ML20085H232

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1995 for Jm Farley Nuclear Plant Units 1 & 2
ML20085H232
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/31/1995
From: Allison S, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506210059
Download: ML20085H232 (10)


Text

~-. , . .. .

  • ' Southem Nuclear Oper1 ting Coveany

' - )' Post Office Box 1295 -

l

. Birmingham. Alabima 35201'

)

.- Telephone (205) 668-5131 I o... uor.y Southern Nudear Operating Company- -

Vice Pr.sident Farley Project the Southern electnc System .

l 1

June 12,1995. I Docket Nos. 50 348 50-364 U.S. Nuclear Regulatory Commission -4 ATTN: DocumentControlDesk Washington, D.C. 20555 -

Joseph M. Farley Nuclear Plant Monthlv Ooerating Data Reoort Gentlemen:

Attached are the May 1995 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as l required by Section 6.9.1.10 of the Technical Specifications. j 1

If you have any questions, please advise.

Respectfully submitted,

.pD SNfd' ) ,

e Dave Morey RWC:jgp(mor)

Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross l

l l

r

~

9506210059 950531 "

PDR ADOCK 05000348 R PDR l-o l \\

I

1 Joseph M. Tadcy Nuclear Plant Unit 1-Narrative Summary of Operations May 1995 There were no unit shutdowns or major power reductions'during the month.

There was no major safety related maintenance performed during the month.

7-OPERATING DATA REPORT DOCKET NO. 50-348 DATE June 8,1995 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 OPERATING STATUS

1. Unit Name: Joseph M. Farley- Unit 1
2. Reporting Period: May 1995 1) Cumulative data since 12-01-77, l
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. 1
4. Nameplate Rating (Gross MWe): 860_ ,
5. Design Electrical Rating (Net MWe): 829 l
6. Maximum Dependable Capacity (Gross MWe): 85CL l
7. Maximum Dependable Capacity (Net MWe): 812 l
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since j Last Report, Give Reasons: N/A '

1

9. Power Level To Which Restricted, if Any (Net MWe): N/A i
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative i'. H urs in Reporting Period 744.0 3,623.0 153,383.0
12. Number Of Hours Reactor Was Critical 744.0 3,532.7 122,789.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 744.0 3,512.9 120,966.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,969,706.8 9,286,628.7 311,422,345.7
17. Gross Electrical Energy Generated (MWH) 642,725.0 3,051,343.0 100,465,048.0
18. Net Electrical Energy Generated (MWH) 610,785.0 2,896,785.0 94,896,774.0 ,
19. Unit Service Factor 100.0 97.0 78.9
20. Unit Availability Factor 100.0 97.0 78.9
21. Unit Capacity Factor (Using MDC Net) 101.1 98.5 76.0
22. Unit Capacity Factor (Using DER Net) 99.0 96.4 74.6
23. Unit Forced Outage Rate 0.0 3.0 5.9  ;
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)- 1 Refiseling/ Maintenance Outage, September 16,1995. ilpproximately 33 day. j l
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A )
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved j l

Initial Criticality 08/06/77 08/09/77 l Initial Electricity 08/20/77 08/l8/77 i Commercial Operation 12/01/77 12/01/77 i

i

l DOCKET NO. 50-348-i UNIT 1

(, DATE June 8,1995 I COMPLETED BY - S. M. Allison

, TELEPHONE (334) 899-5156 ext.3442 MONTH' May l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

! l 824 17 820

'2 827 18 819 3 829 19 817 4 826 20 826 5 816 21: 826 6 821 22 826 ,

i 7 827 23 823 8 821 24 821 l

l 9 819 25 822 10 822 26 818

~

l1 820 27 819 l

12 821 28 819 f-13 818 29 818 14 815 30 817 15 815 31 819 16 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the

reporting period. Compute to the nearest whole megawatt.

L L

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNITNAME J. M. Farley - Unit 1 -

DATE_ June 8,1995 COMPLETED BY : S. M. Allison REPORT MONTH May ' TELEPHONE (334) 899-5156, ext. 3442 -

' METilOD OF LICENSEE CAUSE AND CORRECrlVE DURATION SilUTTING EVENT SYSTEM - COMPONENT ACTION TO

' NO. DATE TYPE (1) 110URS REASON (2) DOWN REACrOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE There were nO Shutdowns Or power reductions during the month.

i 4

=f f

1: 2- 3: 4: 5:

F: Forced Reason Method Exhibit G. Instrudons for Exhibit I- Same Source S: Scheduled . 'A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C -Refueling 3 - Automatic Scram . Report (LER) File (NUREG-0161)

D-Regulatory Restriction 4 - Other(Explain)

E - Operator Training & License Examination F - Administrative G-Operational Error (Explain)

I1- Other (Explain) -

6 8

o a

. _ . _ _ . _ _ 4 , . . _ _ . _ . _ _ _ _ - . _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _ _ . _ . . _ . _ . _ _ _ _ _ . _ _ _ _ _ _ _ . _ _

L' Joseph M. Farley Nuclear Plant

[ Unit 2 i Narrative Summary of Operations i

May 1995 l

There was no major safety related maintenance performed during the month.

l l

The unit was synchronized to the grid at 0645 on April 27,1995. During -

startup and following on line operation, higher than expected sodium ,

levels were observed in the secondary system and the steam generators. 1

- The higher than expected sodium levels resulted in several power reductions beginning on May 2,1995, to enhance the removal of sodium

( from the steam generators. The unit returned to 100 percent power at i 1100 on May 13,1995.

l .

