HL-2058, Rev to 900921 Application for Amend to License DPR-57, Adding Note to TS Table Re Temporary Bypass of RWCU Differential Flow Isolation Instrumentation When Sys Restoration,Testing or Maint Performed

From kanterella
(Redirected from ML20092K558)
Jump to navigation Jump to search
Rev to 900921 Application for Amend to License DPR-57, Adding Note to TS Table Re Temporary Bypass of RWCU Differential Flow Isolation Instrumentation When Sys Restoration,Testing or Maint Performed
ML20092K558
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/19/1992
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092K562 List:
References
HL-2058, NUDOCS 9202250251
Download: ML20092K558 (2)


Text

. - _ _ _ _ _ _ _

m y -3 %, v nwy

, ow r = c, w ea m

, Ij-5t ( '

O,i ? ' f :.

( p.

> A, t m- - .

u J. i neonam. Je s: .. ; . , , bCUIhl NOWCI

,, ,r ,

HL-2058 002957 February 19, 1992 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNIT 1 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 REQUEST TO REVISE TECHNICAL SPECIFICATIONS:

PROTECTIVE INSTRUMENTATION Gentlemen:

By letter dated September 21, 1990, Georgia Power Company (GPC) submitted a request to revise protective instrumentation requirements contained in the Plant Hatch Units 1 and 2 Technical Specifications (TS).

Part of this submittal involved allowing a temporary bypass of the reactor water cleanup (RWCU) differential flow isolation instrumentation when system restoration, testing, or maintenance is being performed. This allowance was to be implemented by a note being added to the isolation actuatio~ instrumentation tables of each unit's TS. 'ihe note was added to the Unit 2 table as intended, but due to a clerical error the word

" maintenance" was unintentionally omitted from the note in the Unit 1 table. This letter is to request the note be added to the table in the Unit 1 TS in the same form as in the Unit 2 TS, including the word

" maintenance." Since this submittal only corrects an error made in the development of the previous submittal, the description of the proposed changes and the 10 CFR 50.92 evaluation included in the letter dated September 21, 1990 are still valid.

Enclosed are page change instructions for incorporating the proposed change. Following the enclosure is the proposed TS page.

Please contact this office if you have any questions.

Sincerely, h

' J. T. Packham, Jr.

MCM/cr Enclosure cc: (See next page.)

9202250251 920219 PDR P

ADOCK 05000321 1

\l )

PDR '

f . .

Georgia Power sha U.S. Nuclear Regulatory Commission February 19, 1992 Page Two cc: Georaia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant NORMS U.S. Nuclear Requjatory Commission. Washington. D.C.

Mr. K. Jabhour, Licensing Project Manager - Hatch U.S. Nuclear Regulatory Commission. Reaion 11 Mr S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch State of Georaia Mr. J. D. Tanner, Commissioner - Department of Natural Resources 70077b

____ _ _ _ _ _ _ _