ML20086R230

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to TR 099, TMI-1 Cycle 10 Colr. Rev Incorporates Table 3, Bwst,Bamt & Rbast Min Boron Requirements for Cold Shutdown
ML20086R230
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/20/1995
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086R234 List:
References
C311-95-2306, NUDOCS 9507310064
Download: ML20086R230 (1)


Text

. -

~

GPU Nuclear Corporation Route 441 South gf P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717) 944-7621 Writer's Direct Dial Number:

C311-95-2306 (717) 948-8005 July 20,1995 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Generating Station, Unit I (TMI-1)

Docket No. 50-289 Facility Operating License No. DPR-50 Cycle 10 Core Operating Limits Report (COLR), Revision 2 As required by TMI-l Technical Specifications, Section 6.9.5.4, a revision to the COLR for Cycle 10 operation is attached for NRC staff information.

This COLR revision incorporates Table 3, "BWST, BAMT and RBAST Minimum Boron Requirements for Cold Shutdown." This change implements the relocation of volume and boron concentration requirements for the chemical addition system boric acid mix tank and reclaimed boric acid storage tank to the COLR from the Technical Specifications, requested by Technical Specification Change Request No. 252 dated May 17, 1995.

Sincerely, jf IL k T. G. Br 'ghton Vice President and Director, TMI Enclosure c: Administrator, Region 1

! TMI Senior NRC Resident Inspector NRC Project Manager, TMI-l 0O t 9507310064 950720 PDR P

ADOCK 05000289 L b

1 PDR GPU Nuclear Corporat on is a subsidary of General Pubic Util: ties Corporation