Monthly Operating Repts for Jul 1995 for Jm Farley Plant Units 1 & 2
ML20087F626
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/31/1995
From: Alison S, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508150359
Download: ML20087F626 (9)


Text

" '

/ Southern Nucisar Operitano Company

': / Post Offica Box 1295

'T, Birmingtm, Altma 35201 4 Telephone (205) 868-5131 L $

a. ue .y Southern Nudear Operating Company Vice Presideat Far:ey Protect "

August 11, 1995 Docket Nos. 50-348 50-364 l

t I

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l

[ Joseph M. Farley Nuclear Plant l Monthly Onerating Report i I Gentlemen.  ;

1 Attached are the July 1995 Monthly Operating Reports for Joseph M Farley Nuclear Plant Units I and z, e required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advice. .l t

> 1 I

Respectfully submitted,

[1 ]%n Dave Morey l

l RWC:(mor) l Attachments I

cc: Mr. S. D. Ebneter l l Mr. B. L Siegel Mr. T. M. Ross l

1

(

j k

l l

bb17"f I

1 1

9508150359 950731 I DR ADOCK 0500 8 [ ,hy/,

-,y 7 ej Joseph M. Farley Nuclear Plant

. Unit 1 Narrative Summary of Operations July 1995 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

1 4

. OPERATING DATA REPORT

, DOCKET NO. 50-348 DATE August 4,1995

, COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 OPERATING. STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes

~2. Reporting Period: July 1995 1) Cumulative data since 12-01-77, ,

3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7 i
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since  !

Last Report, Give Reasons: N/A  !

1

9. Power Level To Which Restricted, If Any (Net MWe): N/A ,
10. Reasons For Restrictions, If Any: N/A l

1 1

This Month Yr. to Date Cumulative

11. Ilours in Reporting Period 744.0 5,087.0 154,847.0_
12. Number Of Hours Reactor Was Critical 744.0 4,867.1 124,123.9
13. Reactor Remrve Shutdown llours 0.0 0.0 3,650.0
14. Hours Generator On-line . 744.0 4,831.3 122,285.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,972,981.9 12,691,900.1 314,827,617.1
17. Gross Electrical Energy Generated (MWH) 637,417.0 4,150,737.0 101,564,442.0
18. Net Electrical Energy Generated (MWH) 605,367.0 3,934,995.0 95,934,984.0
19. Unit Service Factor '

100.0 95.0 79.0

20. Unit Availability Factor 100.0 95.0 79.0
21. Unit Capacity Factor (Using MDC Net) 100.2 95.3 76.1
22. Unit Capacity Factor (Using DER Net) 98.2 93.3 ,

74.7

23. Unit Forced Outage Rate 0.0 5.0 6.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refheling/Afaintenance Outage, September 16,1995 3pproximately 1 33 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 _

08/18/77 Commercial Operation 12/01/77 12/01/77

k ., DOCKET NO. 50-348'-

UNIT - 1-DATE August 4,1995 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442

[MONTil July -

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 815 17 812 2 814 -18 815 3 813 19 814 4- 816 20 813 5 813 21 813 _

6 812 22 814 7 813 23 811 8 814 24 812 9 813 25 813 10 816 26 816-11 813 27 815 12 812 28 819 13 812 29 815 14 816 30 813 15 812 31 815 16 809 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting period. Compute to the nearert whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-343 UNIT NAME J. M. Farley - Unit 1 -

DATE August 4,1995 COMPLETED BY S. M. Allison REPORT MONTil July TELEPilONE (334) 899-5156, ext. 3442 METiiOD OF LICENSEE CAUSE ANDCORRECTIVE I

(

DURATION SifUTTING EVENT SYSTEM COMPONENT ACTION TO

! NO DATE TYPE Q) IfOURS REASON (2LDOWN REACTOR [3) REPORT # CODE (4) CODE (5) PREVENT RFCURRENCE j There were nO Shutdowns or power reductions during the month.

I: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Source 5: Scheduled A - Equipment I ailure (Explain) 1 - Manual Preparations of Date Entry D - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 -Other (Explain)

E - Operator Training & License Examination F- Administrative G - Operational Error (Explain)

Il- Other (Explain) e 4

e i

6.

Joseph M. Farley Nuclear Plant

. Unit 2 Narrative Summary of Operations July 1995 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month, i

1 l

1

. OPERATING DATA REPORT

, DOCKET NO. 50-364 DATE August 4,1995 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 OPERATING. STATUS ,

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: July 1995 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (_MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): _

860

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A  ;

1 This Month Yr. to Date Cumulative I l

11. Ilours in Reporting Period 744.0 5,087.0 122,760.0
12. Number Of11ours Reactor Was Critical 744.0 3,634.0 105,291.7 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 744.0 3,406.2 103,628.8 0.0 0.0 0.0  ;
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWil) 1,896,020.9 7,370,807.8 263,710,513.5
17. Gross Electrical Energy Generated (MWil) 613,483.0 2,368,427.0 86,422,969.0
18. Net Electrical Energy Generated (MWH) -582,729.0 2,201,467.0 81,923,765.0
19. Unit Service Factor 100.0 67.0 84.4
20. Unit Availability Factor _

100.0 67.0 84.4 21 Unit Capacity Factor (Using MDC Net) 95.3 52.6 81.4

22. Unit Capacity Factor (Using DER Net) 94.5 52.2 80.5 l
23. Unit Forced Outage Rate 0.0 6.0 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): )

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

, . . . i 4' DOCKET NO. 50-364  ;

~

. UNIT 2 DATE August 4,1995 1

- COMPLETED BY S.M. Allison j

' TELEPHONE (334) 899-5156 g .

i ext. 3442 i

. MONTII .

July  !

l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -  !

(MWe-Net) (MWe-Net) 1 554 17 817 2 459 18 819 3 466 19 818  :

4 686 20 816 5 819 21 819 6 821 22 820 .j 7 F. 23 817 8 823 24 -818 9 820 25 819 823 26 820 10 _

11 819 27 816 12 819 28 820 13 822 29 819 14 821 30 817 15 819 31 820 16 816 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS *

'[

DOCKET NO. 50-364 UNIT NAME 1 M. Farley - Unit 2 DATE August 4.1995 COMPLETED BY S. M. Allison REPORT MONTil July TELEPilONE (334) 899-5156. ext. 3442 p.- -T i METilOD OF LICENSEE CAUSE AND CORRECTIVE ]

DURA 110N SIIUITING EVENT SYSTEM COMPONENT AC110N 10

/

u NO. DATE TYPE {lj d IOliRS REASON (2)JX_)WN REACTOR Q), RI PORT # CODE (4) CODE (5) PRE \ TNT RECURRENCE -l There were no Shutdowns or power reductions during the month.

I l

l I J 1: 2: 3: 4: 5:

F: Fcned Reason Method Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 -Other (Explain)

E - Operator Training & License Examination F- Administrative G - Operational Enor (Explain)

II- Other (Explain)