Monthly Operating Repts for Nov 1983
ML20083A019
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 11/30/1983
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8312200132
Download: ML20083A019 (17)


Text

__

k. ,

_\

e OPERATING DATA REPORT d-DOCKET NO. 50-269 '

DATE "- "

COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee No. 1 Notes

1. Unit Name:
2. Reporting Period: Eovanber 1.1983-November 30, 1983 Year-to-date and cumulative capacity factors are calcu-
3. Licensed Thermal Power OlWt): 2568 lated using a weighted
4. Nameplate Rating (Gross MWes: 934
5. Design Electrical Rating (Net MWe): 886
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): _ 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None-

9. Power Level To which Restricted. If Any (Net MWet: None
10. Reasons For Restrictions. If Any:

This Month Yr.to.Date Cumulative

11. Hours In Reporting Period 720.0 8 016.0 90 961.0
12. Number Of Hours Reactor Was Critical 720.0 6 129.6 63 796.6
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 720.0 6 062.4 60 645.4 l
15. Unit Reserve Shutdown Hours -

l

16. Gross Thermal Energy Generated (MWH) 1 864 359 15 279 249 144 398 936 17 Gross Electrical Energy Generated (MWH) 645 220 , _ ,

5 284 030 50 201 940 l 616 626 5 031 669 47 528 595

15. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 75.6 66.7
20. Unit Availability Factor 100.0 75.6 66.7
21. Unit Capacity Factor iUsing MDC Net) 99.6 73.0 60.6
22. Unit Capacity Factor (Using DER Net) 96.7 70.9 59.0
23. Unit Forced Outage Rate 0.0 1.0 17.7
24. Shutdowns Scheduled Over Next e Months IType. Date.and Duration of Each :

None l 25. If Shur Down At End Of Report Period. Estimated Date of '.,:artup:

26. Units in Test Status aPrior to Commercial Operations: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER A TION 8312200132 831130 Tt; e

S{ /

I- PDR ADDCK 05000269 8,,,...*

R PDR

AVERAGE D AILY UNIT POWER LEVIL DCCXIT NO. 50-269 ryg7 Oconee 1 D ATE 12-15-83 COMPLEHD BY J. A. Reavis TELEPHONE 704-373-7567 SiONDI November, 1983 DAY AVERAGE DAILY POWER LIVEL DAY

, AVERAGE DAILY POhER LIVIL (5the-Nets , 3 g w,.3,, ,

I 858 g7 860 2 858 859 13 3 857 816 19 4 858 20 859 5 854 858 21 6 858 ,, 858 7 858 , 859 3

3 858 859 9 856  :$ 858 to 857

  • 858
3 858 855 7

12 859 855 3

II 899 ;9 857 14 859 855 30 15 859 3; g6 860

!NSTRUCTICNS Cn this fctr::t list :ne aer:ge ugly ; .t: ; ;wer :e.e :., '.IWe..Nt f r ese , :., . ,, ... y . n , . . .

.: ne2 rest .vnete . egsw:::

i g - - , - , , , - , . _ _ , . . _ . - - . - . -

- ,,..,,-.,_.---.--,--..,-,,,-w .,,__,.y _, _y.y_,,p. ,p_-- ._,. . _ _ _- , - . - - - - , . , - ,

50-269 .

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO.

UNIT NAME Uconee 1 DATE 12/15/83 REPORT MONTil Novamhpr 1983 COMPLETED HY J.A. Reavis TELEPflONE 704-373-7567 I

"E -

C n re 3 un 3 n

(;4

.2 e . E, -:, .s % Licensee ct c Canse a C orcesive No. Date

.g gg g y g g. gyen o

y g g;

$5 E' j@g Repint a NG yU Prevent Recurrence d

i 14-P 83-11-19 S --

B -

CC Turbine valve movement test-VALVEX 1

1 1

l 1

i 1 2 1 4 F: Forced Reason: Methost: Exhibii G - Inst ructions S: Schetlulet! A Esluipment Failure (Explain) ^

1 -Manual for Preparation of Data 11 Maintenance of Test 2 Manual Scram. Entry Sheets for I.ieensee C Refocling .t Automatic Scram. Event Report (I.ER) File tNUREG-i D Itegulatory Restriction 1 Other (Explain) 01bl)

E Ope;ator Training 1 License Examination F Administrative 5 1 G-Opeiational Error (IIxplain) - Exhibit 1 Same Souree i 19/77) Il Other (Explain)

DOCKET N0: 50-269 UNIT: Oconee 1 DATE: 12/15/83 NARRATIVE SU N RY Month: November, 1983 Oconee unit I ran well the entire montt of November. Power was reduced on the 19th.

. for monthly valve testing.

M E

MONTHLY REFUELING INFORMATION REQUEST 8

- 1. Facility name: Oconee Unit 1 ,

2. Scheduled next refueling shutdown: February, 1985 ,
3. Scheduled restart following refueling: April, 1985 ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

. 7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 1123 .

8. Present licensed fuel pool capacity: 1312 .

Size of requested or planned increase: .

9. -Projected date of last refueling which can be accommodated by present i licensed capacity: .

