification '

Results - Release Category Frequencies (Per Reactor-Year) . . . . . . . . . . . . .54-262 54-72 Release Category IC Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-263 54-73 Release Category ICP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . 54-2 64 j

54-74 Release Category XL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-265 i 54-75 Release Category BP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-266 I 54-76 Release Category CI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-267 54-77 f

Release Category CI-C Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-268 54-78 Release Category CFE Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-269 54-79 Release Category CFE-C Dominant Sequences . . . . . . . . . . . . . . . . . . . . . .54-270 54-80 Release Category CFI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-271 I 54-81 Release Category CFL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-272 54-82 Release Category CFV Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-273 4 54-83 Core Damage for Internal Initiating Events at Shutdown - Risk Decrease ...54-274 54-84 Core Damage for Internal Initiating Events at Shutdown - Risk Increase . . . .54-275 54-85 Shutdown Common Cause Importance - Risk Decrease . . . . . . . . . . . . . . . .54-276 54-86 Shutdown Common Cause Importance - Risk Increase . . . . . . . . . . . . . . . .54-277 54-87 Shutdown Ifuman Error Risk Importance - Risk Decrease . . . . . . . . . . . . . .54-278 54-88 Shutdown Human Error Risk Importance - Risk Increase . . . . . . . . . . . . . .54-278 54-89 Shutdown Component Importance - Risk Decrease . . . . . . . . . . . . . . . . . . .54-279 54-90 Shutdown Component Importance - Risk Increase . ..................54-279 54-91 Operator Actions for Sensitivity Cases 7 and 8 . . . . . . . . . . . . . . . . . . . . . .54-280 l

56-1 AC and Non-class 1E DC Equipment Locations . . . . . . . . . . . . . . . . . . . . . 5 6-55 l 56-2 AP600 Building Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-57 56-3 Flooding Analysis Initial Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . 56-59 56-4 At-Power Detailed Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-63  ;

56-5 At-Power Flooding-Induced Core Damage Frequency Quantification ]

Su mmary Resul ts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-68  !

56-6 Shutdown Flooding-Induced Core Damage Frequency Quantification Summary Results . . . . ..... ............................. {

.. 56-72 i 56-7 At-Power Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-77 56-8 l

Shutdown Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 8 7 B 59-1 Internal Initiating Event Core Damage Frequency Contribution by Initiating j Event . . . . . . . ............................................59-68 i 59 2 Internal Initiating Events at Power Dominant Core Damage Sequences . . . . . . 59-69 l 59-3 Sequence 1 - Safety Injection Line Break Dominant Cutsets (SI-LB-02) . . . . . 59-71 j

Revision: 6 gg e!

November 15,1995 W=6 We@uSe m:Wavmev6%6.wpf:Ib Ivi 4

0 S

,m LIST OF TABLES (Cont.)

Table No. Title _Page 59-4 Sequence 2 - ATWS Dominant Cutsets (ATWS-1-07) . . . . . . . . . . . . . . . . . . 59-72 59-5 Sequence 3 - ATWS Dominant Cutsets (ATWS-28) . . . . . . . . . . . . . . . . . . . 59-73 59-6 Sequence 4 - Large LOCA Dominant Cutsets (LLOCA-03) . . . . . . . . . . . . . . 59-75 59-7 Sequence 5 - Safety Injection Line Break Dominant Cutsets (SI-LB-03) . . . . . 59-76 59-8 Sequence 6 - Intermediate LOCA Dominant Cutsets (NLOCA-M) . . . . . . . . . 59-78 59-9 Sequence 7 - Intermediate LOCA Dominant Cutsets (NLOCA-06) . . . . . . . . . 59-79 59-10 Sequence 8 - Reactor Vessel Rupture Cutset ........................59-80 59-11 Sequence 9 - Large LOCA Dominant Cutsets (LLOCA-M) . . . . . . . . . . . . . . 59-81 59-12 Sequence 10 - Intermediate LOCA Dominant Cutsets (NLOCA-16) . . . . . . . . 59-83 59-13 Sequence 11 - Medium LOCA Dominant Cutsets (MLOCA-04) . . . . . . . . . . . 59-85 59-14 Sequence 12 - RCS Leak Dominant Cutsets (RCSLK-M) . . . . . . . . . . . . . . 59-87 59-15 Sequence 13 - Medium LOCA Dominant Cutsets (MLOCA-05) . . . . . . . . . . . 59-89 59-16 Typical System Failure Probabilities, Showing Higher Reliabilities for Safety S yste ms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-91 59-17 Relative Distribution of Human Error Probabilities Illustrating the Use of Generally High Failure Probabilities . . . . . . . . . . ...... . . . . . . . . . . . . 5 9-92 59-18 Summary of Level 1 At-Power Importance and Sensitivity Analysis Results . . 59-93 59-19 Summary of Sensitivity Analysis Results for Containment Response . . . . . . . . 59-96

( 59-20 Summary of Total AP600 Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-97 59-21 Comparison of AP600 PRA Results to Risk Goals ...... . . . . . . . . . . . . 5 9-9 8 59-22 Site Boundary Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . 5 9-99 59-23 Site Boundary Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . .59-100 59-24 Population Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . 59- 101 59-25 Population Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . . .59-102 A-1 Actuation and Trip Signals Used in AP600 MAAP4 Analyses . . . . . . . . . . . . . A-53 A-2 RCS Pressure Requirements for LOCA Categories . . . . . . . . . . . . . . . . . . . . . A-54 A-3 Break Size Definition, No ADS . ............................ . . . A-55 A-4 Summary of ADS Success Criteria Definitions Supported by MAAP4 Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 6 A-5 SLOCA Cases for ADS Manual Actuation (NRHR Operation) . . . . . . . . . . . . A-57 A-6 Automatic ADS Success Criteria for IRWST Gravity Drain, No PRHR . . . . . . . A-57 3 A-7 Transient Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-57 A-8 NLOCA Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-58 l j

A-9 Approximate Times that NRHR is Credited in MAAP4 Analyses . . . . . . . . . . A-5 8 '

A-10 System Assumptions for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . A 59 A-11 Sequence of Events for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . . A-63 n A-12 System Assumptions for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . A-67 i A-13 Sequence of Events for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . . A-71 A-14 System Assumptions for MAAP4 Small LOCA Cases .. ... ... ...... A-76 O

V Revision: 6 6 November 15,1995 jyij mAap6005praVocrev6\ lot 6.wpf:lb

LIST OF TABLES (Cont.)

Table No. Title .P.!!gg A-15 Sequence of Events for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . . A 84 A-16 System Assumptions for MAAP4 Steam Generator Tube Rupture Cases . . . . . . A-92 A-17 Sequence of Events for MAAP4 Steam Generator Tube Rupture Cases . . . . . . . A-94 A-18 Summary of System Assumptions for MAAP4 Transient Cases . . . . . . . . . . . A 96 A-19 Sequence of Events for MAAP4 Transient Cases . . . . . . . . . . . . . . . . . . . . . A-100 O

Revision: 6 November 15,1995 BlfEL g Westinghouse N' h maap6mpraocrev6ua&-gab jyg

O. LIST OF FIGURES (Cont.)

Flaure No. Ti ut .Page  ;

52-16 Safety injection Line Break Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 137 52-17 Steam Line Break Downstream of MSIVs Event Tree . . . . . . . . . . . . . . . . .52-138 52-18 Steam Line Break Upstream of MSIVs Event Tree . . . . . . . . . . . . . . . . . . . 52139 52-19 Stuck Open Secondary Side Safety Valve Event Tree . . . . . . . . . . . . . . . . .52-140 52-20 Small LOCA Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 141 52-21 RCS Leak Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52-142 52 22 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .52-143 52-23 Loop During Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .52-144 54-1 LOSP During Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .54-281 54-2 Loss of RNS Initiator During Hot / Cold Shutdown (RCS Filled) Event Tree . .54-282 54-3 Loss of CCW/SW Initiator During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-28 3 54-4 LOCA/RNS Pipe Rupture During Hot / Cold Snutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-284 54-5 LOCA/RNS-V024 Opens During Hot / Cold Shutdown (RCS Filled)

Eve nt Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-285 54-6 Overdraining of Reactor Coolant System During Draindnwn to Mid-Loop . . .54-286 I

{~ 54-7 54 8 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-287 Loss of RNS Initiator (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-288 54-9 Loss of CCW/SW Initiator (RCS Drained) Event Tree . . . . . . . . . . . . . . . . 54-2 89 l 54-10 LOCA/RNS-V024 Opens (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . .54-290 l 54-11 Accumulator Injection (Dilution Scenario) Event Tree . . . . . . . . . . . . . . . . .54-291 l 54-12 Shutdown Transient Case SDIB2 RCS Pressure vs. "Hme . . . . . . . . . . . . . .54-292 54-13 Shutdown Transient Case SD182 Mass Flow Rate vs. ~l'une . . . . . . . . . . . .54-293 54-14 Shutdown RNS Break Case SD3A (3500 gpm) . . . . . . . . . . . . . . . . . . . . . .54-294 54-15 Shutdown RNS Break Case' SD3A2 (2000 gpm) . . . . . . . . . . . . . . . . . . . . .54-295 54-16 Shutdown RNS Break Case SD3A3 (1000 gpm) . . . . . . . . . . . . . . . . . . . . . 54-2%

54-17 Shutdown Plant Damage State Substate Event Tree for LP-ADS . . . . . . . . . .54-297 54-18 Shutdown Plant Damage State Substate Event Tree for LP-1 A . . . . . . . . . . .54-298 54-19 Shutdown Plant Damage State Substate Event Tree for LP-3D . . . . . . . . . . .54-299 54-20 Shutdown Plant Damage State Substate Event Tree for LP-3BR . . . . . . . . . .54-300 54-21 Shutdown Plant Damage State Substate Event Tree for LP-3BE . . . . . . . . . .54-301 56-1 Flood Zones and Barriers Plan at 66'-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-93 '

56-2 Flood Zones and Barriers Plan at 82 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-95 56-3 Flood Zones and Barriers Plan at 96 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-97 56-4 Flood Zones and Barriers Plan at 100'-0" & 107'-2" . . . . . . . . . . . . . . . . . . . 56-99 56-5 Flood Zones and Barriers Plan at 1 17'-6" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 101 56-6 Flood Zones and Bamers Plan at 135 '-3" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 103 Revision: 5 h July 21,1995 Keiij mNp600pratoaov5%fiwyf:Ib

sm -

LIST OF FIGURES (Cont.)

Figure No. Title g 56-7 Flood Zones and Barriers Plan at 160'-6" & 153'-0" . . . . . . . . . . . . . . . . . . 5 6-105 56-8 Flood Zones and Barriers Plan at 160*-6" & 180'-0" . . . . . . . . . . . . . . . . . .56-107 56-9 8-in Fire Main Rupture at-Power Event Tree . . . . . . . . . . . . . . . . . . . . . . .56-109 56-10 8-in. Fire Main Rupture during Hot / Cold Shutdown Event Tree . . . . . . . . . .56-110 56-11 8-in. Fire Main Rupture during RCS Drained Conditions Event Tree . . . . . . .56-111 59-1 AP600 PRA Core Damage for Internal Initiating Events at Power . . . . . . . . 5 9- 103 59-2 AP600 Core Damage Frequency Contributions . . . . . . . . . . . . . . . . . . . . . .59-104 Included in Appendix A are Figures A-1 through A-197 O

l Revision: 6 November 15,1995 =_ T Westingh0Use m:Waberev6\lof6 wpf:1b XCiv

i O

Simplified Passive Advanced Light Water Reactor Plant Program AP600 Probabilistic Risk Assessment O

l 1

l Prepared for U.S. Department of Energy San Francisco Operations Office DE-AC03-90SF18495 l l

' l O

@~ L mAap600pratocrev6Voc6.wpf:Ib i

_ _ _ _ _ . _ . _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ . . _ _ ~. _ _ _ _ _ _ _ . _ __

1 1

l l

1 i s TABLE OF CONTENTS (Cont.)

i Section . Tite, .Page, I i

i 54.6 Success Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-41  !

54.6.1 MAAP4 Code Analysis for Shutdown Success Criteria . . . . . . . . . 54-42 I 54.6.2 MAAP4 farameter File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-42

54.6.3 MAAP4 Input Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 54-43 54.6.4 Definhion of MAAP4 Cases From Event Trees . . . . . . . . . . . . . 54-45 54.6.5 Results From MAAP4 Analyses . . . . . . . . . . . . . . . . . . . . . . . . . 54-46 54.7 Common Cause Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-47 54.8 Human Reliability Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-47 54.8.1 Operator Actions Calculated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-47 54.8.2 Conditional Human Error Probabilities . . . . . . . . . . . . . . . . . . . . . . 54-53 ,

54.9 Fault Tree Quannfication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-53 )

54.10 Level 1 Core Damage Ihquern;y Quannfication . . . . . . . . . . . . . . . . . . . . . . 54-56 54.10.1 Core Damage Qumat*adon Method . . . . . . . . . . . . . . . . . . . . . . .54-56 54.10.2 Quantification inputs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-58 l 54.10.3 Level 1 Shutdown Core Damage Frequency Results . . . . . . . . . . . 54-59  !

$4.11 Shutdown and Low-Power Release Category QnaaWicahan . . . . . . . . . . . . . . 54-59 54.11.1 Level I/ Level : PRA Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-60 54.11.2 Containment E ent Tree Quantification . . . . . . . . . . . . . . . . . . . . . 54-63 1

\ 54.11.3 Shutdown and Aw-Power Containment Event Tree  !

Quantification Results Summr ry . . . . . . . . . . . . . . . . . . . . . . . . . 54-65 1 54.12 Shutdown Assessment importance and Sensitivity Analyses . . . . . . . . . . . . . . 54-66 54.12.1 Importance Analyses for Core Damage at Shutdown . . . . . . . . . . . , . 54-67 54.12.2 Other Sensitivity Analyses for Shutdown Core Damage . . . . . . . . . . 54-73 54.13 Summary of Shutdown Level-1 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-75 54.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-81 I '

CHAP'IER 56 PRA IN'IERNAL FLOODING ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . 56-1 56.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 1 56.1.1 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-1 56.2 Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-1 56.2.1 Summary of Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-1 56.2.2 Information Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-2

, 56.2.3 laitial Screening Assat=* ............................56-3 56.2.4 Detailed Screening Aurament . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-4 56.2.5 Identification of Flood-tadneed laMad=5 Events . . . . . . . . . . . . . . . 56-6 56.2.6 Initiating Event Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-7 56.3 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-7 56.3.1 General Floodmg Analysis Assumptions and Engineering Judynaan . 56-7 i 56.3.2 AP600. Specific Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-9 56.4 Information Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 56 1 1 Revision: 5 gg July 21,1995 xxxv * **"*se

! l l TABLE OF CONTENTS (Cont.)

l Section Title Pa.ge l l

l l 56.4.1 PR A-Modeled Equipment and Locations . . . . . . . . . . . . . . . . . . . . 56-11 56.4.2 Entifkation of Areas for Floodmg Evaluation . . . . . . . . . . . . . . . . 56-11 56 5 At Nwer Operations . .......................................56-12 56.5.1 Initial Screening Assessment ............. . . . . . . . . . . . . . . 5 6- 12

$6.5.2 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-12 56.5.3 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-28 56.5.4 l Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-32 '

56.5.5 Quantification of At-Power Flood-Induced Events . . . . . . . . . . . . . . 56-39 56.6 Shutdown Operations . . . . ...................................56-41 56.6.1 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-4 1 56.6.2 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . 56-42 56.6.3 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-43 56.6.4 Shutdown Quantification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-4 8 l 56.7 Seismically Induced Flooding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-51 56.8 Flooding IIazards During Refueling Outages . . . . . . . . . . . . . . . . . . . . . . . . 56-52 56.9 Flooding Sensitivity Study . . . . . . . . . . . . . . ......................56-52 56.9.1 Flooding Iluman Error Probabilities Sensitivity Study . . . . . . . . . . . 56-52 56.10 Summary of Findings .. .....................................56-53 CHAI'ER 58 WINDS. FLOODS, AND OTHER EXTERNAL EVENTS 58,1 I ntrod ucti o n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58-1 58.2 External Events Analysis . . . . . . . . . . . . . . . . . ............. 58-1 58.2.1 Severe Winds and Tornadoes . . . . . . . . . . . . . . . . . . . . . 58 1 58.2.2 External Floods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 2 58.2.3 Transportation and Nearby Facility Accidents . . . . . . . . . . 58 2 58.3 Conclusion . . . . . . . . . . . . . . . . ............. . . . . . . . . . . 5 8 -3 58.4 References . . . . . . . . ................................. 58-3 CHAPTER 59 PRA RESULTS AND INSIGHTS 59.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9- 1 l

59.2 Use of PRA in the Design Process . . . . . . . . . . . . . . . . . . ...... 59-3 59.2.1 Stage 1 - Use of PRA During the Early Design Stage . . . . . 59-4 59.2.2 Stage 2 - Preliminary PRA . . . . . . . . . . . . . . . . . . . . . . . 59-5 59.2.3 Stage 3 - AP600 PRA Submittal to NRC (1992) . . . . . . . . . 59-7 59.2.4 Stage 4 - PRA Revision 1 (1994) . . . . . . . . . . . . . . . . . . . 59-7 59.2.5 Stage 5 - PRA Revisions 2 6 (1995) . . . . . . . . . . . . . . . 5 9-8 59.3 Core Damage Frequency from Internal Initiating Events at Power . . . 59-9 59.3.1 Dominant Core Damage Sequences . . . . . . . . . . . . . . . . . 5911 59.3.2 Component Importances for At-Power Core Damage Frequency .................................59-35 o r 5,1995 Westingh0US0 uAsp600VraVocrev6Moc6.wpf:Ib xxxyl

W~

wmu TABLE OF CONTENTS (Cont.)

Section Title _Page 59.3.3 System Importances for At-Power Core Damage . . . . . . . . 59-35 59.3.4 System Failure Probabilities for At-Power Core Damage . . 59-36 59.3.5 Common Cause Failure Importances for At Power Core Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 6 59.3.6 Human Error Importances for At-Power Core Damage . . . 59-36 59.3.7 Sensitivity Analyses Summary for At-Power Core Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-38 59.3.8 Summary of Important Level 1 At-Power Results . . . . . . . 59-39 59.4 Severe Release Frequency for Internal Initiating Events at Power . . . 59-43 59.4.1 Containment Response and Plant Risk Results . . . . . . . . . 59-43 59.4.2 Sensitivity Analyses for Containment Response . . . . . . . . 59-45 59.5 Core Damage and Severe Release Frequency from Events at S hutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-46 59.5.1 Summary of Shutdown Level 1 Results . . . . . . . . . . . . . . 59-46 59.5.2 Large Release Frequency for Shutdown and Low-Power Eve nts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-51 59.5.3 Shutdown Results Summary . . . . . . . . . . . . . . . . . . . . . . 59-52 59.6 Core Damage and Severe Release Frequency from External and

(]

v Other Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 2 59.6.I Results of Internal Flooding Assessment . . . . . . . . . . . . . 5 9-52 59.7 Overall Plant Risk Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-53 59.8 Plant Features Important to Reducing Risk . . . . . . . . . . . . . . . . . . . 59-54 59.8.1 Reactor Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-55 l 59.8.2 Systems Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-56 59.8.3 Instrumentation and Control Design . . . . . . . . . . . . . . . . 5 9-5 9 59.8.4 Plant Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 l 59.8.5 Plant Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.6 Containment Design . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 1 59.9 PRA Input to the Design Certification Process . . . . . . . . . . . . . . . . 59-66 59.9.1 PRA Input to Reliability Assurance Program . . . . . . . . . . 59-66 59.9.2 PRA Input to ITAACs . . . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.3 PRA Input to Tech Specs . . . . . . . . . . . . . . . . . . . . . . . 5 9-66 59.9.4 PRA Input to MMI/ Human Factors / Emergency Response Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-66 59.9.5 PRA Input to COL Action Items . . . . . . . . . . . . . . . . . . . 59-67 APPENDIX A MAAP4 ANALYSIS TO SUPPORT SUCCESS CRITERIA A.1 I ntroductio n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 1 A.I.1 MAAP4 Overview and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 A. I.2 MAAP4 Model for AP600 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 1 l

l s ~

W Revision: 6

\

Y W95tif@00S8 November 15,1995 XXXyij mAap600lpraitocrev6%c6.wpf:1b

i l . _ _ _ _ .

l l

TABLE OF CONTENTS (Cont.)

O Section Title Page 1

\

1 l

l A. I .3 Core Damage Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4 A.1.4 Analysis Method . . . . . . ............................ . . . A-5 A.2 Initiating Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 A.2.1 Medium Loss of Coolant Accident ..........................A-7

, A.2.2 Intermediate Loss of Coolant Accident ....................... A-9 I l

1 A.2.3 Small Loss of Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 l A.2.4 Steam Generator Tube Rupture . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 l A.2.5 Transie nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 12 l A.3 Break Size Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-14 l l A.4 ADS S uccess Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-15 l l A.4.1 Automatic Depressurization for RNS Operation . . . . . . . . . . . . . . . . A-17 l A.4.2 Manual Depressurization for RNS Operation . . . . . . . . . . . . . . . . . A-17

! A.4.3 Automatic Depressurization for RNS Gravity Drain ...... ...... A-20 l

A.4.4 Manual Depressurization for In-Containment Refueling Water Storage Tank Gravity Drain . . . . . . . . . . . . . . . . . A-22 A.5 Accumulator and Core Makeup Tank Success Criteria . . . . . . . . . . . . . . . . . . . A-26 A.6 Passive Residual IIeat Removal Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-27 l A.7 Nor:*ni Residual Heat Removal and In-Containment l Refueling Water Storage Tank Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-28 A.8 Sensitivity Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.1 System Interaction . . . ... .........................A-29 A.8.2 Containment Isolation . . . . . .... ................... .. A-31 A.8.3 Passive System Performance . . . . . . . . . . . ..................A-32 t

A.9 MAAP4 Results . . . . . . . . . . . . . . . . . . . ... ..................... A-34 i

A.9.1 Medium Loss-of-Csohnt Accident . . . . . . . . . . . . . . . . . . . . . . . . . A-34 l A.9.2 Intermediate Loss-af-Cochnt Accident ......................A-39 l

l A.9.3 Small Loss-of-Coolant Accioent . . . . . . . . . . . . . . . . . . . . . . . . . . . A-43 l A.9.4 Steam Generator Tbbe Rupture . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46 A.9.5 Transie nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4 9 l A.10 References . . . . . . . . . . . . . . . . . . . . . . ..........................A-52 O

Nov r 15,1995 3 WestiligtI0t1Se u:\ap600'praiocrev6Voc6.wpf:Ib xxxvili

y i

.A

h. _1.

O LIST OF TABLES (Cont.)

Table No. . Title _Pau, 54-41 Fault Tree RNT2 Success Criteria Summary . . . . . . . . . . . . . . . . . .. ..54-158 54-42 Fault Tree RNP2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . .54-159 54-43 Loss of CCS/SWS,Dunng Shutdown Initiating Event Fault Tree CSWF2 Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-160 54-44 Fault Tree CCTS Success Criteria Summnry . . . . . . . . . . . . . . . . . . . . . . . .54-161 54-45 Fault Tree CCPS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . ..54-162 54 r%It Tree SWTS Success Cnteria Summary . . . . . . . . . . . . . . . . . . . . . . .54-163 54-47 Fault Tree SWPS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . . .54-164  ;

54-48 Fault Tree VLHS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . . .54-165 )

AC & DC Fault Trees Success Criteria Summary . . . . . . . . . . . . . . . . . . . .54-166

~

54-49 54-50 Fault Tree ADQLTS Data Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-180 54-51 Fault Tree AD1LTS Data Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-181 54-52 AP600 Shutdown Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-1 A2 54-53 ADS Success Criteria for ShutMwn Conditions . . . . . . . . . . . . . . . . . . . . .54-183 l 54-54a Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADTS , ADLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 185 54-54b ha-* of Events for MAAP4 Cases Supporting ADS Success Criteria

.ADSS................................................ . 54 186 k 54-54c Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54- 187 54-54d M-e of Events for MAAP4 Cases Supporting ADS Success Criteria ADLS and ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-188 54-54e W- of Events for MAAP Cases Supporting ADS Success Criteria ,

ADNS .................................................54-189 54-55 Conunon Cause Failure Evaluated for munMwn . . . . . . . . . . . . . . . . . . . . .54-190 54-56 AP600 Shutdown Assessment HEP Sununary Resuks . . . . . . . . . . . . . . . . .54-191 54-57 DW Level Evaluation Summary for Shutdown Meenement . . . . . . . .54-200 54-58 Shutdown Master Data Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-204 54-59 List of Basic Events and their Desenptions (Shutdown Model) . . . . . . . . . . .54-220 54-60 AP600 DunMwn Maaanmant level 1 Accident M-Quantification Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-228 54-61 List of Dominant Sequences (At Munkwn) . . . . . . . . . . . . . . . . . . . . . . . .54-229 54-62 List of Dominant Cutsets (At Shutdown) . . . . . . . . . . . . . . . . . . . . . . . . . .54-233 54-63 Shutdown Initiating Event Importances . . . . . . . . . . . . . . . . . . . . . . . . . .54-244 54-64 Basic Event liiipni.sa Using Risk-Decrease Measure (At ShutMwn) . . . . .54-245 54-65 Basic Event liiigni.-as Using Risk lacrease Measure (At Shutdown) . . . . .54-251 54-66 AP600 Containment Event Tree Nodal Quesdons . . . . . . . . . . . . . . . . . .54-257 54-67 AP600 Relcase Category Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-258 54-68 Summary of Shutdown and Low-Power Accident Classes . . . . . . . . . . . . . .54-259 54-69 AP600 MusMwn and Low-Power Plant Damage Substate Frequencies . . . . .54-260

) Revision: 5 N h July 21,1995 IV mV80s=*=mi.pr: b

Z:'

LIST OF TABLES (Cont.)

Table No. Title .hge 54-70 AP600 Shutdown and Low-Power Plant Damage Substate Conditional Probabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 61 54-71 AP600 Shutdown and Low-Power Containment Event Tree Quantification Results - Release Category Frequencies (Per Reactor-Year) . . . . . . . . . . . . .54-262 54-72 Release Category IC Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-263 54-73 Release Category ICP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-264 54-74 Release Category XL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-265 54-75 Release Category BP Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-266 54-76 Release Category CI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . . .54-267 54-77 Release Category CI-C Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-268 54-78 Release Category CFE Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-269 54-79 Release Category CFE-C Dominant Sequences . . . . . . ...............54-270 54-80 Release Category CFI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-271 54-81 Release Category CFL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-272 54-82 Release Category CFV Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-273 54-83 Core Damage for Internal Initiating Events at Shutdown - Risk Decrease ...54-274 54-84 Core Damage for Internal Initiating Events at Shutdown - Risk Increase . . . .54-275 54-85 Shutdown Common Cause Importance - Risk Decrease . . . . . . . . . . . . . . . .54-276 54-86 Shutdown Common Cause Importance - Risk Increase .............. .54-277 54-87 Shutdown Human Error Risk Importance - Risk Decrease . . . . . . . . . . . . . .54-278 54-88 Shutdown Human Error Risk Importance - Risk Increase . . . . . . ........54-278 54-89 Shutdown Component Importance - Risk Decrease . . . . . . . . . . . . . . . . . . .54-279 54-90 Shutdown Component Importance - Risk Increase . . . . . . . . . . . . . . . . . . . .54-279 54-91 Operator Actions for Sensitivity Cases 7 and 8 . . . . . . . . . . . . . . . . . . . . . .54-280 56-1 AC and Non-class 1E DC Equipment Locations . . . . . . . . . . . . . . . . . . . . . . 56-55 56-2 AP600 Building Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-57 56-3 Flooding Analysis Initial Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . 56-59 56-4 At-Power Detailed Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-63 56-5 At-Power Flooding-Induced Core Damage Frequency Quantification l

S ummary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-68 56-6 Shutdown Flooding-Induced Core Damage Frequency Quantification I Summary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-72 56-7 At-Power Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-77 56-8 Shutdown Flooding Dominant Cutsets . . . . . . . . . . . . . . . .... . . . . . . . . 56-87 59-1 Internal Initiating Event Core Damage Frequency Contribution by Initiating E ve nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-6 8 59-2 Internal Initiating Events at Power Dominant Core Damage Sequences . . . .. 59-69 59-3 Sequence 1 - Safety Injection Line Break Dominant Cutsets (SI-LB-02) . . . . . 59-71 ho r 15,1995 mAap600%praVocrev6Tlat6.wpf:lb lvj

,,,, [ W @ 00S8

=_..

j I

LIST OF TABLES (Cont.)

Table No. Title fage, !

59-4 Sequence 2 - ATWS Dominant Cutsets (ATWS-1-07) . . . . . . . . . . . . . . . . . . 59-72 59-5 Sequence 3 - ATWS Dominant Cutsets (ATWS-28) . . . . . . . . . . . . . . . . . . . 59-73 59-6 Sequence 4 - Large LOCA Dominant Cutsets (LLOCA-03) . . . . . . . . . . . . . . 59-75 59-7 Sequence 5 - Safety Injection Line Break Dominant Cutsets (SI-LB-03) . . . . . 59-76 59-8 Sequence 6 - Intermediate LOCA Dominant Cutsets (NLOCA-04) . . . . . . . . . 59-78 59-9 Sequence 7 - Intermediate LOCA Dominant Cutsets (NLOCA-06) . . . . . . . . . 59-79 59-10 Sequence 8 - Reactor Vessel Rupture Cutset ........................59-80 59-11 Sequence 9 - Large LOCA Dominant Cutsets (LLOCA-04) . . . . . . . . . . . . . . 59-81 59-12 Sequence 10 - Intermediate LOCA Dominant Cutsets (NLOCA-16) . . . . . . . . 59-83 59-13 Sequence 11 - Medium LOCA Dominant Cutsets (MLOCA-04) . . . . . . . . . . . 59-85 59-14 Sequence 12 - RCS Leak Dominant Cutsets (RCSLK-04) . . . . . . . . . . . . . . . 59-87 59-15 Sequec 0 - Medium LOCA Dominant Cutsets (MLOCA-05) . ......... 59-89 59-16 Typical Sysem Failure Probabilities, Showing Higher Reliabilities for Safety Systems . ...............................................59-91 59-17 Relative Distribution of Human Error Probabilities Illustrating the Use of Generally High Failure Probabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-92 59-18 Summary of Level 1 At-Power Importance and Sensitivity Analysis Results . . 59-93 p 59-19 Summary of Sensitivity Analysis Results for Containment Response . . . . . . . . 59-96 h 59-20 59-21 Summary of Total AP600 Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-97 Comparison of AP600 PRA Results to Risk Goals . . . . . . . . . . . . . . . . . . . . 59-98 59-22 Site Boundary Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . 59-99 59-23 Site Boundary Dose 72-Hour Risk From hternal Events . . . . . . . . . . . . . . .59-100 59-24 Population Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-101 59-25 Population Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-102 A-1 Actuation and Trip Signals Used in AP600 MAAP4 Analyses . . . . . . . . . . . . . A 53 A-2 RCS Pressure Requirements for LOCA Categories . . . . . . . . . . . . . . . . . . . . . A-54 A-3 Break Size Definition, No ADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-55 l A-4 Summary of ADS Success Criteria Definitions Supported by MAAP4  !

Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 5 6 A-5 SLOCA Cases for ADS Manual Actuation (NRHR Operation) . . . . . . . . . . . . . A-57 A-6 Automatic ADS Success Criteria for IRWST Gravity Drain, No PRHR . . . . . . . A-57 A-7 Transient Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-57 A-8 NLOCA Cases for ADS Manual Actuation (IRWST Gravity Drain) . . .... . A-58 A-9 Approximate Times that NRHR is Credited in MAAP4 Analyses . . . . . . . . . . . A-58 A-10 System Assumptions for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . A-59 A-11 Sequence of Events for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . . A-63 A-12 System Assumptions for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . A-67 A-13 Sequence of Events for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . . A-71 A-14 System Assumptions for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . A-76 g

i<

V Revision: 6

[ M @ 00S8 6 November 15,1995 Ivil map 60mprawcreve6.wpr: b

\

r.-r.

RW ---

LIST OF TABLES (Cont.) .

Table No. Title fate A-15 Sequence of Events for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . . A-84 A-16 System Assumptions for MAAP4 Steam Generator Tube Rupture Cases . . . . . . A-92

. A-17 Sequence of Events for MAAP4 Steam Generator Tube Rupture Cases . . . . . . . A-94 A-18 Summary of System Assumptions for MAAP4 Transient Cases . . . . . . . . . . . . A-96  :

A-19 Sequence of Events for MAAP4 Transient Cases . . . . . . . . . . . . . . . . . . . . A-100 l

1 l

i I

i I

l i,

e l

1 I

r I

l Revision: 6 ENEL Novemher 15,1995 ITm6 3 Westinghouse m%6oWrnmeve6..prab lviu..

