Addendum to Stamiris Contention on Transamerica Delaval,Inc Diesel Generators Addressing Late Filing Factors of 10CFR2.714
ML20087G792
Person / Time
Site: Midland
Issue date: 03/15/1984
From: Stamiris B
STAMIRIS, B.
To:
NRC COMMISSION (OCM)
References
OL, NUDOCS 8403200139
Download: ML20087G792 (2)


Text

-

(.- .

~

U.S. NUCLEAR REGULATORY C M 1IhltW

'/Te matte r of ag4 pp 19 Dgk)$ Nos. 50-329 OL l

Midland Plant 50-330 OL s 1&2 CFF;.;E OF 5ECEEI' '

r,0Cr'.timG & SEW -

BEFORE THE ATOMIC SAFETY & LICENSINd N D 3/15/84 ADDENDUM TO STAMIRIS 0.L. CdiTENTIGi Gi TDI DIhSEL GhNERATORS ADDRESSING THE LATE FILIIfG FACTORS OF 10 CFR 2.714

/

/

I

/ (i) The delay in f fling this TDI contentton was 'due to 'he . on-

/

/

[ going status of the 'IRO revleur of the TDI issues. The contention

/ Is based upon documents issued by the NRC in mid February 1984. These documents indicated that sufficient information had been developed to warrant ASLB consideration of the TDI quality assurance and operating ability issues ratsad therein. The. secy-84-34 Policy Notice contained in the Feb 15. 19840 Ki 84-024 most clearly reveals the great signifi-cance which the NRC attributes to the TDI safety issues. Prior to the' issuance 1or' the Februarf documents, I considered the NRC review of TDI Issues to be in an information - gathering stage lacking the overall assessments upon which this contention is based.

f l (11) In the absence of other OL part.les contentions on this matter, other means of protecting petitioner's " interests on the TDI Issues did not exist.

(iii) The Midland OL record w!!! be- more: soundly developed if if the TDI safety issues are addressed. Intervenor hopes to proifuce a witness on these issues.

1 .

O referenced in par. 2 of S/4/84 pleading by docket nos. 50-416, 50-317, t

840320013 l ~ "

?" ^ "9 840315en as&3

< .~-

(iv) The petitioners Interests in the TDI Issues are not otherwise addressed by other parties in the Midland OL proceeding.

(v) The petitioners participat. ion in TDI Issues will not significantly delay the OL proceeding, and sufficient time exists to adilress t.hase issues prior to estimated plant completlon. The Issues of the. OL proceeding will be broadaneit only to the extent nac4 4 ary t.'; .11 fres ;

the imperative safety issues involved.

Respectfully Submitted, Barbara scaalris 5795 N. River Freeland, Mich. 43623 cc: ASLB Board G3, OL Parties

!DtC Secretary i