Final Deficiency Rept Re Mechanical Shock Arrestors. Initially Reported on 840823.Review of Accepted Snubber Traveler Packages Performed.Corrective Action Rept Initiated
ML20093B867
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/21/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-84-168, NUDOCS 8410100259
Download: ML20093B867 (1)


Text

r KANSA3 GAS AND ELECTRIC COMPANY THE ELECT 5hC COMPANY

@LENN L MOESTER v4s Postermt muctuan September 21, 1984 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Region IV 3M@BDWK%

F 611 Ryan Plaza Drive, Suite 1000 -

~"

Arlington, Texas 76011 '

~i  ;

~ ~

KMLNRC 84-168 ~

Re: Docket No. STN 50-482 Subj: Final 10CFR50.55(e) Report - Mechanical Shock Arrestors

Dear Mr. Hunter:

This letter provides a final report on a potential 10CFR50.55(e) concerning mechanical shock arrestors installed at Wolf Creek Generating Station (WCGS) .

This concern was initially reported by Mr. H.K. Chernoff of Kansas Gas and Electric Company (KG&E) , to Mr. Lawrence Martin of the Nuclear Regulatory Commission, Region IV, on August 23, 1984.

During a review of documentation packages related to the installation of mechanical shock arrestors (snubbers), it was observed that the recorded "L"/

pin to pin (PP) dimension was not within the range specified on the Special Instruction Sheet. As a result of this concern, a review of accepted snubber traveler packages was performed. Other examples were found where the recorded "L"/PP dimension was outside of the specified range. In order to resolve this concern a Corrective Action Report (CAR No. 1-H-0044) was initiated.

The Corrective Action Report directed that a documentation revic't and/or field walkdown of all mechanical shock arrestor installations be performed to assure that the installed condition of the snubber does in fact fall within the allow-able range. Any discrepancies identified during this process will be recorded and an engineering evaluation performed to determine what if any rework will be needed to resolve the identified discrepancies.

All corrective actions identified including any necessary rework to mechanical shock arrestors will be completed prior to fuel load. If you have any questions concerning this subject, please contact me or Mr. Otto Maynard of my staff.