=

O Simplified Passive Advanced Light Water Reactor Plant Program AP600 Probabilistic Risk Assessment O

Prepared for U.S. Department of Energy San Francisco Operations Office DE-AC03-90SF18495 O

@m. m_ m:\ap600praVocrev6Voc6.wpf:1b l

l

.m . .- - .-

1 l

- 1 l

O

\v/

TABLE OF CONTENTS (Cont.)

Section . Title Lage.

54.6 Success Criteria .. ................... ........ ...... . . . . 54-41 54.6.1 MAAP4 Code Analysis for Shutdown Success Criteria . . . . 54-42 54.6.2 MAAP4 farameter File . . . . . . . . . . . . . . . . . . . ..... . . . 54-42 1 54.6.3 MAAP4 Input Changes . . ... ............ ..... .. . . 54-43 54.6.4 Definition of MAAP4 Cases From Event Trees ....... . .. . 54-45 54.6.5 Results From MAAP4 Analyses . . .... ..... ... . .. .. 54-46 54.7 Common Cause Analysis . . . . . . . . .. .. .... .... .. ... . . 54-47 54.8 Human Reliability Analysis . . . . ..... .. .... .. .. ...... . . . 54-47 54.8.1 Operator Actions Calculated . . . . .... ...... . ........ . 54-47 54.8.2 Conditional Human Error Probabilities . . . . . . . . . . . . . . . . . . . . . 54-53 54.9 Fault Tree Quantincation . . . . ......... ............. ..... .. 54-53 54.10 Level 1 Core Damage Frequency Quantin c ation . . . . . . . . . . . . . . . . . .. . 54-56 54.10.1 Core Damage Quantincation Method . . . . . . . . . . . . . . . . . . . . .. 54-56 54.10.2 Quantincation Inputs . . .. ........................ .. 54-58 54.10.3 Level 1 Shutdown Core Damage Frequency Results . . . . . . . . . . . 54-59 54.11 Shutdown and Low-Power Release Category Quantification . . . . . . . . . . . . . 54-5 9 54.11.1 Level I/ Level PRA Interface . . . . . . . . . . . . . . . . . . . . . . . . . . 54-60 54.11.2 Containment E eat Tree Quantification . . . . . .. . . . . . . . . . . . . 54-63 V 54.11.3 Shutdown and ..aw-Power Containment Event Tree Quantification Results Summary . .................. .. . 54-65 54.12 Shutdown Assessment Importance and Sensitivity Analyses . . . . . . . . . . . . . 54-66 54.12.1 Importance Analyses for Core Damage at Shutdown . . . . . . . . . . . 54-67 54.12.2 Other Sensitivity Analyses for Shutdown Core Damage . . . . . . . .. 54-73 54.13 Summary of Shutdown Level-1 Results . . . . . . . . . . . . . . . . . ...... . . . 54-75 54.14 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-81 CHAP'IER 56 PRA IN'IERNAL FLOODING ANALYSIS . . . . . . . . . . . . . . . ......... 56-1 56.1 Introduction . . . . .. ...................... ............ . . . 5 6-1 56.1.1 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-1 56.2 Methodology . . . . . . . . ..... ... ...........................56-1 56.2.1 Summary of Methodology . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . 56-1 56.2.2 Infonnation Collection . . . . . . . . . . . . . . . . . . . . . . ........ . 56-2 56.2.3 Initial Screening Assessment ........ ................. . 56-3 56.2.4 Detailed Screening A"r=wn' . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-4 56.2.5 Identification of Flood-Induced Initianng Events . . . . . . . . . . . . . 5 6-6 56.2.6 Initiating Event Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-7 56.3 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ .... 56-7 56.3.1 General Floodmg Analysis Assumptions and Fnpnaermg Judgments . 56-7 56.3.2 AP600-Specific Assumptions . . . . . . . . . . . . . . . . . . . ..... . . 56-9 56.4 Information Collection . . . . .............................. . .. 56-11 g Revision: 5

[ W86$1gfl0088 r.mlm July 21,1995 e m:\np600pravocrev5\nociwpf:1b

l 1

TABLE OF CONTENTS (Cont.)

Section Title _P,_ age l

l 56.4.1 PRA-Modeled Equipment and Locations . . . . . . . . . , . . . . . . . . . . 56-11 56.4.2 Identification of Areas for Flooding Evaluation . . . . . . . . . . . . . . . . 56-11 l 56.5 At-Power Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 12 56.5.1 Initial Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 12 56.5.2 Detalhd Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 12 56.5.3 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-28 1 56.5.4 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-32 56.5.5 Quantification of At-Power Flood-Induced Events . . . . . . . . . . . . . . 56-39 56.6 Shutdown Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-41 l

56.6.1 Detailed Screening Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-41 l 56.6.2 Identification of Flood-Induced Initiating Events . . . . . . . . . . . . . . . 56-42 l 56.6.3 Calculation of Flood-Induced Initiating Event Frequencies . . . . . . . . 56-43 56.6.4 Shutdown Quantification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-48 56.7 Seismically Induced Flooding . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . 5 6-51 l 56.8 Flooding Hazards During Refueling Outages . . . . . . . . . . . . . . . . . . . . . . . . 56-52

$6.9 Flooding Sensitivity Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... .. 56-52 56.9.1 Flooding Human Error Probabilities Sensitivity Study . . . . . . . . . . . 56-52 16.10 Summary of Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6 -5 3 i CHAPTER 58 WINDS, FLOODS, AND OTHER EXTERNAL EVENTS 58.1 Introduction . . . . . . . . . . . ............................. 58-1 58.2 External Events Analysis . . . . . . . . . . . . ................... 58-1 58.2.1 Severe Winds and Tornadoes . . . . . . . . . . . . . . . . . . . . 5 8- 1 58.2.2 External Floods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 8-2 58.2.3 Transportation and Nearby Facility Accidents . . . . . . . . . . . 58-2 58.3 Co ncl usi on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58-3 58.4 Re ferences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 8-3 CHAIYTER 59 PRA RESULTS AND INSIGHTS 59.1 Introduction . . . . . . . . . . . . . . . ......... . . . . . . . . . . . . . . 5 9- 1 59.2 Use of PRA in the Design Process . . ...................... 59-3 ,

59.2.1 Stage 1 - Use of PRA During the Early Design Stage . . . . . 59-4 1 59.2.2 Stage 2 - Preliminary PRA . ............ ...... . 59-5 59.2.3 Stage 3 - AP600 PRA Submittal to NRC (1992) . . . . . . . . . 59-7 59.2.4 Stage 4 - PRA Revision 1 (1994) . . . . . . . . . . . . . . . . . . . 59-7 59.2.5 Stage 5 - PRA Revisions 2-6 (1995) . . . . . . . . . . . . . . . 59- 8 59.3 Core Damage Frequency from Internal Initiating Events at Power . . 59-9 59.3.1 Dominant Core Damage Sequences . . .... . .... . 59-11 59.3.2 Component Importances for At-Power Core Damage Frequency ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 5 No r 15,1995 6 W8Stiflgh00Se u:\ap60mpraVoerev6Moc6.wpf:1b xXxVi

=

rau (9~)

TABLE OF CONTENTS (Cont.)

Section Title _Page 59.3.3 System Importances for At-Power Core Damage . . . . . . . . 59-35 59.3.4 System Failure Probabilities for At-Power Core Damage . . 59-36 59.3.5 Common Cause Failure Importances for At-Power Core Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 6 59.3.6 Human Error Importances for At-Power Core Damage . . . 59-36 59.3.7 Sensitivity Analyses Summary for At-Power Core Dam age . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-3 8 59.3.8 Summary of Important Level 1 At-Power Results . , . . . . . 59-39 59.4 Severe Release Frequency for Internal Initiating Events at Power . . . 59-43 59.4.1 Containment Response and Plant Risk Results . . . . . . . . . 59-43 59.4.2 Sensitivity Analyses for Containment Response . . . . . . . . 59-45 59.5 Core Damage and Severe Release Frequency from Events at S hutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-46 59.5.1 Summary of Shutdown Level 1 Results . . . . . . . . . . . . . 59-46 59.5.2 Large Release Frequency for Shutdown and Low-Power Eve nts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-51 59.5.3 Shutdown Results Summary . . . . . . . . . . . . . . . . . . . . . . 59-52  ;

, 59.6 Core Damage and Severe Release Frequency from External and l (Q) Other Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-52 59.6.1 Results of Internal Floodmg Assessment . . . . . . . . . . . . . 59-52 59.7 Overall Plant Risk Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 3 59.8 Plant Features Important to Reducing Risk . . . . . . . . . . . . . . . . . . . 59-54 l 59.8.1 Reactor Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-5 5 59.8.2 Systems Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-56 59.8.3 Instrumentation and Control Design . . . . . . . . . . . . . . . . 59-59 59.8.4 Plant Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.5 Plant Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.8.6 Containment Design . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-60 59.9 PRA Input to the Design Certification Process . . . . . . . . . . . . . . . . 59-66 59.9.1 PRA Input to Reliability Assurance Program . . . . . . . . . . 59-66 59.9.2 PRA Input to ITAACs . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-66 59.9.3 PRA Input to Tech Specs . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.4 PRA Input to MMI/ Human Factors / Emergency Response Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-66 59.9.5 PRA Input to COL Action Items . . . . . . . . . . . . . . .. . . . 5 9-67 APPENDIX A MAAP4 ANALYSIS TO SUPPORTSUCCESS CRITERIA A.1 Introdu cti on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 1 A.I.1 MAAP4 Overview and Limitations . . . . . . . . . . . . . . . . . . . . .... A-1 A. I.2 MAAP4 Model for AP600 . . . . . . . ........ ......... .... A-1 n.

)

,m ENE. Revision: 6 gm-m uswCS8 mm November 15, 1995 XXXvij mAap600pruocnv& toc 6.wpf:Ib

TABLE OF CONTENTS (Cont.)

O Section Title ,P_ age i

A.1.3 Core Damage Definition ....... .........................A-4 A.1.4 Analysis Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5

) A.2 Initiating Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 A.2.1 Medium Loss of Coolant Accident ...... ...... ............ A-7 A.2.2 Intermediate Loss of Coolant Accident .... .................. A-9 A.2.3 Small Loss of Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . A- 10 A.2.4 Steam Generator Tube Rupture . . . . . . . . . . . . . .............. A-11 A.2.5 Transient . . . . . . . . . . . . . . . .......................... A-12 A.3 Break Size Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-14 A.4 ADS S uccess Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A- 15 A.4.1 Automatic Depressurization for RNS Operation . . . . . . . . . . . . . . . . A-17 A.4.2 Manual Depressurization for RNS Operation . . . . . . . . . . . . . .... A-17 A.4.3 Automatic Depressurization for RNS Gravity Drain ............. A-20 A.4.4 Manual Depressurization for In-Containment Refueling Water Storage Tank Gravity Drain . . . . . . . . . . . . . . ... A-22 A.5 Accumulator and Core Makeup Tank Success Criteria . . . . . . . . . . . . . . . . . . . A-26 A.6 Passive Residual Heat Removal Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-27 A.7 Normal Residual Heat Removal and In-Containment Refueling Water Storage Tank Success Criteria . . . . . . . . . . . . . . . . . . . . . . . A-28 A.8 Sensitivity Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.1 System Interaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-29 A.8.2 Contninment Isolation ............... .......... ...... A-31 A.8.3 Passive System Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-32 A.9 M AAP4 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-34 A.9.1 Medium Loss-of-Coolant Accident ......................... A-34 4

A.9.2 Intermediate Loss-of-Coolant Accident . . . . . . . . . . . . . . . . . . . . . . A-3 9 A.9.3 Small Loss-of-Coolant Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . A-43 A.9.4 Steam Generator Tube Rupture . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46 A.9.5 Transient . . . . . . . . . . . . . . .. .........................A-49 A.10 Re ferences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-52 O

ov r 5,1995 h W8Stingh00Se uNp600%prah:rev6\ toc 6.wpfdb XXXviii

+

m-O LIST OF TABLES (Cont.)

Table No. . Title ,P. age i

l l

54-41 Fault Tree RNT2 Success Criteria Summary . . . . . ..... ...... .... 54 158  ;

54-42 Fault Tree RNP2 Success Criteria Summary . . .. . .. . ...... . .54-159 54-43 Loss of CCS/SWS,Dunng Shutdown Initiating Event Fault Tree CSWF2 Success Criteria Summary . . . . . . . .... . . .. . .. .. .54-160 54-44 Fault Tree CCTS Success Criteria Summary . . . . ........ .... .. .54-161 54-45 Fault Tree CCPS Success Criteria Summary . . . . . . . . ... ... .. l .54-162 54-46 Fault Tree SWTS Success Criteria Summnry . . . ...... ......... 54 163 54-47 Fault Tree SWPS Success Ctiteria Summary . . . ........ . . . . .54-164 54-48 Fault Tree VLHS Success Criteria Summary . . . . . . . . . . . . . . . . . . . . .54-165 I 54-49 AC & DC Fault Trees Success Criteria Summary . . . . . . . . . . . . . . . . . .54-166 54-50 Fault Tree ADQLTS Data Summary . . . . . . . . . . .......... . .. ..54-180 54-51 Fault Tree ADTLTS Data Summary . . . . . . . . . . . . . . . . . . . . .....54-181 54-52 AP600 Shutdown Modes ............. ........ .. ... . . . .54-182 54-53 ADS Success Criteria for Shutdown Conditions . . . . . . . . ... . . . . . . .54-183 54-54a Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria ADTS, ADLS . . . . . . . . . . ..... .. ............... . . . . . . . . . 54- 185 54-54b Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria l ry ADSS . . . ............ .......... ...... ............ .54-186 Q 54-54c Sequence of Events for MAAP4 Cases Supporting ADS Success Criteria 54 54d equence of Events fo MAAP4 Case Supportlig AD Su Criteria l ADLS and ADTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-188 54-54e Sequence of Events for MAAP Cases Supporting ADS Success Criteria ADNS....... ......................... . . . . . . . . . . . . . . . .54-189 54-55 Common Cause Failure Evaluated for Shutdown . . . . . . . . . . . . . . . . . . . . .54-190 54-56 AP600 Shutdown Assessment HEP Snmmary Results . . . . . . . . . . . . . . . . .54-191 54-57 Dependency Level Evaluation Summary for Shutdown Assessment . . . . . . . .54-200 54-58 Shutdown Master Data Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-204 54-59 List of Basic Events and their Descriptions (Shutdown Model) . . . . . . ...54-220 54-60 AP600 Shutdown Assessment Level 1 Accident Sequences Quantification Results ................................. .. .54-228 54-61 List of Dominant Sequences (At Shutdown) . . . . . . . . . . . . . . . . ......54-229 54-62 List of Dominant Cutsets (At Shutdown) . . . . . . . . . . . . . . . . . . . . . . . . . .54-233 54-63 Shutdown Initiating Event Importances . . . . . . . . . . . . . . . . . . . . . . . . . . .54-244 54-64 Basic Event Importances Using Risk-Decrease Measure (At Shutdown) . . . . .54-245 54-65 Basic Event importances Using Risk-Increase Measure (At Shutdown) . . . . .54-251 54-66 AP600 Containment Event Tree Nodal Questions . . . . . . . . . . . . . . . . . ..54-257 54-67 AP600 Release Category Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-25 8 54-68 Summary of Shutdown and Low-Power Accident Classes . . . . . . . . . .54-259 54-69 AP600 Shutdown and Low Power Plant Damage Substate Frequencies . . . . .54-260 g Revision: 5 O sWmlt' July 21,1995 ly mAap600prasacrev5%t$.wp0lb

=

-- l l

LIST OF TABLES (Cont.)

Table No. Title _Psyte 1

54-70 AP600 Shutdown and Low-Power Plant Damage Substate Conditional

{

Probabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 61 1 54-71 AP600 Shutdown and Low Power Containment Event Tree Quantification l Results - Release Category Frequencies (Per Reactor-Year) . . . . . . . . . . . . .54-262 54-72 Release Category IC Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-263 54-73 Release Category ICP Dominant Sequences . . . . . . ...... . . . . . . . . . . 54-2 64 54-74 Release Category XL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-265 54-75 Release Category BP Dominant Sequences . . . . . . . , , . . . . . . .54-266 l

54-76 Release Category CI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-267 1 54-77 Release Category CI-C Dominant Sequences . . . . .... . . . . . . . . . . . . 54-2 6 8 54-78 Release Category CFE Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . 54-2 69 54-79 Release Category CFE-C Dominant Sequences . . . . . . . . . . . . . . . . . . . . .54-270 54-80 Release Category CFI Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . . .54-271 54-81 Release Category CFL Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-272 l 54-82 Release Category CFV Dominant Sequences . . . . . . . . . . . . . . . . . . . . . . .54-273  !

54-83 Core Damage for Internal Initiating Events at Shutdown - Risk Decrease ...54-274 ,

54-84 Core Damage for Internal Initiating Events at Shutdown - Risk Increase . . . .54-275 '

54-85 Shutdown Common Cause Importance - Risk Decrease . ..............54-276 54-86 Shutdown Common Cause Importance - Risk Increase . . . . . . . . . . . . . . . .54-277 i 54-87 Shutdown Human Error Risk Importance - Risk Decrease . . . . . . . . . . . . .54-278  !

54-88 Shutdown Human Error Risk Importance - Risk Increase . . . . . . . . . . . . . . . 54.278 l 54-89 Shutdown Component Importance - Risk Decrease . . . . . . . . . . . . . . . . . . .54-279 l 54-90 Shutdown Component Importance - Rnk Increase . . . . . . ......... ...54-279 54-91 Operator Actions for Sensitivity Cases 7 and 8 . . . . . . . . . . . . . . . . . . . . . 54-2 80 56-1 AC and Non-class IE DC Equipment Locations . . . . ............... . 56-55 l 56-2 AP600 Building Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-57 56-3 Flooding Analysis Initial Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . 56-59 l 56-4 At-Power Detailed Screening Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-63 '

56-5 At-Power Flooding-Induced Core Damage Frequency Quantification S ummary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56-68 56-6 Shutdown Flooding-Induced Core Damage Frequency Quantification Summary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-7 2 l 56-7 At-Power Flooding Dominant Cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-77 56-8 Shutdown Flooding Dominant Cutsets . . . . . . . . . . . ...... ... . . . . . . . 56-87 59-1 Internal Initiating Event Core Damage Frequency Contribution by Initiating E ve nt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9- 6 8 59-2 Internal Initiating Events at Power Dominant Core Damage Sequences . . .. 59-69 59-3 Sequence 1 - Safety Injection Line Break Dominant Cutsets (SI-LB-02) . . . . . 59-71 Revision: 6 g O

November 15,1995 m=:h 9 ,m

,, ,ouse ungu l

mAap600pra'tocrev6 Jot 6.wp61b Ivi

w M

rx

)

LIST OF TABLES (Cont.)

Table No. Title Page 59-4 Sequence 2 - ATWS Dominant Cutsets (ATWS 1-07) . . . . . . . . . . . . . . . . . . 59-72 59-5 Sequence 3 - ATWS Dominant Cutsets (ATWS-28) . . . . . . . . . . . . . . . . . . 5 9-7 3 59-6 Sequence 4 - Large LOCA Dominant Cutsets (LLOCA-03) . . . . . . . . . . . . . . 59-75 59-7 Sequence 5 - Safety Injection Line Break Dominant Cutsets (SI-LB-03) . . . . . 59-76 59-8 Sequence 6 - Intermediate LOCA Dominant Cutsets (NLOCA-04) . . . . . . . . . 59-78 59-9 Sequence 7 - Intermediate LOCA Dominant Cutsets (NLOCA-06) . . . . . . . . . 59-79 59-10 Sequence 8 - Reactor Vessel Rupture Cutset ........................59-80 59-11 Sequence 9 - Large LOCA Dominant Cutsets (LLOCA44) . . . . . . . . . . . . . . 59-81 59-12 Sequence 10 - Intermediate LOCA Dominant Cutsets (NLOCA-16) . . . . . . . . 59-83 59-13 Sequence 11 - Medium LOCA Dominant Cutsets (MLOCA-04) . . . . . . . . . . . 59-85 59-14 Sequence 12 - RCS Leak Dominant Cutsets (RCSLK-04) . . . . . . . . . . . . . . . 59-87 59-15 Sequence 13 - Medium LOCA Dominant Cutsets (MLOCA-05) . . . . . . . . . . . 59-89 59-16 Typical System Failure Probabilities, Showing Higher Reliabilities for l

Safety S ystems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-91 l 59-17 Relative Distribution of Human Error Probabilities Illustrating the Use of I

Generally High Failure Probabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9-92 '

59-18 Summary of Level 1 At-Power Importance and Sensitivity Analysis Results . . 59-93 e 59-19 Summary of Sensitivity Analysis Results for Containment Response . . . . . . . 59-96 k' 59-20 Summary of Total AP600 Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-97 59-21 Comparison of AP600 PRA Results to Risk Goals . . . . . . . . . . . . . . . . . . . . 59-98 59-22 Site Boundary Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . 59-99 59-23 Site Boundary Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . .59-100 59-24 Population Dose 24-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-101 59-25 Population Dose 72-Hour Risk From Internal Events . . . . . . . . . . . . . . . . . .59-102 A-1 Actuation and Trip Signals Used in AP600 MAAP4 Analyses . . . . . . . . . . . . . A-53 A-2 RCS Pressure Requirements for LOCA Categories . ...................A-54 A-3 Break Size Definition, No ADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 55 A-4 Summary of ADS Success Criteria Definitions Supported by MAAP4 Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 6 A-5 SLOCA Cases for ADS Manual Actuation (NRHR Operation) . . . . . . . . . . . . . A-57 A-6 Automatic ADS Success Criteda for IRWST Gravity Drain, No PRHR . . . . . . . A-57 A-7 Transient Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-57 A-8 NLOCA Cases for ADS Manual Actuation (IRWST Gravity Drain) . . . . . . . . . A-58 A-9 Approximate Times that NRHR is Credited in MAAP4 Analyses . . . . . . . . . . . A-58 A-10 System Assumptions for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . A-59 A-11 Sequence of Events for MAAP4 Medium LOCA Cases . . . . . . . . . . . . . . . . . . A-63 A-12 System Assumptions for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . A-67 A-13 Sequence of Events for MAAP4 Intermediate LOCA Cases . . . . . . . . . . . . . . . A-71 A-14 System Assumptions for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . A-76

(

C Revision: 6 T Westingt100S8 =h November 15,1995 Ivil m 4 @ % ^ = " m w ib

l

r::

I

\

l LIST OF TABLES (Cont.)

Table No. Title I

A-15 Sequence of Events for MAAP4 Small LOCA Cases . . . . . . . . . . . . . . . . . . . A 84 A-16 System Assumptions for MAAP4 Steam Generator Tube Rupture Cases . . . . . . A-92  ;

A-17 Sequence of Events for MAAP4 Steam Generator Tube Rupture Cases . . . . . . . A-94 l A-18 Summary of System Assumptions for MAAP4 Transient Cases . . . . . . . . . . . . A-96 A-19 Sequence of Events for MAAP4 Transient Cases . . . . . . . . . . .......... A-100 l

l I

O 1

l l

1 l

l l

Revision: 6 ENEL y M@@Se November 15,1995 Mm6 m%60Waweve6.wpr:tb iviu

/

(

LIST OF FIGURES (Cont.)

Figure No. Title _Page  :

52 16 Safety Injection Line Break Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . 52 137 52-17 Steam Line Break Downstream of MSIVs Event Tree . . . . . . . . . . . . . . . . .52-138

52-18 Steam Line Break Upstream of MSIVs Event Tree . . . . . . . . . . . . . . . ...52-139 52-19 Stuck Open Secondary Side Safety Valve Event Tree . . . . . . . . . . . . . . . . .52-140 52 20 Small LOCA Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..52-141 1 52-21 RCS Leak Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52- 142

i 52 22 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .52-143 l 52-23 Loop Durmg Hot / Cold Shutdown (RCS Filled) Event Tree . . . . . . . . . . . .52-144 l 54-1 LOSP During Hot /Coki Shutdown (RCS Filled) Event Tree . . . . . . . . . . . . .54-281 l

54-2 Loss of RNS Initiator During Hot / Cold Shutdown (RCS Filled) Event Tree . .54-282 54-3 Loss of CCW/SW Initiator During Hot / Cold Shutdown (RCS Filled)

Eve nt Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 8 3 54-4 LOCA/RNS Pipe Rupture During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54-2 84 54-5 LOCA/RNS-V024 Opens During Hot / Cold Shutdown (RCS Filled)

Event Tree . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54-285 54-6 Overdraining of Reactor Coolant System During Draindown to Mid-Loop . . .54-286 iO' 54-7 Loss of Offsite Power (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . . . .54-287  ;

( 54-8 Loss of RNS Initiator (RCS Dramed) Event Tree . . . . . . . . . . . . . . . . . . . .54-288  !

54-9 less of CCW/SW Initiator (RCS Drained) Event Tree . . . . . . . . . . . . . . . . 54-2 89 l 54-10 LOCA/RNS-V024 Opens (RCS Drained) Event Tree . . . . . . . . . . . . . . . . . .54-290 54-11 Accumulator Injection (Dilution Scenario) Event Tree . . . . . . . . . . . . . . . . .54-291 54-12 Shutdown Transient Case SD1B2 RCS Pressure vs. Time . . . . . . . . . . . . . .54-292 54-13 Shutdown Transient Case SD1B2 Mass Flow Rate vs. Tune . . . . . . . . . . . .54-293 54-14 Shutdown RNS Break Case SD3A (3500 gpm) . . . . . . . . . . . . . . . . . . . . . .54-294 54-15 Shutdown RNS Break Case SD3A2 (2000 gpm) . . . . . . . . . . . . . . . . . . . . .54-295 54-16 Shutdown RNS Break Case SD3A3 (1000 gpm) . . . . . . . . . . . . . . . . . . . . . 54-2%

54-17 Shutdown Plant Damage State Substate Event Tree for LP. ADS . . . . . . . . . .54-297 54-18 Shutdown Plant Damage State Substate Event Tree for LP-1 A . . . . . . . . . . .54-298 54-19 Shutdown Plant Damage State Substate Event Tree for !? CD . . . . . . . . . . .54-299 54-20 Shutdown Plant Damage State Substate Event Tree fo r :" i1R . . . . . . . . . .54-300 54-21 Shutdown Plant Damage State Substate Event Tree for . "3E . . . . . . . . . . 54 301 56-1 Flood Zones and Barriers Plan at 66 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-93 56-2 Flood Zones and Barriers Plan at 82 '-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-95 56-3 Flood Zones and Barriers Plan at 96 *-6" . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6-97 56-4 Flood Zones and Barriers Plan at 100'-0" & 107'-2" . . . . . . . . . . . . . . . . . . . 5 6-99 56-5 Flood Zones and Barriers Plan at 1 17'-6" . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 101 56-6 Flood Zones and Barriers Plan at 135 ' 3 " . . . . . . . . . . . . . . . . . . . . . . . . . . 5 6- 103

(%

EO agL % Jy 1, xcill mWm nemti-pt:1b e

=:

un --

LIST OF FIGURES (Cont.)

Figure No. Title g 56-7 Flood Zones and Barriers Plan at 160'-6" & 153'-0" . . . . . . . . . . . . . . . . . .56-105 56-8 Flood Zones and Barriers Plan at 160'-6" & 180'-0" . . . . . . . . . . . . . . . . . .56-107 56-9 8-in. Fire Main Rupture at-Power Event Tree . . . . . . . . . . . . . . . . . . . . . .56-109 56-10 8-in. Fire Main Rupture during Hot / Cold Shutdown Event Tree . . . . . . . . . .56-110 56-11 8-in. Fire Main Rupture during RCS Drained Conditions Event Tree . . . . . . .56-111 59-1 AP600 PRA Core Damage for Internal Initiating Events at Power . . . . . . . .59-103 59-2 AP600 Core Damage Frequency Contributions . . . . . . . . . . . . . . . . . . . . . .59-104 Included in Appendix A are Figures A-1 through A-197 9

Revision: 6 O November 15, 1995 g [ Westingh00Se m:\ap600prakocrevfNd&wp(:Ib XCiV

n ---- n

59. PRA Results and Insights O(3 CHAPTER 59 '

PRA RESULTS AND INSIGHTS 59.1 Introduction i

This chapter summarizes the use of the AP600 PRA in the design process, PRA results and insights, plant features important to reducing risk, and PRA input to the design certification process.

AP600 is expected to achieve a higher standard of severe accident safety performance than currently operating plants, because both prevention and mitigation of severe accidents have been addressed during the design stage, taking advantage of PRA insights, PRA success criteria analysis, severe accident research, and severe accident analysis. Since PRA considerations have been integrated into the AP600 design process from the beginning, many of the traditional PRA insights relating to currently operating plants are not at issue for the i AP600. Both the Level 1 and Level 2 results show that addressing PRA issues in the design process leads to a low level of risk. The PRA results indicate that the AP600 design meets l the higher expectations and goals for new generation passive pressurized water reactors '

(PWRs).

l p The total plant core damage frequency (CDF) and large release frequency from internal and

() external events, except seismic, at power and shutdown for the AP600 plant is calculated to be 3.0E-07 events per reactor-year and 2.4E-08 events per reactor-year, respectively. These l frequencies are at least two orders of magnitude less than a typical pressurized water reactor I plant currently in operation. This reduction in risk is due to many plant design features, with the dominant reduction coming from highly reliable and redundant passive safety-related systems that impact both at-power and shutdown risks. These passive systems are much less dependent on operator action and support systems than plant systems in currently operating l plants.

l A synopsis of the insights gained from the PRA about the AP600 design includes:

The AP600 design benefits from the high level of redundancy and diversity of the passive safety-related systems. The passive systems have been shown to be highly reliable, their designs are simple so that a limited number of components are required to function.

AP600 is less dependent on nonsafety-related systems than current plants or advanced light water reactor evolutionary plants. When no credit is taken for nonsafety-related systems following an accident, AP600 still meets the NRC safety goal, whereas current plants may not.

i o )

f v)

E WM _ Novem r1, 59-1 m:\ap600pr=\sec59cn59.R06:1b

==

59. PRA Results and Insights

__ i i

The nonsafety-related support systems (ac power, component cooling water, service Gl water, air) have a limited role in the plant risk profile because the passive safety-related systems do not require cooling water or ac power.

AP600 is less dependent on human actions than current plants or advanced light water reactor evolutionary plants. Even when no credit is taken for operator actions, the AP600 meets the NRC safety goal, whereas current plants may not.

l De core damage and large release frequencies are low despite the conservative l assumptions made in specifying success criteria for the passive systems. De success criteria have been developed in a more systematic, rigorous manner than typical PRA success criteria. The baseline success criteria are bounding cases for a large number of  ;

PRA success sequences. De baseline success sequences, in most cases, have been j defined with:

worst break size and location for a given initiating event  ;

I worst automatic depressurization system (ADS) assumption in the success criterion a

worst number of core makeup tanks (CMT) and accumulators  !

l worst containment conditions for in-containment refueling water storage tank I (IRWST) gravity injection.

Many less-limiting sequences are therefore represented by a baseline success criteria.

Single system or component failures are not overly important due to the redundancy and diversity of safety-related systems in the design. For example, the following lines of defense are available for reactor coolant system (RCS) makeup:

chemical and volume control system 1

core makeup tanks j

?

partial automatic depressurization system in combination with normal residual heat removal full automatic depressurization system with accumulators and in-containment refueling water storage tank i full automatic depressurization system with core makeup tanks and in-containment refueling water storage tank  :

Typical current PRA dominant initiating events are significantly less important for the AP600. For example, the reactor coolant pump (RCP) seal loss-of-coolant accident O

No r 15,1995 - 3 Westinghouse m:\ap6005pra\sec59CH59.R06:1b 59-2

__ _ i

59. PRA Results and Insights j l

(3 l (LOCA) event has been eliminated as a core damage initiator since AP600 uses canned i motor reactor coolant pumps which do not have seals. Another example is the loss of l offsite power (LOOP) event. He station blackout and loss of offsite power event is a minor contributor to AP600 since the passive safety-related systems do not require the support of ac power.

j l

= Passive safety-related systems are available in all shutdown modes. Planned

{

maintenance of passive features is only performed during shutdown modes when that l feature is not risk important. In addition, planned maintenance of nonsafety-related l defense-in-depth features used during shutdown is performed at power. J De AP600 passive containment cooling design is highly robust. Air cooling alone can prevent containment overpressurization, although the design has several lines of defense for containment cooling. l l

He potential for containment isolation and containment bypass is lessened by having  !

fewer penetrations to allow fission product release. In addition, all normally open and risk important penetrations are fail closed, thus eliminating the dependence on ,

instrumentation and control (I&C) and batteries. l 1

The reactor vessel lower head has no vessel penetrations, thus eliminating penetration failure as a potential vessel failure mode. Preventing the relocation of molten core

/]

'V debris to the containment eliminates the occurrence of several severe accident phenomena, such as ex-vessel fuel-coolant interactions and core-concrete interaction, which may threaten the containment integrity. Herefore, AP600, through the '

prevention of core debris relocation to the containment, significantly reduces the l likelihood of containment failure. l 59.2 Use of PRA in the Design Process The AP600 design has evolved over a period of years. PRA techniques have been used since the beginning in an iterative process to optimize the AP600 with respect to public safety.

