Enclosure 4 i Edwin I. Hatch Nuclear Plant Response to Second RFAI j Power Uprate Submittal l

l Pave Change Instructions  !

4 The proposed changes to the Plant Hatch Units 1 and 2 Operating License and Technical Specifications will be incorporated as follows: l Unit 1 Operatine License P_ age Instruction 3 Replace Unit 1 Technical Specifications Egge Instruction l.1-5 Replace 3.1-23 Replace ,

3.3-7 Replace 3.3-32 Replace i 3.3-66 Replace 3.4-4 Replace ,

3,4-8 Replace 3.4-28 Replace 3.5-5 Replace 3.5-12 Replace IIL-4865 E4-1 l 9506230336 950620 PDR ADOCK 05000321 P PDR

Enclosura 4 l Response to Second RFAI .  !

Pan Chanee Instructions l

I Unit 2 Operatine License i

Egge Instruction  !

4 Replace

]

L- l l

Unit 2 Technical Soccifications l Eage Instruction 1.1-5 Replace 3.1-23 Replace i 3.3-8 Replace i 3.3-33 Replace 3.3-67 Replace 3.4-4 Replace l 3.4-8 Replace l 3.4-28 Replace 3.5-5 Replace 3.5-12 Replace

/

HL-4865 E4-2

i

- 3. - ~!

(2) Pursuant to the Act and 10 CFR Part 70, Gecrgia Power Company to receive, possess and use at any time special nuclear material as reactor fuel,  ;

in accordance with the limitations for storage  ;

and amounts required for reactcr operation, as  !

described in the Final Safety Analysis Report, as _;

suppicmented and amended;- ,

(3)' Pursuant to the Act and 10 CFR Parts 30, 40 and 70 Georgia Power Company to receive. '

possess and use at any time any byproduct, .;

source and special nuclear material as sealed  ;

neutron sources for reactor startup, sealed-  !

sources for reactor instrumentation and t radiation monitoring equipment calibration,  ;

and as fission detectors in amounts as required; )

(4) Pursuant to the Act and 10 CFR Parts 30. 40 l and 70 Georgia Power Ccmpany to receive, I possess and use in amounts as reovired any byproduct, source or special nuclear material without restriction to chemical or physical .

fom, for sample analysis or inst ument t calibration or associated with radioactive 5 apparatus or components; g -

(5) Pursuant to the Act and 10 CFR Parts 30 and 70, .

Georgia Power Comany to possess, but not ,

separate, such byproduct and special nuclear g materials as may be procuced by the operation ,

of the facility. = J C. This license shall be deemed to contain and is subject to _the conditions specified in the following Comnission regulations in I 10 CFR Chapter I: Part 20, Sectien 30.34 of Part 30. Section 40.41 of Part 40, Sections 50-54 and 50-59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules. regulations, ano orders of the Commission now or- l hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) M6ximum Power tevel The Georgia Power Company is authorized to operate the facility at steady state reactor core power levels not in excess of 4486 megawatts thema).

, (g j (1) Technical Soecifications The Technical Soecifications contained in appendices i A and B. as revised through Amendment No./55 are '

hereby incorporated in the license. The iteensee j shall ooerate the facility in accordance with the Technical Specifications.

l Definiticns l 1.1  !

1.1 Definitions (continued) .

l PHYSICS TESTS PHYSICS TESTS shall be those tests performed to  !

measure the fundamental nuclear characteristics of  !

, the reactor core and related instrumentation.

These tests are:  !

a. Described in Section 13.6, Startup and Power i Test Program, of the FSAR; l
b. Authorized under the provisions of  ;
10 CFR 50.59; or j
c. Otherwise approved by the Nuclear Regulatory j Commission.  !

RATED THERMAL POWER RTP shall be a total reactor core heat transfer i (RTP) rate to the reactor coolant of 2558 MWt. l REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval j SYSTEM (RPS) RESPONSE from when the monitored parameter exceeds its RPS 1 TIME trip setpoint at the channel sensor until l de-energization of the scram pilot valve solenoids. The response time may be measured by l means of any series of sequential, overlapping, or l total steps so thet the entire response time is measured.

SHUTDOWN MARGIN (SDM) 'SDM shall be the amount of reactivity by which the reactor is subcritical or would be subcritical assuming that:

a. The reactor is xenon free; l  :
b. The moderator temperature is 68 F; and
c. All control rods are fully inserted except for  !

the single control rod of highest reactivity l worth, which is assumed to be fully withdrawn. l With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SDM. -

STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, i channels, or other designated components during the interval specified by the Surveillance  ;

i-(continued)

HATCH UNIT 1 1.1-5 PROPOSED CHANGE 6/7/95

SLC Systeo 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.5 Verify the concentration of sodium 31 days pentaborate in solution is within the Region A limits of Figure 3.1.7-1. ANRN Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or sodium pentaborate is added to solution AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the Region A limits of Figure 3.1.7-2 l

SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position,-or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate In accordance 2 41.2 gpm at a discharge pressure with the 2 1201 psig. Inservice l Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from 18 months on a pump into reactor pressure vessel. STAGGERED TEST BASIS (continued)

HATCH UNIT 1 3.1-23 PROPOSED CHANGE 6/7/95

p RPS Instrumentation 3.3.1.1-Table 3.3.1.1 1 (page 2 of 3)

Reactor Protection System Instrumentation APPLICA8LE- CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM i SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE j o FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE I r-j 1

2. Average Power Range j Monitors (continued)
c. Fixed Neutron 1 2 F SR 3.3.1.1.1 s 120% RTP F lux - High SR 3.3.1.1.2 i SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.10 SR 3.3.1.1.15
d. Downscale 1 2 F SR 3.3.1.1.5 a 4.2% RTP i SR 3.3.1.1.8 4 SR 3.3.1.1.15 ,
e. Inop 1,2 2 G SR 3.3.1.1.8 NA ,

SR 3.3.1.1.9 l SR 3.3.1.1.15

]

3. Reactor vessel Steam 1,2 2 G SR 3.3.1.1.1 s 1085 psig l Dome Pressure - High SR 3.3.1.1.9  ;

SR 3.3.1.1.13 SR 3.3.1.1.15 l

4. Reactor vessel Water 1.2 2 G SR 3.3.1.1.1 2 0 inches i Level -Low, Level 3 SR 3.3.1.1.9 SR 3.3.1.1.13 .!

SR 3.3.1.1.15 {

5. Main Steam isolation 1 8 F SR 3.3.1.1.9 s 10% closed  ;

Valve - Closure SR 3.3.1.1.13  !

SR 3.3.1.1.15 }

6. Drywell Pressure - High 1,2 2 G SR 3.3.1.1.1 s 1.92 psig l SR 3.3.1.1.9  !

SR 3.3.1.1.13 l SR 3.3.1.1.15 j (continued)

I HATCH UNIT 1 3.3-7 PROPOSED CHANGE 6/7/95

ATWS-RPT Instrumentation-

-3.3.4.2 f

SURVEILLANCE REQUEREMENTS (continued)

SURVEILLANCE FREQUENCY  ;

SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. 92 days '!

I SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The 18 months Allowable Values shall be:

a. Reactor Vessel Water Level -- Low Low, l Level 2: 2 -47 inches; and
b. Reactor Steam Dome Pressure -- High:

s 1175 psig. l l SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST 18 months including breaker actuation. -

P HATCH UNIT 1 3.3-32 PROPOSED CHANGE 6/7/95

LLS Instrumentatien- l 3.3.6.3. l Table 3.3.6.3 1 (pese 1 of 1) '!

Low-Low Set Instrumentation -l REGUIRED CHANNELS PER SURVEILLANCE ALLOWABLE  !

FUNCTION FUNCTION REQUIREMENTS VALUE.  ;

l Reactor Steam Dame Pressure-High 1 per LLS valve - SR 3.3.6.3.1 s 1085 psig i

1. l SR 3.3.6.3.4 t SR 3.3.6.3.5  ;

SR 3.3.6.3.6 i

2. Low Low set Pressure Setpoints 2 per LLS valve SR 3.3.6.3.1 Low:

SR 3.3.6.3.4 - Open s 1005 pois SR 3.3.6.3.5 Close s 857 pelg  ;

SR- 3.3.6.3.6 Medlun-Lows  ;

open 5 1020 psig l Close s 872 pois Medium-Night open 5 1035 psIe Close s 887 psig  ;

High:

Open 5 1045 pels i Close s 897 psig l

?

3. Taftpipe Pressure Switch 2 per S/RV SR 3.3.6.3.2 2 80 psis and '

SR 3.3.6.3.3 5 100 psig

. SR 3.3.6.3.5 -

SR 3.3.6.3.6 .'

i 1

HATCH UNIT 1 3.3-66 PROPOSED CHANGE 6/7/95 l

Recirculatisn Loops Operating  !

3.4.1 i

}

70

^

m OPERATm NOT auowEn em a ,

6 g _

E m /

I~-

opeRata Auowso namon N

10 '

0- ' ' ' ' ' ' . , , , , ,

a i i e i ,

CORE FLOW (% RATED)

Figure 3.4.1-1 (Page 1 of 1)

Power-Flow Operating Map with One Reactor Coolant System Recirculation Loop in Operation ,

HATCH UNIT 1 3.4-4 PROPOSED CHANGE 6/13/95 ,

S/RVs 3.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY-SR. 3.4.3.1. Verify the safety function lift .setpoints In accordance of the S/RVs are as follows:- with the Inservice Number of Setpoint . Testing Program S/RVs (osia) 4 1110 33.3 4 1120 33.6 3 1130 33.9 Following testing, lift settings shall be within i 1%.

SR 3.4.3.2 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are -

adequate to perform the test. j Verify each S/RV opens when manually 18 months actuated.

i HATCH UNIT 1 3.4-8 PROPOSED CHANGE 6/7/95

)

Reactor Steam Dome Pressure 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure LC0 3.4.10 The reactor steam dome pressure shall be s 1058 psig. l APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within dome pressure to limit. within limit.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY l

1 SR 3.4.10.1 Verify reactor steam dome pressure is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> s 1058 psig. l l I

HATCH UNIT 1 3.4-28 PROPOSED CHANGE 6/7/95

ECCS -- Operating 3.5.1 SURVEILLANCE REQUIREMENTS -(continued)

SURVEILLANCE FREQUENCY SR 3.5.1.6 -------------------NOTE--------------------

Only required to be performed prior to entering MODE 2 from MODE 3 or 4, when in MODE 4 > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Verify each recirculation pump discharge 31 days valve cycles through one complete cycle of full travel or is de-energized in the closed position.

SR 3.5.1.7 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing Program SYSTEM HEAD NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PVMPS PRESSURE OF CS 2: 4250 gpm 1 2: 113 psig LPCI 2: 17,000 gpm 2 2: 20 psig SR 3.5.1.8 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 1058 psig 92 days j and 2: 920 psig, the HPCI pump can develop a flow rate 2: 4250 gpm against a system head corresponding to reactor pressure.

(continued)

HATCH UNIT 1 3.5-5 PROPOSED CHANGE 6/7/95

RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System piping is filled 31 days with water from the pump discharge valve to the injection valve.

SR 3.5.3.2 Verify each RCIC System manual, power 31 days operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.3.3 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 1058 psig 92 days l and 2 920 psig, the RCIC pump can develop a flow rate 2 400 gpm against a system head corresponding to reactor pressure.

SR 3.5.3.4 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 165 psig, 18 months the RCIC pump can develop a flow rate 2 400 gpm against a system head corresponding to reactor pressure.

(continued)

HATCH UNIT 1 3.5-12 PROPOSED CHANGE 6/7/95

5 I

I i

.a.

(1) t'astna:- Fower L evel Georgia Fower Company is author 12eo to operate the f acility ,

at steady state reactor core power levels not in excess of 7

44%, megawatts thermal in accordance with the conditions 2M specified herein and in Attachment 2 to this license. i Attachment 2 is an integral part of this license. j l

l (2) Technical Specifications J 1

The Technical Specifications centainec in Appendices A and B. as revised through Amendment No. % e art hereoy incer-

~

porated in the license. The licenste shall operate the facility in accordance with the Tec.nical Specifications.

(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisf action of the Corzuission within the stated tine periods following the issuance of the license or within the operational restrictions indicated. The removal of these conditions shall be made by an amenoment to the license supported by a favorable evaluation by the Comnission.

., , _,e. a__....

Q .g ---

,____4.

e_.__ r _...;..m.,, ,

_ _ ;. . , , , g

,m,1. .s . .. 4.. 4. _w a , L 6. _ _ . . . _

j l'_.. ... ... ,.....,_ ___ . _  ;

,.7 ,, ,,

. .u . _ _ , , . _ . M : _ _ s. _,e_ . _ . ._._s-

.,..._....,,,,,,,, N e .4.. .--_..n .: wee 1 k., .4f a ..1m..e ame4i2.h . E _ _

__,_..,..,..3 _ .. < _ "Js .. . _ _1_ i , _ T ~ ' - _ ~ _ ~ ' ' " " ' z

~. ___ _ ] { { ~,,;;-]" "'

.T. ~. m n n - -. . . . .  ?

l

' N e

Definitiens 1.1 1.1 Definitions MINIMUM CRITICAL POWER appropriate correlation (s) to cause some point in RATIO (MCPR) (continued) the assembly to experience boiling transition, divided by the actual assembly operating power.

MODE. A MODE shall correspond to any one inclusive combination of mode switch position, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

OPERABLE - OPERABILITY A system, subsystem, division, component, or i device shall be OPERABLE or have OPERABILITY when i it is capable of performing its specified safety function (s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, division, component, or device to perform its specified safety function (s) are also capable of performing their related support function (s).

PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation.

These tests are:

a. Described in Chapter 14, Initial Tests and Operation, of the FSAR;
b. Authorized under the provisions of 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer (RTP) rate to the reactor coolant of 2558 MWt. l REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval SYSTEM (RPS) RESPONSE from when the monitored parameter exceeds its RPS TIME trip setpoint at the channel sensor until de-energization of the scram pilot valve (continued)

HATCH UNIT 2 1.1-5 PROPOSED CHANGE 6/7/95 i

i SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.5 Verify the concentration of sodium 31 days pentaborate in solution is within the Region A limits of Figure 3.1.7-1. AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or sodium pentaborate is added to solution AND i

Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the Region A limits of Figure 3.1.7-2 SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate In accordance 2: 41.2 gpm at a discharge pressure with the 2: 1201 psig. Inservice l Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from 18 months on a pump into reactor pressure vessel. STAGGERED TEST BASIS

~

(continued)

HATCH UNIT 2 3.1-23 PROPOSED CHANGE 6/7/95

i RPS Instrumentation 3.3.1.1  !

Table 3.3.1.1 1 (page 2 of 3) i Reactor Protection system Instrumentation l

APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM ,

SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWASLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE

2. Average Power Range Monitors (continued) ,

I

c. Fixed Neutron 1 2 F SR 3.3.1.1.1 s 120% RTP

st 3.3.1.1.9 st 3.3.1.1.10 ,

st 3.3.1.1.15 ,

sa 3.3.1.1.16 l 5

d. Downscale 1 2 F SR 3.3.1.1.5 t 4.2% RTP l' SR 3.3.1.1.8 SR 3.3.1.1.15
e. Inop 1,2 2 G SR 3.3.1.1.8 NA sa 3.3.1.1.9 .

