ML20092F644

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for June 1995
ML20092F644
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/30/1995
From:
CENTERIOR ENERGY
To:
Shared Package
ML20092F615 List:
References
NUDOCS 9509180271
Download: ML20092F644 (1)


Text

. . . - _-, . _ . . - . .. . .. - - - . . . . . _ _ _ _ _ _ _ - . _ . _ _ _ . _

b .

I

?

e l

  • IhsdSTRIAL PRETREATMENT f

QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 6/26/95 Perry, Ohio 44081 Laboratory: Quanterra Date of Sample: 6/8 to 6/9/95 Time of sample: 1010 Sample Location: Sewage Pump Station Name of Sampler: Greg Newman Laboratory Address: 1401 Shuffel Dr.

North Canton OH 44720 Date of Analysis: 6/9 to 6/22/95 Flow: 33,000 gpd Name of Analyst: D. Nielsen PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 6/21 to 6/22 350 mg/L BOD Composite 405.1 6/9 to 6/14 98 mg/L TSS Composite 160.2 6/15 to 6/16 120 mg/L Silver Composite 200.7 6/14 to 6/19 .016 mg/L Mercury Composite 245.1 6/14 to 6/16 None Detected pH Grab 150.1 6/9 8.0 s.u.

Oil / Grease Grab 413.1 6/21 to 6/22 15 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry l of those persons immediately respor.sible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonme e an h M/ ice President - Nuclear Signature Dbte Title t

9509180271 950915 PDR ADOCK 05000440 R PDR