Each of these iterations has included:

. Development of a PRA model

. Use of the model to identify weaknesses -

Quantification of PRA benefits of alternate designs and operational strategies

. Adoption of selected design and operational improvements.

The scope and detail of the PRA model has increased from the early studies as the plant design has matured. This iterative design process has resulted in a number of design and l operational improvements. The use of PRA in the AP600 is presented in this section as five distinct stages including: conceptual design analysis (stages 1 and 2), PRA analysis as part Ch

\")

Revision: 6 Y WilS8 November 15, 1995 59-3 m:Whec59CH59.R06:Ib

-

59. PRA Res31ts and Insights M-of the design certification application (stage 3), and revisions of the PRA in support of further O

refinement of the design and modeling assumptions (stages 4 and 5).

59.2.1 Stage 1 - Use of PRA During the Early Design Stage De initial AP600 design incorporated features that were intended to address leading causes of core damage and severe release, as identified from existing PRA studies, including the APWR (SP-90) and Sizewell. Dese features included passive safety-related core damage prevention and mitigation systems, active nonsafety-related systems, and other plant features.

Passive safety-related core damage prevention systems are capable of mitigating PRA events, require no support systems other than instrumentation and control, and need fait safe l equipment for the most common events. Passive system mitigative features included a reduced number of containment penetrations compared to currently operating plants, the penetrations that are open at power are fail safe, improvement of the interfacing systems loss-of-coolant accident event, and hydrogen igniters are provided in the containment. Other plant j features factored into the initial design include a physical separation of electrical and instrumentation and control trains, reduction in the number of flooding sources, and a diverse

)

actuation system (DAS) for anticipated transients without scram (ATWS) events. l Prior to 1989, several probabilistic scoping studies were performed on the AP600 conceptual design, which concentrated on quantifying the core damage frequency and large release frequency for internal initiating events during power operation. He early studies included detailed models of the passive safety-related fluid systems. Rey did not include detailed models of other systems such as instrumentation and control. The use of scoping studies was an iterative process at this stage of the design's evolution. Severai feedback loops were included within the evaluation process: results and insights of a scoping study would identify areas of weakness, then alternative system designs and/or operational strategies were evaluated to optimize plant safety.

He outcome of the scoping study provided insights into the AP600 conceptual design, which led to many design and operational enhancements. Examples of design enhancements include:

Originally the depressurization system consisted of three stages, each stage contained two lines with two normally closed motor-operated valves. An alternate design was then analyzed which included a fourth depressurization stage off the hot leg with valve types diverse from the first three stages.

  • Diverse automatic actuation for certain safety-related functions was introduced. In addition, separate and diverse manual actuation for certain safety-related functions was provided. Specifically, the diverse actuation system was provided to automatically actuate passive residual heat removal (PRHR), core makeup tank, passive containment cooling system (PCS), reactor protection function, automatic depressurization, and containment isolation. In addition, the system provides alarms and information to the main control room for manual actuation of these systems.

O o r 5,1995 _ [ MdigtiollSe mAsp60Gpra\sec59CH59.R06:1b 59-4

59. PRA Results and Insights EA1 -

,A d .

The normal residual heat removal system (RNS) is a separate system from the spent fuel pool cooling system. The normal residual heat removal system, with piping routed outside of the containment, was designed with three containment isolation valves to reduce the probability ofinterfacing systems loss-of-coolant accident events that result in containment bypass.

Protection system logic modifications are adopted to preclude steam generator overfilling during a steam generator tube rupture (SGTR) event. This reduces the need for full reactor depressurization and, therefore, reduces the frequency of core damage for steam generator tube rupture events with the containment bypassed.

The number of onsite power supplies was increased to two nonsafety-related diesel generators. .

l In addition to plant design changes., some changes to the success criteria were made. In the early stages of the PRA, the success criteria were primarily based on engineering judgement or preliminary design basis analyses. However, during the iterative process of this stage of the PRA, some success criteria refinement was examined. An example is the success criteria originally did not credit the accumulators for mitigation of a small loss-of-coolant accident event. Further examination of the response of the accumulators to small and medium loss-of-coolant accidents indicated that,if the core makeup tanks fail, the accumulators willinject and the core will be cooled provided the operators manually initiate automatic depressurization O

G' system. Thus, the small and medium loss-of-coolant accident success criteria were enhanced.

Operational changes were also evaluated at this stage of the PRA. Initial automatic depressurization system valve positioning is an example of an operational change. Originally, the first three stages each contained two lines with two normally closed motor-operated valves. The valve configuration was changed to one valve open and one valve closed in each line to allow for testing during refueling.

59.2.2 Stage 2 - Preliminary PRA Beginning in 1989, a preliminary PRA was conducted in support of the Wertinghouse AP600 application for design certification. The preliminary PRA was performed on the AP600 design that existed at the time of completion of the scoping studies along with design changes made as a result of the final scoping study. The scope of the PRA was also expanded to evaluate both at-power and shutdown conditions as well as external events. Because the AP600 design was evolving throughout this period, the success criteria were primarily based on engineeringjudgement derived from preliminary design basis safety analyses. The system and component dependency analysis and the data used in the preliminary PRA were deliberately conservative. The results of the preliminary PRA identified important areas of O

V g Revision: 6 3 W OUS8 mah November 15,1995 59 5 m:\,600passec55rCH59.R06:1b

E-

59. PRA Results and Insights the AP600 design where the design effort would focus. Examples of specific system design O

changes made during this stage of the PRA include:

a ne in-containment refueling water storage tank system initially consisted of one line l containing a normally closed motor-operated valve and two series check valves. To l improve the reliability of the injection phase of the system, a second parallel path of two check valves in series was added to the existing two series check valves. l Additionally, the motor-operated valve is now normally open, thus the system does not require the opening of a motor-operated valve, which would require an open signal, to initiate injection. Instead, the system operates solely by pressure differential between the pressure in the in-containment refueling water storage tank and the pressure of the direct vessel injection (DVI) line.

To improve the reliability of the sump recirculation function, redundant and diverse i

recirculation valves were incorporated into the design. De AP600 conceptual design l consisted of two parallel check valves from the sump. Diversity was modeled into the i design by changing one of the check valves to a motor-operated valve; redundancy was incorporated by making each line contain two valves in series. Bus, the resulting l recirculation path consists of one line of two motor-operated valves and one line of two I series check valves. l l

Alarms are provided in the main control room to inform the operator of mispositioned isolation valves of the passive core cooling system (PXS) that have remote manual control capability. His reduces the probability of valve mispositioning.  ;

l In the first stage of the PRA, the success criteria were primarily based on engmeermg  ;

judgement. For this stage of the PRA, the success criteria were refined. Examples of more i refm' ed success criteria include: i The more significant success criteria change related to the depressurization system. The {

original success criterion for a small loss-of-coolant accident was one-half of all the l automatic depressurization system stages were required. Taking credit for a design l change that increased the size of the fourth-stage valves and performing best-estimate l loss-of-coolant accident calculations allowed the use of a success criteria that tolerated multiple failures.

Analysis shows that the containment cooling system only requires air cooling to prevent containment failure.

Operational changes were also made as part of this stage of the PRA. The normal residual heat removal system and automatic depressurization system provide some examples of operational changes.

Initiation of the normal residual heat removal system initially required the operators to first decide if it was appropriate to actuate normal residual heat removal system O

are r 5,1995 _ W65 tin l$10US0 m%600w.ec59scn59.Ro6:ib 59-6

u-

59. PRA Results and Insights re-T

('/

following depressurization. To start the normal residual heat removnl system, it was necessary for the operators to locally open three valves. To reduce the operator's burden as to when it was appropriate to actuate normal residual heat removal, an operation change was made so that the operator initiates the system whenever automatic depressurization system is actuated, with the exception of cases when radiation could leak out of containment. Additionally, the system can now be manually actuated from the main control room instead of using local manual actuation.

As an outcome of the scoping PRA stage, the automatic depressurization system stage 1,2, and 3 valve configuration was changed from two normally closed valves to one valve open and one valve closed in each line to allow for testing during refueling.

Further evaluation of this configuration showed that the potential for spurious actuation of the automatic depressurization system had increased. Rus, during the preliminary PRA stage, the automatic depressurization system valve configuration was changed to two closed valves with quarterly testing.

59.2.3 Stage 3 - AP600 PRA Submittal to NRC (1992)

De third stage culminated with the submittal of the AP600 PRA report, along with the AP600 Standard Safety Analysis Report (SSAR), to the NRC on June 26,1992. His stage included a complete Level 3 PRA. The PRA factored in design changes made as a result of the preliminary PRA findings. The success criteria assumptions were verified. Some of the

(~]

V conservative data and dependency factors were adjusted to be more realistic during this stage.

ne outcome of the PRA program, which was characterized by frequent interactions between PRA analysts and design engineers, is an AP600 design that exceeds the NRC and ALWR Utility Requirements Document safety goals.

Because of the extensive interactions during previous design /PRA studies, few plant changes resulted from this study. Two design changes that dkl result include:

De core makeup tank can now be actuated on a low steam generator level plus high hot leg temperature indication. His was done to indirectly reduce the importance of operator actions to initiate passive feed and bleed.

The scope of the diverse actuation system was expanded to include control rod insertion. He system was also expanded to include an actuation signal for opening of the in-containment refueling water storage tank motor-operated valves during mid-loop operations. His was done to provide automatic operation to reduce the dependence on operators to open the valves in the event of an accident during mid-loop operation.

59.2.4 Stage 4 - PRA Revision 1 (1994)

Stage 4 was the first revision to the AP600 PRA. He revision, submitted in July 1994, included the following major changes: Introduction of phenomonology onto the Level 2 p

i)

T We@use Novem r 15, 59-7 mNepta\sec59CH59.R06:Ib 1

)

59. PRA Res-Its and Insights containment event tree and performance of the risk-based seismic margins analysis. In e

addition to Revision 1 of the PRA, this stage also included the focused PRA sensitivity study and initiating event evaluation as part of the regulatory treatment of nonsafety-related systems (RTNSS) topic.

l In September 1993, the focused PRA sensitivity study and initiating event evaluation were submitted to the NRC via the AP600 Implementation Reportfor Regulatory Treaunent of j Nonsafety-Related Systems (WCAP-13856). The focused PRA sensitivity study evaluated the core damage and large release frequencies for AP600 without taking mitigation credit for nonsafety-related systems. He results of the study show that even with no credit taken for ,

nonsafety-related systems, AP600 meets the regulatory goals. l l

De Level 2 PRA was revised to introduce the use of decomposition event trees and to  !

incorp3 rate phenomena onto the containment event tree. Six decomposition event trees were created to analyze the following phenomena:

In-vessel retention of molten core debris nermally induced failures of the reactor coolant system pressure boundary l

  • In-vessel steam explosion
  • Ex-vessel steam explosion Ex-vessel debris coolability Hydrogen combustion analysis.

A containment event tree displays the characteristics of the severe accident progression that impact the fission-product source term to the enviromnent. The containment event tree from o

the Stage 3 PRA that was submitted to the NRC in 1992 was enhanced to include the phenomena that was analyzed in the decomposition event trees.

A risk-based seismic margins analysis was also performed as part of Revision 1 of the AP600 PRA.

There were no appreciable changes in the plant design as a result of this stage of the PRA.

59.2.5 Stage 5 PRA Revisions 2 - 6 (1995) nis stage includes the updates leading to various revisions submitted to the NRC during 1995. The changes made to the PRA resulted from plant changes and NRC questions. Most plant changes incorporated into the PRA were made for other reasons than the PRA. He design changes resulted in small improvements to the core damage and large release frequencies. He primary emphasis of this stage of the PRA was to refine the success criteria calculations and the system and event tree modeling. Some of the PRA-related feedback to the design is summarized below.

Further refinement of the PRA success criteria calculations resulted in making the automatic depressurization system success criteria more conservative.

e o r 15,1995 6 Westhigh0USB maap60awassec59cH59.R06:1b 59-8

n =ii

59. PRA Results and Insights em-s The automatic depressurization system stage 4 valves were changed from air-operated to explosive-operated (squib) valves. This design change was not PRA-motivated; however, a PRA sensitivity study was performed to provide input into the decision to change the fourth-stage valves to squib valves.

Service water blowdown procedures and sources of makeup water were evaluated as a function of service water heat loads during various plant conditions to ensure that the assumed success criteria will be met. The heat loads were also evaluated to assess the required number of cooling tower fans that must operate to ensure adequate cooling.

In addition, the initial fault tree evaluated indicated the potential vulnerability to bypass flow occurring upon loss of a de power supply causing an air-operated valve to open.

Consequently, the power supplies to the equipment were reevaluated.

  • Initial PRA modeling of the need to open the main generator breaker in the fault trees for the 4160 vac buses following a plant trip highlighted the importance of certain functions initially assumed to be performed by the plant control system. It was determined that the plant control system would not be fast enough to perform this action and that a reverse power relay would control opening this breaker.

59.3 Core Damage Frequency from Internal Initiating Events at Power

- Internal initiating events are transient and accident initiators that are caused by plant system,

[v component, or operator failures. External initiating events, which include internal fire and ,

flooding events, and events at shutdown are discussed in other subsections. 1 The AP600 mean plant core damage frequency for internal initiating events at power is calculated to be 2.4E-07 events per year. Twenty six separate initiating event categories were defined to accurately represent the AP600 design. Of these event categories,11 are loss-of-coolant accidents (LOCAs),12 are transients, and 3 are anticipated transients without scram precursors (initiating events that result in an anticipated transient without scram sequence as a result of failure to trip the reactor). Initiating event categories unique to the AP600 design have been defined and evaluated, including safety injection line breaks, core makeup tank line breaks, and passive residual heat removal heat exchanger (HX) tube ruptures. The resulting core damage frequency is very small; a value of 2.4E-07 means that only one core damage event is expected in over 4 million plant-years of operation. This core damage frequency value is two orders of magnitude (i.e.,100 times) smaller than corresponding values typically i calculated for current pressurized water reactors. l The contribution of initiating events to the total plant core damage frequency is summarized in Table 59-1. Figure 59-1 illustrates the relative contributions to core damage frequency from the various at-power initiating events.

Six initiating events, including five loss-of-coolant accidents and one anticipated transient without scram precursor, comprise approximately 91 percent of the total at-power plant core m EAEl. Revision: 6 Wm ungwuS8 wa h November 15,1995 59-9 maapsomprhec59CH59.R06:lb

= _ _ .

59. PRA Results and Insights

-= - -

damage frequency. The remaining 20 initiating events contribute a total of approximately O

9 percent to the core damagc frequency from internal events. The dominant initiating events are:

  • Intermediate loss-of-coolant accident
  • Large loss-of-coolant accident
  • Reactor vessel rupture
  • Medium loss-of-coolant accident Within this group of events, the first four each contribute more than 10 percent to the total core damage frequency. These four events account for approximately 85 percent of the total core damage frequency.

The results show a very low core damage frequency dominated by rare events (i.e.,

intermediate, medium, and large loss-of-coolant accidents, and anticipated transients with failure of reactor trip). This indicates that the AP600 design is robust with respect to its ability to withstand challenges from more frequent events (e.g., transients) and that adequate protection against the more severe events is provided through the defense-in-depth features.

While the anticipated transient without scram contribution appears to be relatively important, this is due in part to PRA modeling simplifications whereby core damage has been assumed to occur if certain combinations of failures occur. For example, core damage is assumed to occur if the protection and safety monitoring system (PMS) and diverse actuation system (DAS) fail (approximately 12 percent of total core damage frequency); if reactor coolant system (RCS) pressure relief fails (approximately 8 percent of total core damage frequency); or if startup feedwater and passive residual heat removal fail. In reality, plant response similar to loss-of-coolant accident response is more likely given these scenarios, with a significant probability of avoiding core damage. The modeling simplifications were made because the anticipated transient without scram core damage frequency is already very low.

Information regarding loss-of-coolant accident categories defined for the AP600 PRA was presented in the discussion of PRA success criteria. For the PRA, the various loss-of-coolant accident categories have been defined based on which plant features are required to mitigate the events. As a result, the PRA and SSAR Chapter 15 loss-of coolant accident size definitions are not identical. The following listing shows how the PRA and SS AR break sizes are related and identifies the PRA size criteria.

SSAR Chapter 15 break size definitions are large (break size greater than I ft.2) or small (break size less than I ft.2),

O o r 5,1995 h W65tingt10US0 mAap60L7pra\sec59CH59.R06:1b 59 10

w u- -u

59. PkA Results and Insights KAE -
  • PRA break sizes are defined as follows: I I

Large breaks are those with an equivalent inside diameter of approximately 9 in. I or larger. Reactor vessel rupture is included in this category. The automatic )

depressurization system (ADS) is not required for in-containment refueling tvater i storage tank (IRWST) injection for large breaks. l Medium breaks are those with an equivalent inside diameter between approximately 5 in. and 9 in. Core makeup tank line breaks and safety injection i line breaks are included in this category. Automatic depressurization system is )

not required for normal residual heat removal system (RNS) operation for medium i breaks, but is required for in-containment refueling water storage tank injection. l Intermediate breaks are those with an equivalent inside diameter between approximately 2 in, and 5 in. Operation of automatic depressurization system stages 1,2, or 3 (or, alternatively, passive residual heat removal) is not required to satisfy the automatic depressurization system stage 4 automatic actuation pressure interlock with intermediate breaks, but is required to depressurize the reactor coolant system to the normal residual heat removal system operating pressure.

Small breaks are those with an equivalent inside diameter between approximately 3/8 in. and 2 in. Steam generator tube rupture and passive residual heat removal

(]

V heat exchanger tube rupture break sizes fall within this range, but are evaluated as separate events based on differing initial plant response. Small breaks are larger than those for which the chemical and volume control system (CVS) can maintain reactor coolant system water level, but not large enough to allow automatic actuation of automatic depressurization system stage 4 without operation of either automatic depressurization system stages 1,2, or 3 or passive residual heat removal.

Coolant losses smaller than those resulting from small breaks are defined as reactor coolant system leaks. Operation of one chemical and volume control system makeup pump can maintain reactor coolant system water inventory for reactor coolant system leaks.

59.3.1 Dominant Core Damage Sequences A total of 566 potential core damage event sequences for internal initiating events at power are modeled in the AP600 PRA. These core damage sequences are the combinations of initiating event occurrences and subsequent successes and failures of plant systems and operator actions that result in core damage. Some of these sequences are composite sequences, i.e., they consist of similar event sequences that are combined and analyzed together (such as consequential steam generator tube rupture resulting from various initiators).

Therefore, a larger number of sequences are actually represented by the model. Of these O

g Revision: 6

[ Westingh00$8 cm- November 15,1995 59-11 m:Waec59'CH59.R06:1b

m-m

59. PRA Results and Insights 566 event sequences,208 result in frequencies ranging from 8E-08 to 2E-15 events per year.

O The remaining sequences do not produce any cutsets representing them in the top 21,000 cutsets; that is, their core damage frequencies are not significant relative to the cere damage frequencies for the other sequences.

De majority of the core damage frequency is represented by the top sequences, specifically:

Ee 10 sequences with the highest core damage frequency together contribute approximately 87 percent of the total core damage frequency (2.12E-07 events per year)

Re top 13 sequences contribute approximately 90 percent (2.19E-07 events per year)

The top 50 sequences contribute approximately 99.2 percent (2.41E-07 events per year)

De top 100 sequences contribute over approximately 99.9 percent (2.43E-07 events per year) i Each core damage sequence is composed of component-level cutsets, with a total of approximately 21,000 cutsets included in the baseline analysis of internal initiating events at power (100 percent of 2.43E-07 events per year core damage frequency). A cutset is a combination of initiating event occuncence and the component or operator failures that constitute the various system-level failures that lead to core damage.

The 100 highest frequency cutsets together contribute approximately 90 percent of the total core damage frequency (approximately 2.18E-07 events per year)

He top 200 cutsets contribute approximately 94 percent (2.28E-07 events per year)

Re top 500 cutsets contribute approximately 97 percent (2.35E-07 events per year) ne top 1,000 cutsets contribute approximately 98 percent (2.39E-07 events per year)

Re top 2,000 cutsets contribute approximately 99 percent (2.41E-07 events per year) ne top 13 accident sequences that contribute 90 percent of the core damage frequency from internal initiating events at power are discussed in this section. Rese sequences are listed in i Table 59-2 and discussed in detail later in this chapter.

The following information is provided to aid the reader in understanding the information presented for these dominant sequences:

An identifier le provided along with the sequence name that corresponds to the sequence in the event trees. De sequence identifier indicates the name of the event tree for the initiating event and the sequence number on that event tree. For example, SI-LB-02 stands for the second sequence, or path, on the safety injection line break (SI-LB) event tree.

O Nov r 5,1995 - Westingh00Se m:sp6copussec590159.R06:lb 59-12

59. PRA Results and Insights i

3 (b =

Sequence frequency is the core damage frequency contributed by the ladividual sequence. It is the initiating event frequency multiplied by the probabilities of failure and success of the various systems modeled to mitigate the event and prevent core damage. Any given sequence may have both successes and failures of various systems; for a core damage sequence, the set of failures implies that at least one of the success criteria defined for prevention of core damage was not met.

Contribution to core damage is the percentage of the total core damage frequency from initiating events that was produced by the sequence in question.

Initiating event frequency is the number of events per year calculated for the type of core damage initiator in question. l l

Conditional core damage probability is defined as the ratio of event sequence frequency divided by the initiating event frequency. It provides a measure of the reliability of plant features for mitigating a core damage initiator.

l The conditional core damage probability results for the dominant core damage sequences indicate the following:

  • The conditional probability of core damage, given the occurrence of a loss-of-coolant

'_ accident, is generally in the range of about 1E-04 to 1E-05 (with the exception of l reactor vessel rupture, for which core damage is assumed). This indicates that the (v) various features of the AP600 would act to prevent core damage from all but between l

1 in 10,000 and 1 in 100,000 loss-of-coolant accidents. Since loss-of-coolant accidents are relatively rare events, this is a significant level of protection. I The conditional probability of core damage, given the occurrence of the most limiting anticipated transient without scram precursor, is on the order of SE-08. Anticipated transient without scram precursors are more frequent than loss-of-coolant accidents (anticipated transient without scram precursor frequency is on the order of one per i year). However, AP600 features provide a high level of protection against core damage I (only 1 in 20 million such events is expected to lead to core damage), resulting in a low anticipated transient without scram core damage frequency.

(n U)

T W@Se h6 59-13 Novem r1, aw60awwe59nt59.R06:Ib

=

59. PRA Res11ts and Insights en-Sequence 1: Safety Injection Line Break (SI LB-02)

O Sequence Frequency: 8.4E-08/ year Contribution to Core Damage: 34 percent Initiating Event Frequency: 1.0E-04/ year Conditional Core Damage Probability: 8.0E-04 Description of Sequence The initiating event is a break that occurs in one of the two safety injection lines (including the direct vessel injection (DVI) line and the line that connects the core makeup tank, accumulator, or in-containment refueling water storage tank to the direct vessel injection),

resulting in a loss of reactor coolant. All capability for reactor coolant system injection from the core makeup tank and in-containment refueling water storage tank through this broken line is postulated to be lost due to excessive spillage through the break, but core makeup tank injection through the intact line is successful. Full reactor coolant system depressurization, (depressurization to the pressure at which in-containment refueling water storage tank gravity injection can occur) is successful through operation of automatically or manually actuated automatic depressurization system operation. However,in-containment refueling water storage tank injection through the intact line fails. All normal residual heat removal system injection is assumed to spill through the break and, as a result, is unavailable.

Core damage is postulated due to reactor coolant loss through the break and the open automatic depressurization system valves, with subsequent lack of capability to maintain reactor coolant inventory due to failure of injection through the intact in-containment refueling water storage tank line. Core damage will be delayed since core makeup tank injection is successful; accumulator injection is expected due to the success of full reactor coolant system depressurization via the automatic depressurization system, but its status is not evaluated in bis sequence since core damage would not be prevented without in-containment refueling water storage tank injection.

This sequence is assigned to the 3BE plant damage state. The definition of this plant damage state is full depressurization at the time of core damage, with successful core makeup tank and accumulator injection.

For this event, the redundant injection path for reactor coolant system inventory makeup is disabled by the break. This leaves only one injection path, which results in a relatively high frequency of core damage from this event. In this sequence, only one system fails, in-containment refueling water storage tank injection.

Important Modeling Assumptions It is assumed that the break is large enough to cause one injection path to fail due to excessive spillage of the injected water. If a smaller break were to occur, the loss Revision: 6 O

November 15,1995 _ T Westinghouse maap60Wu'.ec590159.R06:lb 59-14

59. PRA Resuhs and Insights O

through the break and the spillage of the injected water through the break would be less, which might provide alternative success criteria.

The size of the break in the safety injection line can range from small to medium loss-of-coolant accidents. For this analysis, a medium loss-of-coolant accident is postulated.

Risk Important Failures he dominant cutsets for this sequence are provided in Table 59-3. Rese cutsets show that the risk important failures are:

i a

Common cause and random failure of both check valves on the intact in-containment refueling water storage tank discharge line (70-percent contribution)

Plugging of the in-containment refueling water storage tank discharge line strainer in the intact line (30-percent contribution)

Q C/

This sequence does not depend directly on success of operator actions. Credit is given for manual actuation of the core makeup tank and automatic depressurization system as a backup action if automatic actuations fail. The core damage frequency of this sequence would not change significantly if these actions were not credited.

I Revision: 6 YN w_ November 15,1995 59-15 m:\ap600praisec57CH59.R06:1b

=:

59. PRA Results and Insights Sequence 2: Anticipated Transient Without Scram Precursor (Loss of Normal O

Feedwater with Failure of Reactor Trip) (ATWS-1-07)

Sequence Frequency: 3.0E-08/ year Contribution to Core Damage: 12 percent Initiating Event Frequency: 6.1E-01/ year (anticipated transient without scram precursor without main feedwater)

Conditional Core Damage Probability: 4.9E-08 Description of Sequence A loss of main feedwater transient occurs. Reactor trip is needed, but both automatic and manual reactor trip fall as a result of the failure of the protection and safety monitoring system to provide a trip signal to the reactor trip breakers. Automatic and manual reactor trip using the diverse actuation system also fail. Core damage is postulated because the failures involved in the protection and safety monitoring system and diverse actuation system are assumed to prevent actuation of any other safety systems, resulting in reactor coolant system overpressure, loss of reactor coolant system integrity and inventory, and core damage. His sequence is assigned to the 3A core damage state (high-pressure core damage) without further analysis.

Important Modeling Assumptions Common cause failures of instrumentation ind control hardware will affect only similar hardware (only similar groups of control baards, not all boards, are affected by a given hardware common cause failure).

Core damage occurs through subsequent overpressure, loss of inventory, and loss of core cooling if the protection and safety monitoring system and diverse actuation system reactor trip signals fail.

In this sequence, no credit is taken for the ability of active or passive safety-related systems to provide reactor coolant system makeup and core cooling following a break in the reactor coolant system as a result of overpressure caused by the loss of feedwater and failure to trip the reactor.

Risk Important Failures The dominant cutsets for this sequence are provided in Table 59-4. For this sequence, contributing failures involve the failure of both the protection and safety monitoring system and diverse actuation system to actuate a reactor trip and failure of the operators to take action to trip the reactor in a timely manner. He most important failures are:

Operator fails to perform manual reactor trip either by the protection and safety monitoring system (action to initiate opening of the reactor trip breakers) or by the Revision: 6 g O

November 15,1995 mtsh 3 Westinghouse maap60Gprabec59'CH59.R06:1b 59-16

ii=::

59. PRA Results and Insights a

(O diverse actuation system (action to initiate tripping of the control rod motor-generator sets)

Common cause hardware failure of the protection and safety monitoring system boards

. Hardware failure of the diverse actuation sysk-m Failure of the diverse actuation system transmitters (turbine impulse chamber pressure transmitters are modeled)

Credit is taken for manual trip of the reactor by the operators using either the protection and safety monitoring system or diverse actuation system cues and equipment. The combined failure probability of the operator actions in the protection and safety monitoring system and diverse actuation system for this sequence is 0.027. This is a relatively high probability of failure (almost 3 failures in 100 attempts) as a result of the modeling of the diverse actuation system-related operator action as strongly dependent on the protection and safety monitoring system-related action. The action for manual trip by the operator appears in most of the cutsets. If no credit is taken for this action, the sequence frequency would increase to about 1.0E-06.

O i

O 8 h Novem r ,

59-17 mAap600prabec59CH59.R06:1b

59. PRA Results and Insights Sequence 3: Anticipated Transient Without Scram Precursor (Loss of Normal O

Feedwater with Failure of Reactor Trip) (ATWS-28)

Sequence Frequency: 2.0E-08/ year Contribution to Core Damage: 8 percent Initiating Event Frequency: 6.lE-01/ year (anticipated transient without scram precursor l without main feedwater) i Conditional Core Damage Probability: 3.3E-08 l Description of Sequence This sequence encompasses all combinations of failures on the anticipated transient without scram loss of main feedwater precursor event tree that do not directly lead to success or to core damage, and for which further evaluation of plant response is modeled in the event tree.

There are several scenarios encompassed by this sequence:

Failure of reactor trip as a result of failure of the protection and safety monitoring system trip signal, success of the diverse actuation system trip signal, but failure of the control rod motor-generator sets to open

.s.sessful protection and safety monitoring system trip signal generation, failure of the reacter trip breakers to open, and failure of the diverse actuation system reactor trip ,

signal Successful protection and safety monitoring system trip signal generation, failure of the reactor trip breakers to open, successful diverse actuation system trip signal generation, but failure of the control rod motor-generator sets to trip In each scenario, both automatic and manual actuations are modeled for the protection and safety monitoring system and diverse actuation system.

Following failure to trip the reactor, heat removal by either startup feedwater or passive residual heat removal is successful. The operators fail to actuate the rod control system (via the plant control system) so that the control rods fail to step into the core. This leads to a heatup and pressurization of the reactor coolant system. Reactor coolant system pressure relief fails as a result of either failure of one or both of the pressurizer safety valves to open, or as a result of the occurrence of the event early in the fuel cycle, during which the core reactivity feedback is not adequate to prevent reactor coolant system heatup in excess of the safety valve relief capacity.

Core damage is postulated due to reactor coolant system pressure in excess of 3200 psig, which is beyond the established stress limits for the reactor coolant system (and beyond design basis and analysis domain). Thus, core damage is postulated due to lack of analysis. In reality, it is likely that a break would occur in the reactor coolant system due to the high pressure; this break would relieve the high reactor coolant system pressure, allowing operation 9

o r 15,1995 b. Westirigt100Se m4600ga\wc59CH59.R06:1b 59-18

ii-- E i

59. PRA Results and Insights

( y) of the various mitigation systems. This sequence is assigned to the 3A plant damage state, in which the reactor coolant system is at high pressure when core damage occurs.

Important Modeling Assumptions There is a period of time at the beginning of each cycle during which core reactivity feedback is not sufficient to prevent overpressurization of the reactor coolant system given a loss of normal feedwater anticipated transient without scram. However,if the operators can initiate the stepping in of the control rods within one minute after the event occurs, sufficient negative reactivity will be inserted to eliminate the concern that the capacity of the safety valves is exceeded due to insufficient reactivity feedback.

If reactor coolant system pressure goes beyond 3200 psi, core damage is assumed; no credit for loss-of-coolant accident-mitigating systems is credited.

=

The time available for operator actions to trip the reactor is very short (approximately 2 minutes) for the loss of normal feedwater anticipated transient without scram.

Risk Important Failures The dominant cutsets for this sequence are listed in Table 59-5. They indicate that the following failures are risk important in this sequence:

l r'N b +

Failure of reactor coolant system overpressure protection due to either pressurizer safety valves failing to open or adverse reactivity feedback considerations 1

  • Failure of control rod motor generator sets to deenergize
  • Common cause failure of protection and safety monitoring system hardware l

Common cause failure of reactor trip breakers to open Three operator actions are important to success for this sequence. These are:

Operator actuation of reactor trip via the protection and safety monitoring system Operator actuation of reactor trip (motor-generator set trip) by diverse actuation system Operator actuation of control rod insertion via the plant control system (PLS) l l

l f'\

U g ..