SR 3.3.1.1.15

3. Reactor vesset steam 1,2 2 G SR 3.3.1.1.1 5 1085 pois l Dome Pressure - High SR 3.3.1.1.9 ,

sa 3.3.1.1.13 i SR 3.3.1.1.15-SR 3.3.1.1.16 l

4. Reactor vessel Water 1,2 2 G SR 3.3.1.1.1 a 0 inches '

Level - Low, Level 3 st 3.3.1.1.9 SR 3.3.1.1.13 sa 3.3.1.1.15 +

sa 3.3.1.1.16 i

5. Main steam Isolation 1 8 F st 3.3.1.1.9 5 10% closed  !

Yaive - Closure SR 3.3.1.1.13  !

st 3.3.1.1.15 SR 3.3.1.1.16 l

6. Drywell Pressure - High 1,2 2 G SR 3.3.1.1.1 s 1.92 psig

(continued) j I

i i

I

?

HATCH UNIT 2 3.3-8 PROPOSED CHANGE 6/7/95

ATWS-RPT Instrumentatien 3.3.4.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The 18 months Allowable Values shall be:

a. Reactor Vessel Water Level -- Low Low, Level 2: 2 -47 inches; and
b. Reactor Steam Dome Pressure -- High:

s 1175 psig. l SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST 18 months including breaker actuation.

HATCH UNIT 2 3.3-33 PROPOSED CHANGE 6/7/95

. _ _ ._ _ ._ . _ ..~ _ ._ _

L LLS Instrumentaticn 3.3.6.3  ;

r Table 3.3.6.3 1 (page 1 of 1)  !

Lrw-Low set Instrumentation  !

REQUIRED CHANNELS PER SURVE!LLANCE ALLOW 48LE i FUNCTION FUNCTION REQUIREMENTS VALUE

1. Reactor Steam Dome Pressure- High 1 per LLS valve SR 3.3.6.3.1 s 1085 psig l SR 3.3.6.3.4 SR 3.3.6.3.5 SR 3.3.6.3.6 ,

+

2. Low-Low set Pressure Setpoints 2 per LLS valve SR 3.3.6.3.1 Low: I SR 3.3.6.3.4 '

open s 1010 pelg SR 3.3.6.3.5 . Close s 860 pelg ,

SR 3.3.6.3.6  !

Medlue-Low:

Open 5 1025 psig close s 875 psig -

Medita-Migh:  !

Open 5 1040 pelg l Close s 890 psig High: [

Open s 1050 psig Close 5 900 psig  ;

l

3. Tallpipe Pressure Switch 2 per S/RV SR 3.3.6.3.2 2 80 pais and  !

SR 3.3.6.3.3 5 100 pois i SR 3.3.6.3.5 SR 3.3.6.3.6 i

i

?

r

[

i HATCH UNIT 2 3.3-67 PROPOSED CHANGE 6/7/95 ,

y ...,y .

1 I

Recirculaticn Loops Operating -)

3.4.1 >

i i

i i

70 t

80 oPenanon nor Auoweo MM E

/

~

r a /

/  :

OPERATION Auowen 1 nemou i

i t

10

0. . . . ,

CON! FLOW (% RATED)

A i

f f

Figure 3.4.1-1 (Page 1 of 1)  :

Power-Flow Operating Map with One Reactor Coolant System Recirculation Loop in Operation  ;

i HATCH UNIT 2 3.4-4 PROPOSED CHANGE 6/13/95 t

S/RVs l 3.4.3  !

i i

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.3.1 Verify the safety function lift setpoints In accordance of-the S/RVs are as follows: with the Inservice  ;

Setpoint Number of Testing Program S/RVs (osia) l 4 1120 i 33.6 i 4 1130 33.9 i 3 1140 34.2 .

Following testing, lift settings shall be .

within 1%.

I SR 3.4.3.2 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ,

after reactor steam pressure and flow are adequate to perform the test. ,

1 Verify each S/RV opens when manually 18 months- t actuated.  ;

O I

i I

l l

i l

k HATCH UNIT 2 3.4-8 PROPOSED CHANGE 6/7/95

Reactor Stea:a Dome Pressure 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) ]

i 3.4.10 Reactor Steam Dome Pressure  ;

LC0 3.4.10 The reactor steam dome pressure shall be s 1020 psig. j l

i APPLICABILITY: MODES 1 and 2.

ACTIONS l CONDITION REQUIRED ACTION COMPLETION TIME l i

A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within dome pressure to limit. within limit.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ,

associated Completion l Time not met.

I SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4

SR 3.4.10.1 Verify reactor steam dome pressure is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> s 1058 psig. l ,

l HATCH UNIT 2 3.4-28 PROPOSED CHANGE 6/7/95

ECCS -- 0perating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.6 -------------------NOTE--------------------

Only required to be performed prior to entering MODE 2 from MODE 3 or 4, when in MODE 4 > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Verify each recirculation pump discharge 31 days valve cycles through one complete cycle of full travel or is de-energized in the closed position.

SR 3.5.1.7 Verify the following ECCS pumps develop the In accordance specified flow rate against a systern head with the corresponding to the specified reactor Inservice pressure. Testing Program SYSTEM HEAD N0. CORRESPONDING 0F TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF CS 2: 4250 gpm 1 2: 113 psig LPCI 2: 17,000 gpm 2 2: 20 psig SR 3.5.1.8 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> -

after reactor steam pressure and flow are adequate to perform the test.

l Verify, with reactor pressure s 1058 psig 92 days l and 2: 920 psig, the HPCI pump can develop a flow rate 2: 4250 gpm against a system head corresponding to reactor pressure.

(continued)

HATCH UNIT 2 3.5-5 PROPOSED CHANGE 6/7/95

RCIC System 3.5.3 j l

1 SURVEILLANCE REQUIREMENTS l SURVEILLANCE FREQUENCY l i

i SR 3.5.3.1 Verify the RCIC System piping is filled 31 days  :

with water from the pump discharge valve to  !

the injection valve.

SR 3.5.3.2 Verify each RCIC System manual, power 31 days operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.3.3 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 1058 psig 92 days l 1 and 2e 920 psig, the RCIC pump can develop a '

flow rate 2: 400 gpm against a system head corresponding to reactor pressure.

SR 3.5.3.4 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 165 psig, 18 months the RCIC pump can develop a flow rate i 2: 400 gpm against a system head j corresponding to reactor pressure.

(continued) l l

HATCH UNIT 2 . 3.5-12 PROPOSED CHANGE 6/7/95

]

l, Definitions l 1.1 l

l 1.1 Definitions (continued)

PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation.

These tests are:

a. Described in Section 13.6, Startup and Power Test Program, of the FSAR;
b. Authorized under the provisions of 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer (RTP) rate to the reactor coolant of 2+34Q1Wt.

REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval SYSTEM (RPS) RESPONSE from when the monitored parameter exceeds its RPS TIME trip setpoint at the channel sensor until de-energization of the scram pilot valve solenoids. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

SHUTDOWN MARGIN (SDM) SDM shall be the amount of reactivity by which the reactor is subcritical or would be suberitical assuming that:

a. The reactor is xenon free;
b. The moderator temperature is 68 F; and
c. All control rods are fully inserted except for the single control rod of highest reactivity worth, which is assumed to be fully withdrawn.

With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SDM.

STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, 1 channels, or other designated components during '

the interval specified by the Surveillance (continued)

HATCH UNIT 1 1.1-5 Amendment No. 195 l l

SLC System 3.1.7 ,

1

' SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY ~ ,

'SR 3. I '. 7. 5 Verify the concentration of. sodium 31 days pentaborate in solution ~is within the -l i

Region A limits of Figure 3.1.7-1. AND Once within  !

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after  :

water,or sodium pentaborate is added to solution  :

i 0E0 \

Once within  !

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution i temperature is restored within the Region A  !

limits of a Figure 3.1.7-2 .

h SR 3.1.7.6 Verify each SLC subsystem mar;ual and power 31 days operated valve in the flow path that is not  :

locked, sealed, or otherwise secured in  !

position is in the correct position, or can be aligned to the correct position.  !

SR 3.1.7.7 Verify each pump develops a flow rate In accordance j 2: 41.2 gpm at a discharge pressure with the l 2: psig. Inservice ,

Testing Program 12 01 .;

-)

SR 3.1.7.8 . Verify flow through one SLC subsystem from 18 months on'a pump into reactor pressure vessel. STAGGERED TEST BASIS (continued)

. HATCH UNIT 1 3.1-23 Amendment No. 195 .

l l

l RPS Instrumentation 3.3.1.1  !

l Table 3.3.1.1-1 (page 2 of 3)

Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM ,

SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REDUIREMENTS VALUE

(

2. Average Power Range Monitors (continued)
c. Fixed Neutron 1 2 F SR 3.3.1.1.1 5 120% RTP Flux - High SR 3.3.1.1.2 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.10 SR 3.3.1.1.15
d. Downscate 1 2 3.3.1.1.5 F SR a 4.2% RTP SR 3.3.1.1.8 SR 3.3.1.1.15
e. Inop 1,2 2 G SR 3.3.1.1.8 NA SR 3.3.1.1.9 SR 3.3.1.1.15 1025
3. Reactor Vessel Steam 1,2 2 G SR 3.3.1.1.1 5 psig Dome Pressure - High SR 3.3.1.1.9 SR 3.3.1.1.13 SR 3.3.1.1.15
4. Reactor Vessel Water 1,2 2 3.3.1.1.1 Level - tow, Level 3 G SR a 0 inches SR 3.3.1.1.9 SR 3.3.1.1.13 SR 3.3.1.1.15
5. Main Steam Isolation 1 8 F SR 3.3.1.1.9 5 10% closed Valve - Closure SR 3.3.1.1.13 SR 3.3.1.1.15
6. Drywell Pressure - High 1,2 3.3.1.1.1 2 G SR s 1.92 psig i SR 3.3.1.1.9 '

SR 3.3.1.1.13 SR 3.3.1.1.15 I

t (continued)

I F

1 i

)

l HATCH UNIT 1 3.3-7 Amendment No. 195 i

\

I ATWS-RPT Instrumentation l 3.3.4.2 i SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The 18 months Allowable Values shall be:

a. Reactor Vessel Water Level -- Low Low, level 2: 2: -47 inches; and
b. Reactor Steam Dome Pressure -- High:

psig.

SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST 18 months including breaker actuation.

i 4

HATCH UNIT 1 3.3-32 Amendment No. 195

i 1

l i

LLS Instrumentation 3.3.6.3 Table 3.3.6.3-1 (page 1 of 1)

Low-Low Set Instrumentation REQUIRED CHANNELS PER SURVEILLANCE ALLOWASLE  ;

FUNCTION FUNCTION REQUIREMENTS VALUE l

1. Reactor Steam Dome Pressure - High 1 per LLS valve SR 3.3.6.3.1 5 psig SR 3.3.6.3.4 f SR 3.3.6.3.5 09C '

SR 3.3.6.3.6 l t

2. Low Low Set Pressure Setpoints 2 per LLS valve SR 3.3.6.3.1 Low: I SR 3.3.6.3.4 open 5 1005 psis i SR 3.3.6.3.5 Close s 857 pois SR 3.3.6.3.6 Medita-Low:

Open 5 1020 psis close 5 872 psis l Medium-High*

Open 5 1035 psig ,

close s 887 psig ,

High.

Open 5 1045 psig  !

Close s 897 psig .

l

3. Taltpipe Pressure Switch 2 per S/RV SR 3.3.6.3.2 2 80 psig and  :

SR 3.3.6.3.3 s 100 psig j SR 3.3.6.3.5

l i

?

i i

r i

1 1

HATCH UNIT 1 3.3-66 Amendment No. 195  :

I t

o Recirculation Loops Operating 3.4.1 78 80 OPER ATlOld . SOT ALLouuED RESeOss M

I g

y . - iss 4; m 76 7. co a i,a E

g a

f. OPERATIOst w

ALLOuuRO g .

.. O.,

m u

m = = =

CORE PLOut(E RATEDI sutt 7 Figure 3.4.1-1 (Page 1 of 1)

Power-Flow Operating Map with One R+v.-tor Coolant System Recirculation Loop in Operation i

HATCH UNIT 1 3.4-4 Amendment No. 195

S/RVs  ;

3.4.3 i SURVEILLANCE REQUIREMENTS SURVEILLANCE ~ FREQUENCY  ;

SR 3.4.3.1 Verify the safety function lift setpoints In accordance' l of the S/RVs are as follows: with the Inservice i Number of Setpoint Testing Program S/RVs (psia)  ;

4 h080 32.4 7

~

? Ilio A 351  ;

4 1090 32.7 li 10 i 35. (, t 3

(1100 33.0,/ H 3o 3I 9 -

Following testing, lift settings shall be -

within 1%.

SR 3.4.3.2 -------------------NOTE-------------------- i Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l after reactor steam pressure and flow are  ;

adequate to perform the test.

i Verify each S/RV opens when manually 18 months ,

actuated.  !

I i

1 1

i HATCH UNIT 1 3.4-8 Amendment No. 195

Reactor. Steam Dome Pressure 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure IOC9 LC0 3.4.10 The reactor steam dome pressure shall be s psig.

1 APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within dome pressure to limit. within limit.

l l

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion I Time not met.

1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify reactor steam dome pressure is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> s 10

{

(

HATCH UNIT 1 3.4-28 Amendment No. 195

ECCS -- Operating 3.5.1 ,

ACTIONS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.6 -------------------NOTE--------------------

Only required to be performed prior to entering MODE 2 from MODE 3 or 4, when in MODE 4 > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Verify each recirculation pump discharge 31 days valve cycles through one complete cyc1c of full travel or is de-energized in the closed position.

SR 3.5.1.7 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing Program SYSTEM HEAD N0. CORRESPONDING 0F TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF CS 2: 4250 gpm 1 2: 113 psig LPCI 2: 17,000 gpm 2 2: 20 psig l

SR 3.5.1.8 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

loS8 Verify, with reactor pressure s psig 92 days and 2: 920 psig, the HPCI pump can develop a flow rate 2: 4250 gpm against a system head corresponding to reactor pressure.  ;

l (continued)

HATCH UNIT 1 3.5-5 Amendment No. 195

1

-j I

RCIC. System {

3.5.3 l l

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY- f i

SR 3.5.3.1 Verify the RCIC System piping is filled 31 days {

  • with water from the pump discharge valve to  !

the injection valve. '

SR 3.5.3.2 Verify each RCIC System manual, power 31 days i operated, and automatic valve in the flow path, that is not locked, sealed, or i otherwise secured in position, is in the  !

correct position.  !

i SR 3.5.3.3 -------------------NOTE--------------------

Not. required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

8058 Verify, with reactor pressure s le psig 92 days  :

and 2: 920 psig, the RCIC pump can develop a  !

flow rate 2: 400 gpm against a system head corresponding to reactor pressure.

SR 3.5.3.4 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />  !

after reactor steam pressure and flow are )

adequate to perform the test.

Verify, with reactor pressure s 165 psig, 18 months i the RCIC pump can develop a flow rate  !

2: 400 gpm against a system head l corresponding to reactor pressure. I i

l (continued) .

2

)

l

]

1 HATCH UNIT 1 3.5-12 Amendment No. 195

i Definitions  :

1.1 1.1 Definitions MINIMUM CRITICAL POWER appropriate correlation (s) to cause some point in ,

RATIO (MCPR) (continued) the assembly to experience boiling transition, f divided by the actual assembly operating power.  ;

MODE A MODE shall correspond to any one inclusive combination of mode switch position, average  !

reactor coolant temperature, and reactor vessel  !

head closure bolt tensioning specified in  ;

Table 1.1-1 with fuel in the reactor vessel.  ;

OPERABLE -- OPERABILITY A system, subsystem, division, component, or device shall be OPERABLE or have OPERABILITY when  !

it is capable of performing its specified safety.  ;

function (s) and when all necessary attendant ,

instrumentation, controls, normal or emergency '

electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, division, ,

component, or device to perform its specified i safety function (s) are also capable of performing their related support function (s).  !

PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation. -

These tests are-l

a. Described in Chapter 14. Initial Tests and Operation, of the FSAR; 1
b. Authorized under the provisions of 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

RATED THERMAL POWER RTP shall be a total reactor core heat transfe (RTP) rate to the reactor coolant of MWt.

2f58 REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval SYSTEM (RPS) RESPONSE from when the monitored parameter exceeds its RPS TIME trip setpoint at the channel sensor until de-energization of the scram pilot valve (continued)

HATCH UNIT 2 1.1-5 Amendment No. 135

SLC System 3.1.7 T

SURVEILLANCE RE0VIREMENTS (continued) -

SURVEILLANCE FREQUENCY- l f

~

SR 3.1.7.5 Verify the concentration of sodium- 31 days pentaborate in solution is within the  !

Region A limits.of Figure 3.1.7-1. AND-l i

Once within l 24 hcurs after -

water or sodium i pentaborate is  ;

added to

~

. solution AND Once within ,

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after i

. solution >

temperature is '

restored within  !

the Region A .

limits of f Figure 3.1.7-2 t

SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days  ;

operated valve in the flow path that is not  !

locked, sealed, or otherwise secured in position is in the correct position, or can  !

l be aligned to the correct position. .

SR 3.1.7.7 Verify each pump develops a flow rate In accordance  !

2 41.2 gpm at a discharge pressure with the  !

2 psig. Inservice ,

4 Testing Program

{

1 SR 3.1.7.8 Verify flow through one SLC subsystem from 18 months on a  !

pump into reactor pressure vessel. STAGGERED TEST '

BASIS  !

f (continued) l HATCH UNIT 2 3.1-23 Amendment No. 135 l

l l

RPS Instrumentation 3.3.1.1 l l

Table 3.3.1.1 1 (page 2 of 3)

Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE i FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS

- VALUE

2. Average Power Range Monitors (continued)
c. Flaed Neutron 1 2 F SR 3.3.1.1.1 s 120% RTP F tux - H i gh SR 3.3.1.1.2 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.1D SR 3.3.1.1.15 SR 3.3.1.1.16
d. Downscale 1 2 F SR 3.3.1.1.5 t 4.2% RTP SR 3.3.1.1.8 SR 3.3.1.1.15 l
e. Inop 1,2 2 G SR 3.3.1.1.8 NA I SR 3.3.1.1.9 Ig g SR 3.3.1.1.15 -
3. Reactor vessel Steam 1,2 2 G SR 3.3.1.1.1 s psig Dome Pressure - High SR 3.3.1.1.9 SR 3.3.1.1.13 I SR 3.3.1.1.15 SR 3.3.1.1.16
4. Reactor vessel Water 1,2 3.3.1.1.1 2 G SR a 0 inches Level - Low, Level 3 SR 3.3.1.1.9 SR 3.3.1.1.13 SR 3.3.1.1.15 SR 3.3.1.1.16
5. Main Steam Isolation 1 8 F SR 3.3.1.1.9 5 10% closed Valve - Closure SR 3.3.1.1.13 SR 3.3.1.1.15 SR 3.3.1.1.16
6. Drywell Pressure - High 1,2 2 G SR 3.3.1.1.1 s 1.92 psig  !

SR 3.3.1.1.9 '

SR 3.3.1.1.13 SR 3.3.1.1.15 (continued) i HATCH UNIT 2 3.3-8 Amendment No. 135

t ATWS-RPT~ Instrumentation .

3.3.4.2 '

t SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY' l SR -3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. 92 days q

SR 3.3.4.2.3 i Perform CHANNEL CALIBRATION. The 18 months i Allowable Values shall be:

l

a. Reactor Vessel Water Level -- Low Low,  !

Level 2: 2: -47. inches; and

b. Reactor Steam Dome Pressure -- High:
SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST 18 months j including breaker actuation. i t

i 1

1 1

l HATCH UNIT 2 3.3-33 Amendment No. 135

, , . - - . . . , , - . - - - , , , , . - . , . , . . . . . - . w. - , - , . - , , , . , ,

LLS Znstrumentation 3.3.6.3 Table 3.3.6.3 1 (page 1 of 1)

Lcw-Low Set Instrumentation REQUIRED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION FUNCTION REQUIREMENTS VALUE

1. Reactor Steam Dome Pressure - High 1 per LLS valve SR 3.3.6.3.1 5 v 'psig SR 3.3.6.3.4 SR 3.3.6.3.5 IOBS SR 3.3.6.3.6
2. Low-Low Set Pressure Setpoints 2 per LLS valve SR 3.3.6.3.1 Low:

SR 3.3.6.3.4 open s 1010 psig SR 3.3.6.3.5 Close 5 860 psig SR 3.3.6.3.6 Meditsn-Low:

Open s 1025 psig close s 875 psig Medium-High:

Open 5 1040 psig close s 890 psig l

High:

Open 5 1050 psig Close 5 900 psig I

3. Tailpipe Pressure Switch 2 per S/RV SR 3.3.6.3.2 2 80 psig and l SR 3.3.6.3.3 5 100 psig l SR 3.3.6.3.5 SR 3.3.6.3.6 I

I l

I l

l 1

1 HATCH UNIT 2 3.3-67 Amendment No. 135

I Recirculation Loops Operating l 3.4.1

.- t i

i i

P Se I

i e  :

l orgaATeensesef '  ;

ALLouuto namoa M .

/  !

l ,

L o wt r- 1% 4e N 1s. 7. <.4 h e l-e F- WGAAftoel i

ALLousto .

I - asman H

w.. ,

m a se m 80R8 PLmt15 AATEDI Figure 3.4.1-1 (Page 1 of 1)

Power-Flow Operating Map with One Reactor  ;

Coolant System Recirculation Loop in Operation i HATCH UNIT 2 3.4-4 Amendment No. 135 i

g:.

S/RVs 3.4.3- '

SURVEILLANCE REQUIREMENTS s SURVEILLANCE '

FREQUENCY i

SR 3.4.3.1 Verify'the safety function lift setpoints In accordance of the S/RVs are as follows: with the  !

Inservice l Number of Setpoint. Testing Program S/RVs (osic) -

4 90 32 1:10 1 33.4  :

4 1100 33.0 Il30 1 33'i [

, 3 I s1110 1 33.3,/I itio t 34.1 Following testing, lift settings shall be l within i 1%.  ;

SR 3.4.3.2 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />  !

after reactor steam pressure and flow are i j

adequate to perform the test. '

Verify each S/RV opens when manually 18 months  !

actuated.  !

s E

l l

l l

l l

HATCH UNIT 2 3.4-8 Amendment No. 135

~

Reactor Steam Dome Pressure 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure LCO 3.4.10 The reactor steam dome pressure shall be s 1020 psig.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within dome pressure to limit, within limit.

B. Required Action and 8.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify reactor steam dome pressure is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 5 .

1D59 I

HATCH UNIT 2 3.4-28 Amendment No. 135

ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY-SR 3.5.1.6 -------------------NOTE-------------------- -

Only required to be performed prior to entering MODE 2 from MODE 3 or 4, when in MODE 4 > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Verify each recirculation pump discharge 31 days valve cycles through one complete cycle of full travel or is de-energized in the closed position.

SR 3.5.1.7 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice i pressure. Testing Program '

SYSTEM HEAD N0. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF CS 2: 4250 gpm 1 2: 113 psig LPCI 2: 17,000 gpm 2 2: 20 psig l

SR 3.5.1.8 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s M psig flof9) 92 days <

and 2: 920 psig, the HPCI pump can develop a 1 flow rate 2: 4250 gpm.against a system head corresponding to reactor pressure. {'

l 1

l o

(continued) l l

l l

HATCH UNIT 2 3.5-5 Amendment No. 135 l

l j

f RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System piping is filled 31 days with water from the pump discharge valve to the injection valve.

SR 3.5.3.2 Verify each RCIC System manual, power 31 days operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.3.3 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

sos *s Verify, with reactor pressure s psig 92 days and 2: 920 psig, the RCIC pump can develop a '

flow rate 2: 400 gpm against a system head corresponding to reactor pressure.

SR 3.5.3.4 -------------------NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure s 165 psig, 18 months the RCIC pump can develop a flow rate 2: 400 gpm against a system head corresponding to reactor pressure.

(continued) l l

l HATCH UNIT 2 3.5-12 Amendment No. 135 l

c ,

-q l

Encl 6sure 5 )

i Edwin I. Hatch Nuclear Plant  !

Response to Second RFAI Power Uprate Submittal ~

s Bases Chanees -

I l

l i

l i

1 i

i l

l 1

'l 1

)

I l

I I

i i

1 i

I I

i I

l lIL-4865 ES-1 i

SLC System 83.1.7-i BASES. ,

SURVEILLANCE SR 3.1.7.4 and SR 3.1.7.6 (continued) '

REQUIREMENTS in the nonaccident position provided it can be' aligned to- l the accident position from the control room, or locally by a- i dedicated operator at the valve control. This'is acceptable

-since the.SLC System is a manually initiated system. This ,

Surveillance also does not apply to valves that are locked, sealed, or otherwise secured in position since they are -

verified to be in the correct position prior to locking, 1 sealing, or securing. This verification of valve alignment  !

does not require any testing or valve manipulation; rather, i it involves verification that those valves capable of being j mispositioned are in the correct position. This SR does not i apply to valves that cannot be inadvertently misaligned, such as check valves. The 31 day Frequency is based on engineering judgment and is consistent with the procedural  ;

controls governing valve operation that ensures correct  :

valve positions.  ;

SR 3.1.7.5 >

This Surveillance requires an examination of the sodium  ;

pentaborate solution by using chemical analysis to' ensure ; 1 that the proper concentration of boron exists in the storage i tank (within Region A limits of Figures 3.1.7-1.and  ;

3.1.7-2). SR 3.1.7.5 must be performed anytime sodium .

pentaborate'or water is_added to the storage tank solution -

to determine that the boron solution concentration is within the specified limits. SR 3.1.7.5 must also be performed any g time the temperature is restored to within the Region A  !

limits of Figure 3.1.7-2, to ensure that no significant  :

boron precipitation occurred. The 31 day Frequency of this Surveillance is appropriate because of.the relatively slow j variation of boron concentration between surveillances.

I SR 3.1.7.7 Demonstrating that each SLC System pump develops a flow rate 2 41.2 gpm at a discharge pressure a 1201 psig ensures that l pump performance has not degraded during the fuel cycle.

This minimum pump flow rate requirement ensures that, when combined with the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive (continued)

HATCH UNIT I B 3.1-44 PROPOSED CHANGE 6/7/95

Pritary Centainment Isolation Instrumentation B 3.3.6.1 BASES APPLICABLE 1.c. Main Steam Line Flow - Hiah - (continued)

SAFETY ANALYSES, LCO, and detect the high flow. Four channels of Main Steam Line APPLICABILITY Flow - High Function for each unisolated MSL (two channels per trip system) are available and are required to be OPERABLE so that no single instrument failure will preclude detecting a break in any individual MSL.

The Allowable Value is chosen to ensure that offsite dose limits are not exceeded due to the break. .The Allowable Value corresponds to s 116 psid, which is the parameter l monitored on control room instruments.

This Function isolates the Group 1 valves, l.d. Condenser Vacuum - Low The Condenser Vacuum - Low Function is provided to prevent overpressurization of the main condenser in the event of a loss of the main condenser vacuum. Since the integrity of

, the condenser is an assumption in offsite dose calculations, the Condenser Vacuum - Low Function is assumed to be OPERABLE and capable of initiating closure of the MSIVs.

The closure of the MSIVs is initiated to prevent the addition of steam that would lead to additional condenser pressurization and possible rupture of the diaphragm installed to protect the turbine exhaust hood, thereby preventing a potential radiation leakage path following an accident.

Condenser vacuum pressure signals are derived from four pressure transmitters that sense the pressure in the condenser. Four channels of Condenser Vacuum - Low function are available and are required to be OPERABLE to ensure that no single instrument failure can preclude the isolation function.

The Allowable Value is chosen to prevent damage to the condenser due to pressurization, thereby ensuring its integrity for offsite dose analysis. As noted (footnote (a) to Table 3.3.6.1-1), the channels are not required to be OPERABLE in MODES 2 and 3 when all turbine stop valves (TSVs) are closed, since the potential for condenser (continued)

HATCH UNIT 1 B 3.3-154 PROPOSED CHANGE 6/7/95

Pricary Containment Isolation Instrumentation  !

B 3.3.6.1 .

BASES

{

APPLICABLE 3.a. 4.a. HPCI and RCIC Steam Line Flow - Hiah i SAFETY ANALYSES, (continued)  !

LCO, and  ;

APPLICABILITY recirculation and MSL breaks. However, these instruments i prevent the RCIC or HPCI steam line breaks from becoming l bounding.

l The HPCI and RCIC Steam Line Flow - High signals are  !

initiated from transmitters (two for HPCI and two for RCIC)  :

that are connected to the system steam lines. Two channels i of both HPCI and RCIC Steam Line Flow'- High Functions are ,

available and are required to be OPERABLE to ensure that no l single instrument failure can preclude the isolation  !

function.

The Allowable Values are chosen to be low enough to ensure -

that the trip occurs to prevent fuel damage and maintains 1 the MSLB event as the bounding' event. The Allowable Values correspond to s 228 inches water column for HPCI and l s 209 inches water column for RCIC, which are the parameters '

monitored on control room instruments.

These Functions isolate the Group 3 and 4 valves, as appropriate.

3.b. 4.b. HPCI and RCIC Steam Supolv Line Pressure - Low Low MSL pressure indicates that the pressure of the steam in the HPCI or RCIC turbine may be too low to continue operation of the associated system's turbine. These .

isolations are for equipment protection and are not assumed in any transient or accident analysis in the FSAR. However, they also provide a diverse signal to indicate'a possible system break. These instruments are included in Technical Specifications (TS) because of the potential for risk due to possible failure of the instruments preventing HPCI and RCIC i initiations. Therefore, they meet criterion' 4 of the NRC I Policy Statement (Ref. 6).

The HPCI and RCIC Steam Supply Line Pressure - Low signals are initiated from transmitters (four for HPCI and four for RCIC) that are connected to the system steam line. Four channels of both HPCI and RCIC Steam Supply Line Pressure - Low Functions are available and are required to i

r (continued)

HATCH UNIT I B 3.3-159 PROPOSED CHANGE 6/7/95 i

1 Recirculation Loops Operating.

B 3.4.1 BASES LCO. and APRM Flow Biased Simulated Thermal Power - High setpoint (continued) (LCO 3.3.1.1) must be applied to allow continued operation consistent with the assumptions of Reference 3. In addition, core flow as a function of core thermal power must i be in the " Operation Allowed Region" of Figure 3.4.1-1 to )

ensure core thermal-hydraulic oscillations do not occur. , j APPLICABILITY In MODES I and 2, requirements for operation of-the Reactor l Coolant Recirculation System are necessary since there is .)

considerable energy in the reactor core and the limiting i design basis transients and accidents are assumed to occur. j In MODES 3, 4, and 5, the consequences of an accident are l reduced and the coastdown characteristics of the j recirculation loops are not important.  !

l ACTIONS A.1 and B.1 l Due to thermal-hydraulic stability concerns, operation of the plant with one recirculation loop is controlled by .

restricting the core flow to a 45% of rated core flow when i THERMAL POWER is greater than the 76% rod line. This l .

requirement is based on the recommendations contained in GE l SIL-380, Revision 1'(Reference 4), which defines the region >

where the limit cycle oscillations are more likely to occur. .

