Text
. .
- l. :**
l ., ' ..
l ,
.CP&L l
1
- Carolina Power & Light Company j
! P. O. Box 10429 I Southport, NC 28461-0429
- NOV 151995 l
FILE: B09-13510C l SERIAL: BSEP/95-0590 l
United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT
! Gentlemen: i l-In accordance with Technical Specification 6.9.1.11 for the Brunswick Nuclear Plant, Units 1
- and 2, Carolina Power & Light Company herewith submits the report of operating statistics l
! and shutdown experience for the month of October 1995. I f
If you have any questions regarding this report, please contact Ms. Frances Harrison at (910) 457-2756.
1 ry tr ly yours, l
R.Lopn Plant Manager Brunswick Nuclear. Plant FH/mcg MSC/93-8524 l Enclosures cc: Mr. S. D. Ebneter, Regional Administrator, Region 11 l
Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswick Mr. D. C. Trimble, NRR Project Manager - Brunswick The Honorable H. Wells, Chairman - North Carolina Utilities Commission i
S) c
- n ,- ,,
- UVg ,)
9511210174 951031 DR ADOCK 05000324 b I PDR
. . .-. - - . . ~ . - - . . - . . . . . . . _ - . . . - - . . . . - . . - - - - . . . - . .. . . . . . -
. (
l ENCLOSURE 1
- BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 :
DOCKET NOS. 50-325 & 50-324-LICENSE NOS. DPR-71 & DPR-62 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT !
i l
l l
l l
i El-2
'CP&L 60 PLANT PERFORMMCE DATA SYSTEM. PAGE 1 1(UN DATE 11/07/95 APPENDIX B-- AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:4,7:03 BRUNSi!!CK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 OCf03ER 1995 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -14 17 800 2 15 18 800 3 459 19 801 4 768 20 800 5 768 21 799 6 795 22 800 7 796 23 800 8 795 24 799 9 797 25 799 10 797 26 798
, 11 797 27 798 l
12 798 28 798
- 13 797 29 800 14 797 30 801 i
l 15 798- 31 802 l 16 800 o
1.16 - 8 i
A E
t
1
!.CP&$CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 11/07/95 OPERATING DATA REPORT RPD36-000 RUN TIME 12:4.7:04 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 '
COMPLETED BY FRANCES HARRISON i OPERATING STATUS TELEPHONE (910)457-2756
- 1. UNIT NAME: BRUNSWICK UNIT 1 NOTES
- 2. REPORTING PERIOD: OCTOBER 95
- 3. LICENSED THERMAL POWER (MWT) : 2436 !
- 4. NAMEPLATE RATING (GROSS MWE) : 867.0
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 791.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE) : 767.0 ------------------------------- !
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE l
- 11. HOURS IN REPORTING PERIOD 745.00 7296.00 163248.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 703.23 6057.42 101928.74 t
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10 F
- 14. HOURS GENERATOR ON LINE 700.68 5930.18 97887.17
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 :
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1681892.35 14272138.14 215807865.03
- 17. GROSS ELEC. ENERGY GEN. (MWH) 562265.00 4745080.00 70904805.00 i
- 18. WET ELEC. ENERGY GENERATED (MWH) 546993.00 4605891.00 68204930.00 ,
- 19. UNIT SERVICE FACTOR 94.05 81.28 59.96 l
- 20. UNIT AVAILABILITY FACTOR 94.05 81.28 59.96 ;
- 23. UNIT FORCED OUTAGE RATE- 5.95 2.54 14.28
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACd) :
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 1
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY ---_---- --------
INITIAL ELECTRICITY -------- ------_-
COMMERCIAL OPERAT. TON -------- -----_--
1.16 - 9
- CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 11/07/95 APPEifDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 ,
RUN TIME 12:4.7:03 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 ;
COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 OCTOBER 1995 DAY. AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL i (MWE-NET) (MWE-NET) 1 681 17 705 2 682 18 702 3 677 19 701 -
4 673 20 695 5 670 21 689 ,
6 642 22 689 7 327 23 688 8 524 24 684 9 635 25 681 10 667 26 679 11- 559 27 676 12 705 28 672 13 718 29 672 14 706 30 671 15 708 31 667 16 708 I
1.16 - 8
. . - -. . . - ~ - - - - - -- - . . . - . ., -
- CP&L CO PIANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 11/07/95 OPERATING DATA REPORT RPD36-000 RUN TIME 12:4,7:04 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756