Revision: 6 3 W65tingt100S8 wmW November 15,1995 59-19 m:\aP600'pra\sec59CH59.R06:Ib

~.. - - _ . - - .__ -.

l

59. PRA Results and Insights l \

Sequence 4: Large Loss-of-Coolant Accident (LLOCA-03) l Sequence Frequency: 1.7E-08/ year Contribution to Core Damage: 7 percent i Initiating Event Frequency: 1.lE-04/ year l Conditional Core Damage Probability: 1.6E-04 Description of Sequence This sequence is a large loss-of-coolant accident initiating event (equivalent to a break l diameter of greater than 9 in., other than reactor vessel rupture), followed by successful injection by one or more accumulators, but failure of the in-containment refueling water storage tank injection from both lines. Core damage is postulated due to in-containment refueling water storage tank injection failure, after which it is assumed that the loss of reactor coolant system inventory can not be made up in time to prevent core damage. After the accumulators have fully injected, the reactor coolant system water level will keep dropping due to boil-off and coolant losses through the break.

His sequence is assigned to the 3BE plant damage state, which is defined as full depressurization with successful core makeup tank and accumulator injection. The reactor coolant system is at low pressure due to depressurization through the break.

Important Modeling Assumptions No credit is taken for core makeup tank injection; core makeup tank injection is expected and would delay, but not prevent, core damage.

Risk Important Failures Dominant cutsets for this sequence are listed in Table 59-6. He dominant failure for this sequence is the common cause failure ofin-containment refueling water storage tank injection line check valves to open. Dese valves can only be tested and maintained during a refueling outage. Thus, the failure exposure time assigned to them is large, which makes die failure probability high.

Bere are no operator actions modeled in this sequence.

O h'o r 15,1995 t= - Westinghouse m:wwec59a59.R06:1b 59-20

59. PRA Results and Insights n

t Sequence 5: Safety IqJection Line Break (SI LB-03)

Sequence Frequency: 1.6E-08/ year Contribution to Core Damage: 6.5 percent Initiating Event Frequency: 1.0E-04/ year Conditional Core Damage Probability: 1.5E-04 Description of Sequence The initiating event is a break that occurs in one of the two safety injection lines, resulting i in a loss of reactor coolant. All capability for reactor coolant system injection from the core makeup tank and in-containment refueling water storage tank through this broken line is postulated to be lost due to excessive spillage through the break, but core makeup tank injection through the intact line is successful. Full reactor coolant system depressurization via the automatic depressurization system fails, i.e., depressurization to the pressure at which in-containment refueling water storage tank injection can occur.

i Core damage is postulated due to the inability to icj: ct in-containment refueling water storage tank water into the core after the core makeup tank inventory is depleted, because, without I automatic depressurization system operation, the reactor coolant system pressure remains i above the pressure at which in-containment refueling water storage tank injection can occur.

This sequence is assigned plant damage state 3D, which is defined as core damage with partial C depressurization of the reactor coolant system (in this case, due to the break).

)

Important Modeling Assumptions Credit is taken for both automatic and manual autonratic depressurization system actuation, both of which are unsuccessful in this sequence.

It is assumed that the break is large enough to cause one injection path to fail due to l excessive spillage of the injected water. If a smaller break were to occur, the loss through the break and the spillage of the injected water through the break would be less; this might provide alternative success criteria (e.g., reactor coolant system depressurization using automatic depressurization system stages 1,2, and 3 rather than l stage 4).

1

'Ihe size of the break in the safety injection line can range from small to medium loss-of-coolant accidents. For this analysis, a medium loss-of-coolant accident is postulated.

l

= It has been conservatively assumed that the break occurs in the line to which the normal residual heat removal system is connected.

f3 V

Y WilS8 agm :. Novem r1 59-21 maap600pn\*c59 cts 9.R06:lb

l

59. PRA Results and Insights l l

l Risk Important Failures The dominant cutsets for this sequence are provided in Table 59-7. The dominant failure is  ;

the common cause failure of the automatic depressurization system fourth-stage squib valves (explosive valves) to open after an actuation signal is received. Failure of automatic and manual automatic depressurization system actuation is a much lower contributor to automatic depressurization system failure.

The following operator actions are modeled for manual actuation of the automatic depressurization system,if automatic actuation fails:

l Operator fails to recognize the need for automatic depressurization system actuation or i fails to actuate the system using protection and safety monitoring system-related cues  ;

and equipment j

=

Operator fails to actuate automatic depressurization system using diverse actuation system cues and equipment. This failure is assigned a failure probability corresponding to a high dependence on the preceding action to actuate automatic depressurization i system using protection and safety monitoring system 1

0' l

l l

1

\

l 1

Revision: 6 O

November 15,1995 w_ [ Westifighouse mAap600pra\sec57G159.R06:Ib $9 22

59. PRA Results and Insights O

l

' h Sequence 6: Intermediate Loss-of Coolant Accident (NLOCA-04)

Sequence Frequency: 1.2E-08/ year

, Contribution to Core Damage: 4.8 percent i

Initiating Event Frequency: 7.7E-04/ year Conditional Core Damage Probability: 1.5E-05 1

Description of Sequence '

His is an intermediate loss-of-coolant accident initiating event with a break size range equivalent to a 2- to 5-in. diameter. After the break occurs, a core makeup tank injection signal is generated, either one or both core makeup tanks actuate, the reactor coolant pumps trip, and the core makeup tanks inject when required. Full reactor coolant system depressurization (depressurization to the point at which in-containment refueling water storage tank injection can occur) using the automatic depressurization system valves is successful, but both the normal residual heat removal system and the in-containment refueling water storage tank fail to inject.

Core damage is postulated due to the failure to make up reactor coolant system inventory from both long-term sources (normal residual heat removal system and in-containment refueling water storage tank) after the core makeup tank has injected. He sequence is assigned to the 3BE plant damage state. The reactor coolant system is at low pressure due to depressurization through the break. His sequence involves failures of both safety-related (in-containment refueling water storage tank) and nonsafety-related (normal residual heat removal) systems.

( Important Modeling Assumptions Credit is taken for automatic and manual actuation of automatic depressurization system.

Only manual actuation is credited for the normal residual heat removal system.

Risk Important Failures De dominant cutsets for this sequence are provided in Table 59-8. He following are the risk important failures:

Common cause failure of the check valves in both in-containment refueling water storage tank injection lines to open Normal residual heat removal system isolation motor-operated valves (MOVs) 011,022, or 023 fall to open due to hardware failure

=

In-containment refueling water storage tank motor-operated valves ll7B or 118B fall to open, resulting in failure of normal residual heat removal system recirculation Common cause plugging of strainers in in-containment refueling water storage tank he models credit an operator action for actuation of the normal residual heat removal system.

Here .is no modeled operator action for in-containment refueling water storage tank injection.

(r E

YD tsh Novem r 5, 59-23 m \ap600pra\sec59CH59.R06:Ib

l

59. PRA Restits and Insights NAW -

Sequence 7: Intermediate Loss of Coolant Accident (NLOCA-06)

O' Sequence Frequency: 1.1E-08/ year Contribution to Core Damage: 4.4 percent Initiating Event Frequency: 7.7E-04/ year Conditional Core Damage Probability: 1.4E-05 Description of Sequence An intermediate loss-of-coolant accident initiating event occurs (equivalent to a 2- to 5-in, diameter break). After the break occurs, a core makeup tank injection signal is generated, I either one or both core makeup tanks actuate, the reactor coolant pumps (RCPs) trip, and the core makeup tanks inject when required. Full reactor coolant system depressurization fails (depressurization via the automatic depressurization system valves to the pressure at whichin- ,

containment refueling water storage tank injection can occur), but partial depressurization is j successful (depressurization via automatic depressurization system to the pressure at which normal residual heat removal system injection can occur). However, normal residual heat removal system injection falls.

Core damage is postulated due to the inability to provide reactor coolant system makeup after the core makeup tank empties, as a result of normal residual heat removal system failure and the inability to inject from the in-containment refueling water storage tank as a result of the i failure to depressurize sufficiently. His sequence is assigned plant damage state 3D, which j is defined as core damage with partial depressurization of the reactor coolant system. ]

Important Modeling Assumptions Credit is taken for the ability to depressurize the reactor coolant system partially (to normal residual heat removal system injection pressure) via the automatic depressurization system if full reactor coolant system depressurization via the automatic j depressurization system fails. The automatic depressurization system success criteria for partial depressurization are less restrictive than the automatic depressurization system success criteria for full depressurization.

Credit is taken for manual actuation of the normal residual heat removal system following partial depressurization.

  • For this sequence, the full depressurization success criteria for automatic depressurization system require operation of the fourth-stage automatic depressurization i system valves, with no credit for the first three stages. De automatic depressurization system success criteria are deterraned assuming operation of only one core makeup tank; with both core makeup tanks injecting, there could be a higher probability of successful full depressurization.

O o r 15,1995 6 Westingh0USB mAap60@ra\sec59CH59.R06:lb 59-24

_ . . - . . . . . . . . ~.

59. PRA Res11ts and Insights n
V Risk Important Failures The dominant cutsets for this sequence are provided in Table 59-9. The following failures are risk important:

Common cause failure of automatic depressurization system fourth-stage squib (explosive) valves to open

. Normal residual heat removal system isolation motor-operated valves 011,022, or 023 fail to open due to hardware failures

. In-containment refueling water storage tank motor-operated valves 117B or 118B fail to open, resulting in failure of normal residual heat removal system recirculation 4

The models credit an operator action for actuation of the normal residual heat removal system.

Credit is also given for manual actuation of automatic depressurization system if automatic actuation fails.

!3 V

/m 3 WW0m h Novem r1, 59-25 m: sap 60&pravec59ct59.Ro6:1b

59. PRA Res lts and lasights Sequence 8: Reactor Vessel Rupture (RV-RP-02)

O l

Sequence Frequency: 1.0E-08/ year l Contribution to Core Damage: 4.1 percent l Initiating Event Frequency: 1.0E-08/ year l

Conditional Core Damage Probability: 1.0 Description of Sequence 1

A reactor vessel rupture event occurs. His event prevents the core from remaining covered  !

with water due to the size and location of the break. Core damage is postulated as a direct i result of the initiating event.

l This event is assigned the 3C plant damage state category, which is a special category for the reactor vessel rupture initiating event.

Important Modeling Assumptions '

It is assumed that the safety-related systems cannot keep the core covered after the event ,

occurs. j Risk Important Failures ne initiating event frequency is the only risk important failure. There are no operator actions O

modeled. The only cutset for this event (as shown in Table 59-10)is the occurrence of the initiating event.

l l

Revision: 6 O

November 15,1995 m:W'wec590159.R06:Ib 59-26 h_ [ Westiflghouse

59. PRA Res:lts and Insights Sequence 9: Large Loss of Coolant Accident (LLOCA-04)

Sequence Frequency: 7.3E-09/ year Contribution to Core Damage: 3.0 percent Initiating Event Frequency: 1.lE-04/ year Conditional Core Damage Probability: 6.7E-05 Description of Sequence A large loss-of-coolant accident initiating event occurs (break size eoulvalent to greater than 9-in. in diameter). Both accumulators fail to inject. Core damage is postulated due to core uncovery as a result of accumulator injection failure; core damage occurs before in-containment refueling water storage tank injection can reflood the core. No credit is taken  ;

for core makeup tank injection. This sequence is assigned to the 3BR plant damage state, l which is defined as full reactor coolant system depressurization with failure of both accumulators and core makeup tanks.

Important Modeling Assumptions No credit is taken for core makeup tank injection; core makeup tank injection is expected, but it is assumed to be too slow to prevent core damage for this event. Core damage is assumed to occur solely on the failure of accumulators. This is conservative

/T since it is expected that core makeup tank injection would be effective for breaks at the V smaller end of the size range defined for a large loss-of-coolant accident in the PRA.

Risk Important Failures The dominant cutsets for this sequence are listed in Table 59-11. Common cause failure of the accumulator check valves to open is the dominant failure mode. This is followed by various combinations of random failure of two check valves to open. 'Ihere are no operator actions modeled in this sequence.

Revision: 6 3 W85tingh00S8 6 November 15,1995 59-27 m:up600 pow.c59ats9.R06:lb

59. PRA Resdts and Insights Sequence 10: Intermediate Loss of Coolant Accident (NLOCA-16)

O Sequence Frequency: 5.8E-09/ year Contribution to Core Damage: 2.4 percent Initiating Event Frequency: 7.7E41/ year Condit4nal Core Damage Probability: 7.5E-06 Description of Sequence An intermediate loss-of-coolant accident initiating event occurs (equivalent to a 2- to 5-in.

diameter break). After the break occurs, a core makeup tank injection signal is generated, I but one or more reactor coolant pumps fail to trip; this failure is assumed to prevent effective i core makeup tank injection. Both full reactor coolant system depressurization l (depressurization via the automatic depressurization system valves to the pressure at which in-containment refueling water storage tank injection can occur) and partial depressurization j (depressurization via automatic depressurization system to the pressure at which normal l residual heat removal system injection can occur) fall. l l

Core damage is postulated due to the inability to provide reactor coolant system injection.

Failure of the reactor coolant pump trip prevents core makeup tank injection, and failure of automatic depressurization system prevents injection from both the normal residual heat l

removal system and the in-containment refueling water storage tank in time to prevent core I damage.

l Dis sequence is assigned to the 1 AP plant damage state. This state is defined as a small loss of coolant with failure to depressurize but with passive residual heat removal operating. In this sequence, the status of passive residual heat removal is not determined, but the break size is sufficiently large that at least partial depressurization is provided.

Important Modeling Assumptions

  • Core makeup tank injection is assumed to fail as a result of failure of reactor coolant pump trip.

=

In this sequence, no credit is taken for automatic depressurization system actuation, as a result of the failure of core makeup tank injection. His makes operator actions important in this sequence.

A relatively high failure probability is assigned to the failure to trip reactor coolant pumps, since the reactor coolant pump breakers can only be tested during a refueling outage. Rus, the failure exposure time assigned to them is large, which makes the failure probability high.

Revision: 6 O

November 15,1995 ENEL mm W - ~ungn0US0 m:hp60Wn\sec590159.R06:Ib 59-28

t i =__ _ .

59. PRA Results and Insights p

\

Risk Important Failures The dominant cutsets for this sequence are shown in Table 59-12. Risk important component failures are related to failure of the reactor coolant pumps to trip:

.

  • Common cause failure to open of 4.16 Kvac circuit breakers to trip the reactor coolant pumps
  • Reactor trip breakers fail to open There are several operator actions that appear in the dominan: core damage cutsets. These are:

=

Operator fails to manually actuate the automatic depressurization system using diverse actuation system cues and equipment These operator actions are important in this sequence because failure of core makeup tank

, injection prevents automatic depressurization system actuation on low core makeup tank level.

(d i Failure of the protection and safety monitoring system-related operator action results in failure of both full and partial depressurization. Further, a failure probability corresponding to a high dependency is assigned to the diverse actuation system-related operator action because it follows the similar protection and safety monitoring system-related action in the sequence.

p MDW 6 Novem r ,

59-29 m:W60WnW9'CH59.R06:1b

=ii  ;

59. PRA Results and Insights Sequence 11: Medium Loss-of-Coolant Accident (MLOCA-04)

O i Sequence Frequency: 2.4E-09/ year Contribution to Core Damage: 1.0 percent Initiating Event Frequency: 1.6E-04/ year l Conditional Core Damage Probability: 1.5E-04 Description of Sequence A medium loss-of-coolant initiating event occurs (break size equivalent to between 5 and 9 in.

diameter). One or more core makeup tanks inject into the reactor coolant system, but the l

normal residual heat removal system fails. Reactor coolant system depressurization via l automatic depressurization system stage 4 valve operation is successful, but both lines ofin-containment refueling water storage tank injection fail. Core damage is postulated due to the i inability to provide long-term reactor coolant system inventory makeup and core cooling following the failures of normal residual heat removal system and in-containment refueling water storage tank injection. This sequence is assigned to the 3BE plant damage state. In this state, the reactor coolant system is fully depressurized after a loss-of-coolant accident.

Important Modeling Assumptions Credit is taken in the models for manual actuation of the normal residual heat removal system in injection mode, followed by gravity recirculation, for successful termination of the event.

However, in this sequence, normal residual heat removal system fails.

Although operation of the automatic depressurization system is not required to reach the normal residual heat removal system operating pressure for a medium loss-of-coolant accident, automatic depressurization system operation is required to allow in-containment refueling water storage tank injection following normal residual heat removal system failure.

Risk Important Failures Table 59-13 lists the dominant cutsets for this sequence. The dominant risk-important failure is the common cause failure to open ofin-containment refueling water storage tank injection check valves on both lines.

Other significant failure contributors are:

Normal residual heat removal system isolation motor-operated valves 011,022, or 023 fail to open In-containment refueling water storage tank recirculation motor-operated valves ll7B or 118B fail to open, resulting in failure of normal residual heat removal system recirculation O

o r 15,1995 35m6 00S8 m:\ap6@pra\wc57CH59.R06:1b 59-30

59. PRA Results and Imights EEM '

Credit is taken for the proceduralized operator action to actuate the normal residual heat removal system. Credit is also taken for operator action to actuate the core makeup tanks and automatic depressurization system as a backup to automatic actuation. These actions are not risk important in this sequence.

i l

O l

l UN h Novem r1, 59-31 m: sap 600pris.ec590{59.R06:Ib

59. PRA Resdts and Insights enu -

Sequence 12: Reactor Coolant System Leak (RCSLK-N)

O Sequence Frequency: 2.3E-09/ year Contribution to Core Damage: 1.0 percent Initiating Event Frequency: 1.2E-02/ year Conditional Core Damage Probability: 1.9E-07 Description of Sequence A reactor coolant system leak initiating event is a coolant leak within the capacity of a chemical and volume control system makeup pump. The chemical and volume control system fails, or the operators fail to take action to shut down the plant, eventually leading to a reactor trip due to excessive reactor coolant system inventory loss. From this point on, the event progresses as a small loss-of-coolant accident. Core makeup tank actuation occurs, the reactor coolant pumps are tripped, and at least one core makeup tank injects. Passive residual heat removal operation and full reactor coolant system depressurization via the automatic depressurization system are successful. However, injection via the normal residual heat removal system and in-containment refueling water storage tank injection both fail. Core damage is postulated due to the inability for long-term reactor coolant system inventory makeup and core cooling following in-containment refueling water storage tank and normal residual heat removal system failures. His sequence is assigned to the 3BE plant damage state. In this state, full reactor coolant system depressurization is achieved after a loss-of- i coolant accident.

Important Modeling Assumptions

)

Following a reactor coolant system leak event, if chemical and volume control system operation and manual shutdown are successful, the event is terminated; otherwise a reactor trip and small loss-of-coolant accident plant response are postulated.

Risk Important Failures The dominant cutsets for this sequence are listed in Table 59-14. The dominant risk important failure is the common cause failure to open of the in-containment refueling water storage tank check valves; this failure renders in-containment refueling water storage tank injection inoperable.

Other significant contributors fall the nonsafety-related chemical and volume control system and normal residual heat removal system. These are failures of electrical eqaipment or HVAC chillers. They appear as significant primarily as a result of the PRA modeling, whereby chemical and volume control system unavailability models assume that reactor trip has already occurred. However, for the reactor coolant system leak event sequence, the chemical and volume control system is required to prevent a reactor trip. Thus, in the fault tree model, post-reactor trip electrical bus transfer logic makes failures in supporting systems more significant than they would be had the model been set up specifically for this sequence.

O or r 5,1995 6 Y W65tingh00Se m:Wawc59citS9.R06:Ib 59-32

:-- 5 5
59. PRA Res11ts and Insights re-

,s-I f Three operator actions appear in the cutsets; none is dominant:

Operators fall to perform manual shutdown to avoid reactor trip Operators fail to actuate normal residual heat removal system Operators fail to align the standby chilled water pump (which affects normal residual heat removal system)

I O l l

r (h

O W==

EAfE4 Eh November 15,1995 Revision: 6 59-33 m:hp60@raVec59Cll59.R06:Ib

1

59. PRA Rer!ts and Insights l WM - l Sequence 13: Medium Loss-of Coolant Accident (MLOCA-05)

O Sequence Frequency: 2.3E-09/ year Contribution to Core Damage: 1.0 percent 1 Initiating Event Frequency: 1.6E44/ year Conditional Core Damage Probability: 1.4E-05

{

Description of Sequence 1

A medium loss-of-coolant accident initiating event occurs (break size equivalent to between

{

5- and 9-in. diameter). One or both core makeup tanks inject into the reactor coolant system, j but the normal residual heat removal system fails. Reactor coolant system depressurization I via the automatic depressurization system also fails. Core damage is postulated due to the

, inability to provide makeup to the reactor coolant system following normal residual heat removal system failure and the inability to provide in-containment refueling water storage tank injection in time as a result of automatic depressurization system failure.

1

'Ihis sequence is assigned to the 3D plant damage state. In this state, the reactor coolant l system is partially depressurized after a loss-of-coolant accident. Although automatic depressurization system failed, the break provides depressurization in this case.

Important Modeling Assumptions Credit is taken for manual and automatic actuation of the automatic depressurization O.I system.

Risk Important Failures

'lhe dondnant cutsets for this sequence are shown in Table 59-15. 'Ihe dominant risk important failure is the common cause failure of the fourth-stage squib valves to open.

Other significant contributors include:

Normal residual heat removal system isolation motor-operated valves 011,022, or 023 fall to open In-containment refueling water storage tank recirculation motor-operated valves 117B or 118B fail to open, resulting in failure of normal residual heat removal system recirculation Credit is taken for the operator to actuate the normal residual heat removal system. Credit is also taken for operator action to actuate the core makeup tanks and automatic depressurization system as a backup to automatic actuation. These actions are not risk important in this sequence.

O o r 5,1995 w- 3 W65tingh00S8 mAap60@rhec59CI59.R06:Ib 59-34

w---m

59. PRA Results and Insights m-O V' 593.2 Component Importances for At Power Core Damage Frequency Chapter 33 presents tables of the relative importances of all basic events appearing in the cutsets for the baseline core damage quantification. Rese tables indicate risk decrease and risk increase. Risk decrease is the factor by which the core damage frequency would decrease if the failure probability for a given basic event is set to 0.0; it is a useful measure of the benefit that might be obtained as a result of improved component maintenance or testing, better procedures, or operator training. Risk increase is the factor by which the core damage frequency would increase if the failure probability for a given basic event is set to 1.0; it is a useful measure of which components or actions would most adversely affect the core damage frequency if actual operating practices resulted in higher failure probabilities than assumed in the PRA.

He risk decrease results (as discussed in detail in Chapter 50) show that no component contributes more than 20 percent to the total core damage frequency, and that only one single component failure (in-containment refueling water storage tank discharge line strainer plugged) contributes more than 10 percent. In general, there are few single component failures with a risk reduction worth greater than 1 percent. De contribution from unscheduled maintenance is also small; there is no scheduled maintenance for safety-related systems at power. Rese results indicate that there are no components for which an improvement in design, test, or maintenance (i.e., a change resulting in a significant reduction of the component failure rate) would have a significant impact on core damage frequency.

V De risk increase results indicate that there are only three components for which guaranteed failure results in a core damage frequency increase of at least 10 times. Other single-component failures (including unavailability due to unscheduled maintenance) have significantly lower risk increase values, corresponding to a factor of six or lower increase in core damage frequency given an assumption of total unreliability for these components.

Rese results indicate that the AP600 design includes sufficient redundancy and diversity of protection so that single component-related failures do not have a large impact on the core damage frequency results.

59.3.3 System Importances for At Power Core Damage System importances for plant core damage frequency from internal initiating events at power are presented in Chapter 50. ney are obtained by setting the failure probabilities for the affected system components to 1.0 in the baseline cutsets and recalculating the core damage frequency.

The results of the sensitivity analyses show that the protection and safety monitoring system, the Class 1E de power system, and the in-containment refueling water storage tank are important in maintaining a low core damage frequency. He risk-important systems are safety-related systems. Thus, the nonsafety-related systems are significantly less important to plant core damage frequency than are the safety-related systems.

O V

T WilSe 6 Novem r ,

59-35 mup60awasuc59atS9.R06:lb

59. PRA Results and Insights 59.3.4 System Failure Probabilities for At-Power Core Damage O

Some selected system failure probabilities for typical success criteria used in the at-power PRA are listed in Table 59-16. A system may have different failure probabilities based on the success criteria assigned. For a key safety-related system such as the automatic depressurization system, this is especially pronounced; the automatic depressurization system has many success criteria and corresponding failure probabilities that range over a factor af 100. The values in the table are representative of the various cases.

As can be seen from the system 4 unavailabilities listed in Table 59-16, the highest unavailabilities (i.e.,10-2 to 10 , indicating lower reliability) are associated with nonsafety-related systems or functions. The lower unavailabilities (i.e.,10" to 104 , indicating higher reliability) are associated with safety-related systems.

59.3.5 Common Cause Failure Importances for At-Power Core Damage The basic event risk decrease importance results (as presented in Chapter 50) show that common cause failures of hardware associated with the protection and safety monitoring system, common cause failures ofin-containment refueling water storage tank gravity injection components, and common cause automatic depressurization system squib valve failures are of potential significance in maintaining the current level oflow plant core damage frequency.

The risk increase importances for common cause failures of the following sets of components show that these are also of potential significance to the current low level of core damage frequency from internal events: software common cause failure of all logic cards in the protection and safety monitoring system, plant control system, and diverse actuation system; logic board failures of the protection and safety monitoring system; failures of transmitters used in the protection and safety monitoring system; failures of reactor trip breakers; plugging of containment sump recirculation screens; failures of in-containment refueling water storage tank gravity injection line check valves; plugging of strainers in the in-containment refueling water storage tank; failures of fourth-stage automatic depressurization system explosive (squib) valves; failures of accumulator check valves; and accumulator tank failures.

59.3.6 Human Error Importances for At-Power Core Damage In the PRA, credit is taken for various tasks to be performed in the control room by the team of trained professionals. Most of these tasks are rule-based, with only a few skill-based tasks relating to immediate shutdown of the reactor following anticipated transient without scram precursors. Although these tasks are usually termed operator actions, the tasks almost always refer to the completion of a well-defined mission by a team of trained operators following procedures. Further, not every individual or group error during a mission necessarily fails the mission, since procedural recovery is built into the emergency procedures. Moreover, a very strong diversity is introduced through monitoring of the emergency procedure status trees by a shift technical advisor, who is not a regular member of the team. These considerations are factored into the PRA evaluation of human errors.

O ove r 5,1995 W85tl0gh00S8 dp60%ec59CH59.R06:1b 6

59-36

59. PRA Resuhs and Insights

/"N l V here are thirty-two such operator actions that appear in the dominant core damage cutsets.

l l

De actions appear in the cutsets rather than in the sequences since they are modeled within l the functional system fault trees to assess their impact at the appropriate logic level. These actions are grenped by their failure probabilities, without regard to the specific tasks involved  ;

(i.e., the ndon description 3 are intentionally omitted from the table) in Table 59-17 to indicate l the sneral range of credit taken for the various actions included in the PRA models. In

~

rev ewing this information, which does not imply an importance ranking, it is useful to note the following. I It can reasonably be expected that a team of trained professionals will have an average mission failure probability on the order of 1.0E-03 or less during the performance of a task (i.e., a failure rate of 1 in 1,000 trials), as long as the following conditions are met:

There has not been a prior related team failure during the progression of the event, or, I if tnere is one, it has been followed by the successful completion of a task (i.e., the l team has not previously mis-diagnosed the actions required to mitigate the event) l l

The time window available for the task is equal to or greater than the expected time I needed to complete the task I The task is rule-based rather than knowledge-based (i.e., it requires primarily that the

. operators follow a set ofinstmetions with which they are familiar, rather than requiring

( primarily cognitive processes)

L It can be seen from Table 59-17 that most of the operator actions modeled have been assigned values that are in the range of average to very high failure probabilities. Most of the human error probabilities that appear in the dominant cutsets are within a close range of an average failure probability. The very high failure probability tasks are primarily conditional or dependent failure probabilities that have been assigned by the human reliability analyst to actions that follow a prior failure to perform a related action in the same event sequence.

Such dependent probabilities are assigned when multiple related task failures are not separated by intermediate task successes. The lower probability tasks tend to be those requiring actuation of a device after a separately modeled diagnosis task has succeeded.

De risk decrease results for operator actions (discussed in Chapter 50) show that there are only six human actions with importances greater than 1 percent. There are only three actions for which the internal initiating events at-power core damage frequency contribution would decrease by more than 5 percent ifit were assumed that the operators always were successful.

This indicates that there would be no significant tenefit from additional refinement of the actions modeled nor from special emphasis on operator training in these actions (versus other emergency actions).

The risk increase results show that there are only five operator actions with importance greater than 100 percent; i.e., these are the only modeled operator actions whose guaranteed failure would result in a core damage increase greater than the base case core damage frequency.

A T Wed$00S6 h Novem r 15, 59-37 m:\ap600pra\sec59CH59,R06:Ib

59. PRA Results and Insights ne most important action in this ranking (operator fails to actuate automatic depressurization O

system) results in just under one order of magnitude increase in core damage frequency. Rese results indicate that the plant design is not overly sensitive to failure of operator actions and the core damage models do not take undue credit for operator response.

A sensitivity was performed in which the failure probabilities for the 32 operator actions are set to 0.0 (perfect operator). The resulting core damage frequency is 1.78E-07 per year, or a decrease of 27 percent. His indicates that perfection in human error probabilities is not risk important at the level of plant risk obtained by the base case; there is no significant benefit to be gained by improving operator response beyond the assumptions made in the PRA.

Another sensitivity was performed in which the failure probabilities for the 32 human error probabilities and also for indication failure (protection and safety monitoring system, plant control system or diverse actuation system originated) are set to 1.0 (failure). De result of the sensitivity analysis shows that the core damage frequency increased to 2.78E-05 events per year. The resulting core damage frequency with no credit for operator actions is still low (about one event in 36,000 reactor-years), on the order of core damage frequency for current plants with credit for operators. This means that, in general, operator actions are important in maintaining a very low plant core damage frequency for internal events at power but are not essential to establishing the acceptability of plant risk. De presence of trained operators will help ensure that the very low core damage frequency prediction is valid. His finding demonstrates a significantly lower dependence on human actions than exists for current plants.

He AP600 meets the safety goal without human action, whereas current plants typically do not.

59.3.7 Sensitivity Analyses Summary for At Power Core Damage Dirty-six importance and sensitivity analyses were performed on the core damage model for internal initiating events at power. Dese cases and results are discussed in Chapter 50.

He analyses were chosen to address the following issues:

Importances ofindividual basic events and their effect on plant core damage frequency Importances of safety-related and nonsafety-related systems in maintaining a low plant core damage frequency Importances of containment safeguards systems in maintaining a low large release frequency Effect of human reliabilities as a group on plant core damage frequency Other specific issues such as passive system check valve reliability and diesel generator mission time e

o r 15,1995 Y W85tingfl0llS8 maap600pra\sec59CH59.R06:1b 59-38

._=

59. PRA Results and Insights r~'s

~] Re sensitivity analyses results are listed in Table 5918. They show that: I If no credit is taken for operator actions, the plant core damage frequency is 2.8E-05 events per year. His compares well with core damage frequencies for existing plants where credit is taken for operator actions.

Re most important systems for core damage prevention are the protection and safety monitoring system, Class lE de power, automatic depressurization system, in-  !

containment refueling water storage tank, and accumulators; none of the nonsafety- i related systems have high system importance. l l

Dere are no operator actions that would provide a significant risk decrease if they were made to be more reliable. There are only two sets of operator actions that are risk-important (i.e., whose guaranteed failure would result in a large increase in core damage i

frequency): manual automatic depressurization system actuation and manual reactor trip following an anticipated transient without scram precursor. -

1

  • If the reliability of all check valves is assumed to be a factor of 10 worse, the total l plant core damage frequency would only increase into the 1E-06 (i.e., very low) range.

J This shows that the passive safety-related systems that depend on check valve opening perform well, even if pessimistic check valve reliabilities are assumed.

ne plant core damage frequency is not affected by the diesel generator mission time (V] duration. His is due to the AP600 design's passive features, which do not require ac power for operation.

The common cause failure basic events, particularly those associated with safety-related systems, are important individually, and also as a group for plant core damage frequency. His is expected for a plant with highly redundant safety-related systems, for which individual component random failure contributions are of reduced significance.

59.3.8 Summary ofImportant Level 1 At-Power Results Core Damage Contribution from Various Types of Initiating Events ne results of the PRA show that the following AP600 design features provide the ability for plant systems to respond to various initiating events and contribute to a very low core damage frequency.

He manual feed and bleed operation in current pressurized water reactors is replaced by the automatic depressurization system and core makeup tank /in-containment refueling water storage tank injection. His increases the success probability for bleed and feed and helps reduce core damage contribution from transients with failure of decay heat removal.

t u

YO 6 Novem r 5, 59-39 m:\ap600er=\sec59citS9.R06:lb

I

59. PRA Rescits and Insights The switchover-to-recirculation operation in current pressurized water reactors is e

replaced with automatic recirculation of sump water into the reactor coolant system loops by natural circulation.