- If the core flow as a function of core thermal power is in j the " Operation Not Allowed Region" of Figure 3.4.1-1, prompt i

.. action should be initiated to restore the flow-power  !

combination to within the Operation Allowed Region. The -l 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on the low probability of an  ;

accident occurring during this time period, on a reasonable  ;

time to complete the Required Action, and on frequent core  !

monitoring by operators allowing core oscillations to be j quickly detected. An immediate reactor scram is also ,

required with no recirculation pumps in operation, since all  !

forced circulation has been lost and the probability of  !

thermal-hydraulic oscillations is greater. i I

(continued)

HATCH UNIT 1 B 3.4-4 PROPOSED CHANGE 6/7/95 j

1 l

I Reactor Stea2 Dome Pressure B 3.4.10 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.10 Reactor Steam Dome Pressure BASES BACKGROUND The reactor steam dome pressure is an assumed value in the -

determination of compliance with reactor pressure vessel overpressure protection criteria and is also an assumed initial condition of design basis accidents and transients.

APPLICA.8LE The reactor steam dome pressure of s 1058 psig is an l SAFETY ANALYSES initial condition of the vessel overpressure protection analysis of Reference 1. This analysis assumes an initial maximum reactor steam dome pressure and evaluates the response of the pressure relief system, primarily the safety / relief valves, during the limiting pressurization transient. The determination of compliance with the overpressure criteria is dependent on the initial reactor steam dome pressure; therefore, the limit on this pressure ensures that the assumptions of the overpressure protection analysis are conserved. Reference 2 also assumes an initial reactor steam dome pressure for the analysis of design basis accidents and transients used to determine the limits for fuel cladding integrity (see Bases for LC0 3.2.2, " MINIMUM CRITICAL POWER RATIO (MCPR)") and 1% cladding plastic strain (see Bases for LC0 3.2.1, " AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)").

Reactor steam dome pressure satisfies the requirements of Criterion 2 of the NRC Policy Statement (Ref. 3).

LC0 The specified reactor steam dome pressure limit of s 1058 psig ensures the plant is operated within the l assumptions of the overpressure protection analysis.

Operation above the limit may result in a response more severe than analyzed.

APPLICABILITY In MODES I and 2, the reactor steam dome pressure is required to be less than or equal to the limit. In these (continued)

HATCH UNIT 1 B 3.4-53 PROPOSED CHANGE 6/7/95

Reactor SteaQ Dome Pressure B 3.4.10 BASES APPLICABILITY MODES, the reactor may be generating significant steam and (continued) events which may challenge the overpressure limits are possible.

In MODES 3, 4, and 5, the limit is not applicable because the reactor is shut down. In these MODES, the reactor pressure is well below the required limit, and no anticipated events will challenge the overpressure limits.

ACTIONS A11 With the reactor steam dome pressure greater than the limit, prompt action should be taken to reduce pressure to below the limit and return the reactor to operation within the bounds of the analyses. The 15 minute Completion Time is reasonable considering the importance of maintaining the pressure within limits. This Completion Time also ensures that the probability of an accident occurring while pressure is greater than the limit is minimized, fl.d If the reactor steam dome pressure car.not be restored to  !

within the limit within the associated Completion Time, the  ;

plant must be brought to a MODE in which the LC0 does not l apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion '

Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonab.le, based on operating experience, to reach MODE 3 from full power conditions in an  :

orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.4.10.1 REQUIREMENTS Verification that reactor steam dome pressure is s 1058 psig l ensures that the initial conditions of the vessel overpressure protection-analysis is met. Operating experience has shown the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency to be sufficient for identifying trends and verifying operation within safety -

analyses assumptions.

f i

(continued) liATCH UNIT 1 B 3.4-54 PROPOSED CHANGE 6/7/95

ECCS - Operating B 3.5.1

. BASES BACKGROUND pumps without injecting water into the RPV. These test ,

(continued) lines also provide suppression pool cooling capability, as .

described in LC0 3.6.2.3, "RHR Suppression Pool Cooling." '

Two LPCI inverters (one per subsystem)-are designed to provide the power to various LPCI subsystem valves

(e.g., inboard injection valves). This will ensure that a l postulated worst case single active component failure, during a design basis loss of coolant accident (which includes loss of offsite power), would not result in the low '

pressure ECCS subsystems failing to meet their design function. (While an alternate power supply is available, the low pressure ECCS subsystems may not be capable of meeting their design function if the alternate power supply is in service.)

The HPCI System (Ref. 3) consists of a steam driven turbine pump unit, pi;;ing, and valves to provide steam to the turbine, as well as piping and valves to transfer water from I the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV-through the feedwater sparger. Suction piping for the system is provided from the CST and the suppression pool.

Pump suction for HPCI is normally aligned to the CST source to minimize injection of suppression pool water into the RPV. However, if the CST water supply is low, or if the suppression pool level is high, an automatic trartsfer to the suppression pool water source ensures a water supply for continuous operation of the HPCI System. The steam supply to the HPCI turbine is piped from a main steam line upstream of the associated inboard main steam isolation valve.

The HPCI System is designed to provide core cooling for a wide range of reactor pressures (150 psig to 1154 psig). l Upon receipt of an initiation signal, the HPCI turbine stop valve and turbine control valve open simultaneously and the turbine accelerates to a specified speed. As the HPCI flow increases, the turbine governor valve is automatically adjusted to maintain design flow. Exhaust steam from the HPCI turbine is discharged to the suppression pool. A full flow test line is provided to route water from and to the CST to allow testing of the HPCI System during normal operation without injecting water into the RPV.

The ECCS pumps are provided with minimum flow bypass lines, which discharge to the suppression pool. The valves in (continued)

HATCH UNIT 1 B 3.5-3 PROPOSED CHANGE 6/7/95

RCIC System- l B 3.5.3  !

B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM  ;

B 3.5.3 RCIC System ,

BASES BACKGROUND The RCIC System is not part of the ECCS; however, the RCIC i System is included with the ECCS section because of their  :

similar functions. '

The RCIC System is designed to operate either automatically or manually following reactor pressure vessel (RPV) isolation accompanied by a loss of coolant flow from the feedwater system to provide adequate core cooling and control of the RPV water level. Under these conditions, the High Pressure Coolant Injection (HPCI) and RCIC systems perform similar functions. The RCIC System design requirements ensure that the criteria of Reference 1 are i satisfied.

The RCIC System (Ref. 2) consists of a steam driven turbine pump unit, piping, and valves to provide steam to the turbine, as well as piping and valves to transfer water from i the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV through the feedwater sparger. Suction piping is provided t from the condensate storage tank (CST) and the suppression ,

pool. Pump suction ~1s normally aligned to the CST to minimize injection of suppression pool water into the RPV.

However, if the CST water supply is low, or the suppression pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for continuous operation of the RCIC System. The steam supply to the turbine is piped from a main steam line upstream of the associated inboard main steam line isolation valve.

The RCIC System is designed to provide core cooling for a l wide range of reactor pressures (150 psig to 1154 psig). l Upon receipt of an initiation signal, the RCIC turbine accelerates to a specified speed. As the RCIC flow increases, the turbine control valve is automatically adjusted to maintain design flow. Exhaust steam from the RCIC turbine is discharged to the suppression pool. A full flow test line is provided to route water from and to the CST to allow testing of the RCIC System during normal )

operation without injecting water into the RPV.

(continued)

HATCH UNIT 1 B 3.5-23 PROPOSED CHANGE 6/7/95 l

l

Prinary_ Containment ,

B 3.6.1.1 BASES (continued) ,

A APPLICABLE The safety design basis for the primary containment is that  ;

, SAFETY ANAL.YSES it must withstand the pressures and temperatures of the  ;

limiting DBA without exceeding the design leakage rate. ,

The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE such that release of fission products to the environment is controlled by the rate of  :

primary containment leakage.

Analytical methods and assumptions involving the primary  ;

containment are presented in References 1 and 2. The safety '

analyses assume a nonmechanistic fission product release following a DBA, which forms the basis for determination of offsite doses. The fission product release is, in turn, based on an assumed leakage rate from the primary containment. OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not ,

exceeded.

The maximum allowable leakage rate for the primary containment (L ) is 1.2% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> al. the maximum peak containment pressure (P,)

of 49.6 psig (Ref.1). l Primary containment satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

1 LC0 Primary containment OPERABILITY is maintained by limiting leakage to less than L,, except prior to the first startup after performing a required 10 CFR 50, Appendix J, leakage test. At this time, the combined Type B and C leakage must be < 0.6 L,, and the overall Type A leakage must be

< 0.75 L,. Compliance with this LC0 will ensure a primary containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analyses.

Individual leakage rates specified for the primary containment air lock are addressed in LC0 3.6.1.2.

(continued) l

, HATCH UNIT 1 B 3.6-2 PROPOSED CHANGE 6/7/95 l

Pricary Containment Air Lock B 3.6.1.2 BASES BACKGROUND containment leakage rate to within limits in the event of a (continued) DBA. Not m'aintaining air lock integrity or leak tightness may result in a leakage rate in excess of that assumed in the unit safety analysis.

APPLICABLE The DBA that postulates the maximum release of radioactive SAFETY ANALYSES material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE, such that release of fission products to the environment is controlled by the rate of primary containment leakage. The primary containment is designed with a maximum allowable leakage rate (L ) of 1.2%

byweightofthecontainmentairper24hoursatthe calculated maximum peak containment pressure (P,) of 49.6 psig (Ref. 2). This allowable leakage rate forms the l basis for the acceptance criteria imposed on the SRs associated with the air lock.

Primary containment air lock OPERABILITY is also required to minimize the amount of fission product gases that may escape primary containment through the air lock and contaminate and pressurize the secondary containment.

The primary containment air lock satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LCO As part of primary containment, the air lock's safety function is related to control of containment leakage rates following a DBA. Thus, the air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

The primary containment air lock is required to be OPERABLE.

For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows only one air lock door to be opened at a time. This provision ensures that a gross breach of primary containment does not exist when primary containment is required to be (continued)

HATCH UNIT 1 B 3.6-7 PROPOSED CHANGE 6/7/95

Drywell Pressure B 3.6.1.4 8 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Drywell Pressure BASES BACKGROUND The drywell pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (DBA) o'r loss of coolant accident (LOCA).

APPLICABLE Primary containment performance is evaluated for the entire SAFETY ANALYSES spectrum of break sizes for postulated LOCAs (Ref.1).

Among the inputs to the DBA is the initial primary containment internal pressure (Ref.1). Analyses assume an initial drywell pressure of 1.75 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA drywell internal pressure does not exceed the maximum allowable of 62 psig.

The maximum calculated drywell pressure occurs during the reactor blowdown phase of the DBA, which assumes an instantaneous recirculation line break. The calculated peak drywell pressure for this limiting event is 49.6 psig l (Ref. 1).

Drywell pressure satisfies Criterion 2 of the NRC Policy Statement (Ref. 2).

LC0 In the event of a DBA, with an initial drywell pressure s 1.75 psig, the resultant peak drywell accident pressure I will be maintained below the drywell design pressure.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining drywell pressure within limits is not required in MODE 4 or 5.

(continued)

HATCH UNIT 1 B 3.6-28 PROPOSED CHANGE 6/7/95

Main Condenser Offgas B 3.7.6 BASES LCO with this requirement (2436 MWt x 100 pCi/MWt-second =

(continued) 240 mci /second). The 240 mci /second limit is conservative for a rated core thermal power of 2558 MWt.

APPLICABILITY The LC0 is applicable when steam is being exhausted to the main condenser and the resulting noncondensibles are being i processed via the Main Condenser Offgas System. This occurs i during MODE 1, and during MODES 2 and 3 with any main steam ,

line not isolated and the SJAE in operation. In MODES 4

.and 5, steam is not being exhausted to the main condenser and the requirements are not applicable.  !

ACTIONS Ad If the offgas radioactivity rate limit is exceeded, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is ,

reasonable, based on engineering judgment, the time required to complete the Required Action, the large margins ,

associated with permissible dose and exposure limits, and the low probability of a Main Condenser Offgas System rupture.

B.I. B.2. B.3.1. and B.3.2 If the gross gamma activity rate is not restored to within the limits in the associated Completion Time, all main steam lines or the SJAE must be isolated. This isolates the Main Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at least one main steam isolation valve in each main steam line is closed, and at least one main steam line drain valve in  ;

the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable, based on operating experience, to perform the actions from full power conditions in an orderly manner and without challenging unit systems.

An alternative to Required Actions B.1 and B.2 is to place the unit in a MODE in which the LC0 does not apply. To '

achieve this status, the unit must be placed in at least i MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The ,

, (continued) i HATCH UNIT I B 3.7-33 PROPOSED CHANGE 6/7/95 l

l Inservice Leak and Hydrostatic Testing Operation B 3.10.1 ,

B 3.10 SPECIAL OPERATIONS B 3.10.1 Inservice Leak and Hydrostatic Testing Operation BASES BACKGROUND The purpose of this Special Operations LC0 is to allow certain reactor coolant pressure tests to be performed in MODE 4 when the metallurgical characteristics of the reactor pressure vessel (RPV) require the pressure testing at ~;

temperatures > 212 F (normally corresponding to MODE 3).

System hydrostatic testing and system leakage (same as inservice leakage tests) pressure tests required by Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Ref.1) are performed prior to'the reactor going critical after a refueling outage. Inservice system leakage tests are i performed at the end of each refueling outage with the system set for normal power operation. Some parts of the Class 1 boundary are not pressurized during these system tests. System hydrostatic tests are required once per interval and include all the Class I boundary unless the test is broken into smaller portions. Recirculation pump operation and a water solid RPV (except for an air bubble I for pressure control) are used to achieve the necessary temperatures and pressures required for these tests. The minimum temperatures (at the required pressures) allowed for these tests are determined from the RPV pressure and temperature (P/T) limits required by LCO 3.4.9, " Reactor Coolant System (RCS) Pressure and Temperature (P/T) Limits."

These limits are conservatively based on the fracture toughness of the reactor vessel, taking into account anticipated vessel neutron fluence. The hydrostatic test requires increasing pressure to approximately 1139 psig. l The system leakage test requires increasing pressure to approximately 1035 psig. l With increased reactor vessel fluence over time, the minimum allowable vessel temperature increases at a given pressure.

Periodic updates to the RCS P/T limit curves are performed as necessary, based upon the results of analyses of irradiated surveillance specimens removed from the vessel.

(continued)

HATCH UNIT 1 B 3.10-1 PROPOSED CHANGE 6/7/95

i SLC System B 3.1.7 BASES SURVEILLANCE SR 3.1.7.4 and SR 3.1.7.6 (continued)

REQUIREMENTS in the nonaccident position provided it can be aligned to the accident position from the control room, or locally by a dedicated operator at the valve control. This is acceptable since the SLC System is a manually initiated system. This Surveillance also does not apply to valves that are locked, sealed, or otherwise secured in position since they are verified to be in the correct position prior to locking, sealing, or securing. This verification of valve alignment does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. The 31 day Frequency is based on engineering judgment and is consistent with the procedural controls governing valve operation that ensures correct valve positions.

SR 3.1.7.5 This Surveillance requires an examination of the sodium pentaborate solution by using chemical analysis to ensure that the proper concentration of boron exists in the storage tank (within Region A limits of Figures 3.1.7-1 and 3.1.7-2). SR 3.1.7.5 must be performed anytime sodium pentaborate or water is added to the storage tank solution to determine that the boron solution concentration is within the specified limits. SR 3.1.7.5 must also be performed any time the temperature is restored to within the Region A  :

limits of Figure 3.1.7-2, to ensure that no significant . l boron precipitation occurred. The 31 day Frequency of this  !

Surveillance is appropriate because of the relatively slow l variation of boron concentration between surveillances.

