BECO-LTR-95-106, Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 951213.W/o Encl

From kanterella
(Redirected from ML20093G998)
Jump to navigation Jump to search
Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 951213.W/o Encl
ML20093G998
Person / Time
Site: Pilgrim
Issue date: 10/12/1995
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-LTR-95-106, NUDOCS 9510190317
Download: ML20093G998 (2)


Text

__

n',

10CFR50 A pendix E p., Section IV. 2 Boston EcMoon Pilgnm Nuclear Power station Rocky Hill Road Plymouth. Massachusetts 02360 E. T. Boulette, PhD Senior Vice President - Nuclear October 12,1995 ,

BECo Ltr. 95- 106 I U. S. Nuclear Regulatory Commission Attn: Document Control Desk (w/o attachment)

Washington, DC 20555 )

Docket No. 50-293  !

License No. DPR-35 l

Subject:

1995 NRC/ FEMA Evaluated Exercise Scenario Submittal l l

Enclosed is Boston Edison's scenario package for the Pilgrim Nuclear Power Station (PNPS) l NRC/ FEMA Evaluated Exercise Scheduled for December 13,1995.

Two copies of the scenario package for this exercise are attached for your review. The enclosures adhere to FEMA's Guidance, Radiological Emergency Preparedness exercise manual (REP-14), dated September 1991, which states that the exercise scenario be submitted at least 60 days in advance of the exercise. The scenario package includes:

. Scope and Object;ves  !

. Schedules

. Contingency and Simulation Information

. Controller and Player Information

. Exercise Rules

. Radiation Levels & Release Rates

. Data / Messages (Plant, Radiochemistry, Radiological)

If you have questions or require additional information, please do not hesitate to contact the Emergency Preparedness Onsite Division at (508) 830 8041, b C u/_,0 .

E. T. Boulette, PhD GWV/jlm onsite/ exercise /95e:: sum. doc Attachments cc: see next page 1

%I O

-7 0011 n 9510190317 951012 PDR ADOCK 05000293 F PDR

.c ./ a

~ ~'

. 10CFR50 App::ndix E Section IV.F.2 Page 2 U. S. Nuclear Regulatory Commission i .

cc: Regional Administrator, Region 1'(w/o attachment)

U. S. Nuclear Regulatory Commission 475 Allendale Road

- King of Prussia, PA 19406 L Mr. R. B. Eaton, Project Manager (w/o attachment) r Division of Reactor Projects - I/II U. S. Nuclear Regulatory Commission

Office of Nuclear Reactor Regulation

- Mail Stop: 14D1 l ' 1 White Flint North 11555 Rockville Pike Rockville, MD 20852

! Chief of Emergency Preparedness

and Radiation Protection Mail Stop 14E21 i

One White Flint North i 11555 Rockville Pike

! Rockville, MD 20852-2738 l

Senior NRC Resident inspector (w/o attachment)

Pilgrim Nuclear Power Station 1

1

]

l l

1 i

\

l l

l 1

e

... . =-.