. The diverse actuation system provides diverse backup for automatic or manual actuation of safety-related systems, increasing the system reliability for the passive residual heat removal, core makeup tank, and automatic depressurization systems.

Among the plant features that contribute to the small core damage frequency are the following:

The plant design is based on a defense-in-depth concept whereby there are several means (both active and passive) of providing reactor coolant system makeup following a loss-of-coolant accident, at both high and low pressures (i.e., chemical and volume control system pumps, core makeup tanks, accumulators,in-containment refueling water storage tank gravity injection, and normal residual heat removal system). Similarly, there are diverse means of core cooling, including the passive residual heat removal and normal residual heat removal systems.

. The ability to depressurize and establish feed and bleed heat removal via the automatic depressurization system and core makeup tanks without operator action provides an additional reliable means of core cooling and inventory control.

The diversity and redundancy in the design of the automatic depressurization system provides a highly reliable system for depressurizing to allow injection and core cooling by the various sources of water.

The design of the reactor coolant pumps eliminates the dependence on component cooling water and accompanying reactor coolant pump seal loss-of-coolant accident core damage contribution, which is typically significant for current plants.

The design of the safety-related heat removal systems eliminates the dependence on service water and ac power during accidents; such dependencies can be significant contributors to core damage for current plants.

Loss-of-Coolant Events. The at-power core damage results are dominated (roughly 75 percent) by various loss-of-coolant events. More than half of the loss-of-coolant accident contribution is due to the safety injection line break, which is a special initiator, in that its occurrence partially defeats features incorporated into the plant to respond to losses of primary coolant. Even though the safety injection line break core damage frequency dominates the results, its value is very small (one event in 10 million reactor years), with little credit for nonsafety-related systems.

Anticipated Transients Without Scram. Anticipated transients without scram sequences contribute about 21 percent of the at-power core damage frequency,in part due to modeling Revision: 6 O

November 15,1995 g T hikgiiOUSe mAap600$ nWc55PCH59.R06:1b 59-40

b '::Z::

59. PRA Results and Insights O

V simplifications whereby,in the absence of specific modeling and success criteria,it has been assumed that core damage will occur given certain combinations of failures. With additional analysis and modeling detail,it is expected that the anticipated transient without scram core damage frequency could be shown to be lower. However, since the total anticipated transient without scram core damage frequency is on the order of I event in 20 million reactor years, additional modeling was not undertaken.

Transients. The contribution of transients to core damage frequency is only about 3 percent of the at-power core damage frequency (total contribution from all transient initiators with reactor trip is less than 1 event in 100 million reactor years). This is the result of the defense-in-depth features of the AP600 design, whereby core ccoling following transients is available from main feedwater, startup feedwater, and passive residual heat removal, as well as from feed and bleed, using diverse and redundant sources of makeup (core makeup tanks, accumulators, in-containment refueling water storage tank, normal residual heat removal system) and of depressurization (four stages of automatic depressurization system).

Loss of Offsite Power. De loss of offsite power core damage frequency contribution at power is insignificant. AP600 passive systems provide cooling without any offsite or onsite ac or de power. In addition, the passive residual heat removal heat exchanger is backed up by bleed and feed cooling using the automatic depressurization system and core makeup tanks or in-containment refueling water storage tank gravity injection, which require only de power provided by long-term batteries. With onsite power available, startup feedwater provides an additional means of decay heat removal. i Steam Generator Tube Rupture. He steam generator tube rupture event contributes only about 1.5 percent of the at-power core damage frequency. Compared to operating pressurized water reactors this is a very low contribution. Among the reasons for the small steam generator tube rupture core damage contribution are the following:

  • The first line of defense is the startup feedwater system and chemical and volume control system
  • A reliable safety-related passive residual heat removal system coupled with the core makeup tank subsystem, which provide automatic protection
  • A third line of defense using automatic depressurization system and in-containment refueling water storage tank for accident mitigation should the above-mentioned systems fail.

Further, the automatic depressurization system provides a more reliable alternate decay heat removal path through feed and bleed than the high-pressure manual feed and bleed cooling of current operating plants, b) r Mghotise @L., Novem r1, 59-41 mAap600spra\nc59CH59.R06:1b

59. PRA Results and Insights Finally, the large capacity of the in-containment refueling water storage tank increa.ses the O

long-term recovery probability for unisolable steam generator leaks that bypass containment, by preventing depletion of borated water and core damage.

Dependence on Operator Action l l

Re results of the PRA show that the AP600 is significantly less dependent on operator action to reduce plant risk to acceptable levels than are current plants. His was shown through the sensitivity analyses and the operator action contributions from both the risk decrease and risk increase measures. Almost all operator actions credited in this PRA are performed in the control room; there is very little credit for local actions outside the control room. Further, the human actions modeled in the AP600 PRA are generally simpler than those for current plants (e.g., no manual switchover to ECCS recirculation). Thus, the tanks for AP600 operators are easier and less likely to fail. Ifit were assumed that the operators never perform any actions credited in the PRA, the internal events core damage frequency would still be lower than the result obtained for many current pressurized water reactors including operator actions.

Dominant System / Component Failure Contributors l

Contribution to Core Damage Freauency. Component-related contributors to core damage l frequency from internal events at power are dominated by common cause failures. Dere are no single components for which an improvement in design, test, or maintenance (resulting in perfect component performance) would have a large impact on the core damage frequency j results.

Dependence on Component Reliability. Most of the component failures with relatively high i risk increase worth are common cause failures. His is an indication of the high degree of built-in redundancy and diversity of AP600 safety-related systems, particularly in view of the low baseline core damage frequency. The results demonstrate a well-balanced design, for which diversity eliminates any strong dependence on active valves or on any specific type of 4

valve.

Sensitivity to Numerical Values and Modeline Assumptions. The core damage results are not sensitive to increases in the failure probabilities of basic events: even for the basic event with the highest contribution to core damage, an increase of a factor of 10 in the failure probability i increases the core damage frequency by at most a factor of 2.8. With respect to groups of components,it is observed that check valves are important; if the passive system check valve failure probability is increased by a factor of 10, the core damage frequency increases by a factor of 18 Tnis increase is not insignificant, but it does not change the conclusion that the core darm ge goal of IE-05 is comfortably met. Finally, the modeling assumptions in system and accident sequence success criteria are bounding (e.g., conservative) whenever a range of conditions are represented by a single, selected condition or success criterion. Since the modeling assumptions already represent an upper bound type estimate, there are no significant contributions to core damage due to conditions outside the assumed ranges that are unaccounted for. As an example, the automatic depressurization system success criteria for O

ov r 15,1995 6 W85tillgh00S8 m:\ap300$ra\sec59Gl59.R06:1b 59-42

u- _

59. PRA Results and Insights o

\ l loss-of-coolant accident events are selected to cover the worst conditions (e.g., break size, break location) of the range, rather than typical conditions as is done in most PRAs.

l Test and Maintenance Unavailability Safety-related systems do not have scheduled test or  !

maizitenance during power operation. His eliminates the unavailability due to test or scheduled mainte: nance of safety-related system components at power. l l

Systemjteliability and Defense-in-Depth. He results show that the safety-related systems I have derdoastrated high reliabilities (e.g., failure probability in the range of IE-06 to IE-04),

l due to the nature of the system designs (namely passive systems, with no test or maintenance l

requirements during power operation). Moreover, multiple means of success exist for '

transients and credible loss-of-coolant accident events. This means that a failure of a safety-related system will not lead to core damage, because other diverse systems back up the first

)

one. His defense-in-depth philosophy leads to the low core damage frequency.  !

i 59.4 Severe Release Frequency for Internal Initiating Events at Power l

59.4.1 Containment Response and Plant Risk Reruits l The results of the Level 2 (containment response) and Level 3 (plant risk) analyses for the internal initiating events at power demonstrate that the AP600 containment design is rot'ust in its ability to prevent releases following a severe accident and that the risk to the public due to severe accidents for AP600 is very low. The large release frequency (containment failure frequency) of the AP600 can be divided into three types of failures: 1) initially failed containment, in which the integrity of the containment is either failed due to the initiating event or never achieved from the beginning of the accident; 2) containment-failure-induced by high energy severe accidera phenomena; or 3) basemat penetration due to unmitigated core-concrete interaction. He total of these failures is the overall large release frequency. He following summarizes importalit results of the containment event tree quantification with respect to large release frequency and contributions of the different failure types.

l Re overall release frequency for AP600 is 1.0E-08 events per year. This is approximately 4.1 percent of the core damage frequency for internal initiating events at power and well below the design goal of 10 percent.

Re impaired containment frequency, which includes containment bypass, containment isolation failure, and excessive containment leakage, is 9.9E-09 events per year. His accounts for about 99 percent of the overall release frequency. This is significant because, for such sequences, containment integrity is compromised either by the nature l of the initiating event (e.g., bypass) or by conditions occurring at the outset of the event (e.g., leakage or failure of isolation), rather than as a result of conditions inside j containment following core damage. It indicates the robustness of the AP600 I containment design. l

(' '

Revision: 6 3 W95tingfl0US8 November 15,1995 59-43 m:\ap600trassec59CH59.R06:Ib l

59. PRA Res lts and Insights The containment failure frequency as a result of severe accident phenomena is 1.6E-10 e

events per year; this is about 1.6 percent of the overall release frequency or about 0.06 percent of the core damage frequency. Approximately 64 percent of the early containment failure frequency is due to early containment failures in accident class 3C, in which rupture of the reactor vessel is the initiating event and for which no core damage mitigation is modeled. he contribution of early containment failures in accident class 3C is the result of conservative containment modeling assumptions.

The frequency of containment isolation failure is dominated (71 percent) by accident class 1AC, in which operator failure to isolate the containment following automatic isolation failures is a significant contributor. His indicates the importance of this operator action.

The frequency of containment basemat failure is 1.3E-10 events per reactor-year.

Basemat failure occurs more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the onset of core damage. The frequency accounts for 1.3 percent of the overall large release frequency. He basemat failure frequency is 0.05 percent of the core damage frequency.

He timing of induced containment failure resulting from severe accident phenomena is defined with respect to the time of fission product release from the damaged core. Early containment failure occurs when the containment fails during the core melt and relocation or as a result of phenomena that occur at the time of reactor vessel failure. Intermediate containment failure occurs within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of core damage and is typically induced by a ,

hydrogen combustion event. Late comainment failure occurs more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after core '

damage and is also often induced by hydrogen combustion. The passive nature of the AP600 containment cooling system removes decay heat from the containment regardless of the operation of any systems; therefore, there are no long-term overpressure failures from decay heat steaming.

The high-pressure melt ejection frequency is 4.4E-11 events per year. This is approximately 0.5 percent of the overall release frequency, approximately 0.02 percent of core damage frequency, and approximately 0.4 percent of the early containment failure frequency. It is conservatively assumed that all high-pressure melt ejection events lead to containment failure, since the frequersey of these events is very small.

However, AP600 design features and emerging consensus among industry experts on direct containment heating for existing pressurized water reactors affords considerable promise that containment integrity would be maintained.

The release frequency is not sensitive to high-pressure core damage sequences. If all high-pressure sequences are assumed to result in a release, the release frequency would increase to 1.31E-08 per year, or about 5.4 percent of the core damage frequency. This conditional containment failure probability is less than the 10 percent goal for AP600.

Intermediate and late containment failures have very little contribution to the large release frequency.

Revision: 6 ENEL e

November 15,1995 m:\sp6(X4ra\sec59GI59.R06:1b wxw_ T W @ 00Se 59-44

M "9 l-ii

59. PRA Results and Insights

'vf The reactor cavity becomes flooded for all accident sequences in which the in-containment refueling water storage tank drains into the reactor coolant system. In addition, the design includes a special provision to allow manual flooding of the cavity for those sequences in which in-containment refueling water storage tank draining is unsuccessful. His capability to flood the reactor cavity prevents vessel failure and relocation of core debris to the containment. This involves an operator action that is included in the containment event tree.

As a result, only about 6 percent of AP600 sequences result in vessel failure. Approximately two-thirds of this is due to accident class 3C, in which vessel failure is the initiating event.

Further, the release frequency is not sensitive to vessel failures into a cavity that is not flooded. If all sequences in which cavity flooding fails are assumed to result in a release, the release frequency would increase to 1.48E-08 per year, or about 6 percent of the core damage frequency. His conditional containment failure probability is less than the 10 percent goal for AP600.

Risk to the public from severe accidents for AP600 is significantly lower than that for typical current generation plants.

Importance of Operator Actions to Containment Response and Plant Risk The containment response modeling includes credit for operator actions to help mitigate a core damage event. These include depressurizing the reactor coolant system if this did not occur prior to core damage, floodmg the reactor cavity if this did not occur automatically, and

[)

v actuating the containment hydrogen control system.

Of these action 4, initiating reactor coolant system depressurization is of particular significance to the risk results, since it transforms potentially high-pressure melt ejection scenarios into low-pressure scenarios, in which there is less chance of containment failure. The combined effect of the credit for operator action and automatic depressurization system response is to reduce the frequency of high-pressure melt ejection by about one order of magnitude. The Level 2 decomposition event tree analysis results show that there is typically greater than an hour between the time of core uncovery and the time at which there is a threat to the integrity of the reactor coolant system (i.e., a potential high-pressure melt ejection concern), so this credit is reasonable. This does indicate, however, the importance of this action to plant severe accident management guidelines.

59.4.2 Sensitivity Analyses for Containment Response Six sensitivity analyses were performed with the plant damage state event tree systems (containment safeguards systems) Aividually assumed to be unavailable to determine their effect on the severe release frequency.

A summary of the results is given in Table 59-19.

The results show that guaranteed failure of containment isolation would cause an increase in large release frequency to 2.43E-07 per year, because all core damage sequences would go V

M @ 00S8 6 Novem r 1 ,1995 59-45 maap60eprassec59 cts 9.no6:1b

u-u

59. PRA Res lts and Insights to release in this case. This indicates the benefit provided by the robust AP600 containment O'

design. The remaining containment systems have relatively small increases. No other single containment safeguards failure results in a significant increase in the total fission product release frequency.

59.5 Core Damage and Severe Release Frequency from Events at Shutdown 59.5.1 Sununary of Shutdown Level 1 Results The low-power and shutdown assessment calculated a core damage frequency of 5.5E-08 events per year. The top six accident sequences contribute 92 percent of the Level 1 shutdown core damage frequency. These dominant sequences result from:

Failure of normal residual heat removal system due to a loss of component cooling or service water system initiating event during drained condition, which contributes 54.1 percent of the shutdown core damage frequency

. Loss of offsite power (LOOP) initiating event during drained condition, with failure of  !

grid recovery within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, which contributes 13.6 percent of the shutdown core i damage frequency l Loss of normal residual heat removal system initiating event during drained condition, l which contributes 10.4 percent of the shutdown core damage frequency Loss of offsite power initiating event during drained condition, with success of grid recovery within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, which contributes 5.4 percent of the shutdown core damage frequency 1

Loss-of-coolant accident initiating event due to inadvertent opening of RNS-V024 l during hot / cold shutdown conditions, which contributes 5.0 percent of the shutdown l core damage frequency l l

Reactor coolant system overdraining event during drainage to mid-loop, which contributes 3.4 percent of the shutdown core damage frequency The descriptions of the dominant sequences are provided in the following paragraphs.

Loss of Component Cooling or Service Water System Initiating Event during Drained Condition

'Ihis sequence is a loss of decay heat removal initiated by failure of the normal residual heat removal system as a result of failure of the component cooling water or service water system during mid-loop / vessel flange operation, which has an estimated duration of 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />. Core damage occurs if automatic and manual actuation of the in-containment refueling water g;

Revision: 6 November 15,1995  % T Westinghouse m:\ap600pra\sec59CH59.R06:lb 59-46

I l

ii=- i;

59. PRA Results and Insights l

l 1

,r ~.

t , l V 1 l

storage tank injection motor-operated valves and manual actuation of the normal residual he'at l

removal system pump suction motor-operated valve fail.

l The major contributors to core damage frequency due to loss of component cooling water I system / service water system during drained condition are 1

Hardware failures of both service water pumps or common cause failure of the output l logic I/Os from the plant control system

- a Common cause failure of the in-containment refueling water storage tank injection motor-operated valves and normal residual heat removal system pump suction valve Common cause failure of the strainers in the in-containment refueling water storage tank Loss of Offsite Power Initiating Event during Dralned Condition (with failure of grid recovery within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

This r,qience is initiated by loss of offsite power during mid-loop / vessel-flange operation,  ;

which has an estimated duration of 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />. In this sequence, the normal residual heat l removal system fails to restart automatically following the initiating event, and the grid is not recovered within I hour. Core damage occurs if automatic and manual actuation of the in-containment refueling water storage tank injection motor-operated valves and manual actuation l of the normal residual heat removal system pump suction motor-operated valve fail.

The major contributors to core damage frequency given loss of offsite power (without grid recovery) during drained condition are:

Software common cause failure of protection and safety monitoring system / plant control system instrumentation and control logic cards Failure of a normal residual heat removal system pump to restan or run a Failure of a diesel generator to start and run a

Failure of main circuit breaker 100 (or 200) to open

  • Failure to recover ac power within I hour Common cause failure of the in-containment refueling water storage tank injection motor-operated valves and normal residual heat removal system pump suction valve Common cause failure of the strainers in the in-containment refueling water storage tank f'N g Revision: 6 WNM mas lh November 15,1995 59-47 m:\ap600h P r*\$ec59CI59.R%:Ib

ih j

59. PRA Rescits and Insights Loss of Normal Residual Heat Removal System Initiating Event during Drained 01 Condition ,

This sequence is a loss of decay heat removal initiated by failure of the normal residual heat removal system during drained conditions. The loss of decay heat removal occurs following I failure of the normal residual heat removal system due to normal residual heat removal system hardware faults during mid-loop / vessel-flange operation. Core damage occurs if automatic and i manual actuation of the in-containment refueling water storage tank injection motor-operated valves and manual actuation of the normal residual heat removal system pump suction motor-operated valve fail.

'Ihe major contributors t -ore damage frequency due to loss of the normal residual heat removal system during drd 4 condition are:

Common cause failure of the normal residual heat removal system pumps to run Common cause failure of the in-containment refueling water storage tank injection motor-operated valves and normal residual heat removal system pump suction valves Common cause failure of the strainers in the in-containment refueling water storage tank Loss of Offsite Power Initiating Event during Dralned Condition (with success of grid recovery within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

This sequence is initiated by loss of offsite power during mid-loop / vessel-flange operation.

In this sequence, the normal residual heat removal system does not restart automatically following the initiating event, but the grid is recovered within I hour; however, manual normal residual heat removal system restart (after grid recovery) fails. Core damage occurs if automatic and manual actuation of the in-containment refueling water storage tank injection motor-operated valves and manual actuation of the normal residual heat removal system pump suction motor-operated valve fail.

The major contributors to core damage frequency given loss of offsite power (with grid recovery) during drained condition are:

Software common cause failure of protection and safety monitoring system / plant control system instrumentation and control logic cards Failure of normal residual heat removal system pumps to run or to restart Common cause failure of the in-containment refueling water storage tank injection motor-operated valves and normal residual heat removal system pump suction valve Common cause failure of the strainers in the in-containment refueling water storage tank Revision: 6 g O

November 15,1995 m:=r- T Westinghouse mAap600pra\sec59CH59.R06:Ib 59-48

l w l

59. PRA Results and Insights (V!

Loss-of-Coolant Accident Initiating Event due to Inadvertent Opening of RNS-V024 during Hot / cold Shutdown Conditions This sequence is a loss-of-coolant accident initiated by inadvertent opening of RNS-V024 during hot / cold shutdown conditions when the reactor coolant system is filled and pressurized (which has an estimated duration of 220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />). Following the initiating event, the core makeup tanks are actuated, and the automatic depressurization system actuates. Core damage occurs if the in-containment refueling water storage tank injection check valves do not open automatically.

The major contributors to core damage frequency due to a loss-of-coolant accident through l RNS-V024 during hot / cold shutdown conditions are: l Inadvertent opening of RNS-V024 due to operator error (an initiating event frequency contributor)

Commor cause failure of the in-containment refueling water storage tank injection check vives

  • Common cause failure of the strainers in the in-containment refueling water storage tank Reactor Coolant System Overdraining Event during Drainage to Mid Loop A

This sequence is initiated by reactor coolant system overdraining during drainage to mid-loop conditions. Draining to mid-loop has an estimated duration of 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br />. Following the j initiating event, manual isolation of the normal residual heat removal system fails. Core damage occurs if manual actuation of the in-containment refueling water storage tank injection motor-operated valves and manual actuation of the normal residual heat removal system pump suction motor-operated valve fail.

The major contributors to core damage frequency due to reactor coolant system overdraining initiated during drainage to mid-loop are:

Common cause failure of the chemical and volume control system air-operated valves to close automatically upon receipt of low hot leg level signals and failure of the operator to stop draining (initiating event frequency contributors)

Operator fails to isolate the normal residual heat removal system Operator fails to open the in-containment refueling water storage tank injection motor-operated valves Operator fails to open the normal residual heat removal system pump suction valve O

v

[ W85tingh00S8 g Revision: 6 m;=:l6 November 15,1995 59-49 m:\ap600pra\sec59\Cl!59.R06:1b

n-n

59. PRA Res lts and Insights

+

Common cause failure of the in-containment refueling water storage tank injection O

motor-operated valves and normal residual heat removal system pump suction valve Common cause failure of the strainers in the in-containment refueling water storage tank he conclusions drawn from the shutdown Level I study are as follows:

  • Re overall shutdown core damage frequency is very small.
  • Initiating events during reactor coolant system drained conditions contribute approximately 85 percent of the total shutdown core damage frequency; loss of decay heat removal capability (during drained condition) due to failure of the component cooling water system or service water system has the greatest contribution (54 percent of the shutdown core damage frequency).

Common cause failures of in-containment refueling water storage tank components contribute approximately 83 percent of the total shutdown core damage frequency; common cause failure of the in-containment refueling water storage tank motor-operated valves contributes approximately 63 percent of the total shutdown core damage frequency. His indicates that maintaining the reliability of the in-containment refueling water storage tank motor-operated valves and strainers is important in maintaining the current level oflow core damage frequency at shutdown.

+

Human errors are not overly important to shutdown core damage frequency. There is O no particular dominant contributor. Sensitivity results show that the shutdown core damage frequency would remain very low even with little credit for operator actions.

One action, operator failure to recognize the need for reactor coolant system depressurization during hot / cold shutdown conditions, is identified as having a significant risk increase value. His indicates it is important that the operators understand and are appropriately trained for this operator action.

=

Individual component failures are not significant contributors to shutdown core damage frequency, and there is no particular dominant contributor. His confirms the at-power conclusion that single independent component failures do not have a large impact on core damage frequency for AP600 and reflects the redundancy and diversity of protection at shutdown as well.

=

The in-containment refueling water storage tank provides a significant benefit during shutdown because it serves as a backup to the normal residual heat removal system.

Revision: 6 O

ENEL T Westinghouse November 15,1995 mg_

msp60@rwec59 cts 9.R06:1b 59-50

n=-u

59. PRA Results and Insights 59.5.2 Large Release Frequency for Shutdown and Low Power Events The following items summarize the results of the release frequency assessment for shutdown and low-power operation for the AP600:

De overall shutdown large n ' ease frequency for AP600 is 1.4E-08 events per reactor-year. This frequency includes the containment bypass, containment isolation failure, i excessive containment leakage, and containment failures / release modes.

The frequency of compromised containment integrity resulting from the accident )

initiator is 3.2E-09 events per reactor-year. This impaired containment frequency includes containment bypass, containment isolation failure, and excessive containment leakage. It accounts for 22.5 percent of the overall shutdown large release frequency.

The frequency of containment failure within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of core damage is 2.lE-11 events per reactor-year. This insignificantly small frequency includes early and intermediate containment failures. It accounts for 0.15 percent of the overall large release frequency.

Early containment failure contributes 0.1 percent to the large release frequency.

Approximately 88 percent of the early containment failure frequency is due to high-pressure melt ejection cases. The frequency of high-pressure melt ejection cases

! (1.3E-11 events per reactor year)is less than 0.02 percent of the core damage frequency C and contributes less than 0.1 percent of the large release frequency. Given the insignificant fraction of the core damage frequency involved, no further analyses of the associated phenomena have been performed and no decomposition event trees were I developed to demonstrate containment integrity for melt ejection phenomena, despite {

the fact that both AP600 design features and the emerging consensus on direct containment heating for existing pressurized water reactors afford considerable promise that integrity would be maintained. High-pressure melt ejection cases are included with the early contamment failure release category CFE-C.

The frequency of containment failure after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of core damage due to basemat failure is 1.1E-08 events per reactor-year. Basemat failure occurs more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />  !

after the onset of core damage. The frequency accounts for 77.4 percent of the overall large release frequency. Late containment failure due to hydrogen combustion is f

negligible with respect to basemat failure. )

j Because many of the water sources to the containment are valved off during shutdown  !

conditions, a significant percentage of the severe accidents at shutdown result in a dry i reactor cavity condition in which the debris cannot be cooled. (No credit is taken in l the models for actions by the operators outside the control room to re-open valves to I these water sources.)

i O

V Y WM bn. Novem r1, 59-51 m:\ap600spras,ec59%CH59.R06:1b i

59. PRA Resilts and Insights l 59.5.3 Shutdown Results Summary e.

The results of the low-power and shutdown assessment show that the AP600 design includes redundancy and diversity at shutdown not found in current plants; in particular, the in-containment refueling water storage tank provides a unique safety backup to the normal residual heat removal system. Maintenance at shutdown has less impact on the defense-in- i depth features for AP600 than for current plants; in accordance with plant technical specifications, safety-related system planned maintenance is performed only during those shutdown modes when the protection provided by the safety-related system is not required.

Further, maintenance of nonsafety systems, such as the normal residual heat removal system, I component cooling water system, and service water system, is performed at power to avoid j adversely affecting shutdown risk. These contribute to the extremely low shutdown core '

damage and large release frequency.

59.6 Core Damage and Severe Release Frequency from External and Other Events nis section will be completed later, after the corresponding analysis is completed.

l 59.6.1 Results of Internal Flooding Assessment l

l A scoping internal flooding analysis was performed based on available AP600 detailed design information, with conservative assumptions or engineering judgement used for areas lacking detailed information.

The AP600 design philosophy of minimizing the number of potential flooding sources in safety-related areas, along with the physical separation of redundant safety-related components

! and systems from each other and from nonsafety-related components, minimizes the consequences of internal flooding. The core damage frequencies from flooding events at power and during shutdown operations are not appreciable contributors to the overall AP600 core damage frequency. The internal flooding-induced core damage frequencies are estimated to be:

l l 2.20E-10 events per year for power operations

! =

1.54E-09 events per year for shutdown operations ne internal flooding analysis conservatively assumes that flooding of nonsafety-related equipment results in system failure of the affected system. This results in a higher flooding-induced core damage frequency at shutdown than at power, because of the use of the nonsafety-related normal residual heat removal system as the primary means of decay heat removal at shutdown.

He top three at-power flooding scenarios comprise 95 percent of the at-power flooding-induced core damage frequency. The dominant at-power flooding core damage initiators are as follows:

o r 5,1995 _ [ Westingfl00Se m:\ap600\pra\sec59CH59.R06:lb 59-52

-u_
59. PRA Results and Insights

,a

)

or main and startup feedwater piping in the turbine building 135'-3" general area; this initiator contributes 37 percent of the at-power flooding core damage frequency.

Loss of feedwater to both steam generators due to rupture of condensate, fire protection !

or main and startup feedwater piping in the turbine building 117'-6" general area; this '

contributes 33 percent of the at-power flooding core damage frequency.

Loss of feedwater to both steam generators due to rupture of an expansionjoint on the l circulating water system in the turbine building 100'-0" general area; this contributes I 24 percent of the at-power flooding core damage frequency.

The top two shutdown flooding s;enarios comprise 95 percent of the shutdown flooding-induced core damage frequency. The dominant shutdown flooding core damage initiators are as follows:

Loss of decay heat removal from faihire of the component cooling water system or service water system during reactor coolant system drained condition due to a mpture of component cooling water, fire protection, or service water piping in the turbine building general area; this contributes 48 percent of the shutdown flooding core damage frequency.

1 g Loss of decay heat removal from failure within the normal residual heat removal system

\ during reactor coolant system drained condition due to a rupture of chemical and volume control or fire protection piping in the auxiliary building RCA; this contributes 47 percent of the shutdown flooding core damage frequency.

59.7 Overall Plant Risk Results l l

The total plant risk expressed in terms of plant core damage frequency and severe release l frequency (releases of 25 rem or more at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the site boundary) for all events studied l

in this PRA are summarized in Table 59-20.

The contribution of various events to total plant core damage frequency is shown in Figure 59-2.

The total plant core damage and large release frequency analysis results show the following:

l

  • The total mean core damage frequency is two orders of magnitude smaller than those I for existing pressurized water reactors. The cumulative core damage probability for a population of 50 AP600 units operating for 60 years each would be less than 0.001, l which is a low probability of occurrence. l

[ 6S8 6 Novem r1, 59-53 m^ap600pra\sec59CH59.R06:1b

= _ _ .

59. PRA Results and Insights The total plant severe release frequency is another order of magnitude smaller than that O

of the core damage frequency; that places such a release frequency in the range of incredible events.

De plant core damage frequency .is dominated by at-power events, with shutdown events as the second contributor; internal flooding events are a negligible contributor to core damage frequency.

He severe release frequency is a'most equally shared by at-power and shutdown events.

He severe release frequency as t percentage of core damage frequency is 4 percent for at-power events and 25 percent for shutdown events.

The results show that the design goals of low core damage frequency and low severe release frequency have been met; the AP600 frequencies are lower than the NRC and ALWR goals set for new plant designs, as shown in Table 59-21. Dese results show the effectiveness of passive systems in mitigating severe accidents and reflect the reduced dependence of AP600 on nonsafety systems and human actions.

The plant risk results for internal events at power and shutdown are summarized in Tables 59-22 through 59-25.

The plant risk results indicate the following:

99 percent of the risk is from containment bypass and containment isolation failure O <

initiated sequences. His demonstrates the robustness of the containment since there is little risk from severe accident sequences that fail the containment structure.

Approximately 75 percent of the risk is from at-power conditions, and 25 percent is from shutdown and low-power conditions.

Here is little increase (<10 percent) in risk following the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after core damage. His demonstrates that the containment continues to provide protection beyond the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the accident.

59.8 Plant Features Important to Reducing Risk Westinghouse used PRA results extensively in the AP600 design process to identify areas for design improvement and areas for further risk reduction. Rese results were also compared with existing commercial nuclear power plants to identify additional area of risk reduction.

Examples of the more significant AP600 plant features and operator actions that reduce risk are discussed in this section. Examples are provided in the area of reactor design, system design, plant structures and layout, and containment design.

O No r 15,1995 6 T Westinghouse mw600passec59cits9.R06:1b 59-54

ai

59. PRA Results and Insights (D

\"/

AP600 has more lines of defense as compared to current operating plants, which provide more success paths following an initiating event and provide redundancy ani diversity to fight common-cause-related concerns. Examples of extensive AP600 lines 07 defense follow:

  • For criticality control:

control rod insertion via reactor trip breaker opening control rod insertion via motor-generator set de-energization ride out via turbine trip

. For core heat removal:

main feedwater startup feedwater l passive residual heat removal automatic depressurization system and feed-and-Need via normal residual heat removalinjection automatic depressurization system and passive feed-and-bleed via in-containment refueling water storage tank injection

= For reactor coolant system makeup: l l

n -

chemical and volume control system Q -

core makeup tanks automatic depressurization system and normal residual heat removal automatic depressurization system, accumulators, and in-containment refueling water storage tank injection automatic depressurization system, core makeup tanks, and in-containment refueling water storage tank injection

. For containment cooling:

fan coolers normal residual heat removal passive containment cooling system with passive water drain passive containment cooling system with alternate water supply passive containment cooling system without water (air only) fire water 59.8.1 Reactor Design The AP600 reactor coolant system has many features that reduce the plant risk profile. The pressurizer is larger than those used in comparable current operating plants, resulting in a longer drainage time during small loss-of-coolant accident events. The larger pressurizer increases transient operation margins, resulting in u more reliable plant with fewer reactor trips O - . . . . .

\-

Revision: 6 3 W85tingfl0038 mg=: w Novehber 15,1995 59-55 mV@huS9CI59.R06:1b

59. PRA Results and Insights and avoiding challenges to the plant and operator during transients. The larger pressurizer e

also eliminates the need for fast-acting PORVs, which are a possible source of reactor coolant system leaks.