SR 3,1.7.7 Demonstrating that each SLC System pump develops a flow rate 2 41.2 gpm at a discharge pressure a 1201 psig ensures that l pump performance has not degraded during the fuel cycle. 1 This minimum pump flow rate requirement ensures that, when combined with the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive (continued) i HATCH UNIT 2 B 3.1-44 PROPOSED CHANGE 6/7/95 l

Primary Centainment Isolation Instrumentaticn B 3.3.6.1 BASES APPLICABLE 1.c. Main Steam Line Flow - Hiah (continued)

SAFETY ANALYSES, LCO, and detect the high flow. Four channels of Main Steam Line APPLICABILITY Flow - High Function for each unisolated MSL (two channels per trip system) are available and are required to be OPERABLE so that no single instrument failure will preclude detecting a break in any individual MSL.

The Allowable Value is chosen to ensure that offsite dose  ;

limits are not exceeded due to the break. The Allowable l Value corresponds to s 145 psid, which is the parameter l l monitored on control room instruments. j This Function isolates the Group 1 valves. I 1.d. Condenser Vacuum -- Low I The Condenser Vacuum - Low function is provided to prevent overpressurization of the main condenser in the event of a loss of the main condenser vacuum. Since the integrity of the condenser is an assumption in offsite dose calculations, the Condenser Vacuum - Low Function is assumed to be OPERABLE and capable of initiating closure of the MSIVs. j The closure of the MSIVs is initiated to prevent the j addition of steam that would lead to additional condenser .

pressurization and possible rupture of the diaphragm l installed to protect the turbine exhaust hood, thereby preventing a potential radiation leakage path following an  ;

accident. j l \

Condenser vacuum pressure signals are derived from four 1 pressure transmitters that sense the pre.ssure in the condenser. Four channels of Condenser Vacuum - Low Function j are available and are required to be OPERABLE to ensure that '

no single instrument failure can preclude the isolation function.

The Allowable Value is chosen to prevent damage to the condenser due to pressurization, thereby ensuring its integrity for offsite dose analysis. As noted (footnote (a) to Table 3.3.6.1-1), the channels are not required to be OPERABLE in MODES 2 and 3 when all turbine stop valves (TSVs) are closed, since the potential for condenser

! I (continued)

HATCH UNIT 2 B 3.3-154 PROPOSED CHANGE 6/7/95

Pri;ary Ccntainment Isolatien Instrumentatien B 3.3.6.1 BASES APPLICABLE 3.a. 4.a. HPCI and RCIC Steam Line Flow - Hiah SAFETY ANALYSES, (continued)

LCO, and

  • APPLICABILITY recirculation and MSL breaks. However, these instruments prevent the RCIC or HPCI steam line breaks from becoming bounding.

The HPCI and RCIC Steam Line Flow - High signals are initiated from transmitters (two for HPCI and two for RCIC)  ;

that are connected to the system steam lines. Two channels of both HPCI and RCIC Steam Line Flow - High Functions are ,

available and are required to be OPERABLE to ensure that no  :

single instrument failure can preclude the isolation function.

The Allowable Values are chosen to be low enough to ensure that the trip occurs to prevent fuel damage and maintains the MSLB event as the bounding event. The Allowable Values correspond to s 212 inches water column for HPCI and s 153 inches water column for RCIC, which are the parameters monitored on control room instruments.

These Functions isolate the Group 3 and 4 valves, as appropriate.

3.b. 4.b. HPCI and RCIC Steam Supply Line Pressure - Low Low MSL pressure indicates that the pressure of the steam in the HPCI or RCIC turbine may be too low to continue l operation of the associated system's turbine. These i isolations are for equipment protection and are not assumed in any transient or accident analysis in the FSAR. However, they also provide a diverse signal to indicate a possible system break. These instruments are included in Technical Specifications (TS) because of the potential for risk due to possible failure of the instruments preventing HPCI and RCIC l initiations. Therefore, they meet Criterion 4 of the NRC I Policy Statement (Ref. 7).  ;

The HPCI and RCIC Steam Supply Line Pressure - Low signals are initiated from transmitters (four for HPCI and four for RCIC) that are connected to the system steam line. Four channels of both HPCI and RCIC Steam Supply Line

  • Pressure - Low Functions are available and are required to I (continued)  ;

i HATCH UNIT 2 B 3.3-159 PROPOSED CHANGE 6/7/95

R circulation Lo:ps Operating B 3.4.1 BASES LCO and APRM Flow Biased Simulated Thermal Power - High setpoint (continued) (LC0 3.3.1.1) must be applied to allow continued operation consistent with the assumptions of Reference 3. In addition, core finw as a function of core thermal power must be in the " Operation Allowed Region" of Figure.3.4.1-1 to ensure core thermal-hydraulic oscillations do not occur.

APPLICABILITY In MODES I and 2, requirements for operation of the Reactor Coolant Recirculation System are necessary since there is considerable energy in the reactor core and the limiting design basis transients and accidents are assumed to occur.

In MODES 3, 4, and 5, the consequences of an accident are reduced and the coastdown characteristics of the recirculation loops are not important.

ACTIONS A.1 and B.1 Due to thermal-hydraulic stability concerns, operation of the plant with one recirculation loop is controlled by restricting the core flow to 2: 45% of rated core flow when THERMAL POWER is greater than the 76% rod line. This . l requirement is based on the recommendations contained in GE SIL-380, Revision 1 (Reference 4), which defines the region where the limit cycle oscillations are more likely to occur.

If the core flow as a function of core thermal power is in the " Operation Not Allowed Region" of Figure 3.4.1-1, prompt action should be initiated to restore the flow-power combination to within the Operation Allowed Region. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on the low probability of an accident occurring during this time period, on a reasonable time to complete the Required Action, and on frequent core >

monitoring by operators allowing core oscillations to be quickly detected. An immediate reactor scram is also l required with no recirculation pumps in operation, since all forced circulation has been lost and the probability of thermal-hydraulic oscillations is greater.

(continued)

HATCH UNIT 2 B 3.4-4 PROPOSED CHANGE 6/7/95

-Reactor'Steaa Dome Pressure I B 3.4.10 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.10 Reactor Steam Dome Pressure BASES BACKGROUND The reactor steam dome pressure is an assumed value in the  !

determination of compliance with reactor pressure vessel overpressure protection criteria and is also an assumed initial condition of design basis accidents and transients.

APPLICABLE The reactor steam dome pressure of s 1058 psig is an l I

SAFETY ANALYSES initial condition of the vessel overpressure protection analysis of Reference 1. This analysis assumes an initial maximum reactor steam dome pressure and evaluates the response of the pressure relief system, primarily the safety / relief valves, during the limiting pressurization transient. The determination of compliance with the overpressure criteria is dependent on the initial reactor steam dome pressure; therefore, the limit on this pressure ensures that the assumptions of the overpressure protection ,

analysis are conserved. Reference 2 also assumes an initial reactor steam dome pressure for the analysis of design basis accidents and transients used to determine the limits for fuel cladding integrity (see Bases for LC0 3.2.2, " MINIMUM -

CRITICAL POWER RATIO (MCPR)") and 1% cladding plastic strain (see Bases for LCO 3.2.1, " AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)").

Reactor steam dome pressure satisfies the requirements of Criterion 2 of the NRC Policy Statement (Ref. 3).

LC0 The specified reactor steam dome pressure limit of s 1058 psig ensures the plant is operated within the 'l assumptions of the overpressure protection analysis.

Operation above the limit may result in a response more severe than analyzed.

APPLICABILITY In MODES 1 and 2, the reactor steam dome pressure is required to be less than or equal to the limit. In these (continued)

HATCH UNIT 2 B 3.4-53 PROPOSED CHANGE 6/7/95 l

I 1

Reactor Steaa Dome Prassure -

B 3.4.10 BASES APPLICABILITY MODES, the reactor may be generating significant steam and ,

(continued) events which may challenge the overpressure limits are possible.

In MODES 3, 4, and 5, the limit is not applicable because the reactor is shut down. In these MODES, the reactor pressure is well below the required limit, and no anticipated events will challenge the overpressure limits. '

ACTIONS M j With the reactor steam dome pressure greater than the limit, ,

prompt action should be taken to reduce pressure to below ,

the limit and return the reactor to operation within the bounds of the analyses. The 15 minute Completion Time is reasonable considering the importance of maintaining the pressure within limits. This Completion Time also ensures ,

that the probability of an accident occurring while-pressure +

is greater than the limit is minimized.

M  !

If the reactor steam dome pressure cannot be restored to [

within the limit within the associated Completion Time, the  ;

plant must be brought to a MODE in which the LCO does not  !

apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an  ;

orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.4.10.1 REQUIREMENTS Verification that reactor steam dome pressure is s 1058 psig l ensures that the initial conditions of the vessel i overpressure protection analysis is met. Operating  !

experience has shown the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency to be sufficient '

for identifying trends and verifying operation within safety analyses assumptions.

i (continued)

HATCH UNIT 2 B 3.4-54 PROPOSED CHANGE 6/7/95 e

I

. .. _ - . - - - .. . . . - .- - _ . ~ - .

c :l

.e l ECCS'- Operating.

8 3.5.1 r l BASES.  ;

l l

  • BACKGROUND pumps'without injecting _ water into the RPV.' These testi I (continued)- lines'.also provide suppression pool cooling capability, as described in LCO 3.6.2.3, "RHR Suppression Pool Cooling."

Two LPCI inverters-(one per' subsystem) are designed to- -!

. provide the power to various LPCI subsystem valves  ;

(e.g., inboard injection valves). This will ensure'that a  !

postulated worst case single active component failure, l during a design basis loss of coolant accident (which  !

includes loss of offsite power), would not result'in the low  :

pressure ECCS subsystems failing to meet their design j function. (While an alternate power supply'is available,  ;

the low pressure ECCS subsystems may not be capable of meeting their design function if the alternate power supply is in service.) i The HPCI System '(Ref. 3) consists of a steam driven turbine  !

pump unit, piping, and valves to provide steam to. the  !

turbine, as well as piping and valves to transfer water from t the suction source to the core via the feedwater system

line, where the coolant is distributed within.the RPV through the feedwater sparger. Suction piping for the system is provided from the CST and the suppression pool.

Pump suction for HPCI is normally aligned to the CST source to minimize injection of suppression pool water into the l RPV. However, if the CST water supply is low, or if the-4 suppression pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for  !

. continuous operation of the HPCI System. The steam supply  !

to the HPCI turbine is piped from a main steam line upstream of the associated inboard main steam isolation valve.

l The HPCI System is designed to provide core cooling for a l

. wide range of_ reactor pressures (162 psid to 1169 psid, l i i vessel to pump suction). Upon receipt of an initiation l signal, the HPCI turbine stop valve and turbine control  !

valve open simultaneously and the turbine accelerates to a specified speed. As the HPCI flow increases, the turbine l

. governor valve is automatically adjusted to maintain design -

4 fl ow. Exhaust steam from the HPCI turbine is discharged to  !

> the suppression pool. A full flow test line is provided to

route water from and to the CST to allow testing of the HPCI System during normal operation without injecting water into i the RPV. 1

. The ECCS pumps are provided with minimum flow bypass lines, which discharge to the suppression pool. The valves in (continued) 4 i

HATCH UNIT 2 B 3.5-3 PROPOSED CHANGE 6/7/95-Y' f

- . , - - - - . , . y - , - - , ..r., ~-.-r_.-,., _ - , , - , , , _ , , - - -..

i RCIC System B 3.5.3 I

B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION i J

COOLING (RCIC) SYSTEM l

B 3.5.3 RCIC System j BASES l

BACKGROUND The RCIC System is not part of the ECCS; however, the RCIC System is included with the ECCS section because of their similar functions.

The RCIC System is designed to operate either automatically l or manually following reactor pressure vessel (RPV) isolation accompanied by a loss of coolant flow from the feedwater system to provide adequate core cooling and control of the RPV water level. Under these conditions, the .

High Pressure Coolant Injection (HPCI) and RCIC systems perform similar functions. The RCIC System design requirements ensure that the criteria of Reference 1 are satisfied. j The RCIC System (Ref. 2) consists of a steam driven turbine pump unit, piping, and valves to provide steam to the turbine, as well as piping and valves to transfer water from  ;

the suction source to the core via the feedwater system  !

line, where the coolant is distributed within the RPV through the feedwater sparger. Suction piping is provided from the condensate storage tank (CST) and the suppression pool. Pump suction is normally aligned to the CST to minimize injection of suppression pool water into the RPV. l However, if the CST water supply is low, or the suppression pool level is high, an automatic transfer to the suppression i pool water source ensures a water supply for continuous operation of the RCIC System. The steam supply to the turbine is piped from a main steam line upstream of the associated inboard main steam line isolation valve.

The RCIC System is designed to provide core cooling for a wide range of reactor pressures (150 psig to 1154 psig). l Upon receipt of an initiation signal, the RCIC turbine accelerates to a specified speed. As the RCIC flow increases, the turbine control valve is automatically adjusted to maintain design flow. Exhaust steam from the RCIC turbine is discharged to the suppression pool. A full flow test line is provided to route water from and to the CST to allow testing of the RCIC System during normal operation withoct injecting water into the RPV. i (continued) l HATCH UNIT 2 B 3.5-23 PROPOSED CHANGE 6/7/95 l

Prizary Containment B 3.6.1.1 BASES (continued)

APPLICABLE The safety design basis for the primary containment is that SAFETY ANALYSES it must withstand the pressures and temperatures of the limiting DBA without exceeding the design leakage rate.

The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE such that release of fission products to the environment is controlled by the rate of ,

primary containment leakage.

Analytical methods and assumptions involv'ng the primary containment are presented in References 1 and 2. The safety analyses assume a nonmechanistic fiss;on product release following a DBA, which forms the basis for determination of offsite doses. The fission product release is, in turn, based on an assumed leakage rate from the primary containment. OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not exceeded.

The maximum allowable leakage rate for the primary containment (L ) is 1.2% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> al the maximum peak containment prassure (P,) ,

of 45.5 psig (Ref. 1). l Primary containment satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LC0 Primary containment OPERABILITY is maintained by limiting leakage to less than L,, except prior to the first startup after performing a required 10 CFR 50, Appendix J, leakage i test. At this time, the combined Type B and C leakage must be < 0.6 L and the overall Type A leakage must be

< 0.75 L,.,, Compliance with this LC0 will ensure a primary containment configuration, includin; equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analyses.

Individual leakage rates specified for the primary containment air lock are addressed in LCO 3.6.1.2.

(continued)

HATCH UNIT 2 B 3.6-2 PROPOSED CHANGE 6/7/95 l

1

___._I

Primary Centainment Air Lock' l B 3.6.1.2  !

BASES I BACKGROUND containment leakage rate to within limits in the event of a (continued) DBA. Not maintaining air lock integrity or leak tightness may result in-a leakage rate in excess of that assumed in ,

the unit safety analysis.

APPLICABLE The DBA that postulates the maximum release of. radioactive  !

SAFETY ANALYSES material within primary containment is a LOCA. In the l analysis of this accident, it is assumed that primary 1 containment is OPERABLE, such that release of fission-products to the environment is controlled by the rate of primary containment leakage. The primary containment is designed with a. maximum allowable leakage rate (L ) of 1.2%

byweightofthecontainmentairper24hoursatthe calculated maximum peak containment pressure (P,) of 45.5 psig (Ref. 2). This allowable leakage rate. forms the l basis for the acceptance criteria imposed on the SRs associated with the air lock.

Primary containment air lock OPERABILITY is also required to  ;

minimize the amount of fission product gases that may escape primary containment through the air lock and contaminate and  :

pressurize the secondary containment.  !

The primary containment air lock satisfies Criterion 3 of I the NRC Policy Statement (Ref. 4).  !

i LC0 As part of primary containment, the air lock's safety function is related to control _of containment leakage rates  !

following a DBA. Thus, the air lock's structural integrity j and leak tightness are essential to the successful  :

mitigation of such an event.