- 1. UNIT NAME: BRUNSWICK UNIT 2 NOTES-
- 2. REPORTING PERIOD: OCTOBER 95
- 3. LICENSED THERMAL POWER (MWT) : 2436
- 4. NAMEPLATE RATING (GROSS MWE) : 867.0
- 5. DESIGN ELECTRICAL RATING -(NET MWE) : 821.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE) : 754.0 -------------------------------
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
- 10. RFASONS FOR RESTRICTION IF ANY: :
THIS YR TO COMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 745.00 7296.00 175272.00
- 12. WUMBER OF HOURS REACTOR CRITICAL 745.00 7296.00 111851.70
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LINE 745.00 7296.00 106413.71
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1597090.32 17127724.53. 229378061.03
- 17. GROSS ELEC. ENERGY GEN. (MWH) 512265.00 5508985.00 74158606.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 493971.00 5339687.00 71172946.00
- 19. UNIT SERVICE FACTOR 100.00 100.00 60.71
- 20. UNIT AVAILABILITY FACTOR 100.00 100.00 60.71
- 22. UNIT CAP. FACTOR (USING DER NET) 80.76 89.14 49.46
- 23. UNIT FORCED OUTAGE RATE .00 .00 11.34
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY --- --- --_.____
INITIAL ELECTRICITY __------ - -----_
COMMERCIAL OPERATION ___-- _- -___----
1.16 - 9
_ _ . _ . . _ . . . . . . . . . . _ _ _ _ _ . . . . _ . _ _ . . _ . _ . _ . . . . _ . . . . . ._. . _ . .__ . m. _
.. ]
l- -
! ENCLOSURE 2 i BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2
. DOCKET NOS. 50-325 & 50-324' !
LICENSE NOS. DPR-71 & DPR-62 j i UNIT SHUTDOWN AND POWER REDUCTION ,
l REPORT - OCTOBER 1995 I
l l
l I .
i 1
i i
l
\ .~
1 i
E1-3
DOCKET NO. 050-0325 '
UNIT NAME Brunswick I DATE Novemter 1995 COMPLETED BY f rances Harrison TELEPHONE 910-457-2/56 UNIT SHLITDOWNS AND POWER REDUCTIONS REPORT MONTH October 1995 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE 95-044 950930 F 61.35 A 3 1-95-018 HH PUMPXX Rx Scram due to low vessel level caused by condensate system transient. The transient was a result of loss of condensate pump suction pressure caused by excessive air being admitted to the suction header of the condensate pump when a conductivity cell was being replaced during a schedule power reduction.95-046 95-1004 F 00 A 5 N/A RB CONROD Reduced power to 601 for Rod Improvement.
1: Tym 2: Reason 3: Method 4: Systam Code: 5. Componen+ Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983.
restriction 6- Other per NUREG-1022. per NUREG-1022.
E- Operator Training & Section VI. Item 13.b Section VI Item 13.c License Examination F- Administrative G- Operational error (explain)
H- Other (explain)
+ .
DOCKET NO. 050-0324 '
UNIT NAME Brunswick 11 DATE Novemter 1995 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 -
UNIT SHUTlXMNS AND POWER REDUCTIONS REPORT K) NTH October 1995 METH00 0F LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE <
95-052 950827 5 In H 5 N/A RC ZZ Core Coastdown.
prooress95-055 951006 5 00 B 5 N/A AD K) Reduced power to 25% for drywell entry to add oil to reactor recirculation pump.
95-0 % 951'J10 5 00 B 5 N/A RB CONROD Reduced power to 60% for rod improvement.
1: Tyre 2: Reason 3: Method 4: System Code. 5. Comoonent Coce F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data 3- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983.
restriction 6- Other per NUREG-1022. per NUREG-1022.
E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operational error (explain)
H- Other (explain)
.. i
,+**.
I l
ENCLOSURE 3 i BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 l NRC DOCKET NOS. 50-325 & 50-324 l OPERATING LICENSE NOS. DPR-71 & DPR-62 '
LIST OF REGULATORY COMMITMENTS !
The following table identifies those actions committed to by Carolina Power &
Light Company in this document. Any other actions discussed in the submittal l represent intended or planned actions by Carolina Power & Light Company. They l are described to the NRC for the NRC's information and are not regulatory !
commitments. Please notify the Manager - Regulatory Affairs at the Brunswick i Nuclear Plant of any questions regarding this document or any associated ,
regulatory commitments. l Commitment Committed date or ;
outage
- 1. None j I
I E2-1 j