De AP600 core is larger than comparable operating plants, resulting in a lower power density. If, during a potential severe accident, the core were partially uncovered for a short period of time, the likelihood of fuel damage is reduced.

The AP600 steam generators have large secondary-side waterinventories, allowing significant time (greater than I hour) to recover steam generator feedwater or other means of core heat removal. He AP600 steam generators also employ improved materials and design features that significantly reduce the probability of forced outages or tube rupture.

The AP600 has canned reactor coolant pumps, thus avoiding seal loss-of-coolant accident issues and simplifying the chemical and volume control system. The reactor coolant system has fewer welds, which reduces the potential for loss-of-coolant accident events. The probability of a loss-of-coolant accident is also reduced by the application of " leak-before-break" to reactor coolant system piping larger than 3 in.

59.8.2 Systems Design System design aspects that are intended to reduce plant risk are discussed in terms of safety-related and nonsafety-related systems.

59.8.2.1 Safety.Related Systems AP600 uses passive safety-related systems to mitigate design basis accidents and reduce public risk. The passive safety-related systems rely on natural forces such as density differences, gravity, and stored energy to provide water for core and containment cooling. Rese passive systems do not include active equipment such as pumps. One-time valve alignment of safety-related valves actuates the passive safety-related systems using valve operators such as:

DC motor-operators with power provided by Class IE batteries Air-operators that reposition to the safeguards position on a loss of the nonsafety-related compressed air that keeps the safety-related equipment in standby

  • Check valves he passive systems are designed to function with no operator actions for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following a design basis accident.

e o r 5,1995 - Y Westingh00Se m:Wwc59CH59.R06:Ib 59-56

x_x

59. PRA Results and Indghts um --

n Diversity among the passive systems further reduces the overall plant risk. An example of operational diversity is the option to use passive residual heat removal versus feed-and-bleed functions, and an example of equipment diversity is the use of different valve operators (motor, air, squib) to combat common cause failures.

He passive residual heat removal heat exchanger protects the plant against transients that upset the normal steam generator feedwater and steam systems. He passive residual heat removal subsystem of the passive core cooling system contains no pumps and significantly fewer valves than conventional plant auxiliary feedwater systems, thus increasing the reliability of the system by fewer potential equipment failures (pumps and valves) and less maintenance activities.

For reactor coolant system water inventory makeup during loss-of-coolant accident events, the passive core cooling system uses three passive sources of water to maintain core cooling through safety injection: the core makeup tanks, accumulators, and in-containment refueling water storage tank. Rese sources are directly connected to two nozzles on the reactor vessel so that no injection flow can be spilled for larger break events.

He automatic depressurization system is incorporated into the design for severe accident depressurization of the reactor coolant system. He automatic depressurization system has  ;

10 paths with diverse valves to combat common cause failures and is designed for automatic i or manual actuation by the protection and safety monitoring system or manual actuation by g]

(

the diverse actuation system. De automatic depressurization system can be used in a partial depressurization mode to provide long-term reactor coolant system cooling with normal i residual heat removal system injection, or it can be used in full depressurization mode for passive in-containment refueling water storage tank injection for long-term reactor coolant system cooling. In either case, switchover from injection to recirculation is automatic without manual actions.

he safety-related Class IE de and UPS system has a large battery capacity to support all frontline passive safety-related systems for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. His system has four 24-hour batteries, two 72-hour batteries, and a spare battery. He presence of the spare battery improves testability and helps with the detection of common cause failures.

He passive containment cooling system provides the safety-related ultimate heat sink for the plant. Heat is removed from the containment vessel following an accident by a continuous natural circulation flow of air, without any system actuations. By using the passive containment cooling system following a severe accident, the containment stays well below the predicted failure pressure. De steaming and condensing action of the passive containment cooling system enhances activity removal so that a containment spray system (with pumps and valves) is not required.

AP600 containment isolation is significantly improved over that of conventional PWRs due to a large reduction in the number of penetrations; the number of normally open penetrations is reduced, and there are no penetrations required to support post-accident mitigation features.

O O

3 Wes@use w Novem r1, 59-57 m4Mpsec59GL59.R06:1b

1__ . .

l

59. PRA Results and Insights Containment isolation is improved due to the chemical and volume control system being a O'

closed system, the safety-related passive safety injection components are located inside the containment, and the number of HVAC penetrations are reduced (no maxi purge connection).

Vessel failure potential upon core damage is reduced (in-vessel retention of the damaged core) by providing in-containment refueling water storage tank dump into the reactor cavity.

For events at shutdown, AP600 has passive safety-related systems for all shutdown conditions as a backup to the normal residual heat removal system. This reduces the risk at shutdown through redundancy and diversity.

Post-72-hour connections are incorporated into the passive system design to allow for long-term accident management.

59.8.2.2 Nonsafety-Related Systems

AP600 has nonsafety-related systems capable of mitigating accidents. Rese systems use

, redundant pumps, which are powered by offsite and onsite power supplies. AP600 has certain design features in the nonsafety-related systems to reduce plant risk compared to current operating plants. De main feedwater system can automatically adjust flow from 0 to 100 percent power to reduce the number of transients and provide a continuous decay heat removal function even after the reactor trips in most transients. During transient events, the startup feedwater system can act as a backup to the main feedwater system if the latter is unavailable due to the nature of the initiating event or fails during the transient. During loss of ac power events, startup feedwater pumps are powered by the diesel generators and can be used to remove decay heat since main feedwater is not available. He main feedwater and startup feedwater pumps are motor-driven, rather than steam-driven, for better reliability. Main feedwater controls are digital for better reliability; thus, the main feedwater and startup feedwater system design allows less transients and provides additional nonsafety-related means for decay heat removal for transients. His makes the plant response to transients very robust due to the existence of two nonsafety-related systems in addition to the passive safety-related means of removing decay heat.

He nonsafety-related normal residual heat removal system plays a role in decay heat removal in response to power and shutdown events. He normal residual heat removal system has additional isolation valves and is designed to withstand the reactor coolant system pressure to eliminate interfacing systems loss-of-coolant accident concerns that lead to containment bypass. The normal residual heat removal system provides reliable shutdown cooling, incorporating lessons learned from shutdown events. During mid-loop operations, operation procedures require both normal residual heat removal system pumps to be operable for risk reduction.

Component cooling water and service water systems have a very limited role in the plant risk profile because the passive safety-related systems do not require cooling, and the canned-motor reactor coolant pumps do not require seal cooling from the component cooling water.

Revision: 6 O

gg November 15,1995 m=:h 3 Westinghouse m%axqus ec59CI59.R06:Ib 59-58

u= _

59. PRA Results and Insights

,m t)

The nonsafety-related ac power system (onsite and offsite) also has a very limited role in the plant risk profile since the plant safety-related systems do not depend on ac power. his causes the loss of offsite power event to be less important for the AP600 than in current operating plants. The plant has full load rejection capability to minimize the number of reactor trips. The onsite ac power has two nonsafety-related diesel generators. The diesel generator life is improved and the run failure rate is reduced by avoiding fast starts.

The compressed and instmment air system has low risk importance since the safety-related air-operated valves are fail safe if the air system fails and, except for main feedwater, none of the nonsafety-related systems require air to function. This causes the loss of air event to be less important than in current plant PRAs.

59.8.3 Instrumentation and Control Design i

Three instrumentation and control systems are modeled in the AP600 PRA: protection and l safety monitoring system, plant control system, and diverse actuation system. Both the '

protection and safety monitoring system and plant control system are microprocessor-based; they can perform more functions with less components and provide better control capability. I Four trains of redundancy are provided for the protection and safety monitoring system; 2-out- I of-4 bypass testing in the protection and safety monitoring system reduces the potential for spurious trips due to testing and allows for better testing. Auto testing for the protection and safety monitoring system, and diagnostic self-testing for the protection and safety monitoring i system and the plant control system, provide higher reliability in these systems. Both the

[]

'v protection and safety monitoring system and the plant control system use fiber optic cables j

(with fire separation) and multiplexers. Unlike current plants, there is no cable spreading I room, thus climinating a potential fire area with common cause failure of multiple functions.

Additional fault tolerance is built into the plant control system so that one failure does not prevent the operation of important functions.

Improvements in the plant control system and the protection and safety monitoring system are coupled with an improved control room and man-machine interfaces; these include improvements in the form and contents of the information provided to control room operators for decision making to limit commission errors (for example, an overview panel for conveying crucial information to the operators, alarm priority, computerized procedures, longer operator action times, integration of NSSS/ BOP presentation). In addition, the remote shutdown control is designed to have more functions, similar to the control room, to be performed at the remote shutdown control location, as opposed to operators sending out personnel to local valves.

The diverse actuation system provides a diverse automatic and manual backup function to the protection and safety monitoring system and reduces risk from anticipated transients without scram events. The diverse actuation system also compensates for rare, but consequential potential common cause failures in the protection and safety monitoring system.

O

[ W8Stingh00S8 mm. Novem r1, 59-59 msp6ownsuc59CH59.R06:lb

59. PRA Results and Insights 59.8.4 Plant Layout Plant layout is designed to minimize the consequences of fire and flooding by maximizing the separation of electrical and mechanical equipment areas in the non-radiologically controlled area of the auxiliary building. His separation is designed to minimize the potential for propagation of leaks from the piping areas and the mechanical equipment areas to the l Class IE electrical and Class IE instrumentation and control equipment rooms. De potential flooding sources and volumes in areas of the plant that contain safety-related equipment are limited to minimize the consequences of internal flooding.

AP600 is designed to provide better separation between divisions of safety-related equipment.

Unlike current plants, there is no safety-related cable spreading room. Safety-related cables, divisions B and D are routed separately from divisions A and C.

59.8.5 Plant Structures AP600 has design features in the plant structures that reduce risk, especially for area events, such as internal fires and internal flooding, and seismic events. The turbine building is separated from the safety-related areas of other buildings so that a fire or flood event in the turbine building will not affect safety-related systems.

He number of buildings and the building volume housing safety-related equipment is reduced compared to a current plant. The safety-related buildings are on a common basemat to compensate against the effects of a seismic event. He common basemat for the containment and the safety-related auxiliary building includes all safety-related equipment. Such a building is less susceptible to severe seismic events than the typical multiple building /basemats, which also involve an ultimate heat sink interface (ocean, river, lake, cooling tower).

59.8.6 Containment Design The containment pressure boundary is the final barrier to the release of fission products to the environment, ne AP600 containment has designed-in provisions which help to maintain containment integrity in the event of a severe accident. Much research has been performed to investigate severe accident phenomena since the Bree Mile Island Unit 2 (TMI-2) accident in 1979, and the lessons learned from TMI-2 and in the research experiments have been incorporated into the URD and the AP600 design.

The overall AP600 design provides significant protection to the public and the environment against the release of radiation by reducing the likelihood of the occurrence of severe accidents. De at-power core damage frequency of 2.4E-7 per reactor-year is less than the URD large release frequency goal of 1.0E-6 per reactor-year. However, the containment systems provide additional protection against the release of fission products in the event of a severe accident such that the conditional probability of a large release for AP600 is less than

0.1. Revision

6 O

November 15,1995 _ [ Westinghouse mAap600prakec590159.R06:lb 59-60

menenes m..

59. PRA Results and Insights

!D The at-power large release frequency of the AP600 is 1.0E-8 per reactor year. This low frequency is dominated by containment bypass and containment isolation failure initiated

, events. The probability of severe accident induced containment failures are approximately 0.01 of the core damage frequency. This distribution of the containment failure frequency demonstrates the robustness of the containment structure with regard to severe accident phenomena.

59.8.6.1 Containment Isolation and Leakage Failure of the containment isolation system prior to a severe accident will lead to a direct release pathway from the containment volume to the environment. AP600 has approximately 55 percent fewer piping penetrations and a lower percentage of normally open penetrations compared to current generation plants. Normally open penetrations are closed by automatic valves, and diverse actuation is provided for valves on penetrations with significant leakage potential. All isolation valves have control room indication to inform the operator of the current valve position.

Similarly to containment isolation failure, leakage of closed containment isolation valves in excess of technical specifications may result in larger releases to the environment. Valves which historically have the greatest leakage problems have been eliminated, or their number significantly reduced in the design. Large purge valves have been replaced by smaller more reliable valves, and check valves have only been used in mild service where wear and service O.

d conditions would not be a challenge to successful operation. Solenoid valves are only used on 3/8 inch lines which would be expected to plug with particulate in severe accident events and are too small to challenge the 25 rem release goal if plugging does not occur.

Equipment and personnel hatches have the capability of being tested individually to ensure l a leak-tight seal. Hatch seals can easily be verified on a frequent basis. l l

Therefore, AP600 provides significant protection against the failure to isolate the containment and against failure of isolation valves to fully close.

59.8.6.2 Containment Bypass Historically, containment bypass, an accident in which the fission products are released directly to the environment from the reactor coolant system, is the leading contributor to risk in a nuclear power plant. Typically the containment bypass accident class consists of two types of accident sequences: interfacing systems loss-of-coolant-accidents and unisolated steam generator tube ruptures.

An interfacing systems loss-of-coolant-accident is the failure of valves which separate the high pressure reactor coolant system with a lower pressure interfacing system which extends outside the containment pressure boundary. The failure of the valve causes the reactor coolant system to pressurize the interfacing system beyond its ultimate capacity and can result in a loss-of-coolant accident outside the containment. Coolant and emergency cooling water are n

k g Revision: 6 OllS8 mm November 15,1995 59-61 m46copuS9CH59.R06:lb

59. PRA Results and Insights a p.m lost outside the containment, failing recirculation of cooling water and providing a pathway O

for the direct release of fission products to the environment. In AP600, systems connected to the reactor coolant system are designed with higher design pressures which reduces the likelihood of a pipe rupture in the event of the failure of the interfacing valves. His results in a very low interfacing systems loss-of-coolant-accident contribution to core damage.

Steam generator tube ruptures release coolant from the reactor coolant system to the secondary system and from there, possibly directly to the environment through the steam generator safety valves. He safety valve may fail to rescat, thereby providing a pathway for the loss of coolant and for the release of fission products to the environment, particularly if the steam generator overfills with water during the accident. He unisolated steam generator tube rupture can be mitigated by reducing the reactor coolant system pressure below the opening pressure of the safety valve, thereby preventing it from opening.

AP600 has multiple and diverse automatically actuated systems to reduce the reactor coolant system pressure and mitigate the steam generator tube rupture. De passive residual heat removal subsystem is actuated on the S-signal and, together with the secondary relief valve, effectively reduces the reactor coolant system pressure to prevent the safety valve from opening. If the passive residual heat removal does not stop the loss of coolant, the automatic depressurization system will actuate and depressurize the system. The secondary relief valve is required to open to prevent the safety valve from opening. Ilowever, no operator actions are required to mitigate the accident. Herefore, the likelihood oflarge release consequential to steam generator tube rupture has been reduced in AP600 59.8.6.3 Passive Containment Cooling l

Re passive containment cooling system provides prorction to the containment pressure l boundary by removing the decay and chemical heat that slowly pressurize the containment. l The heat is transferred to the environment through the steel pressure boundary. The heat transfer on the outside of the steel shell is enhanced bi an annular flow path which creates a convective air flow across the shell and by the evaporation of water that is directed onto the top of the containment in the event of an accident. He evaporative heat transfer prevents the containment from pressurizing above the design conditions during most severe accidents.

In some postulated multiple-failure accident scenarios, the water flow may be failed, but the heat transfer on the outside of the steel shell is only reduced, not terminated. De heat removal is limited to convection heat transfer to the air flow and radiation to the annulus baffle. With no water film on the containment shell to provide evaporative cooling, the containment pressurizes above the design pressure to remove decay heat, but reaches a long-term equilibrium well below the ultimate pressure of the containment.

Therefore, the passive containment cooling system provides decay heat removal from the containment in both wet and dry heat transfer conditions without reaching pressures which threaten the containment integrity. Long-term overpressure is not considered to be a credible containment failure mode for AP600 0

Nov r 15,1995 - Westingh0USe mAap600\pra\sec590159.R06:Ib 59-62

n
59. FRA Results and Insights O

59.8.6.4 High Pressure Core Melt Scenarios The automatic depressurization system and the passive residual heat removal heat exchanger provide reliable and diverse reactor coolant system depressurization which significantly reduces the likelihood of high pressure core damage. High pressure core damage sequences have the potential to fail steam generator tubes and create a containment bypass release, or to cause severe accident phenomena at the time of vessel failure which may threaten the containment pressure boundary. Reducing the reactor coolant system pressure during a severe accident significantly lowers the likelihood of phenomena which may induce large fission product releases early in the accident sequence.

59.8.6.5 In Vessel Retention of Molten Core Debris The AP600 reactor coolant system, reactor vessel and containment configuration have features which enhance the design's ability to maintain molten core debris in the reactor vessel. As it melts, debris relocates to the lower head of the reactor vessel where it heats and stresses the reactor vessel wall causing it to creep to failure. De AP600 automatic depressurization l system provides reliable pressure reduction in the reactor coolant system to reduce the stresses l

on the vessel wall. The reactor vessel lower head has no vessel penetrations, thus eliminating l penetration failure as a potential vessel failure mode. The containment configuration directs  !

water to the reactor cavity and allows the in-containment refueling water storage tank water I to be drained into the cavity to submerge the vessel to cool the external surface of the lower

( head and create buoyancy forces which reduce the stresses on the vessel wall. Cooling the V] vessel and reducing the stresses prevents the creep rupture failure of the vessel wall. He reactor vessel reflective insulation has been designed with provisions to allow water inside the insulation panel to cool the vessel surface, and with vents to allow steam to exit the insulation without falling the insulation support structures. The insulation does not interfere with the cooling of the external surface of the vessel.

Preventing the relocation of molten core debris to the containment eliminates the occurrence i

of several severe accident phenomena, such as ex-vessel fuel-coolant interactions and core-concrete interaction, which may threaten the containment integrity. Derefore, through the prevention of core debris relocation to the containment, the AP600 design significantly reduces the likelihood of contamment failure.

59.8.6.6 Early Containment Failure ne low probability of h8gh pressure core damage sequences and the high likelihood of in-vessel retention of core debris significantly reduces the likelihood of early containment failure for AP600. Severe accident phenomena such as direct containment heating and ex-vessel steam explosions are prevented and cannot threaten the integrity of the containment pressure boundary, f3 i 4 3 M 6 00se - Novem r1, 59-63 m^ap600pra\sec59CH59.R06:1b

m;

59. PRA Results and Insights 59.8.6.7 Combustible Gases Generation and Burning O I In severe accident sequences, high temperature metal oxidation, particularly zirconium, results in tra rapid generation of hydrogen and possibly carbon monoxide, he first combustible gas release occurs in the accident sequence during core uncovery when the oxidation of the zircaloy cladding by passing steam generates hydrogen. A second release may occur if the vessel fails and ex-vessel debris degrades the concrete basemat. Steam and carbon dioxide are liberated from the concrete and are reduced to hydrogen and carbon monoxide as they pass through the molten metal in the debris. These gases are highly combustible and in high f concentrations in the containment may lead to detonable mixtures. The release rates are much I higher than the rates associated with the design basis hydrogen release via radiolysis of water, so the hydrogen recombiners alone are not effective in maintaining the concentration below combustible levels. l l

AP600 employs a nonsafety-related hydrogen igniter system for severe releases of combustible gases. The igniters are powered from ac busses or from either of the nonsafety-related diesel I generators. Multiple glow plugs are located in each compartment. The igniters burn the gases at the lower flammability limit. At this low concentration, the containment pressure increase from the burning is small and the likelihood of detonation is negligible. The igniters are spaced such that the distance between them will not allow the burn to transition from deflagration to detonation. The combustible gases are removed with no threat to the containment integrity.

Although the hydrogen igniter system is powered from ac sources, there is little threat of the failure of the system power in the event that it is required to operate. "Ihe igniters are only needed in core damage accidents, and the AP600 is designed to mitigate loss of power events without the sequence evolving into a severe accident. Loss of ac power contributes less than 0.2 percent to the core damage frequency.

The reliability of reactor coolant system depressurization and the small core damage frequency contribution of high pressure accident sequences reduces the threat to the containment from sudden releases of hydrogen from the reactor coolant system. Low pressure release of in-vessel hydrogen enhances the ability of the igniter to maintain the containment atmosphere at the lower flammability limit.

Hydrogen that during a severe accident could be h1jected from the reactor coolant system into the containment through the spargers in the in-containment refueling water storage tank has the potential to produce a diffusion flame at the in-containment refueling water storage tank vent exit along the steel containment wall. A diffusion flame is produced when a combustible gas plume which is too rich to burn enters an oxygen rich atmosphere and is ignited by a glow plug or a random ignition source. The plume is ignited into a standing flame which lasts as long as there is a fuel source. Via convection and radiation, the flame can heat the wall to high temperatures, increasing the likelihood of creep rupture failure of the containment pressure boundary. However, the time required to creep the containment wall to failure is estimated to be tens of hours, which is approximately one order of magnitude longer than the Revision: 6 O

ENEL November 15,1995 mmh E Mill $100S8 i m:\ap600hpra\sec590159.R06:Ib 59-64 I

i

=u

59. PRA Results and Insights V

duration of the hydrogen release. Herefore, the potential for containment failure from the formation of a diffusion flame at the in-containment refueling water storage tank vents is considered to be very low.

There is little threat to the containment integrity from severe accident hydrogen releases and  !

a low probability of carbon monoxide generation. De igniter system is highly reliable in the event of a severe accident and maintains the hydrogen concentration to the lower flammability limit.

59.8.6.8 Intermediate and Long Term Containment Failure Since the passive containment cooling system prevents decay heat pressurization of the containment, intermediate and long-term containment failure can only occur as a result of combustion. Due to the high likelihood ofin-vessel retention of core debris, the potential for ex-vessel combustible gas generation from core-concrete interaction is very low. The frequency of intermediate and long-term containment failures is very low given the high reliabihty of the hydrogen igniters.

He AP600 containment design promotes water draining to the reactor cavity. In the event of a severe accident the cavity can be flooded with in-containment refueling water storage tank water through an operator actuated cavity flooding valve. In the event that the flooding action fails, the coolant and injection water from the core makeup tanks and accumulators will O

V fill the cavity to approximately the top of the lower head hemisphere. He reactor cavity floor is sized to allow sufficient debris spreading to create a coolable debris geometry. If the vessel fails and debris is relocated to the reactor cavity, there is sufficient water available in the contamment to quench the sensible heat from the debris and to allow the water to recirculate to maintain debris cooling over the long-term. Additional system failures must be postulated to limit the mass of water in the containment enough to cause debris dry-out and produce core-concrete interaction. Herefore, the likelihood of basemat penetration during a severe l accident in AP600 is very low. l 59.8.6.9 rission Product Removal AP600 relies on the passive, natural removal of aerosol fission products from the containment atmosphere, primarily from gravitational settling, diffusiophoresis and thermophoresis. Since natural deposition is slower than active deposition, the AP600 containment has a low design leak rate to increase the time available for deposition. Natural removal is enhanced by the passive containment cooling system which provides a large, cold surface area for condensation of steam which increases the diffusiophoretic and thermophoretic removal processes. Severe accident offsite doses are below the 25 rem site-boundary limit. Minimal credit for deposition of fission products in the auxiliary building limits the site boundary dose to less than 1 rem to support emergency planning zone elimination.

1 l

l l

l v Revision: 6 g I T W US8 wasm. November 15,1995 I 59-65 m:\ap600pra\sec590159.R06:1b

=:

59. PRA Res:lts and insights rm-59,9 PRA Input to the Design Certification Process O

The AP600 PRA was used in the design certification process to identify important safety insights and assumptions to support certification requirements such as ITAACs, reliability assurance program (RAP), technical specifications, as well as COL and interface requirements.

Design certification areas that are further discussed in this section include:

3

  • Reliability assurance program

. ITAACs

. Technical specifications g

. MMI / human factors / emergency response guidelines (ERGS) i

. COL action items

. In-service test program.

59.9.1 PRA Input to Reliability Assurance Program The AP600 reliability assurance program (RAP) identifies those systems, structures, and components (SSC) that should be given priority in maintaining their reliability through surveillance, maintenance, and quality control actions during plant operation. To identify these SSCs, the PRA importance analysis results are used as one of the inputs. The PRA importance and sensitivity analyses identify those systems and components that are important in plant risk in terms of either risk increase (e.g., what happens to plant risk if a system or component, or a train is unavailable), or in terms of risk decrease (e.g., what happens to plant risk if a component or a train is perfectly reliable /available). This ranking of components and systems in such a way provides an input for the reliability assurance program. For more information on the AP600 reliability assurance program, refer to SSAR Section 16.2.

59.9.2 PRA Input to ITAACs To be provided later.

l 59.9.3 PRA Input to Tech Specs To be provided later. For more information on the AP600 technical specifications, refer to i SSAR Section 16.1.

59.9.4 PRA Input to MMI / Human Factors / Emergency Response Guidelines The PRA models include modeling of operator actions in response to severe accident sequences, following ERGS. These actions are all procedurized and most of them are performed in the main control room. 'Ihe most risk important of these actions refer to manual actuation of systems in the highly unlikely event of automatic actuation failure of systems.

The risk important operator actions are discussed in Section 59.3. These operator actions and the main human reliability analysis (HRA) model assumptions behind them are reviewed by j human factors engineers for consistency with the as-designed plant, and also for insights that Revision: 6 O

g November 15,1995 ;gg_ [ Westingh00Se n %wopawec59cn59.R06:1b 59-66 1

g-si

59. PRA Res~lts and Insights s-(-)

() they may provide to the man-machine interface (MMI) and human factors areas. For more information on the AP600 MMI, refer to SSAR Chapter 18.

In addition, the human reliability analysis models and operator actions modeled in the PRA were reviewed by the engineers writing the ERGS for consistency between the PRA models and the actual ERGS.

To identify AP600-specific critical and risk important operator actions for further evaluation by the human factors engineers, the risk importance of the operator actions is provided from the PRA results. From the PRA results and sensitivity studies,it can be concluded that the AP600 design has no critical operator actions and very few risk important actions. A critical operator action is defined as that action, when assumed to fail, would result in a plant core damage frequency of greater than 1.0E4% per year; there are no such operator actions in AP600 PRA. The risk important operator actions are defined in terms of risk increase and risk decrease measures, whenever possible.

59.9.5 PRA Input to COL Action Items To be provided later.

l C')

\ }

WOW 6 Novem r ,

59-67 mAap500pra\sec590159.R06:1b

59. PRA R^,sults and Insights 1

Table 59-1 e

l INTERNAL INITIATING EVENT CORE DAMAGE FREQUENCY CONTRIBUTION BY INITIATING EVENT Core Damage Initiating Frequency Percent Event Contribution laitiating Event Category Contribution Frequency 1 1.0LO7 Safety Injection une Break 41.2 1.0LO4 2 5.0E-08 ATWS Precursor with no MFW 20.7 [6.1501](*)

3 3.0008 Intermediate LOCA 12.5 7.7E-04 4 2.6E-08 Large LOCA 10.6 1.1 E-04 5 1.0008 Reacter Vessel Rupture 4.1 1.0608 6 5.0LO9 Medium LOCA 2.0 1.6E-04 7 3.6609 Steam Generator Tube Rupture 1.5 5.2003 8 2.9609 RCS Leak 1.2 1.26'"

9 2.1009 Small IDCA 0.9 1.0LO4 l 10 2.0LO9 ATWS Precursor with SI Signal 0.8 (2.1602j(*)

!! 1.9509 PRHR Tube Rupture 0.8 5.0LN 12 1.8609 Core Power Excursion 0.7 4.5603 13 1.7E 09 Loss of Main Feedwater 0.7 3.4 E-01 14 1.7E-09 Transient with MFW 0.7 1.4E+0C 15 1.5009 CMT Line Break O.6 8.9E-05 16 6.1LIO less of Offsite Power 0.2 1.2E-01 17 3.2E-10 Loss of Condenser 0.1 1.1 E-01 18 2.8610 Loss of MFW to One Steam Generator 0.1 1.9E-01 19 2.2610 Main Steam Une Stuck Open Safety Valve 0.1 1.2E-03 20 1.9610 less of Component Cooling Water / Service Water 0.1 1.6LOI 21 1.2610 laterfacing Systems IDCA 0.1 1.2L10 22 8.0511 ATWS Precursor with MFW Available 0.0 [I.2E+00](*)

23 7.8L11 Ims of Compessed Air 0.0 3.6LO2 24 5.2611 Steam Une Break Upstream of MSIV 0.0 3.7604 25 1.8611 Loes of RCS Flow 0.0 1.8602 26 4.2512 Steam Une Break Downstream of MSIV 0.0 6.0E-N 2.4007 TOTALS 100.0 2.4(*)

(*)= Note that the ATWS precursor frequencies are not included in the total initiating event frequency, since they are already accounted for in other categories.

e Nov r 15,1995 '

- 3 Westinghouse m:\ap600\pra\sec590159.R06:lb 59-68

gi-ii  !