The primary containment air lock is required to be OPERABLE. ,

For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be  !

in compliance with the Type B air lock leakage test, and  !

both air lock doors must be OPERABLE. The interlock allows only one air lock door to be opened at a time. This  ;

provision ensures that a gross breach of primary containment i does not exist when primary containment is required to be i l

(continued)

HATCH UNIT 2 B 3.6-7 PROPOSED CHANGE 6/7/95 l

Drywell Pressure B 3.6.1.4 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Drywell Pressure BASES

. BACKGROUND The drywell pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Desigt. Basis Accident (DBA) or loss of coolant accident (LOCA). f APPLICABLE Primary containment performance is evaluated for the entire SAFETY ANALYSES spectrum of break sizes for postulated LOCAs (Ref.1).  ;

Among the inputs to the DBA is the initial primary containment internal pressure (Ref. 1). Analyses assume an initial drywell pressure of 1.75 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA drywell internal pressure does not exceed the  !

maximum allowable of 62 psig.

The maximum calculated drywell pressure occurs during the reactor blowdown phase of the DBA, which assumes an l instantaneous recirculation line break. The calculated peak i drywell pressure for this limiting event is 45.5 psig l (Re f. 1) .

Drywell pressure satisfies Criterion 2 of the NRC Policy i Statement (Ref. 2).

LC0 In the event of a DBA, with an initial drywell pressure s 1.75 psig, the resultant peak drywell accident pressure will be maintained below the drywell design pressure.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are -

reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining drywell pressure within i limits is not required in MODE 4 or 5.

(continued)

HATCH UNIT 2 B 3.6-29 PROPOSED CHANGE 6/7/95

Main Cend:nser Offgas l B 3.7.6 4

BASES LCO with this requirement (2436 MWt x 100 pCi/MWt-second - .

(continued) 240 mci /second). The 240 mci /second limit is conservative l for a rated core thermal power of 2558 MWt.  ;

APPLICABILITY The LC0 is applicable when steam is being exhausted to the main condenser and the resulting noncondensibles are being ,

processed via the Main Condenser Offgas System. This occurs  :

during MODE 1, and during MODES 2 and 3 with any main steam l line not isolated and the SJAE in operation. In MODES 4 l and 5, steam is not being exhausted to the main condenser and the requirements are not applicable. l ACTIONS AJ  ;

If the offgas radioactivity rate limit is exceeded, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on engineering judgment, the time required '

to complete the Required Action, the large margins associated with permissible dose and exposure limits, and  :

the low probability of a Main Condenser Offgas System  :

rupture. '

B.1. B.2. B.3.1. and B.3.2  !

If the gross gamma activity rate is not restored to within i the limits in the associated Completion Time, all main steam lines or the SJAE must be isolated. This isolates the Main Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at ,

least one main steam isolation valve in each main steam line  ;

is closed, and at least one main steam line drain valve in the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable, based on operating experience, to perform the ,

actions from full power conditions in an orderly manner and without challenging unit systems.

An alternative to Required Actions B.1 and B.2 is to place the unit in a MODE in which the LC0 does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The i i

(continued)

HATCH UNIT 2 B 3.7-33 PROPOSED CHANGE 6/7/95

y

. Inservice Leak and Hydrostatic Testing Operation-B 3.10.1 '

B 3.10 SPECIAL OPERATIONS B 3.10.1 Inservice Leak and Hydrostatic Testing Operation l v  ;

BASES BACKGROUND The purpose of this Special Operations LC0 is to allow l certain reactor coolant pressure tests to be performed in ,

MODE 4 when the metallurgical characteristics of the reactor i pressure vessel (RPV) require the pressure testing at .

temperatures > 212 F (normally corresponding to MODE 3).

System hydrostatic testing and system leakage (same as  :

inservice leakage tests) pressure tests required by Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Ref. 1) are '

performed prior to the reactor going critical after a refueling outage. Inservice system leakage tests are performed at the end of each refueling outage with the system set for normal power operation. Some parts of the Class I boundary are not pressurized during these system tests. System hydrostatic tests are required once per

< - interval and include all the Class I boundary unless the r test is broken into smaller portions. Recirculation pump i operation and a water solid RPV (except for an air bubble i for pressure control) are used to achieve the necessary ,

temperatures and pressures required for these tests. The minimum temperatures (at the required pressures) allowed for  :

these tests are determined from the RPV pressure and .

temperature (P/T) limits required by LC0 3.4.9, " Reactor  !

Coolant System (RCS) Pressure and Temperature (P/T) Limits."

These limits are conservatively based on the fracture  !

toughness of the reactor vessel, taking into account  !

anticipated vessel neutron fluence. The hydrostatic test t requires increasing pressure to approximately 1139 psig. l l The system leakage test requires increasing pressure to approximately 1035 psig. l With increased reactor vessel fluence over time, the minimum  !

allowable vessel temperature increases at a given pressure.

Periodic updates to the RCS P/T limit curves are performed  :

as necessary, based upon the results of analyses of irradiated surveillance specimens removed from the vessel.  ;

(continued)  ;

i HATCH UNIT 2 B 3.10-1 PROPOSED CHANGE 6/7/95 6 - - - -

~ - - - ' * -

SLC System j B 3.1.7 '

BASES SURVEILLANCE SR 3.1.7.4 and SR 3.1. 7 /6 (continued)

REQUIREMENTS in the nonaccident position provided it can be aligned to the accident position from the control room, or locally by a dedicated operator at the valve control. This is acceptable since the SLC System is a manually initiated system. This Surveillance also does not apply to valves that are locked, sealed, or otherwise secured in position since they are verified to be in the correct position prior to locking, sealing, or securing. This verification of valve alignment does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. The 31 day Frequency is based on engineering judgment and is consistent with the procedural controls governing valve operation that ensures correct valve positions.

SR 3.1.7.5 This Surveillance requires an examination of the sodium pentaborate solution by using chemical analysis to ensure that the proper concentration of boron exists in the storage tank (within Region A limits of Figures 3.1.7-1 and 3.1.7-2). SR 3.1.7.5 must be performed anytime sodium pentaborate or water is added to the storage tank solution to determine that the boron solution concentration is within the specified limits. SR 3.1.7.5 must also be performed any time the temperature is restored to within the Region A limits of Figure 3.1.7-2, to ensure that no significant boron precipitation occurred. The 31 day Frequency of this Surveillance is appropriate because of the relatively slow variation of boron concentration between surveillances.

SR 3.1.7.7 Demonstrating that each SLC System pump develops a flow rate 2 41.2 gpm at a discharge pressure 2 M 98 psig ensures that pump performance has not degraded during the fuel cycle.

This minimum pump flow rate requirement ensures that, when combined with the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive (continued)

HATCH UNIT 1 B 3.1-44 REVISION 0

Primary Containment Isolation Instrumentation B 3.3.6.1 BASES APPLICABLE 1.c. Main Steam Line Flow - Hiah (continued)

SAFETY ANALYSES, LCO, and detect the high flow. Four channels of Main Steam Line APPLICABILITY Flow - High function for each unisolated MSL (two channels per trip system) are available and are required to be-OPERABLE so that no single instrument failure will preclude detecting a break in any individual MSL.

The Allowable Value is chosen to ensure that offsite dose limits are not exceeded due to the break. The Allowable Value corresponds to :s; psid, which is the parameter monitored on control room instr nts.

nb This Function isolates the Group 1 valves.

1.d. Condenser Vacuum - low The Condenser Vacuum - Low Function is provided to prevent overpressurization of the main condenser in the event of a loss of the main condenser vacuum. Since the integrity of the condenser is an assumption in offsite dose calculations, the Condenser Vacuum - Low Function is assumed to be OPERABLE and capable of initiating closure of the MSIVs.

The closure of the MSIVs is initiated to prevent the addition of steam that would lead to additional condenser pressurization and possible rupture of the diaphragm installed to protect the turbine exhaust hood, thereby preventing a potential radiation leakage path following an l

accident. '

Condenser vacuum pressure signals are derived from four pressure transmitters that sense the pressure in the '

condenser. Four channels of Condenser Vacuum - Low Function l are available and are required to be OPERABLE to ensure that no single instrument failure can preclude the isolation {

function. l i

The Allowable Value is chosen to prevent damage to the i condenser due to pressurization, thereby ensuring its integrity for offsite dose analysis. As noted (footnote (a) to Table 3.3.6.1-1), the channels are not required to be OPERABLE in MODES 2 and 3 when all turbine stop valves (TSVs) are closed, since the potential for condenser l

I (continued) '

HATCH UNIT 1 B 3.3-154 REVISION 0

Primary Containment Isolation Instrumentation B 3.3.6.1 BASES APPLICABLE 3.a. 4.a. HPCI and RCIC Steam Line Flow -- Hiah SAFETY ANALYSES, (continued)

LCO, and APPLICABILITY recirculation and MSL breaks. However, these instruments prevent the RCIC or HPCI steam line breaks from becoming bounding.

The HPCI and RCIC Steam Line Flow- High signals are initiated from transmitters (two for HPCI and two for RCIC) that are connected to the system steam lines. Two channels of both HPCI and RCIC Steam Line Flow- High Functions are available and are required to be OPERABLE to ensure that no single instrument failure can preclude the isolation function.

The Allowable Values are chosen to be low enough to ensure that the trip occurs to prevent fuel damage and maintains the MSLB event as the bounding event. The Allowable Values orrespond to s inches water column for HPCI and s inches wate olumn for RCIC, which are the parameters monitored on control room W 2.2.8 ruments.

These Functions isolate the Group 3 and 4 valves, as appropriate.

3.b. 4.b. HPCI and RCIC Steam SuDDiv Line Pressure - low Low MSL pressure indicates that the pressure of the steam in the HPCI or RCIC turbine may be too low to continue operation of the associated system's turbine. These isolations are for equipment protection and are not assumed in any transient or accident analysis in the FSAR. However, i they also provide a diverse signal to indicate a possible system break. These instruments are included in Technical Specifications (TS) because of the potential for risk due to possible failure of the instruments preventing HPCI and RCIC initiations. Therefore, they meet Criterion 4 of the NRC Policy Statement (Ref. 6). 1 The HPCI and RCIC Steam Supply Line Pressure - Low signals are initiated from transmitters (four for HPCI and four for RCIC) that are connected to the system steam line. Four channels of both HPCI and RCIC Steam Supply Line Pressure - Low Functions are available and are required to (continued)

HATCH UNIT 1 B 3.3-159 REVISION O

Recirculation Loops Operating B 3.4.1 m

BASES l

LC0 and APRM Flow Biased Simulated Thermal Power - High setpoint (continued)- (LCO 3.3.1.1) must be applied to allow continued operation consistent with the assumptions of Reference 3. In addition, core flow as a function of core thermal power must be in the " Operation Allowed Region" of Figure 3.4.1-1 to ensure cere thermal-hydraulic oscillations do not occur.

APPLICABILITY In MODES 1 and 2, requirements for operation of the Reactor Coolant Recirculation System are necessary since there is considerable energy in the reactor core and the limiting design basis transients and accidents are assumed to occur.

In MODES 3, 4, and 5, the consequences of an accident are reduced and the coastdown characteristics of the recirculation loops are not important.

ACTIONS A.1 and B.1 76 7e Due to thermal-hydraulic stability concerns, operation of the plant with one recirculation loop'is controlled by restricting the core flow to 2: 45% of rated core flow when THERMAL POWER is greater than the 80# rod line. This requirement is based on the recommendations contained in GE SIL-380, Revision 1 (Reference 4), which defines the region where the limit cycle oscillations are more likely to occur.

If the core flow as a function of core thermal power is in the " Operation Not Allowed Region" of Figure 3.4.1-1, prompt action should be initiated to restore the flow-power combination to within the Operation Allowed Region. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on the low probability of an accident occurring during this time period, on a reasonable time to complete the Required Action, and on frequent core monitoring by operators allowing core oscillations to be quickly detected. An immediate reactor scram is also required with no recirculation pumps in operation, since all forced circulation has been lost and the probability of thermal-hydraulic oscillations is greater.

(continued) l HATCH UNIT 1 B 3.4-4 REVISION 0

Reactor Steam Dome Pressure B 3.4.10 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.10 Reactor Steam Dome Pressure BASES BACKGROUND The reactor steam dome pressure is an assumed value in the determination of compliance with reactor pressure vessel overpressure protection criteria and is also an assumed initial condition of design basis accidents and transients.

APPLICABLE The reactor steam dome pressure of s FBE6 #(s orsE) psig is an SAFETY ANALYSES initial condition of the vessel overpressure protection analysis of Reference 1. This analysis assumes an initial maximum reactor steam dome pressure and evaluates the response of the pressure relief system, primarily the safety / relief valves, during the limiting pressurization transient. The determination of compliance with the overpressure criteria is dependent on the initial reactor steam dome pressure; therefore, the limit on this pressure ensures that the assumptions of the overpressure protection analysis are conserved. Reference 2 also assumes an initial reactor steam dome pressure for the analysis of design basis accidents and transients used to determine the limits for fuel cladding integrity (see Bases for LC0 3.2.2, " MINIMUM CRITICAL POWER RATIO (MCPR)") and 1% cladding plastic strain (see Bases for LCO 3.2.I, " AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)").

4 Reactor steam dome pressure satisfies the requirements of  !

Criterion 2 of the NRC Policy Statement (Ref. 3).  !

i LC0 he specified reactor steam dome pressure limit of s $20 psig ensures the plant is operated within the lo5g assumptions of the overpressure protection analysis.

Operation above the limit may result in a response more severe than analyzed.

APPLICABILITY In MODES 1 and 2, the reactor steam dome pressure is required to be less than or equal to the limit. In these (continued)

HATCH UNIT 1 B 3.4-53 REVISION O

i Reactor Steam Dome Pressure B 3.4.10 BASES ,

A APPLICABILITY MODES, the reactor may be generating significant steam and (continued) events which may challenge the overpressure limits are possible.

In MODES 3, 4, and 5, the limit is not applicable because the reactor is shut down. In these MODES, the reactor pressure is well below the required limit, and no anticipated events will challenge the overpressure limits.

ACTIONS ax1 With the reactor steam dome pressure greater than the limit, prompt action should be taken to reduce pressure to below the limit and return the reactor to operation within the bounds of the analyses. The 15 minute Completion Time is reasonable considering the importance of maintaining the pressure within limits. This Completion Time also ensures that the probability of an accident occurring while pressure is greater than the limit is minimized.

1L1 If the reactor steam dome pressure cannot be restored to within the limit within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems. ,

1 l

SURVEILLANCE SR 3.4.10.1 105'8 REQUIREMENTS Verification that reactor steam dome pressure is s 44- psig l ensures that the initial conditions of the vessel i overpressure protection analysis is met. Operating  !

experience has shown the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequera y R.o be sufficient i for identifying trends and verifying ope. . lion wi;nin safety I analyses assumptions.

(continued)

HATCH UNIT 1 B 3.4-54 REVISION 0 ,

l l

1

' ECCS - Operating B 3.5.1 BASES r

r BACKGROUND pumps without injecting water into the RPV. These test (continued) lines also provide suppression pool cooling capability, as described in LC0 3.6.2.3, "RHR Suppression Pool Cooling."

Two LPCI inverters (one per subsystem) are designed to provide the power to various LPCI subsystem valves

_(e.g., inboard injection valves). This will ensure that a postulated worst case single active component failure, during a design basis loss of coolant accident (which includes loss of offsite power), would not result in the low '

pressure ECCS subsystems failing to meet their design function. .(While an alternate power supply is available, the low pressure ECCS subsystems may not be capable of '

meeting their design function if the alternate power supply is in service.)