. \

l At 0302 on May 14,1995, a power reduction was commenced and at 2046 -

l on May 15,1995, the unit was taken offline for secondary system l inspections as part of an investigation to determine the source of the  ;

_ higher than expected sodium levels.

Following the inspections, the reactor was taken critical at 1217 on May 24,' 1995, and synchronized to the grid at 2227 on May 25,1995. The unit

! was held at low power (approximately 30 percent) for further removal of sodium from the steam generators.

(

I

~ r .> + -; ~- e .-e -._. -- --- - , -n -rw.. -e---

OPERATING DATA REPORT DOCKET NO. 50-364 DATE June 8,1995 COMPLETED BY S.M. Allison TELEPHONE (334) 899-5156 ext. 3442 OPERATEGEEAIUS

1. Unit Name: Joseph M. Farley - Unit 2
2. Reporting Period: May 1995 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6 i
7. Maximum Dependable Capacity (Net MWe): 822 l
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A ,
10. Reasons For Restrictions, If Any: N/A l 1

l l

This Month Yr. to Date Cumulative

11. Hours in Reporting Period 744.0 3,623 1 121,296.0 1
12. Number Of Hours Reactor Was Critical 536.8 2,249.0 103,906.7 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 l
14. Hours Generator On-line 502.3 2,158.7 102,381.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 493,006.8 4,594,779.0 260,934,484.7 l
17. Gross Electrical Energy Generated (MWH) 134,723.0 1,487,971.0 85,542,513.0
18. Net Electrical Energy Generated (MWH) 107,843.0 1,379,411.0 81,101,709.0 1
19. Unit Service Factor 67.5 59.6 84.4 )
20. Unit Availability Factor 67.5 59.6 84.4 l
21. Unit Capacity Factor (Using MDC Net) 17.6 46.3 81.6
22. Unit Capacity Factor (Using DER Net) 17.5 45.9 80.7
23. Unit Forced Outige Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operat on): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

DOCKET NO. 50-364 UNIT 2 DATE June 8,1995

' COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)  ;

l l

1 251 17 0' 2 375 18 0 3 59 19 0 4 261 20 0 5 101 21 0 l

6 527 22 0 ,.

. 7 255 23 0 8 65 24 0-l 9 216 25 0 10 81 26 50 .

I 11 194 27 112 i 12 555 28 146 13 795 29 143 14 283 30 144 15 16 31 143 16 0 2

- INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting peric>i Compute to the nearest whole megawatt.

L - UNIT SHUTDOWNS AND POWER REDUCTIONS

DOCKET NO. 50-364 UNIT NAME . J. M. Farley - Unit 2 -

, DATE June 8,1995

. COMPLETED BY S. M. Allison REPORT MONTH May TELEPHONE (334) 899-5156, ext. 3442 METHOD OF LICENSEE CAUSE ANDCORRECTIVE DURATION - SHUTTING EVENT SYSTEM COMPONENT ACTION TO i

NO. DAll! TYPE (1) HOURS REASON (2) DOWN REACTOR (3) REPORT # - CODE (4)  : CODE (5) PREVENT RELNE

003 950502 S 262 9 H- N/A N/A. N/A- N/A- The unit was synchronized to the grid at 0645 on April 27, 1995. During startup and following on line operation, higher than expected sodium levels were observed in the f secondary system and the steam generators. The higher than expected sodium levels resulted in several power 3, reductions beginning at 1207 on May 2,1995, to enhance the removal of sodium from the steam generators. The unit returned to 100 percent power at i100 on May 13,1995.

emepw 2

g-h4 mppmr pr M eet Xubfa 4RMGsmadE gver vmpy mgmqwer

&abiced%;ssekds smw w ngs;qwmymw saluM2:4ddit@2 wqmpygwwwmmwwwn,er;nnpZahE,6 dd4EM:-efSA4142# upAMERWW 004 950514 S 283.5-  : H 1 N/A N/A N/A At 0302 on May 14,1995, a power reduction was 4' commenced and at 2046 on May 15,1995, the unit was taken off line for secondary system inspections as part of an investigation to determine the' source of the higher than expected sodium levels.

1: 2: 3: 4: 5:

F: Forced Re. son - Method Exhibit G. Instructions for Exhibit I - Same Source S: Scheduled ' A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling - 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

' E - Operator Training & License Examination e

F - Administrative G-Operational Error (Explain)

[- ,

H - Other (Explain)

}c .

n e

T -

e-

  • e- < - " *TM' vs e e-- --

W- d- 'm 7 -+ Am- _ T- f- T- -<W=

l

! UNIT SHUTDOWNS AND POWER REDUCTIONS ,

l l

j DOCKET NO. 50-364

l. - . UNIT NAME J. M. Farley - Unit 2 DATE June 8,1995 I.

COMPLETED BY S.M. Allison REPORT MONTH - - May TELEPHONE (334) 899-5iS6, ext. 3442 METiiOD OF LICENSEE CAUSE ANDCORRECTIVE DURATION SIIUITING EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPE (I) 1IOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE

[604 950514 S 283.5 H 1 N/A N/A. N/A Following the inspections, the reactor was taken critical at cont. 1217 on May 24,1995, and synchronized to the grid at 2227 on May 25,1995. The unit was held at low power (approximately 30 percent) for further removal of sodium from the steam generators.

i i-I 1: 2: 3: . 4: 5:

F: Focced Reason Method Exhibit G-Innh for "floit I- Saow Source S: Scheduled A -Equipment Failure (Explain) 1 - Manual Preparations ut Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C- Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 -Other(Explain)

E - Operator Training & License Examination F - Administrative G -Operational Error (Explain)

II- Other (Explain) 6 ,

b O  ?'.,