59. PRA Results and Insights I

..=

b \

V)

Table 59-2 (Sheet 1 of 2)

INTERNAL INITIATING EVENTS AT POWER l DOMINANT CORE DAMAGE SEQUENCES No. Swe Frequency Percent Cnetrib. Sequence Descriptico l 1 8.36E-08 34.36 Safety injection line break initiadng event occurs Success of one d one CMT Success of full ADS depressurization Failure of one of one IRWST injection line 2 2.97E-08 12.18 ATWS precursor with no MFW initiating event occurs Failure d reactor trip due to PMS faults Failure d DAS Reactor fails to trip 3 1.99E-08 8.17 ATWS Fecurscr with no MFW event sequence condnues Success of startup feedwater a PRHR system Failure of manual rod inserdon Failure of pnmary depress. due to PRZR SV or UET l

4 1.72E-08 7.07 Large LOCA initiating event occurs Success of one or two accumulators Failure of two IRWSTinjection lines 5 1.59E-08 6.53 Safety injecdon line break initiating event occurs Success of one of one Chff Failure of full ADS depressunzation 6 1.17E48 4.79 Intermediate IDCA initiating event occurs pi Success d reactor coolant punps to trip Success of one or two Chffs Success of full ADS depressurization Failure of RNS in injecdon mode Failure of two IRWSTinjection lines I

7 1.08F 08 4.43 Intermediate LOCA inidanng event occurs Success of reactor coolant pumps to trip Success of one or two Chffs Failure d full ADS depressurization Success of partial ADS depressunzation Failure of RNS in injection mode 8 1.00E 08 4.11 Reactor vessel rupture initiating event occurs 9 7.32F 09 3.01 Large LOCA inidating event occurs Failure d two accumulators 10 5.77Fe09 2.37 Intermediate IDCA initiating event occurs Failure of reactor coolant pumps to trip Failure d full ADS depressurization Failure of partial ADS depressunzation a

g ReviSi0n: 6 YN wm6 November 15,1995 59-69 m:\ap600prabec59CH59.R06:1b

y--

59. PRA Results and Insights O

Table 59-2 (Sheet 2 of 2)

INTERNAL INITIATING EVENTS AT POWER DOMINANT CORE DAMAGE SEQUENCES No. S:.cence Frequency Percent Contrib. Sequence Description 11 2.44E-09 1.00 Mediurn LOCA initiating event occurs Success of one a two CMrs Failure of RNS in injection made Success of full ADS depressurintion Failure of two IRWST injection lines 12 2.32E-09 .95 RCS leakage event sequence leads to small LOCA event Success of one a two CMrs Success of reactor coolant punps to trip Success of PRliR Success of full ADS depressurization F dlare of RNS in injection mode Feilure of do IRWST injection lines 13 2.32E-09 .95 Mewum LOCA initisting event occurs Success of one or two CMrs Failure of RNS in injection mode Failure of full ADS depressunzation 9

Revision: 6 O

November 15,1995 _ T Westinghouse m:\ap600\pra\sec590159.R06:Ib 59-70

59. PRA Results and Insights O

t

'J Table 59 3 SEQUENCE 1 - SAFETY INJECTION LINE BREAK DOMINANT CUTSETS (SI.LB.02)

NUMBER CUTSET PROS PERCENT BASIC EVENT NAME 1 2.62E.08 31.31 SAFETY INJECTION LINE BREAK CCF OF GRAVITY INJECTION CVs IN 1/1 LINE 'IU OPEN 2 2.52E 08 30.11 SAFETY INJECTION LINE BREAK IRWST DISCHARGE LINE 'A' STRAINER PLUGGED 3 8.06E.09 9.63 SAFETY INJECTION LINE BREAK CHECK VALVE 123A FAILS 'IU OPEN CHECK VALVE 125A FAILS TO OPEN 4 8.06E-09 9.63 SAFETY INJECTION LINE BREAK CHECK VALVE 123A FAILS TO OPEN CHECK VALVE 124A FAILS 'IV OPEN 5 8.06E.09 9.63 SAFETY INJECTION LINE BREAK CHECK VALVE 122A FAILS 'IV OPEN CHECK VALVE 125A FAILS 'lV OPEN 6 8.06E-09 9.63 SAFETY INJECTION LINE BREAK CHECK VALVE 122A FAILS TO OPEN CHECK VALVE 124A FAILS TO OPEN O

l

)

i j

i

)

l 1

)

i

[ WestW h_ Novem r1, 59 71 m:hp600prakec59CH59.R06:Ib i

=:
59. PRA Results and Insights Table 59-4 O

SEQUENCE 2 - ATWS DOMINANT CUTSETS (ATWS.I.07)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 1.33E-08 44.86 AWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERA 1CR FAILS TO MANUALLY TRIP REAC'IOR VIA PMS UNAVAILABILITY GOAL FOR DAS COND. PROB. OF ATW-MAN 04 (OPER. FAILS TO TRIP REAC1OR) 2 6.91E-09 23.31 ATW3 PRECURSOR WITH DC MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS TO MANUALLY TRIP REACTOR VIA PMS TURBINE IMPULSE CHAMBER PRESSURE TRANSMITTER 002 FAILURE COND. PROB. OF AW-MAN 04 (OPER. FAILS TO TRIP REACTOR) 3 6.91E-09 23.31 ATWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR PAILS TO MANUALLY TRIP REACTOR VI A PMS TURSINE IMPULSE CHAMBER PRESSURE TRANSMITTER 001 FAILURE COND. PROS. OF ATW-MAN 04 (OPER. FAILS TO TRIP REACTOR) 4 7.66E-10 2.58 ATWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS TO MANUALLY TRIP REACTOR VIA PMS EDS3 EA 1 DISTR. PNL FAILURE OR T&M S 2.65E-10 .89 AWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS TO MANUALLY TRIP REAC'!OR VI A PMS CCF OF SAFETY PT LT CONTINUOUSLY INTERFACING HIGH PRESUR COND. PROB. OF ATW-MAN 04 (OPER. FAILS TO TRIP REACTOR) 6 2.65E-10 .89 ATWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS TO MANUALLY TRIP REAC10R VIA PMS CCF NON-SAFETY TRANSMITTERS INTERFACINO SYSTEM PRSS COND. PROG. OF ATW-MAN 04 (OPER. FAILS TO TRIP REACTOR) 7 2.51E-10 .85 A WS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS 10 MANUALLY TRIP REACTOR VI A PMS UNAVAILABILITY COAL FOR DAS FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE 8 -10 .68 A WS PRECURSOR WITH NO MFW SOFTWARE CCF OF ALL CARDS OPERATOR FAILS TO MANUALLY TRIP REAC'IOR VI A PMS UNAVAILABILITY GOAL FOR DAS COND. PROB. OF AW-MAN 04 (OPER. FAILS TO TRIP REACTOR) 9 1.31E.10 .44 ATWS PRECURSOR WITH NO MFW PMS BOARDS HARDWARE CCF OPERATOR FAILS TO MANUALLY TRIP REAC'!OR VI A PMS TURBINE IMPULSE CHAMBER PRESSURE TRANSHI'I"PER 002 FAILURE FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE 10 1.31E-10 .44 AWS PRECURSOR WITH NO MF14 PMS BOARDS HARDWARE CCP OPERATOR FAILS TO MANUALLY TRIP REACTOR VIA PMS TURBINE IMPULSE CHAMBER PRESSURE TRANSMI1"I'ER 001 FAILURE FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE 11 1.05E-10 .35 ATWS PRECURSOR WITH PC MFW SOFWARE CCF OF ALL CARDS OPERATOR FAILS 10 MANUALLY TRIP REACTOR VIA PMS TURBINE IMPULSE CHANBER PRESSURE TRANSMITTER 002 FAILURE COND. PROB. OF AW-MAN 04 (OPER. FA"_LS TO TRIP REACTOR) 12 1.05E-10 .35 ATWS PRECURSOR WITH NO MFW SOFTWARE CCF OF ALL CARDS OPERATOR FAILS TO MANUALLY TRIP RCAC'IOR V! A PM9 TURBINE IMPULSE CHAMBER PRESSURE TRANSMI M P 071 FAILURE COND. PROS. OF AW-MAN 04 (OPER. FAILS 7 '

'l' r Revision: 6 g O

November 15,1995 nm;;;;6 3 W95tingh00Se mAap600pra\sec59CH59.R06:Ib 59-72

z::
59. PRA Results and Insights l

= = - ,

1

, l e s 1 L 4 O

Table 59-5 (Sheet 1 of 2)

I SEQUENCE 3 - ATWS DOMINANT CUTSETS (ATWS.28)

NUMBER CLCSET PROB PERCENT BASIC EVENT NAME i

...... ........... ....... ...................................................... ........... l l

1 1.69E-08 85.05 FAILURE OF PRIMARY DEPRESS. DUE TV PRZR SV OR UET I ATW3 PRECURSOR WITH NO MFW i FAILURE OF MGSETS 10 OPEN PMS BOARDS HARDWARE CCF l 1

OPERA 1DR FAILS '!O MANUALLY TRIP REAC1DR VIA PMS j COND. PROB. OF AW-MAN 01 (OPER. FAILS TO STEP-IN CONTROL RODS) l 2 2.13E-09 10.72 FAILURE OF PRIMARY DEPRESS. DUE TV PRZR SV OR UET l ATWS PRECURSOR WITH NO MFW I OTH-RTBREAK l FAILURE CF MCSETS TO OPEN '

OPERATOR FAILS TO STEP IN THE CONTROL RODS 3 3.52E-10 1.77 FAILURE OF PRIMARY DEPRESS. DUE TV PRZR SV OR UET l AWS PRECURSOR WITH NO MW OTH-RTRREAK j UNAVAILABILITY GOAL FOR DAS '

OPERA 1VR FAILS TV MANUALLY TRIP REACTOR VIA DAS j COND. PROB. OF ATW-MAN 01 (OPER. FAILS TO STEP-IN CONTROL RODS) l 4 1.85E-10 .93 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET I A1WS PRECURSOR WITH NO MFW I OTH-RTBREAK TURSINE IMPULSE CHAMBER PRESSURE TRANSMITTER 002 FAILURE

)

j OPERATOR FAILS TO MANUALLY TRIP REACTUR VIA CAS j COND. PROB. OF AW-MAN 01 (OPER. FAILS TO STEP-IN CONTROL RODS) j 5 1.85E-10 .93 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET AWS PRECURSOR WITH NO MFW l

[q1 OTH-RTBREAK i

\ / TURBINE IMPULSE CHAMBER PRESSURE TRANSMITTER 001 FAILURE N/ OPERATOR FAILS TO MANUALLY TRIP REACTVR VIA DAS COND. PROB. OF ATW-MAN 01 (OPER. FAILS TO STEP-IN CONTROL RODS) 6 4.26E-11 .21 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET ATWS PRECURSOR WITH NO MFW OTH-RTBRFAK FAILURE OF MGSETS TO OPEN ROD-CTRL-SYS 7 2.16E-11 .11 FAILURE CF PRIMARY DEPRESS. DUE TO PRZR SV OR DET AWS PRECURSOR WITH No MW FAILURE OF MCSETS TO OPEN PMS BOARDS HARDWARE CCF OPERATOR FAILS 70 MANUALLY TRIP REAC1CR VIA PMS ROD-CTRL-SYS l

l l

i l

l f

m t Y NM h Novem r1, 59-73 m: sap 600,rassec59 cts 9.R06:1b

59. PRA Results and Insights Table 59-5 (Sheet 2 of 2)

O SEQUENCE 3 - ATWS DOMINANT CUTSETS (ATWS.28)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 8 1.32E-11 .07 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET ATWS PRECURSOR WITH NO MFW OTH-RTBREAX EDS3 EA I DISTR. PNL FAILURE OR T&M OPERATOR FAILS TO STEP IN THE CONTROL RODS 9 8.65E-12 .04 FAILURE OF PRIMARY DEPRESS. DUE 70 PRZR SV OR UET ATWS PREOURSOR WITH NO MFW FAILURE OF MGSETS 10 OPEN TRANSMITTERS C0F OPERATOR FAILS TO MANUALLY TRIP REACTOR VIA PMS COND. PROB OF ATW-MAN 01 (OPER. PAILS 'IC STEP-IN CONTROL RODS) 10 4.34E-12 .02 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET AWS PRECURSOR WITH NO MFW OTH-RTBREAK UNAVAILABILITY GOAL FOR DAS FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE OPERATOR FAILS TO STEP IN THE CONTROL RODS 11 2.27E-12 .01 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET AWS PRECURSOR WITH NO MFW OTH-RTBREAK TURBINE IMPULSE CHAMBER PRESSURE TRANSMITTER 002 FAILURE FAILURC OF MANUAL DAS REACTOR TRIP HARDWARE OPERATOR FAILS TO STEP IN THE CONTROL RODS 12 2.27E-12 .01 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET ATWS PRECURSOR WITH NO MFW OTH-RTBREAK TURBINE IMPULSE CHAMBER PRESSURE TRANSMITTER 001 FAILURE FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE OPERATOR FAILS TO STEP IN THE CONTROL RODS 13 1.85E-12 .01 FAILURE OF PRIMARY DEPRESS. DUE TO PRZR SV OR UET ATWS PRECURSOR WITH NO MFW OTH-RTBREAK INSTRUMENT LINE PLUGGED (SG A)

INSTRUMENT LINE PLUGGED (SG B)

OPERATOR FAILS TO MANUALLY TRIP REACTOR VIA DAS COND. PROS OF ATW-MAN 01 (OPER. FAILS TO STEP-IN CONTROL RODS)

O o r 15,1995 w, Westingh00Se m:WVec59TH59.R06:1b 59-74

l l

l

59. PRA Results and Insights dRM t

\' )A Table 59 6 SEQUENCE 4 - LARGE LOCA DOMINANT CUTSETS (LLOCA.03)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAHE l

...... ........... ....... ............................................................... 1 1 1.59E.08 92.44 LARGE LOCA CCF OF GRAVITY INJECTION CVs IN BCT!'M LINES TO OPEN 2 1.27E.09 7.38 LARGE LOCA CCF OF STRAINERS IN IRWST TANK 3 6.11E.12 .04 LARGE I4CA IRWST DISCHARGE LINE *A* STRAINER PLUGGED i

l IRWST DISCHARGE LINE *B* STRAINER PLtX;GED l 1

4 1.95E.12 .01 LARGE LOCA IRWST DISCHARGE LINE 'A' STRAINER PLUGCED I l

CHECK VALVE 1238 FAILS TO OPEN '

CHECK VALVE 125B FAILS TO OPEN 5 1.95E.12 .01 LARGE LOCA IRWST DISCHARGE LINE *A* STRAINER PLUGGED CHECK VALVE 1238 FAILS TO CPEN CH::CK VALVE 124B FAILS TO CPEN l l

6 1.95E-12 .01 LARGE LOCA IRWST DISCHARGC LINE *A* STRAINER PLUGGED l CHECK VALVE 1228 PAILS TO CPEN CHECK VALVE 1258 FAILS TO OPEN 7 1.95E.12 .01 LARGE LOCA IRWST DISCHARGE LINE *A* STRAINER PLUCCEO j CHECK VALVE 1228 FAILS TO OPEN l f3 CHECK VALVE 1248 FAILS 10 OPEN I

/ 't I

\

Dj 8 1.955-12 .01 LARGE LOCA '

CHECK VALVE 123A FAILS TO OPEN CHECK VALVE 125A FAILS 'IO OPEN IRWST DISCHARGE LINE *B* STRAINER PLUGGED 9 1.95E.12 .01 LARGE LOCA l CHECK VALVE 123A FAILS 'IO OPEN CHECK VALVE 124A FAILS TO OPEN l IRWST DISCHARGE LINE *B* STRAINER PLUGGED l

i 10 1.95E-12 .01 LARGE LOCA l CHECK VALVE 122A FAILS TO OPEN i CHECK VALVE 125A PAILS TO OPEN l IRWST DISCHARGE LINE *B* STRAINER PLtJGGED l

11 1.95E.12 .01 LARGE LOCA CHECK VALVE 122A FAILS TO OPEN CHECK VALVE 124A FAILS TO OPEN IRWST DISCHARGE LINE *B* STRAINER PLUGGED

,/%

t n 3 68 as h Novem r1,1 59-75 m:W60@chec59CH59Jt06:lb

59. PRA Rescits and Insights ,

l Table 59-7 (Sheet 1 of 2)

O SEQUENCE 5 - SAFETY INJECTION LINE BREAK DOMINANT CUTSETS (SI.LB-03)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 1.58E-08 99.68 SAFETY INJECTION LINE BREAX DUE TO CCF OF 4TH STAOE ADS SQUIB VALVES M OPERATE 2 3.56E 11 .22 SAFETY HUECTION LINE BREAK COND. PROB. OF REC-KANDAS (FAILURE OF MANUAL DAS ACT.) l CCX-INPUT-LOGIC l

OPER. FAILS TO RECOC. THE NEED FOR RCS DEPRESS. DURING MLOCA 3 1.33E-11 .08 SAFETY INJECTION LINE BREAK COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

CMx.vS FA i l

OPER. FAILS '!V RECOC. THE NEED FOR RCS DEPRESS. DURING MLOCA 4 1.05E-11 .07 SAFETY INJECTION LINE BREAK FAILURE OF MANUAL DAS ACTUATION CCF OF EPO BOARDS IN PMS 5 9.05E-12 .06 SAFETY INJECTION LINE BREAX FAILURE OF MANUAL DAS REAC'IUR TRIP HARDWARE CCF OF EPO BOARDS IN PMS 6 3.80E.12 .02 SAFETY INJECTION LINE BREAK COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

CCX-IN-LOGIC-SW OPER. FAILS M RECOG. THE NEED FOR RCS DEPRESS. DURING MLOCA 7 2.84E-12 .02 SAFETY DUECTION LINE BREAK HARDWARE FAILURE OF ST. 44 LINE 1 HARDWARE FAILURE OF ST. 84 LINE 3 i HARDWARE FAILURE OF ST. 44 LINE 4 8 2.84E.12 .C2 SAFETY INJECTION LINE BREAK HARDWARE FAILURE OF ST. #4 LINE 1 l HARDWARE FAILURE OF ST. 84 LINE 2 HARDWARE FAILURE OF ST. 54 LINE 4 9

ov r 15,1995 ,

_ [ W85tingh0USB mAspax4,Acc59CH59.R06:1b 59-76

59. PRA Results and Insights

,/

$ l

\

\_) l Table 59-7 (Sheet 2 of 2) l l

l SEQUENCE 5 - SAFETY INJECTION LINE BREAK DOMINANT CUTSETS (SI.LB.03)

NUMBER CUTSET PROS PERCENT BASIC EVENT NANE 9 2.84E-12 .02 SAFETY INJECTION LINE BREAK HARDWARE FAILURE OF ST. 44 LINE 2 HARDWARE FAILURE OF ST. 44 LINE 3 HARDWARE FAILURE OF ST. 44 LINE 4 10 2.84E.12 .02 SAFETY INJECTION LINE BREAK HARDWARE FAILURE OF ST. #4 LINE 1 HARDWARE FAILURE OF ST. 94 LINE 2 HARDWARE FAILURE OF ST. #4 LINE 3 11 2.70E-12 .02 SAFETY INJECTION LINE BREAK COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

CCX-INPUT-LOGIC OPERA 10R FAILS TO FULFIL MANUAL ACTUATION OF ADS 12 1.46E-12 .01 SAFETY INJECTION LINE BREAK SOF'IWARE CCF OF ALL CARDS FAILURE OF MANUAL DAS ACTUATION 13 1.26E-12 .01 SAFETY INJECTION LINE BREAK SOFTWARE CCF OF ALL CARDS FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE 14 1.01E-12 .01 SAFETY INJECTION LINE BREAK COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

CMX-VS-FA OPERATOR FAILS 'Io FULFIL MANUAL ACTUATION OF ADS n

I 15 8.10E-13 .01 SAFETY INJECTION LINE BREAK

( CMX-VS-FA b CCF OF SAFETY PT LT CONTINUOUSLY INTERFACING HIGH PRESSURE 16 7.035 13 .00 SAFETY DUECTION LINE BREAK FAILURE CF MANUAL DAS REACTOR TRIP HARDWARE CCX-INPUT-IDGIC OPER. FAILS TO RECOG. THE NEED FOR RCS DEPRESS. DURING MLOCA 1

1 1

l 1

1 1

1 pm (v) g Revision: 6 T Westkigh00S0 gar _ November 15,1995 59 77 m:W\sec59CH59.R06:1b l

1

59. PRA Results and insights Table 59-8 O

SEQUENCE 6 - INTERMEDIATE LOCA DOMINANT CUTSETS (NLOCA-04)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 1.63E.09 14.00 INTERMEDIATE 14CA HARDWARE FAILURE OF ISOLATION MOV 011 CCF OF GRAVITY INJECTICN CVs IN BOTH LINES TO OPEN 2 1. 63 E-09 14.00 INTERMEDIATE LOCA HARDWARE FAILS TO OPEN MOV V022 / CB FTC / RELAY FTC CCF OF GRAVITY I MECTION CVs IN BOTH LINES TO OPEN 3 1.63E.09 14.00 INTERMEDIATE LOCA HARDWARE FAILS TO OPEN MOV V023 / CB FTC / RELAY FTC CCF CF GRAVITY IM ECTION CVs IN BOTH LINES TO OPEN 4 1.385-09 11.86 INTERMEDIATE LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1188 FAILS TO OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES to OPEN 5 1.38E-09 11.86 INTERMEDIATE LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1178 FAILS TO OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES 10 OPEN 6 6.03E-10 5.18 INTERMEDIATE I4CA FAILURE OF AIR COMPRESSOR TRANSMITTER CCF OF GRAVITY IRJECTION CVs IN BOTH LINES 'IO OPEN 7 3.35E.10 2.88 INTERMEDIATE I4CA OPERATOR FAILS TO ALIGN AND ACTUATE THE RNS CCF OF GRAVITY INJECTION CVs IN BOTH LINES to OPEN 8 3.11E-10 2.67 -INTERMEDIATE LOCA UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 9 3.115-10 2.67 INTERMEDIATE LOCA BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES to OPEN 10 2.02E.10 1.74 INTERMEDIATE LOCA CHECK VALVE V013 FAILURE TO OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 11 1.33E-10 1.14 INTERMEDIATE LOCA PUMP 01A FAILS & ST CK V007A & CB FTC & RE FTC & CB ECS122 SPO PUMP 01B FAILS & ST CK V007B & CB FTC & RE FTC & CB ECS221 SPO CCF OF GRAVITY INJECTION CVs IN BOTH LINES 10 OPEN 12 1.30E-10 1.12 INTEPMEDIATE I4CA HARDWARE FAILURE OF ISOLATION MOV 011 CCF OF STRAINERS IN IRWST 13 1.30E-10 1.12 INTEPREDIATE I4CA HARDWARE FAILS TO OPEN HOV V022 / CB PTC / RELAY FTC CCF OF STRAINERS IN IRWST 14 1.30E-10 1.12 INTERMEDIATE LOCA HARDWARE FAILS TO OPEN MOV V023 / CB FTC / RELAY FTC CCF OF STRAINERS IN IRWST 15 1.11E-10 .95 INTEPREDIATE LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1188 FAILS TO CPEN CCF OF STRAINER $ IN IRWST 16 1.11E-10 .95 INTERMEDIATE LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1178 FAILS TO OPEN CCF OF STRAINERS IN IRWST 17 8.88E-11 .76 INTERMEDIATE LOCA CCF TO START OF THE PUMPS CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN Revision: 6 O

g November 15,1995 mush 3 W85 tin @00S6 m:\ap60@ra\wc59Ci59.R06:1b 59-78

59. PRA Results and Insights

[ ]4

+

i"/

Table 59-9 SEQUENCE 7 - INTERMEDIATE LOCA DOMINANT CUTSETS (NLOCA.06)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 1.63E-09 15.12 INTERMEDIATE LOCA DUE TD CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE HARDWARE FAILURE OF ISOLATION MOV 011 2 1.63E-09 15.12 INTERMEDIATE LOCA DUE TO CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE HARDWARE PAILS TO OPEN MOV V022 / CB FTC / RELAY FTC 3 1.63E.09 15.12 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE HARDWARE FAILS 10 OPEN MOV V023 / CB FTC / RELAY FTC 4 1.38E-09 12.80 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE HARDWARE FAILURE CAUSES RECIRC MOV 118B FAILS TO OPEN 5 1.38E.09 12.80 INTERMEDIATE 14CA DUE TO CCF OP 4TH STAGE ADS SQUIB VALVES TO OPERATE HARDWARE FAILURE CAUSES RECIRC MOV 117B FAILS TO OPEN 6 6.03E-10 5.59 INTERMEDIATE I4CA DUE TO CCF OF (TH STAGE ADS SQUIB VALVES TO OPERATE j FAILURE OF AIR COMPRESSOR TRANSMITTER I 7 3.358 10 3.11 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES 10 OPERATE l OPERATOR FAILS TO ALIGN AND ACTUATE THE RNS l l

O 8 3.11E-10 2.88 INTERMEDIATE LOCA l

\g)

[ DUE to CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE UNAVAILABILITY OF BUS ECS ES 1 DUE 10 UNSCHEDULED MAINTENANCE l

l 9 3.11E.10 2.88 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES 10 OPERATE i BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE l r3 2.02E-10 1.87 INTJRMEDIATE LOCA 6

DUE TO CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE I C}iECK VALVE V013 FAILURE TO OPEN i 11 1.33E-10 1.23 INTERMEDIATE LOCA INITIATING EVENT OCCURS l DUE to CCF OF (TH STAGE ADS SQUIB VALVES TO OPERATE PUMP 01A FAILS & ST CK V007A & CB FTC & RE F10 & CB ECS122 SPO PUMP 018 FAILS & ST CK V0078 & CB FTC & RE FTC & CB ECS221 SPO 12 8.88E-11 .82 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE CCF 10 START OF THE PUMPS 13 7.04E.11 .65 INTERMEDIATE LOCA DUE TO CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE CCF 10 OPEN OF THE STOP CHECK VALVES 14 6.95E-11 .64 INTERMEDIATE LOCA DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE STANDBY DG UNAVAILABLE DUE TO TEST AND MAINTENANCE MAIN CEN. BKR ES 01 FAILS TO OPEN (6 12) 15 3.66E.11 .34 INTERHEDIATE I4CA DUE to CCF OF 4TH STAGE ADS SQUI3 VALVES TO OPERATE 125 VDC PANEL EDS2 DS 11 COMPONEN? FAILURES

- _ ~

/m s

(

') Revision: 6 3 W W OUS8 mh November 15,1995 59 79 m:Wassec59CH59.R06:lb

59. PRA Res11ts and Insights Table 59-10 e!

SEQUENCE 8 - REACTOR VESSEL RUPTURE CUTSET This event is modeled to go to core damage following the initiating event. No other cutsets exist. I a

b Revision: 6 e

November 15, 1995 w_ T Westinghouse m:Wakec59CI59.R06:Ib 59-80

59. PRA Results and Insighb F f

\

v/

Table 59-11 (Sheet 1 of 2)

SEQUENCE 9 - LARGE LOCA DOMINANT CUTSETS (LLOCA.04)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 5.41E-09 73.95 LARGE LOCA COMMON CAUSE FAILURE OF 2 ACCUMULATOR CHECK VALVES 2 3.25E.10 4.44 LARGE LOCA CHECK VALVE 029B FAILS TO OPEN CHECK VALVE 029A FAILS TO OPEN 3 3.25E.10 4.44 LARGE LOCA CHECK VALVE 029B FAILS TO OP.'P!

CHECK VALVE 028A FAILS TO OPL.*

4 3.25E.10 4.44 LARGE LOCA CHECK VALVE 0288 FAILS TO OPEN CHECK VALVE 029A FAILS 10 OPEN 5 3.25E-10 4.44 LARGE LOCA CHECK VALVE 028B FAILS TO OPEN CHECK VALVE 028A FAILS TO OPEN 6 1.35E-10 1.85 LARGE LOCA FLOW WNING ORIFICE PLUGS CHECK VALVE 029A FAILS TO OPEN 7 1.35E-10 1.85 LARGE I4CA FLOW TUNING ORIFICE PLUGS CHECK VALVE 028A FAILS TO OPEN 8 1.35E-10 1.85 LARGE IDCA

/ n\ CHECK VALVE 029B FAILS TO OPEN

'%) FLOW TtJNING ORIFICE PLUGS 9 1.350-10 1.85 LARGE LOCA CHECK VALVE 028B FAILS TO OPEN FLOW TUNING ORIFICE PLUGS 10 5. 60 E -11 .77 LARGE LOCA FLOW TUNING ORIFICE PLUGS FICW TUNING ORIFICE PLUGS 11 1.27E-11 17 LARGE LOCA COMMON CAUSE FAILURE OF ACCUMULATOR TANKS 12 4.45E-13 .01 LARGE ICCA ACCUMULATOR TANK B (T001B) RUPTURES i CHECK VALVE 029A FAILS TO OPEN '

l 1

Revision: 6

[ W6Stingh00S8 _ November 15,1995 59-81 m^ p60&pras.ec590159.R06:1b

59. PRA Results and Insights Table 59-11 (Sheet 2 of 2)

O SEQUENCE 9 - LARGE LOCA DOMINANT CUTSETS (LLOCA.04)

NUM8ER CUTSET PROB PERCENT BASIC EVENT NAME 13 4.45E-1. .01 LARGE LOCA ACCUMULATOR TANK B (T0018) RUPTURES CHECK VALVE 028A FAILS TO OPEN 14 4.45E.13 .01 LARGE LOCA CHECK VALVE 0298 FAILS TO OPEN ACCUMULATOR TANK A (T001A) RUPTURES 15 4.45E-13 .01 LARGE LOCA CHECK VALVE 028B FAILS TO OPEN ACCUMULATOR TANK A (T001A) RUPTURES 16 1.85E-13 .00 LARGE LOCA ACCUMULATOR TANK B (T001B) RUPTURES FLCW TUNING ORIFICE PLUCS 17 1.85E-13 .00 LARGE 14CA FI4W TUNING ORIFICE PLUGS ACCUMULA1CR TANK A (T001A) RUPTURES 18 1.34E-13 .00 LARGE I4CA FI4W BJNING ORIFICE RUPTURE CHECK VALVE 029A FAILS TO OPEN 19 1.34E.13 .00 LARGE LOCA FLOW TUNING ORIFICE RUPTURE CHECK VALVE 028A FAILS TO OPEN 20 1.34E-13 .00 LARGE LOCA CHECK VALVE 029B FAILS TO OPEN FLOW TUNING ORIFICE RUPTURE 21 1.34E-13 .00 LARGE LOCA CHECK VALVE 028B FAILS 10 OPEN FLOW TUNING ORIFICE RUPTURE 22 5.55E-14 .00 LARGE LOCA FLOW TUNING ORIFICE RUPTURE FICW TUNING ORIFICE PLUGS 23 5.55E-14 .00 LARGE LOCA FLOW TUNING ORIFICE PLOCS FLOW TUNING ORIFICE RUPTURE Revision: 6 O i' November 15,1995 _ 3 W85tingh00Se m:bp600\prakec59CI59.R06:lb 59-82

59. PRA Results and Insights

==

(m )

Tab!c 59-12 (Sheet 1 of 2)

SEQUENCE 10 - INTERMEDl/ . k LOCA DOMINANT CUTSETS (NLOCA.16)

NUMBER CUTSET PROS PERCENT BASIC EVENT NAME 1 3.04E-09 52.58 INTERMEDIATE 14CA COMMON CAUSE FAILURE 'IO OPEN OF 4.16 KVAC CIRCUIT BREAKERS COND. PROB. OF REC-MANDAS (F AILURE OF MANUAL DAS ACT. )

OPER. FAILS TO RECOG. THE NEED FOR RCS DEPRESS. DURING MLOCA 2 3.832-10 6.62 INTERMEDIATE LOCA PUMP B FAILS 'IO TRIP - BREAKER FAILS TO OPEN PUMP B FAILS 'IO TRIP - BREAKER FAILS TO OPEN COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPER. FAILS TO RECOG. THE NEED FOR RCS DEPRESS. CURING MLOCA 3 3.83E-10 6.62 INTERMEDIATS !4CA PUMP B FAILS TO TRIP - BREAKER FAILS 10 OPEN PUMP B FAILS TO TRIP - BREAKER FAILS '10 OPEN CCND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPER. FAILS '!O RECOG. THE NEED FOR RCS DEPRESS. DURING MI4CA 4 3.83E-10 6.62 INTERMEDIATE D3CA PUNP A FAILS TO TRIP - BREAKER FAILS TO OPEN PUMP A FAILS TO TRIP - BREAKER FAILS TO OPEN COND. PRCB. CF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPER. FAILS TO RECOG. THE NEED FOR RCS DEPRESS. DURING MLOCA 5 3.83E-10 6.62 INTERMEDIATE LOCA PUMP A FAILS TO TRIP - BREAKER FA!LS TO OPEN PUMP A FAILS TO TRIP - BREAKER FAILS TO OPEN COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

,, g CPER. FAILS TO RECOG. THE NEED FOR 8tCS DEPRESS. DURING MLOCA

/

1 6 2.96E-10 5.12 INTERMEDIATE LOCA A CCX-TT-UF COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPER. FAILS TO RECCG. THE NEED FOR RCS DEPRESS. DURING MLOCA 1

7 2.3CE-10 3.98 INTERMEDIATE LOCA j COMMON CAUSE FAILURE 10 OPEN OF 4.16 KVAC CIRCUIT BREAKERS '

COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT. )

OPERATOR FAILS TO FULFIL MANUAL ACTUATION OF ADS l 8 6.00E-11 1.04 INTERMEDIATE LOCA COMMON CAUSE FAILURE 'IO OPEN OF 4.16 KVAC CIRCUIT BREAKERS FAILURE OF MANUAL DAS REACTOR TR!P HARDWARE OPER. FAILS '!O RECOG. THE NEED FOR RCS DEPRESS. DURING MLOCA 9 2.90E-11 .50 INTERMEDIATE LOCA PUMP B FAILS TO TRIP - BREAKER FAILS 'IO OPEN PUMP B PAILS '!O TRIP - BREAKER FAILS TO OPEN COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPERATOR FAILS TO FULFIL MANUAL ACTUATION OF ADS (O)

Revision: 6 YD h, November 15,1995 59-83 m:\ap600pra\sec59CH59.R06:1b

59. PRA R; silts and Insights unu --

Table 59-12 (Sheet 2 of 2)

SEQUENCE 10 - INTERMEDIATE LOCA DOMINANT CUTSETS (NLOCA-16)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 10 2.90E.11 .50 INTERMEDIATE I4CA PUMP B FAILS TO TRIP - BREAKER FAILS TO OPEN PUMP B FAILS TO TRIP . BREAKER FAILS TO OPEN COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPERATOR FAILS TO FULFIL MANUAL ACTUATION OF ADS 11 2.90E-11 .50 INTERMEDIATE LOCA PUMP A FAILS TO TRIP BREAKER FAILS 10 OPEN PUMP A FAILS TO TRIP - BREAKER FAILS 10 OPEN COND. PROB. OF REC.MANDAS (FAILURE CF MANUAL DAS ACT.]