The HPCI System (Ref. 3) consists of a steam driven turbine l pump unit, piping, and valves to provide steam to the ,

turbine, as well as piping and valves to transfer water from '

the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV ,

through the feedwater sparger. Suction piping for the '

system is provided from the CST and the suppression pool.

Pump suction for HPCI is normally aligned to the CST source  ;

to minimize injection of suppression pool water into the  ;

RPV. However, if the CST water supply is low, or if the ~

suppression pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for continuous operation of the HPCI System. The steam supply '

to the HPCI turbine is piped from a main steam line upstream i of the associated inboard main steam isolation valve.  ;

The HPCI System is designed to provide core cooling for a wide range of reactor pressures (150 psig to H W psig). Ilf4 i Upon receipt of an initiation signal, the HPCI turbine stop i valve and turbine control valve open simultaneously and the '

turbine accelerates to a specified speed. As the HPCI-flow  !

increases, the turbine governor valve is automatically adjusted to maintain design flow. Exhaust steam from the -

HPCI turbine is discharged to the suppression pool. A full flow test line is provided to route water from and to the CST to allow testing of the HPCI System during normal operation without injecting water into the RPV.

The ECCS pumps are provided with minimum flow bypass lines, which discharge to the suppression pool. The valves in (continued)

HATCH UNIT 1 B 3.5-3 REVISION 0

l 1

RCIC System B 3.5.3 8 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM l 1

B 3.5.3 RCIC System i

BASES BACKGROUND The RCIC System is not part of the ECCS; however, the RCIC -

System is included with the ECCS section because of their  ;

similar functions. ,

The RCIC System is designed to operate either automatically or manually following reactor pressure vessel (RPV) isolation accompanied by a loss of coolant flow from the feedwater system to provide adequate core cooling and control of the RPV water level. Under these conditions, the High Pressure Coolant Injection (HPCI) and RCIC systems perform similar functions. The RCIC System design requirements ensure that the criteria of Reference 1 are satisfied.

The RCIC System (Ref. 2) consists of a steam driven turbine pump unit, piping, and valves to provide steam to the i turbine, as well as piping and valves to transfer water from the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV through the feedwater sparger. Suction piping is provided from the condensate storage tank (CST) and the suppression  :

pool. Pump suction is normally aligned to the CST to ,

minimize injection of suppression pool water into the RPV. '

However, if the CST water supply is low, or the suppression '

pool level is high, an automatic transfer to the suppression  ;

pool water source ensures a water supply for continuous  ;

operation of the RCIC System. The steam supply to the i turbine is piped from a main steam line upstream of the  ;

associated inboard main steam line isolation valve.

S'M i The RCIC System is designed to provide core cooling for a j wide range of reactor pressures (150 psig to psig). ,

Upon receipt of an initiation signal, the RCIC turbine  !

accelerates to a specified speed. As the RCIC flow -

increases, the turbine control valve is automatically i adjusted to maintain design flow. Exhaust steam from the RCIC turbine is discharged to the suppression pool. A full l flow test line is provided to route water from and to the '

CST to allow testing of the RCIC System during normal operation without injecting water into the RPV. i (continued)

HATCH UNIT 1 B 3.5-23 REVISION O l

Primary Containment B 3.6.1.1 BASES (continued) ,

APPLICABLE The safety design basis for the primary containment is that SAFETY ANALYSES it must withstand the pressures and temperatures of the limiting DSA without exceeding the design leakage rate.

The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE such that release of fission products to the environment is controlled by the rate of primary containment leakage.

Analytical methods and assumptions involving the primary containment are presented in References 1 and 2. The safety analyses assume a nonmechanistic fission product release following a DBA, which forms the basis for determination of offsite doses. The fission product release is, in turn, based on an assumed leakage rate from the primary containment. OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not exceeded.

The maximum allowable leakage rate for the primary containment (L ) is 1.2% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> al. the maximum peak containment pressure (P,)

of . psig (Ref. 1).

N Primary containment satisfies Criterion 3 of the NRC Policy '

Statement (Ref. 4).

LC0 Primary containment OPERABILITY is maintained by limiting leakage to less than L,, except prior to the first startup after performing a required 10 CFR 50, Appendix J, leakage test. At this time, the combined Type B and C leakage must be < 0.6 L and the overall Type A leakage must be

< 0.75 L,.,, Compliance with this LCO will ensure a primary containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analyses.

Individual leakage rates specified for the primary containment air lock are addressed in LCO 3.6.1.2.

(continued)

HATCH UNIT 1 B 3.6-2 REVISION 0

Primary Containment Air Lock B 3.6.1.2 BASES BACXbROUND containment leakage rate to within limits in the event of a (continued) DBA. Not maintaining air lock integrity or leak tightness -

may result in a leakage rate in excess of that assumed in the unit safety analysis. ,

APPLICABLE The DBA that postulates the maximum release of radioactive SAFETY ANALYSES material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary '

containment is OPERABLE, such that release of fission products to the environment is controlled by the rate of primary containment leakage. The primary containment is i designed with a maximum allowable leakage. rate (L ) of 1.2% l byweightofthecontainmentairper24hoursatthe .

calculated maximum peak containment pressure (P,) of t tj ej4 . psig (Ref. 2). This allowable leakage rate forms the basis for the acceptance criteria imposed on the SRs  ;

associated with the air lock.

Primary containment air lock OPERABILITY is also required to minimize the amount of fission product gases that may escape primary containment through the air lock and contaminate and pressurize the secondary containment.

The primary containment air lock satisfies Criterion 3 of tie NRC Policy Statement (Ref. 4). i LC0 As part of primary containment, the air lock's safety function is related to control of containment leakage rates following a DBA. Thus, the air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event. .

The primary containment air lock is required to be OPERABLE.

For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows '

only one air lock door to be opened at a time. This '

provision ensures that a gross breach of primary containment does not exist when primary containment is required to be 1

(continued)

HATCH UNIT 1 B 3.6-7 REVISION 0

Drywell Pressure B 3.6.1.4 b

B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Drywell Pressure '

BASES BACKGROUND The drywell pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (DBA) or loss of '

coolant accident (LOCA). ,

APPLICABLE Primary containment performance is evaluated for the entire SAFETY ANALYSES spectrum of break sizes for postulated LOCAs (Ref.1). '

Among the inputs to the DBA is the initial primary containment internal pressure (Ref.1). Analyses assume an initial drywell pressure of 1.75 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that <

the peak LOCA drywell internal pressure does not exceed the maximum allowable of 62 psig.

The maximum calculated drywell pressure occurs during the reactor blowdown phase of the DBA, which assumes an instantaneous recirculation line break. The calculated peak drywell pressure for this limiting event is . psig (Ref. 1). pg Drywell pressure satisfies criterion 2 of the NRC Policy Statement (Ref. 2).

LC0 In the event of a DBA, with an initial drywell pressure s 1.75 psig, the resultant peak drywell accident pressure will be maintained below the drywell design pressure.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining drywell pressure within limits is not required in MODE 4 or 5.

1 (continued)

HATCH UNIT 1 B 3.6-28 REVISION 0

i

- Main Condenser Offgas 1 h_ B 3.7.6

. The UiO M C.*/se"ad M h C* ow*ibe fo r s BASES ( W 4 cec Mermi power of LSty MV/t*

LCO with this requirement (2436 MWt x 100 pCi/MWt-second -

(continued) 240 mci /second). -

APPLICABILITY The LCO is applicable when steam is being exhausted to the  !

main condenser and the resulting noncondensibles are being  ;

processed via the Main Condenser Offgas System. This occurs

{

during MODE 1, and during MODES 2 and'3 with any main steam line not isolated and the SJAE in operation. In MODES 4 and 5, steam is not being exhausted to the main condenser and the requirements are not applicable.

ACTIONS M i If the offgas radioactivity rate limit is exceeded,'72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to  ;

within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is i reasonable, based on engineering judgment, the time required i to complete the Required Action, the large margins >

associated with permissible dose and exposure limits, and the low probability of a Main Condenser Offgas System rupture. ,

B.l. 8.2. B.3.1. and B.3.2 j If the gross ' gamma activity rate is not restored to within the limits in the associated Completion Time, all main steam  !

lines or the SJAE must be isolated. This isolates the Main ,

Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at  !

least one main steam isolation valve in each main steam line i is closed, and at least one main steam line drain valve in the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is  :

reasonable, based on operating experience, to perform the )

actions from full power conditions in an orderly manner and without challenging unit systems. l An alternative to Required Actions B.1 and B.2 is to place the unit in a MODE in which the LC0 does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The (continued)

HATCH UNIT 1 B 3.7-33 REVISION 0

Inservice Leak and Hydrostatic Testing Operation 1 8 3.10.1 B 3.10 SPECIAL OPERATIONS B 3.10.1 Inservice Leak and Hydrostatic Testing Operation BASES '

BACKGROUND The purpose of this Special Operations LC0 is to allow certain reactor coolant pressure tests to be performed in '

MODE 4 when the metallurgical characteristics of the reactor pressure vessel (RPV) require the pressure testing at temperatures > 212 F (normally corresponding to MODE 3).

System hydrostatic testing and system leakage (same as inservice leakage tests) pressure tests required by ,

Section XI of the American Society of Mechanical-Engineers (ASME) Boiler and Pressure Vessel Code (Ref. 1) are performed prior to the reactor going critical after a refueling outage. Inservice system leakage tests are performed at the end of each refueling outage with the system set for normal power operation. Some parts of the Class I boundary arc not pressurized during these system tests. Systet.; hydrostatic tests are required once per interval and include all the Class I boundary unless the test.is broken into smaller portions. Recirculation pump operation and a water solid RPV (except for an air bubble for pressure control) are used to achieve the necessary ,

temperatures and pressures required for these tests. The i minimum temperatures (at the required pressures) allowed for j these tests are determined from the RPV pressure and temperature (P/T) limits required by LC0 3.4.9, " Reactor Coolant System (RCS) Pressure and Tereperature (P/T) Limits."

These limits are conservatively based on the fracture toughness of the reactor vessel, taking into account anticipated vessel neutron fluence. The hydrostatic test requires increasing pressure to approximately H4Hrpsig. 1839 The system leakage test requires increasing pressure to approximately I Q ig.

With increased reactor vessel fiuence over time, the minimum allowable vessel temperature increases at a given pressure.

Periodic updates to the RCS P/T limit curves are performed as necessary, based upon the results of analyses of l irradiated surveillance specimens removed from the vessel. l i

I (continued)

HATCH UNIT 1 B 3.10-1 REVISION 0

SLC Systtm B 3.1.7 BASES  !

SURVEILLANCE SR 3.1.7.4 and SR 3.1.7.6 (continued)

REQUIREMENTS in the nonaccident position provided it can be aligned to the accident position from the control room, or locally by a dedicated operator at the valve control. This is acceptable since the SLC System is a manually initiated system. This Surveillance also does not apply to valves that are locked, sealed, or otherwise secured in position since they are verified to be in the correct position prior _to locking, ,

sealing, or securing. This verification of valve alignment does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. The 31 day Frequency is based on engineering judgment and is consistent with the procedural controls governing valve operation that ensures correct i valve positions.

SR 3.1.7.5 This Surveillance requires an examination of the sodium )

pentaborate solution by using chemical analysis to ensure that the proper concentration of boron exists in the storage 1 tank (within Region A limits of Figures 3.1.7-1 and  !

3.1.7-2). SR 3.1.7.5 must be performed anytime sodium pentaborate or water is added to the storage tank solution to determine that the boron solution concentration is within the specified limits. SR 3.1.7.5 must also be performed any time the temperature is restored to within the Region A limits of Figure 3.1.7-2, to ensure that no significant boron precipitation occurred. The 31 day Frequency of this Surveillance is appropriate because of the relatively slow variation of baron concentration between surveillances.

l l

SR 3.1.7.7 1 01 Demonstrating that each SLC System pump evelops a flow rate a 41.2 gpm at a discharge pressure a psig ensures that i pump performance has not degraded during the fuel cycle.

This minimum pump flow rate requirement ensures that, when combined with the sodium pentaborate solution concentration '

requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive (continued)

HATCH UNIT 2 B 3.1-44 REVISION O

l Primary Containment Isolation Instrumentation B 3.3.6.1 BASES I APPLICABLE 1.c. Main Steam Line Flow - Hiah (continued)

SAFETY ANALYSES, LCO, and detect the high flow. Four channels of Main Steam Line l APPLICABILITY Flow - High Function for each unisolated MSL (two channels per trip system) are available and are required to be OPERABLE so that no single instrument failure will preclude detecting a break in any individual MSL.

The Allowable Value is chosen to ensure that offsite dose limits are not exceeded due to the break. The Allowable Value corresponds to s psid, which is the parameter monitored on control room instruments.

This function isolates the Group 1 valves.

1.d. Condenser Vacuum - Low The Condenser Vacuum - Low Function is provided to prevent overpressurization of the main condenser in the event of a loss of the main condenser vacuum. Since the integrity of the condenser is an assumption in offsite dose calculations, the Condenser Vacuum - Low Function is assumed to be OPERABLE and capable of initiating closure of the MSIVs.

The closure of the MSIVs is initiated to prevent the addition of steam that would lead to additional condenser pressurization and possible rupture of the diaphragm installed to protect the turbine exhaust hood, thereby preventing a potential radiation leakage path following an accident.

Condenser vacuum pressure signals are derived from four pressure transmitters that sense the pressure in the condenser. Four channels of Condenser Vacuum - Low Function are available and are required to be OPERABLE to ensure that no single instrument failure can preclude the isolation function.

The Allowable Value is chosen to prevent damage to the condenser due to pressurization, thereby ensuring its integrity for offsite dose analysis. As noted (footnote (a) to Table 3.3.6.1-1), the channels are not required to be OPERABLE in MODES 2 and 3 when all turbine stop valves (TSVs) are closed, since the potential for condenser (continued)

HATCH UNIT 2 B 3.3-154 REVISION 0

Primary Containment Isolation Instrumentation B 3.3.6.1 BASES APPLICABLE 3.a. 4.a. HPCI and RCIC Steam Line Flow - Hiah SAFETY ANALYSES, (continued)

LCO, and APPLICABILITY recirculation and MSL breaks. However, these instruments prevent the RCIC or HPCI steam line breaks from becoming bounding.

The HPCI and RCIC Steam Line Flow - High signals are initiated from transmitters (two for HPCI and two for RCIC) that are connected to the system steam lines. Two channels of both HPCI and RCIC Steam Line Flow - High Functions are available and are required to be OPERABLE to ensure that no single instrument failure can preclude the isolation-function. 2g' The Allowabl Values are chosen to be low enough to ensure that the trip occurs to prevent fuel damage and maintains-the MSLB event s the bounding event. The Allowable Values correspond to s inches water column for HPCI and 1g3 s inches water column for RCIC, which are the parameters-monitored on control room instruments.

These Functions isolate the Group 3 and 4 valves, as appropriate.

3.b. 4.b. HPCI and RCIC Steam Supply Line Pressure - Low Low MSL pressure indicates that the pressure of the steam in the HPCI or RCIC turbine may be too low to continue operation of the associated system's turbine. These isolations are for equipment protection and are not assumed in any transient or accident analysis in the FSAR. However, they also provide a diverse signal to indicate a possible system break. These instruments are included in Technical Specifications (TS) because of the potential for risk due to possible failure of the instruments preventing HPCI and RCIC initiations. Therefore, they meet Criterion 4 of the NRC Policy Statement (Ref. 7).