OPERATOR FAILS TV FULFIL MANUAL ACTUATION OF ADS 12 2.90E-11 .50 INTERMEDIATE LOCA PUMP A FAILS TO TRIP . BREAKER FAILS TO OPEN PUMP A FAILS TO TRIP - BREAKER FAILS TO OPEN COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

OPERATOR FAILS TO FULFIL MANUAL ACTUATION OF ADS 13 2.73E.11 .47 INTERMEDIATE LOCA PUMP B FAILS TO TRIP . BREAKER FAILS TO OPEN COMPONENTS FAILURE COND. PROB. OF REC-MANDAS (PAILURE OF MANUAL DAS ACT.) i OPER. FAILS TO RECOC. THE NEED FOR RCS DEPRESS. DURINO MLOCA l O

Revision: 6 O

November 15,1995 6 Y Westingt10USB mAap600pra\sec590L9.R06:lb 59 84

59. PRA Results and Insights __

m-

,s

(

t Table 5913 (Sheet 1 of 2)

SEQUENCE 11 - MEDIUM LOCA DOMINANT CUTSETS (MLOCA 04)

NUMBER CttrSET PROS PERCENT BASIC EVENT NAME 1 3.41E-10 13.99 MEDIUM LOCA HARDWARE FAILURE OF ISOLATION MOV 011 CCF OF GRAVITY IMECTION CVs IN BOTH LINES TO OPEN 2 3.41E-10 13.99 MEDIUM IDCA HARDWARE FA!LS TO OPEN MOV V022 / CB FTC / RELAY FTC CCF OF GRAVITY IMECTION CVs IN BOTH LINE3 TO OPEN 3 3.41E.10 13.99 MEDIUM LOCA HARDWARE FAILS TO OPEN MOV V023 / CB FTC / RELAY FTC CCF CF GRAVITY INJECTION CVs IN BOTH LINES 'IO OPEN 4 2.90E-10 11.90 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 118B FAILS '!O OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN

$ 2.90E-10 11.90 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 117B FAILS '!O OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 6 1.26E-10 5.17 MEDIUM LOCA FAILURE OF A!R COMPRESSOR TRANSMITTER CCF OF CRAVITY I MECTION CVs IN BOTH LINES TO OPEN 7 7.00E.11 2.87 MEDIUM LOCA OPERATOR FAILS TO ALIGN AND ACTUATE THE RNS CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN

[g' 8 6.52E-11 2.68 MEDIUM LOCA UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPCN 9 6.52E-11 2.68 MEDIUM LCX'A BUS UNAVAILABLE DUE TD UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BCrPH LINES TO OPEN 10 4.23E-11 1.74 MEDIUM LOCA CHECK VALVE V013 FAILURE TO OPEN CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 11 2.79E-11 1.14 MEDIUM ICCA PUMP 01A FAILS & ST CK V007A & CB FTC & RE FTC & CB ECS122 SPO PUMP 018 PAILS & ST CK V0078 & CB FTC & RE FTC & CB ECS221 SPO CCF OF CRAVITY IMECTION CVs IN BOTH LINES TO CPEN 12 2.72E-11 1.12 MEDIUM LOCA HARDWARE FAILURE OF ISOLATION HOV 011 CCP OF STRAINERS IN IRWST TANK 13 2.72E-11 1.12 MEDIUM LOCA HARDWARE FAILS TO OPEN MOV V022 / CB PTC / RELAY PTC CCP OF STRAINERS IN IRWST 14 2.72E-11 1.12 MEDIUM LOCA HARDWARE FAILS TO OPEN MOV V023 / CB FTC / RELAY FTC CCF OF STRAINERS IN IRWST 15 2.32E-11 .95 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 118B FAILS TO OPEN CCF OF STRAINERS IN IRWST 16 2.32E-11 .95 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1178 FAILS TO OPEN CCF OF STRAINERS IN IRWST 17 1.86E-11 .76 MEDIUM ICCA CCF TO START CF THE PUMPS CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN m

\

U T WmlS8 h Novem r ,

59-85 m4Mp*c59CH59.R06:lb

= . . _ _ .

59. PRA Resdts and Insights l

l Table 59-13 (Sheet 2 of 2) l l

SEQUENCE 11 - MEDIUM LOCA DOMINANT CUTSETS (MLOCA.04) l l

I NUMBER CUTSET PROS PERCENT BASIC EVENT NAME 18 1.47E-11 .60 MEDIUM LOCA CCF TO OPEN OF THE STOP CHECK VALVES 1

CCF OF GRAVITY IEJECTION CVs IN BOTH LINES 10 OPEN 1 19 1.46E-11 .60 MEDIUM UDCA STANDBY CG UNAVAILASLE DUE 'IO TEST AND MAINTENANCE l MAIN CEN. BKR ES 01 FAILS TO OPEN (012)

CCF OF CRAVITY INJECTION CVs IN BOTH LINES TO CPEN 20 1.01E-11 .41 NEDIUM ICCA I FAILURE OF AIR COMPRESSOR TRANSMITTER l

CCF OF STRAINERS IN IRWST J

j 1

i l

O l

l l

~4 l

l l

l l

i l

l l

l l

1 l

l 1

1 0\

Nov r 15,1995 m:\ap600prawc590159.R06:Ib 59-86 w- T M@use l

l I

==

59. PRA Results and Insights m

Table 59-14 (Sheet 1 of 2)

SEQUENCE 12 - RCS LEAK DOMINANT CUTSETS (RCSLK.04)

NUMSER CUTSET PROB PERCENT BASIC EVENT NAME 1 1.06E-10 4.56 RCS LEAK UNAVAILABILITY OF TRAIN *.B* DUE TO MAINTENANCE (2)

UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN Bf7fH LINES TO OPEN 2 1.06E-10 4.56 RCS LEAK CHILLER MS 03 SEGMENT HARDWARE FAILURE OR MAINTENANCE UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 3 1.06E-10 4.56 RCS LEAK CHILLER MS 03 SEGMENT HARDWARE FAILURE OR MAINTENANCE BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 4 8.89E-11 3.83 RCS LEAK CHILLER PUMP MP 03 SEGMENT HARDWARE FAILURE OR MAINTENANCE UNAVAILABILITY OF BUS ECS ES 1 OUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES 10 OPEN 5 8.89E-11 3.83 RCS LEAK CHILLER PUMP MP 03 SEGMENT HARDWARE FAILURE OR MAINTENANCE BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 6 6.37E-11 2.74 RCS LEAK MAIN GEN. BKR ES 01 FAILS TO OPEN (# 12]

f. BAT"fERY 081 UNAVAILABLE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN Y,/ 7 5.44E.11 2.34 RCS LEAK TRAIN *B* HARDWARE FAILURES UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BCrfH LINES TO OPEN 8 4.99E-11 2.15 RCS LEAK STANDBY DG UNAVAILABLE DUE TO TEST AND MAINTENANCE MAIN GEN. BKR ES 01 FAILS TO OPEN [G 12]

STANDBY DG UNAVAILABLE DUE TO TEST AND MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 9 4.72E-11 2.03 RCS LEAK CCF TO START OF ENGINE-DRIVEN FUEL PUMPS MAIN GEN. BKR ES 01 FAILS TO OPEN (# 12)

CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 10 2.83E-11 1.22 RCS LEAK COMMON CAUSE FAILURE 4KV BREAKERS to OPEN MAIN GEN. BKR ES 01 FAILS TO OPEN (# 12]

CCF OF GRAVITY INJECTION CVs IN BCYTH LINES TO OPEN 11 2.52E-11 1.08 RCS LEAK DUE TO CCF TO RUN OF THE MOTOR PUMPS CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 12 2.52E.11 1.08 RCS LEAK UNIT COOLER MS078 SEGMENT HARDWARE FAILURE UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 13 2.52E-11 1.08 RCS LEAK UNIT COOLER MS078 SEGMENT HARDWARE FAILURE BUS UNAVAILABLE DUE 10 UNSCHEDULED MAINTENANCE CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN sm T W use - Novem r1, 59-87 m:\ap600Ppraisec59CH59.R06:lb

=:

l

59. PRA Results and Insights O;

Table 5914 (Sheet 2 of 2)

SEQUENCE 12 - RCS LEAK DOMINANT CUTSETS (RCSLK.04)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 14 2.51E-11 1.08 RCS LEAK UNAVAILABILITY OF BUS ECS ES 1 DUE M UNSCHEDULED MAINTFWANCE OPER. FAILS TV RECOG. THE NEED & ALIGN STANCBY WS PUMP CCF OF GRAVITY INJECTION CVs IN BOTH LINES TO OPEN 15 2.51E-11 1.08 kCS LEAK BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE OPER. FAILS M RECOG. THE NEED & ALIGN STANDBY WS PUMP <

CCF OF GRAVITY INJECTION CVs IN BOTH LINES M OPEN l 16 2.38E.11 1.02 RCS LEAK CHILLER MS 03 SEGMENT HARCWARE FAILURE OR MAINTENANCE STANDBY DC UNAVAILABLE DUE TO TEST AND MAINTENANCE MAIN GEN. BKR ES 01 FAILS TO OPEN (6 12)

CCF OF GRAVITY IK7ECTION CVs IN BOTH LINES to OPEN I

O i

4 a

i l

1 Revision: 6 0 i' November 15,1995 m T Wesdnghouse nWWe59D159.R06:1b 59 88  : l g

59. PRA Results and Imights (m )

Table 5915 (Sheet I of 2)

SEQUENCE 13 - MEDIUM LOCA DOMINANT CUTSETS (MLOCA-05)

NUMBER CUTSET PROB PERCENT BASIC EVENT NAME 1 3.41E-10 14.72 MEDIUM LOCA HARDWARE FAILURE OF ISOLATION MOV 011 DUE 'Io CCF OF 4TM STAGE ADS SQUIB VALVES to OPERATE 2 3.41E-10 14.72 MEDIUM LOCA HARDWARE FAILS 10 OPEN MOV V022 / CB FTC / RELAY FTC DUE M CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 3 3.41E.10 14.72 MEDIUM LOCA HARDWARE FAILS M OPEN MOV V023 / CB PTC / RELAY FTC DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 4 2.90E-10 12.52 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 1188 PAILS TO OPEN DUE M CCF OF (TH STAGE ADS SQUIB VALVES 10 OPERATE 5 2.90E-10 12.52 MEDIUM LOCA HARDWARE FAILURE CAUSES RECIRC MOV 117B FAILS TO OPEN DUE TO CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 6 1.26E-10 5.44 MEDIUM LOCA FAILURE OF AIR COMPRESSOR TRANSMITTER DUE to CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 7 7.00E.11 3.02 MEDIUM LOCA OPERATOR FAILS TO ALIGN AND ACTUATE THE RNS DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES 10 OPERATE

/ \ 8 6.52E-11 2.82 MEDIUM LOCA

\ / UNAVAILABILITY OF BUS ECS ES 1 DUE TO UNSCHEDULED MAINTENANCE V

DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 9 6.52E-11 2.82 MEDIUM LOCA BUS UNAVAILABLE DUE TO UNSCHEDULED MAINTENANCE DUE TO CCF OP 4TH STAGE ADS SQUIB VALVES M OPERATE 10 4.23E-11 1.83 MEDIUM LOCA CHECK VALVE V013 FAILURE to OPEN DUE To CCF OF 4TH STME ADS SQUIB VALVES TO OPERATE 11 2.79E-11 1.20 MEDIUM LOCA PUMP 01A FAILS & ST CK V007A & CB PTC & RE FTC & CB ECS122 SPO PUMP 01B FAILS & ST CK V007B & CB FTC & RE FTC & CB ECS221 SPO DUE 10 CCF OP (TH STAGE ADS SQUIB VALVES TO OPERATE 12 1.86E.11 .80 MEDIUM I4CA CCF TO START OF THE PUMPS DUE to CCF OF 4TH STAGE ADS SQUIB VALVES TO CPERATE 13 1.61E.11 .70 MEDIUM LOCA CCF OF EPO BOARDS IN PMS FAILURE OF MANUAL DAS ACWATION 14 1.47E.11 .63 MEDIUM IDCA CCF TO OPEN OF THE STOP CHECK VALVES DUE 10 CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 15 1.46E.11 .63 MEDIUM IDCA STANDBY DG UNAVAILABLE DUE TO TEST AND MAINTENANCE MAIN GEN. BKR ES 01 FAILS 10 OPEN [e 12)

DUE M CCF OF 4TH STAGE ADS SQUIB VALVES TO OPERATE 16 1.39E.11 .60 MEDIUM LOCA CCF OF EPO BOARDS IN PMS FAILURE OF MANUAL DAS REACTOR TRIP HARDWARE

?\

~

1 s /

%/

m gygy, Revision: 6 g- om ..-mgmMS8 mgh November 15,1995 59-89 m:WaWc59G59.R06:1b

l l

59. PRA Results and Insights )

Table 59-15 (Sheet 2 of 2)

O SEQUENCE 13 - MEDIUM LOCA DOMINANT CUTSETS (MLOCA-05)

NUMBER CtTFSET PROB PERCENT BASIC EVENT NAME 17 1.22E-11 .53 MEDIUM LOCA OPERATOR PAILS TO ALIGN AND ACTUATE THE RNS l

COND. PROB. OF REC-MANDAS (FAILURE OF MANUAL DAS ACT.)

CCX-INPUT-LOGIC LPM-MAN 04C 18 ' 7.66E-12 .33 MPDIUM LOCA 125 VDC PANEL EDG2 DS 11 COMPONENT PA! LURES DUE TO CCP OP 4TH STAGE ADS SQUIB VALVES TO OPERATE l 1

19 7.25E-12 .31 MEDIUM LOCA l BUS UNAVAILABLE DUE 10 TEST OR CORRECTIVE MAINTENANCE DUE TO CCP OP 4TH STAGE ADS SQUIB VALVES 19 OPERATE 1

1 O

l l

Revision: 6 O

November 15,1995 w_ [ Westingh00Se m:W\wc59Cil59.R06:lb 59-90

59. PRA Results and Insights p)

\"

Table 59-16 4

TYPICAL SYSTEM FAILURE PROBABILITIES, SHOWING HIGHER RELIABILITIES FOR SAFETY SYSTEMS system / Function Failure Pault tree Name Probability CMT Valve Signal 4.2e-07 CMT-IC11 (one trains auto and manual actuation)

PRHR Valve signal 9.3e-07 RHR-IC01 fone trains auto and manual actuation)

ADS 3.3e-06 ADS (including operator actions)

Accumulators 6.9e-05 AC2AB

Passive Cont. Cool. 1.0e-04 PCT PRHR 1.0e-04 PRT Core Makeup Tanks 1.te-04 CH2SL IRWST 1.6e-04 IW2AB j 125 vdc IE Bus 3 le-04 IDADS1 (one bus only)

DC Bus (Non-1E) 3.6e-04 EDIDS1 (one bus only)

Containment Isol. 1.4e-03 CIC Hydrogen control 1.5e-03 VLH Reactor Trip by DAS 1.6e-03 DAS (including operator actions excluding MGSET failure)

Chilled Water 1.6e-03 VWH RCP Trip 2.le-03 RCT 4160 vac Bus 4.0e-03 ECEst (one bus only) 490 vac Bus 6.7e-03 ECEK11 (one bus only) f3 Diesel Generators 1.2e-02 DGEN

) Startup Feedwater 1.2e-02 SFWT k

/ Comp. Cooling Water 1.4e-02 CCT service Water 1.4e-02 Swr Compressed Air 1.5e-02 CA!R Condenser 3.2e-02 CDS Main Feedwater 3.Se-02 FWT (includicg condenser)

CVS 4.4e-02 CVS RNS 9.0e-02 RNR

  • = For RTPMS, failure probsbility with and without credit for manual actuation is provided.

l,

}

i r

_- i i

/

eh, i N /

E WM h Novem r ,

59-91 ma.p600 ipr s.ec59Cil59.R06:1b i

=::

N

59. PRA Results and Insights Table 5917 O'

RELATIVE DISTRIBUTION OF HUMAN ERROR PROBABILITIES ILLUSTRATING THE USE OF GENERALLY HIGH FAILURE PROBABILITIES")

Identifier Failure Probability ATW-MAN 01C 5.2E-01 ATW-MANMC 5.3E-01 LPM-MAN 02C 5.0E-01 Very High Failure Probability LPM-MAN 04C 5.0E-01 REC-MANDASC 5.lE-01 REG-MAN 00 2.0E-01 ATW-MAN 01 33E-02 ATW-MANO3 5.2E-02 ATW-MAN 04 5.2E-02 High Failure Probability CVN-MANN 4.0E-02 REC-MANDAS 1.2E-02 ATW-MANOS 5.2E-03 ATW-MAN 06 5.2E-03 ATW-MANil 1.lE-03 CIB-MAN 00 1.8E-03 CIB-MAN 01 13E-03 CVN-MAN 02 1.6E-03 CVN-MAN 03 1.lE-03 DUMP-MAN 01 1.3E-03 LPM-MAN 01 2.2E-03 Average Failure Probabilities LPM-MAN 02 6.5E-03 LPM-MANO3 2.2E-03 LPM-MANN 6.5E-03 LPM-MAN 08 6.5E-03 REN-MAN 02 2.0E-03 RHN-MAN 01 2.9E-03 VWN-MAN 01 5.2E-03 ZON-MAN 01 2.7E-03 ADN-MAN 01 4.9E-04 HPM-MAN 01 5.0E-04 Low Failure Probabilities PRI-MAN 01 5.0E-N PRN-MANO3 8.8E-N (None) Very Low Failure Probabilities

(*)

1he purpose of this table is to show the general range of cperatcr actico failure probabihties, rather than to discuss individual action probabilities. There are no very low pobabilities and few low probabilities.

O ov r 5,1995 up.- W65tingh0036 m: sap 60mprassec59CH59.R06:1b 59-92

4

59. PRA Results and Insights

)

LJ Table 59-18 (Sheet 1 of 3)

SUMMARY

OF LEVEL 1 AT-POWER IMPORTANCE AND SENSITIVITY ANALYSIS RESULTS Case Number Case Description Results 1 Initiating event importances Safety injection line break (41ck) and ATWS (21%) are major contributors to core damage frequency.

2 Common cause failure importances Software CCF of all cards. PMS board hardware CCF, PMS transmitters CCF, and reactor trip breakers CCF are significant contributors to risk increase.

i 3 Human error importances ADS actuation and manual reactor trip operator actions are significant contributors to risk increase.

4 Component importances IRWST strainer plugging, EDS3 EA 1 distributor panel failure IRWST failure, and IRWST check valves are significant contributors to risk increase.

5 No credit taken for ADS in core damage Core damage frequency increases to 1.26E-03.

sequences 6 No credit taken for CMT in core damage Core damage frequency increases to 9.77E-06, sequences 7 No credit taken for ACC in core damage Core damage frequency increases to 1.11E-05.

sequences 8 No credit taken for IRWST injection in Core damage frequency increases to 3.54E-04.

core damage sequences 9 No credit taken for IRWST recirculation in Core damage frequency increases to 1.49E43.

core damage sequences 10 No credit taken for PRHR in core damage Core damage frequency increases to 6.17E-06.

sequences 11 No credit taken for PMS in core damage Core damage frequency increases to 1.23E-02.

sequences

\._

MD8 h Novem r1, 59-93 m%6Mprhec59CH59.R06:Ib

59. PRA Results and Insights O

Table 59-18 (Sheet 2 of 3)

SUMMARY

OF LEVEL 1 AT-POWER IMPORTANCE AND SENSITIVITY ANALYSIS RESULTS Case Number Case Description Results 12 No credit taken for PLS in core damage Core damage frequency increases to 8.92E-07.

sequences 13 No credit taken for DAS in core damage Core damage frequency increases to 6.81E-06.

sequences 14 No credit taken for RNS in core damage Core damage frequency increases to 6.27E-07.

sequences 15 No credit taken for SG overfill protection No noticeable impact on core damage frequency.

in core damage sequences 16 No credit taken for main feedwater in core Core damage frequency increases to 2.53E-07.

damage sequences 17 No credit taken for startup feedwater in Core damage frequency increases to 2.61E-07.

core damage sequences 18 No credit taken for ac power in core Core damage frequency increases to 3.78E-06.

damage sequences 19 No credit taken for diesel generators in Core damage frequency increases to 3.04E-07.

core damage sequences 20 No credit taken for IE de power io core Core damage frequency increases to 6.96E-03.

damage sequences 21 No credit taken for non-1E de power in Core damage frequency increases to 9.14 E-06.

core damage sequences 22 No credit taken for service water system in Core damage frequency increases to 7.15E-07.

core damage sequences 23 No credit t. ken for compooeot cooling Core damage frequency increases to 6.88E-07.

water system in core damage sequences 24 No credit taken for compressed air system Core damage frequency increases to 7.35E-07.

in core damage sequences e

oy r 15,1995 h 3 W85tingh00Se m:\ap00Wisec590159.R06:lb 59-94

=:

59. PRA Res:lts and Imights es Table 5918 (Sheet 3 of 3)

SUMMARY

OF LEVEL I AT-POWER IMPORTANCE AND SENSITIVITY ANALYSIS RESULTS Case Number Case Description Results 25 Set buman error probabilities to 1.0 in core Core damage frequency increases to 2.78E-05.

damage cutsets (no credit for operators) Impact is most noticeable for ATW-T, SLB.V.

SGTR, and PRSTR initiating events.

26 Set human error probabilities to 0.0 Core damage frequency decreases to 1.78E-07.

(perfect operator) 27 Assess importance of HEPs not showing up Core damage frequency increases to 536E-07.

in baseline core damage output (sets all HEPs = 0.1) 28 Increase diesel generator mission time from Core damage frequency increases to 2.44E-07.

2.5 Hours to 24 Hours.

29 Passive system check valve failure to open Core damage frequency increases to 4.32E-06.

probability increased by factor of 10.

q 30 Lower cutoff probability for I&C model No increase in core damage frequency.

quantification (changes from 1.0E-10 to 1.0E-11)

YN 6 Novem rI, 59-95 m460@rwec59 tits 9.R06:lh

59. PRA Res~Jts and Insights

-a O

Table 5919

SUMMARY

OF SENSITIVITY ANALYSIS RESULTS FOR CONTAINMENT RESPONSE Case Name Case Description Severe Release Frequency at 2-1 Hours BASE CASE Base case severe release frequency 1.01E-08 / year DP No credit is taken for " operator depressurizes RCS after 1,19E-08 / year core damage" IS No credit is taken for containment isolation 2.43E47 / year PC No credit is taken for passive core cooling system 1.01E-08 / year 10 No credit is taken for hydrogen control 1.27E-08 / year IR No credit is taken for flooding reactor cavity after core 1.12E48 / year damage RW No credit is taken for recirculating water into reactor cavity 1.02 E-08 / year after core damage i

i l

l l

l l

Revision: 6 O

November 15, 1995 w T Westinghouse m:Wa\sec59CI59.R06:Ib 59-96 l

l

=::
59. PRA Results and Insights Emu -

O V l Table 59-20

?

?

SUMMARY

OF AP600 PRA RESULTS Core Damage Frequency Release Frequency Internal Events 2.4E-07 5.5E-08 1.0E-08 1.4E-08 Internal Flood 2.2E-10 1.5E-09 N/A N/A Internal Fire (1) (1) N/A N/A TOTALS 3.0E-07 2.4E-08 GOALS 1.0E-05 1.0E-06  ;

Notes:

(" Fire contribution will be provided later.

N/A = not applicable l

l l

l l

l l

l l

g Revision: 6 INE WJM- November 15,1995 59-97 m:WEDpnisec59CH59.R06:lb

59. PR L Rssults and Insights O

Table 59-21 COMPARISON OF AP600 PRA RESULTS TO RISK GOALS Large Containment Core Damage Release Success Plant / Goal Frequency Frequency Probability Current PWR ") 6.7E-05 53E-06 92 %

ALWR URD Goal (* IE-05 IE-06 90%

NRC Miety Goal IE44 IE-06 90 %

AP600 3.0E-07 2.4E-08 92 %

Notes:

0)

Selected IPE result (two-loop Westinghouse PWR - internal at-power events and at-power flooding only).

Note that there is no shutdown PRA requirement for currently operating plants.

(#

URD for ALWR passive plant, Revisions 5&6 (all events except seismic and sabotage).

O l

l l

l l

1 l

Revision: 6 O

ENE, W Westinghouse November 15,1995 m:\np6Mprabec590159.R06:1b mm 59-98

0 C/ \

f~~

D)

Table 59-22 $

0 SITE BOUNDARY DOSE 24-HOUR RISK FROM INTERNAL EVENTS y 4a 24-Hour Mean Whole-Body Site Boundary Dose (Effective Dose Equivalent at 0.5-mile Radius) h At-Power Shutdown Mean Site At-Power Shutdown Total Plant  % Contrib E.

Frequency Frequency Boundary Risk Risk Risk to Total Release (per reactor- (per reactor- Dose (rem / reactor-p (rem / reactor- (rem / reactor- Risk g Category year) year) (rem) year) year) year)

{

IC 2.4E-07 4.lE-08 83E-01 2.0E-07 3.4E-08 23E-07 0.12 ICP 1.9E-Il 3.8E-12 1.2E+00 23E-Il 4.6E-12 2.8E-I l <0.01 XL 1.9E-09 4.2E-10 2.5E+01 4.8E-08 1.lE-08 5.9E-08 0.03 BP 5.9E-09 2.lE-09 1.9E+04 1.lE-04 4.0E-05 1.5E4$ 79.1 g C1 2.lE-09 72E-10 1.4E+04 2.9E-05 1.0E-05 3.9E-05 20.6 I Cl-C 1.4E-I l 3.lE-12 33E+03 4.6E-08 1.0E-08 5.6E-08 0.03 CFE 9.5E-11 1.8E-12 2.4E+03 23E-07 43E-09 23E-07 0.12 L CFE-C 6.0E-11 13E-11 9.5E+02 5.7E-08 1.2E-08 6.9E-08 0.04 CFI 3.6E-12 6.0E-12 2.9E+02 1.0E-09 1.7E-09 2.7E-09 <0.01 i CFL 63E-13 2.4E-13 1.6E+00 1.0E-12 3.8E-13 1.4E-12 <0.01 i

CFV 13E-10 1.lE-08 23E+00 3.0E-10 2.5E-08 5.5E-08 <0.01 Total Risk 1.4E4$ 5.0E-05 1.9E-04 100.0 o

a3 a c; E L8 II i

.i

$E' '

'[E

<< l 9 1

gE Table 59-23 E j%

  • SITE BOUNDARY DOSE 72-HOUR RISK FROM INTERNAL EVENTS 72-Hour Mean Whole-Body Site Boundary Dose (Effecuve Dose Equivalent at 0.5-mile Radius)

At-Power Shutdown Mean Site At-Power Shutdown Total Plant Frequency Frequency Bour.dary Risk Risk hk  % Contrib Release (per reactor. (per reactor. Dose (rem / reactor- (rem / reactor- (rendrea&r- to Category year) year) (rem) year) year) year) Total Risk IC 2.4-E07 4.1E-08 9.6E-01 23E-07 3.9E-08 2.7E-07 0.13 ICP 1.9E-Il 3.8E-12 1.4E+00 2.7E-ll 53E-12 3.2E-! ! <0.01 XL 1.9E-09 4.2E-10 2.9E+01 5.5E-08 1.2E-08 6.7E-08 0.03 m BP 5.9E-09 2.lE-09 2.lE+M 1.2E-04 4.4E-05 1.6E-N e 78.4 i CI 2.lE-09 7.2E-10 1.5E+04 3.2E-05 1.lE-05 43E-05 8 21.1 CI-C 1.4E-I l 3.lE-12 4.6E+03 6.4E-08 1.4E-08 7.8E-08 0.M h CFE 9.5E-11 1.8E-12 2.5E+03 2.4E-07 4.5E-09 2.4E-07 0.12 h

Ng CFE-C 6.0E-Il IJE-Il 1.4E+03 8AE-08 1.8E-08 1.0E-07 0.05 CFI 3.6E-12 6.0E-12 1.6E+03 5.8E-09 9.6E-09 1.5E-08 <0.01 CFL 63E-13 2.4E-13 6.8E+01 43E-Il 1.6E-I l 5.9E-I l <0.01 CFV 13E-10 1.lE 08 2.7E+00 53E-10 3.0E-08 3.lE-08 0.01 m Total Risk 1.5E-M 5.5E-05 2.0E-M 100.0 $

EE  :

if E

a e

  • I ifa e G - - -- - - - -

G

i b

Sk b Table 59-24 $

lc POPULATION DOSE 24-HOUR RISK FROM INTERNAL EVENTS I il#

24-Hour Mean Whole-Body Population Dose (Effective Dose Equivalent to 50-mile Radius) g

<a i n.

At-Power Shutdown l Total Plant , y At-Power Shutdown Mean Risk Risk Rhk -

Frequency Frequency Population (person-rem (person-rem

- Release (per reactor- (per reactor. Dose per reactor- per reactor-(person-rem per reactor-

% Contrib to Total h

Category year) year) (person-rem) year) year) year) Rhk g IC 2.4E-07 4.lE-08 1.6E+02 3.8E-05 6.6E-06 4.5E-05 0.12 ICP 1.9E-11 3.8E-12 2.lE+02 4.0E-09 8.0E-10 4.8E-09 <0.01 XL 1.9E-09 4.2E-10 4.7E+03 8.9E-06 2.0E-06 1.lE-05 0.03 f BP 5.9E-09 2.lE-09 3.7E+06 2.2E-02 7.8E-03 3.0E-02 77.7 b CI 2.lE-09 7.2E-10 3.0E+06 63E-03 2.2E-03 8.5E-03 22.0 Cl-C 1.4E-I l 3.lE-12 63E+05 8.8E-06 2.0E-06 1.lE-05 0.03 CFE 9.5E-Il 1.8E-12 5.lE+05 4.8E-05 9.2E-07 4.9E-05 0.13 CFE-C 6.0E-Il 13E-Il 1.5E+05 9.0E-06 2.0E-06 1.lE-05 0.03 B CFI 3.6E-12 6.0E-12 SSE+4% 2.lE-07 3.5E-07 5.6E-07 <0.01 CFL 63E-13 2.4E-13 1.lE+03 6SE-10 2.6E-10 9.5E-10 <0.01 E- CFV 13E-10 1.lE-08 4.5E+02 5.9E-08 5.0E-06 5.lE-06 <0.01 EZ g5 Total Risk 2.8E-02 1.0E-02 3.9E-02 100.0 h

w g se

  1. '3 5 G; E ,i li L8 i i

$1

EE I jE '

.I g 8, Table 59-25

-i POPULATION DOSE 72-HOUR RISK FROM INTERNAL EVENTS 3

%g 72-Hour Mean Whole-Body Population Dose (Effective Dose Equivalent to 50-mile Radius)

  • At-Power Shutdown Total Plant At-Power Shutdown Mean Risk Risk Risk Frequency Frequency Population (person- (person- (person-  % Contrib Release (per reactor- (per reactor- Dose rern/ reactor- rendreactor- rem / reactor- to Total Category year) year) (person-rem) year) year) year) Risk IC 2.4E-07 4.lE-08 1.8E+02 43E-05 7.4E.06 5.0E-05 0.12 ICP 1.9E-11 3.8E-12 2.6E+02 4.9E-09 9.9E-10 5.9E-09 <0.01 XL 1.9E-09 4.2E-10 5.4E+03 1.0E-05 23E-06 1.2E-05 0.03 fO BP 5.9E-09 2.lE-09 4.0E+06 2.4E-02 8.4E-03 3.2E-02 76.6 CI 2.lE-09 7.2E-10 3.4E+06 7.lE-03 2.5E-03 9.6E-03 23.0 CI-C 1.4E-11 3.lE-12 9.2E+05 13E-05 2.9E-06 1.6E-05 0.04 CFE 9.5E-Il 1.8E-12 5.5E+05 5.2E-05 9.9E-07 53E-05 0.13 CFE-C 6.0E-11 13E-Il 2.3E+05 1.4E-05 3.0E-06 1.7E-05 0.04 CFI 3.6E-12 6.0E-12 3.7E+05 13E-06 l 2.2E-06 3.5E-06 <0.01 CFL 63E-13 2.4E-13 1.6E+04 1.0E-08 3.8E-09 1.4E-08 <0.01 m '

CFV 1.3E-10 1.lE-08 53E+02 6.9E-08 5.9E-06 6.0E-06 0.01  %

Total Risk 3.lE-02 1.lE-02 4.2E-02 100.0 [

E E g y a.

a

= F g - .r e

O - - - - - - -

O - - - -- - --

O

59. PRA Results and Imights r ,

I I

%. \

l AP600 PRA CORE DAMAGE CONTRIB1 MONS FROM INTERNAL INmATING EVENTS AT POWER 1E-07 1E-07 -

I W

% 9E-08 8E-08 -

H

% 7E-08 -

6E E i y SE-08 -

1 I m

g 4E-08 3E-08 -

l 2E-08 l U i 1E l OE+00 SI LB ATWS NLOCA LLOCA RV-RP MLOCA SOTR OTHERS l At-PowerInitiating Event Category OV Legend:

SI-LB Safety injection line break ATWS Anticipated transients without scram NLOCA Intermediate loss of coolant accidec:

LLOCA Large loss of coolant accident RV RP Reactor vessel rupture MLOCA Medium loss of coolant accident SGTR Steam generator tube rupture OTHERS All other initiating events at power Figure 59-1 AP600 PRA Core Damage for Internal Initiating Events at Power

.O

')

Y W OUS0 ur_ Novem r1,59-103 m:V#COpraWc590159.R06:Ib

1

( 59. PRA Results and Insights '

O l

I i

3 AP600 PRA TOTAL CORE DAMAGE FREQUENCY CONTRIBUTIONS g 1E 06 -

i i

! i g IE-07 ;- I

> t i i

k 1E '

l I

u.I 5 j k fe IE 09 ,

IE-10 1 At-Power Shutdown Flood At Power Flood at Shuelown Type of Event l

i n

l 4

i f

i Figure 59-2 AP600 Core Damage Frequency Contributions Revision: 6 O

g November 15,1995 maar600pravec59CH59.R06:Ib rat = - 3 M @ 00Se 59-104 j