The HPCI and RCIC Steam Supply Line Pressure - Low signals are initiated from transmitters (four for HPCI and four for RCIC) that are connected to the system steam line. Four channels of both HPCI and RCIC Steam Supply Line Pressure - Low Functions are available and are required to (continued)

HATCH UNIT 2 B 3.3-159 REVISION 0

l Recirculation Loops Operating B 3.4.1 BASES LC0 and APRM Flow Biased Simulated Thermal Power - High setpoint ,

(continued) (LC0 3.3.1.1) must be applied to allow continued operation-consistent with the assumptions.of Reference 3. In addition, core flow as a functiun of core thermal power must be in the " Operation Allowed Region" of Figure 3.4.1-1 to ensure core thermal-hydraulic oscillations do not occur. i APPLICABILITY In MODES I and 2, requirements for operation of the Reactor Coolant Recirculation System are necessary since there is considerable energy in the reactor core and the limiting design basis transients and accidents are assumed to occur.

i In MODES 3, 4, and 5, the consequences of an accident are reduced and the coastdown characteristics of the recirculation loops are not important.

ACTIONS A.1 and B.1 6*d Due to thermal-hydraulic stability oncerns, operation of the plant with one recirculation loop is controlled by  :

restricting the core flow to 2: 45% of rated core flow when THERMAL POWER is greater than the 80s rod line. This  !

requirement is based on the recommendations contained in GE ,

SIL-380, Revision 1 (Reference 4), which defines the region ,

where the limit cycle oscillations are more likely to occur.

If the core flow as a function of core thermal power is in i the " Operation Not Allowed Region" of Figure 3.4.1-1, prompt '

action should be initiated to restore the flow-power combination to within the Operation Allowed Region. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is based on the low probability of an -

accident occurring during this time period, on a reasonable time to complete the Required Action, and on frequent core  !

monitoring by operators allowing core oscillations to be quickly detected. An immediate reactor scram is also

required with no recirculation pumps in operation, since all forced circulation has been lost and the probability of thermal-hydraulic oscillations is greater.

1 (continued)

HATCH UNIT 2 B 3.4-4 REVISION 0

Reactor Steam Dome Pressure B 3.4.10 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.10 Reactor Steam Dome Pressure BASES BACKGROUND The reactor steam dome pressure is an assumed value in the determination of compliance with reactor pressure vessel overpressure protection criteria and is also an assumed initial condition of design basis accidents and transients.

APPLICABLE The reactor steam dome pressure of s an SAFETY ANALYSES initial condition of the vessel overpressure protection analysis of Reference 1. This analysis assumes an initial maximum reactor steam dome pressure and evaluates the response of the pressure relief system, primarily the safety / relief valves, during the limiting pressurization transient. The determination of compliance with the overpressure criteria is dependent on the initial reactor steam dome pressure; therefore, the limit on this pressure ensures that the assumptions of the overpressure protection analysis are conserved. Reference 2 also assumes an initial reactor steam dome pressure for the analysis of design basis accidents and transients used to determine the limits for fuel cladding integrity (see Bases for LC0 3.2.2, " MINIMUM CRITICAL POWER RATIO (MCPR)") and 1% cladding plastic strain (see Bases for LC0 3.2.1, " AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)").

Reactor steam dome pressure satisfies the requirements of Criterion 2 of the NRC Policy Statement (Ref. 3).

LCO The specified reactor steam dome pressure limit of s psig ensures the plant is operated within the assumptions of the overpressure protection analysis.

1056 Operation above the limit may result in a response more severe than analyzed.

APPLICABILITY In MODES 1 and 2, the reactor steam dome pressure is required to be less than or equal to the limit. In these (continued)

HATCH UNIT 2 B 3.4-53 REVISION O

r Reactor Steam Dome Pressure B 3.4.10 BASES APPLICABILITY MODES, the reactor may be generating significant steam and (continued) events which may challenge the overpressure limits are possible.

In MODES 3, 4, and 5, the limit is not applicable because the reactor is shut down. In these MODES, the reactor pressure is well below the required limit, and no anticipated events will challenge the overpressure limits.

ACTIONS 611 With the reactor steam dome pressure greater than the limit, prompt action should be taken to reduce pressure to below the limit and return the reactor to operation within the bounds of the analyses. The 15 minute Completion Time is reasonable considering the importance of maintaining the pressure within limits. This Completion Time also ensures that the probability of an accident occurring while pressure is greater than the limit is minimized.

L.1 If the reactor steam dome pressure cannot be restored to within the limit within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.4.10.1 REQUIREMENTS ID5I9 i Verification that reactor steam dome pressure is s psig ensures that the initial conditions of the vessel overpressure protection analysis is met. Operating experience has shown the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency to be sufficient i for identifying trends and verifying operation within safety '

analyses assumptions.

l (continued)

HATCH UNIT 2 B 3.4-54 REVISION 0 l

ECCS - Operating B 3.5.1 BASES BACKGROUND pumps without injecting water into the RPV. These test (continued) lines also provide suppression pool cooling capability, as described in LC0 3.6.2.3, "RHR Suppressior. Pool Cooling."

Two LPCI inverters (one per subsystem) are designed to provide the power to various LPCI subsystem valves (e.g., inboard injection valves). This will ensure that a postulated worst case single active component failure, during a design basis loss of coolant accident (which includes loss of offsite power), would not result in the low pressure ECCS subsystems failing to meet their design function. (While an alternate power supply is available, the low pressure ECCS subsystems may not be capable of meeting their design function if the alternate power supply ,

is in service.)

The HPCI System (Ref. 3) consists of a steam driven turbine pump unit, piping, and valves to provide steam to the turbine, as well as piping and valves to transfer water from the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV through the feedwater sparger. Suction piping for the system is provided from the CST and the suppression pool.

Pump suction for HPCI is normally aligned to the CST source to minimize injection of suppression pool water into the RPV. However, if the CST water supply is low, or if the suppression pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for continuous operation of the HPCI System. The steam supply to the HPCI turbine is piped from a main steam line upstream of the associated inboard main steam isolation valve. p The HPCI System is designed to provide core coolin or a wide range of reactor pressures (162 psid to psid, vessel to pump suction). Upon receipt of an initiation signal, the HPCI turbine stop valve and turbine control valve open simultaneously and the turbine accelerates to a specified speed. As the HPCI flow increases, the turbine governor valve is automatically adjusted to maintain design flow. Exhaust steam from the HPCI turbine is discharged to the suppression pool. A full flow test line is provided to route water from and to the CST to allow testing of the HPCI System during normal operation without injecting water into the RPV.

The ECCS pumps are provided with minimum flow bypass lines, which discharge to the suppression pool. The valves in (continued)

HATCH UNIT 2 8 3.5-3 REVISION 0

RCIC System !

B 3.5.3 l i

B'3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM l

B 3.5.3 RCIC System ~

BASES L

BACKGROUND The RCIC System is not part of the ECCS; however, the RCIC  ;

System is included with the ECCS section because of their i similar functions.

The RCIC System is designed to operate either automatically or manually following reactor pressure vessel (RPV) isolation accompanied by a loss of coolant flow from the feedwater system to provide adequate core cooling and  :

control of the RPV water level. Under these conditions, the High Pressure Coolant Injection (HPCI) and RCIC systems perform similar functions. The RCIC System design ,

requirements ensure that the criteria of Reference 1 are  :

satisfied. ,

The RCIC System (Ref. 2) consists of a steam driven turbine pump unit, piping, and valves to provide steam to the turbine, as well as piping and valves to transfer water from '

the suction source to the core via the feedwater system line, where the coolant is distributed within the RPV through the feedwater sparger. Suction piping is provided from the condensate storage tank (CST) and the suppression pool. Pump suction is normally aligned to the CST to minimize injection of suppression pool water into the RPV.  ;

However, if the CST water supply is low, or the suppression l pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for continuous operation of the RCIC System. The steam supply to the J turbine is piped from a main steam line upstream of the associated inboard main steam line isolation valve. g The RCIC System is designed to provide core coolin for a wide range of reactor pressures (150 psig to psig).

Upon receipt of an initiation signal, the RCIC turbine accelerates to a specified speed. As the RCIC flow increases, the turbine control valve is automatically adjusted to maintain design flow. Exhaust steam from the RCIC turbine is discharged to the suppression pool, A full flow test line is provided to route water from and to the CST to allow testing of the RCIC System during normal j operation without injecting water into the RPV.  ;

4 (continued) i HATCH UNIT 2 8 3.5-23 REVISION 0 i

Primary Containment  :

B 3.6.1.1 l BASES (continued) i APPLICABLE The safety design basis for the primary containment is that  !

SAFETY ANALYSES 11. must withstand the pressures and temperatures of the limiting DBA without exceeding the design leakage rate.  ;

l The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERA 3LE such that release of fission products to the environment is controlled by the rate of primary containment leakage.

1 Analytical methods and assumptions involving the primary  !

containment are presented in References 1 and 2. The safety analyses assume a nonmechanistic fission product release  ;

following a DBA, which forms the basis for determination of  !

offsite doses. The fission product release is, in turn, based on an assumed leakage rate from the primary ,

containment. OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not ,

exceeded.

The maximum allowable leakage rate for the primary containment (L ) is 1.2% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> al. the maximum peak containment pressure (P,)

psig (Ref. 1).

Primary containment satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LC0 Primary containment OPERABILITY is maintained by limiting except prior to the first startup leakage to lessa than after performing requ L., ired 10 CFR 50, Appendix J, leakage test. At this time, the combined Type B and C leakage must be < 0.6 L and the overall Type A leakage must be

< 0.75 L .,, Compliance with this LC0 will ensure a primary containm,ent configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analyses.

Individual leakage rates specified for the primary containment air lock are addressed in LC0 3.6.1.2.

{ continued)

HATCH UNIT 2 B 3.6-2 REVISION 0

Primary Containment Air Lock B 3.6.1.2 BASES BACKGROUND containment leakage rate to within limits in the event of a (continued) DBA. Not maintaining air lock integrity or leak tightness ,

may result in a leakage rate in excess of that assumed in i the unit safety analysis.

APPLICABLE The DBA that postulates the maximum release of radioactive SAFETY ANALYSES material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE, such that release of fission products to the environment is controlled by the rate of primary containment leakage. The primary containment is designed with a maximum allowable leakage rate (L ) of 1.2%

byweightofthecontainmentairper24hoursatIhe calculated maximum peak containment pressure (P,) of OTS 4S J psig (Ref. 2). This allowable leakage rate forms the basis for the acceptance criteria imposed on the SRs associated with the air lock.

Primary containment air lock OPERABILITY is also required to minimize the amount of fission product gases that may escape primary containment through the air lock and contaminate and pressurize the secondary containment.

The primary containment air lock satisfies Criterion 3 of the NRC Policy Statement (Ref. 4).

LC0 As part of primary containment, the air lock's safety function is related to control of containment leakage rates following a DBA. Thus, the air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

The primary containment air lock is required to be OPERABLE.

For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows only one air lock door to be opened at a time. 'This provision ensures that a gross breach of primary containment does not exist when primary containment is required to be l

(continued)

HATCH UNIT 2 B 3.6-7 REVISION 0 l

r Drywell Pressure B 3.6.1.4 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Drywell Pressure j BASES BACKGROUND The drywell pressure is limited during normal operations to  !

preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (DBA) or loss of coolant accident (LOCA). j l

APPLICABLE Primary containment performance is evaluated for the entire SAFETY ANALYSES spectrum of break sizes for postulated LOCAs (Ref.1).

Among the inputs to the DBA is the initial primary containment internal pressure (Ref.1). Analyses assume an initial drywell pressure of 1.75 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA drywell internal pressure does not exceed the maximum allowable of 62 psig.

The maximum calculated drywell pressure occurs during the reactor blowdown phase of the DBA, which assumes an instantaneous recirculation line break. The calculated peak drywell pressure for this limiting event is 40-(Ref. 1).

Drywell pressure satisfies Criterion 2 of the NRC Policy Statement (Ref. 2).

LC0 In the event of a DBA, with an initial drywell pressure ,

s 1.75 psig, the resultant peak drywell accident pressure '

will be maintained below the drywell design pressure.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of  ;

radioactive material to primary containment. In MODES 4 and '

5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining drywell pressure within limits is not required in MODE 4 or 5.  !

l l

(continued) !

\

HATCH UNIT 2 B 3.6-29 REVISION 0

L .

l 1

, Main Condenser Offgas l

e 2 40 AC.~/src-4 hA; & a c.co servdivt fy f n edt & - core %<rmd paute of 2 8 FWs .

_- ____ n -

LCO with this requirement (2436 MWt x 100 Ci/HWt-second -

(continued) 240 mci /second).'-- ,

l APPLICABILITY. The LC0 is applicable when steam is being exhausted to the main condenser and the resulting noncondensibles are being  ;

processed via the Main Condenser Offgas System. This occurs j during MODE 1, and during MODES 2 and 3 with any main steam-  ;

line not isolated and the SJAE in operation. In MODES 4  ;

and 5, steam is not being exhausted to the main condenser- i and the requirements are not applicable. i ACTIONS A_d .

If the offgas radioactivity rate limit is exceeded, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore the gross gamma activity rate to within the limit. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on engineering judgment, the time required ,

to complete the Required Action, the large margins  !

associated with permissible dose and exposure limits, and the low probability of a Main-Condenser Offgas System rupture.

B.l. B.2. B.3.1. and 8.3.2 If the gross gamma activity rate is not restored to within the limits in the associated Completion Time, all main steam lines or the SJAE must be isolated. This isolates the Main Condenser Offgas System from the source of the radioactive steam. The main steam lines are considered isolated if at least one main steam isolation valve in each main steam line is closed, and at least one main steam line drain valve in the drain line is closed. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable; based on operating experience, to perform the actions from full power conditions in an orderly manner and without challenging unit systems.

An alternative to Required Actions B.1 and B.2 is to place the unit in a MODE in which the LCO does not apply. To achieve this status, the VMt mst be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> gM ut MM 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The (continued)

HATCH UNIT 2 B 3.7-33 REVISION 0

t Inservice Leak and Hydrostatic Testing Operation B 3.10.1

'B 3.10 SPECIAL OPERATIONS B 3.10.1 Inservice Leak and Hydrostatic Testing Operation BASES l

BACKGROUND The purpose of this Special Operations LCO is to allow i certain reactor coolant pressure tests to be performed in  !

MODE 4.when the metallurgical characteristics of the reactor ,

pressure vessel (RPV) require the pressure testing at temperatures > 212 F (normally corresponding to MODE 3).

i System hydrostatic testing and system leakage (same as inservice leakage tests) pressure tests required by l Section XI of the American Society of Mechanical Engineers  ;

(ASME) Boiler and Pressure Vessel Code (Ref. 1) are l performed prior to the reactor going critical after a  !

refueling outage. Inservice system leakage tests are performed at the end of each refueling outage with the i system set for normal power operation. Some parts of the  !

Class I boundary are not pressurized during these system i tests. System hydrostatic tests are required once per  ;

interval and include all the Class I boundary unless the i test is broken into smaller portions. Recirculation pump  :

operation and a water solid RPV (except for an air _ bubble l for pressure control) are used to achieve the necessary  !

temperatures and pressures required for these tests. The i minimum temperatures (at the required pressures) allowed for j these tests are determined from the RPV pressure and  ;

temperature (P/T) limits required by LCO 3.4.9, " Reactor i Coolant System (RCS) Pressure and Temperature (P/T) Limits." i These limits are conservatively based on the fracture ,

toughness of the reactor vessel, taking into account -

anticipated vessel neutron fluence. The hydrostatic test i requires increasing pressure to approximately HefrTsig. Il31 ~

The system leakage test requires increasing pressure to approximately 1 sig. .

With increased reactor vessel fluence over time, the minimum  ;

allowable vessel temperature increases at a given pressure.  ;

Periodic updates to the RCS P/T limit curves are performed ,

as necessary, based upon the results of analyses of  !

irradiated surveillance specimens removed from the vessel.  !

(continued)

HATCH UNIT 2 B 3.10-1 REVISION 0