DUKE POWER COMPANY Date: December 15, 1983 ,

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 4

J

-- - , . , - - - ,,- ,,,,w , ,.-,n- , - - , .---,---r,--,,--,-m,. , ~ - - - , - - . , - - - -- ~-

~

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 12-15-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee No. 2 Notes

1. Unit Name:
2. Reporting Period: November 1.1983-November 30, 1983 Year-to-date and cumulative capacity factors are calcu-
3. Licensed Thermal Power (}lWt): 2568 lated using a weighted
4. Nameplate Rating (Gross SIWE s: 934 5., Design Electrical Rating (Net alwe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any INet MWe):. None
10. Remons For Restrictions. lf Any:

This Month Yr..to.Date CumuL -ive

!!. Hours In Reporting Period 720.0 8 016.0 80 881.0

12. Number Of Hours Reactor Was Critical 0.0 ~5 799.0 56 712.7
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0.0 5 779.6 55 590.0
15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energy Generated (MWH) 0 14 574 039 131 237 348 17 Gross Electrical Energy Generated (MWH) 0 , _ , 4 962 ~19 44 674 916 Id. Set Electrical Energy Generated (MWH) _ - 3 879 4 735 306 42 405 541
19. Unit Service Factor 0.0 72.1 68.7
20. Unit Avsilability Factor 0.0 ,

72.1 68.7

21. Unit Capacity Factor iUsing MDC Net) 0.0 68.7 60.8
22. Unit Capacity Factor Using DER Net) 0.0 66.7 59.2
23. Unic Forced Outage Rate 100.0 4.1 16.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:

None

25. If Shut Down At End Of Report Period. Estimated Date of ~,:artup:

December 7, 1983

26. Units in Test StatusiPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER A TION pn- ;

s - . .. , - . . , _ . . , _ - . _ _ _ _ _ . . . _ , _ .

AVERAGE D ALLY UNIT ?OWER LEVEL

  • ~

DCCKET NO.

(3IT Oconee 2 DATE 12-15-83 e-COMPLETED BY J. A. Reavis TELEPHONE . 704-375-7567 310 NTH November, 1983 DAY AVERAGE DAILY ?OWER LEVEL DAY AVERAGE DAILY power LEVEL (3the-NetI t .\lhe-Net

~

I 17

- ~

2 I3

~

3 19 4 20

~

5 :1

- ~

6 n 7 ;3 3 24 l

l 9 -

s

~

10 25

!1 ._

12 ;3

- ~

13 29 l -

~

14 30 .

~ _

l 15 31 I6 i

!NSTRUCTICNS Cn th:s fer:: :t. list :..e v.er.ge f:tly 2. tt ;wer :e.e :., '.lWe Net f. t ese.*. ::. - .e s- :,y ::. r t-

. ,:..;;e ,

..e c.carest .vneie . .ep.v:::

l

..t-,

l

,.,,,me - , - . e, - --e..- - - . . m .- -- . --.--.--.,,e-- ,, - --,yyy ,--,--e,y3, - , ,, . - , , , - - ,

DOCKET NO.

50-270 LINil Sill!'lllOWNS ANI)11)Wl;lt Itlit UcIlONS UNIT NAnf E Ocnnce 2 ,

llATE 12/15/83 COMI'LEl En ijy J. A. Reavis fil:l' ult i alON'fil November, 1983 704-373-7567 1 ELEl'IloffE

= ii

-, {E 'h -3s'5 1.itensee ,E - r, fl, Cause & Cursective N. .. D.ite y, gg j .j {y li,ceis y ET Ac tions in F ~ ;f3 e iE U ED l'acvent llecussence f5 cI e  !

liegens 8:

u 6

6A 83-11-01 S 648.17 C - RC FUELXX Normal refueling and NSM work.

6B 83-11-28 F 71.83 A - CB PUMPXX Replaced seals on A2'and B2 RCP's 1 J .I l l l . n cil iteanno ' bleihusl: lixhibis G Insienceinn>

S S. licili.leil A.l'ignigonent l ailnie iI stilaint I hiannal l'or Prcparalinn of Dat.: .

Il bl.iinien.ini e os l'est 2. Alan n.nl Scs ain. I'nts) Sheces l'on 1.ieensee C iteluchog - .l. Ansoni.iiie Sann. I!vens Itepini ll.l'iti !!ile INlliti.G-Is.ites;nlatin) Itc> n.unn 1.t)theell.splain1 01611 I (Ipciatos leaniing; X li.cuv i vinonasion l'. A.hnniinisas ive 5 G Opcsaiinnal I nos llNplanin li.shihis 1 - Same Source t* p/ / Il 11 Hihen ll!.spl.un )

a DOCKET N0: 50-270 UNIT: Oconee 2 Date: 12/15/83 NARRATIVE

SUMMARY

Month: November, 1983-Oconee unit 2 entered the. month in aLrefueling outage. During heatup two reactor coolant pump . seals were found to have problems requiring their replacement.

Cooldown to replace seals-began' November 28 and seal work continued through the end of the month.

Iis giiig ug; i gg i i i

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 2 .

5

2. Scheduled next refueling shutdown: Unknown .
3. Scheduled restart following refueling: Unknown ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision 4

1 t If no, has reload design and core configuration been reviewed by Safety Review Committee'regarding unreviewed safety questions? N/A ,

5. Scheduled date(s) for submitting proposed licensing action and supporting

~information: N/A ,

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

m-

7. Number of fuel assemblies (a) in the core: 177 ,

(b) in the spent fuel pool: 1123 ,

8. Present licensed fuel pool capacity: 1312 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: December 15, 1983 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

[

  • Represents the combined' total for Units 1 and 2.

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 12-15-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATU_S_

Oconee No. 3 N0!'5

1. Unit Name: Year-to-date and cumulative
2. Reporting Period:

November 1, 1983-November 30, 1983 capacity factors are calcu-

3. Licensed Thermal Power (}lWt): 2568 lated using a weighted
4. Nameplate Rating (Gross MWei: 934 5.. Design Electrical Rating (Net MWe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): R99
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted. !f Any (Net MWel:
10. Reasons For Restrictions. If Any:

This Month Yr. to.Date Cumulative ,

11. Hours In Reporting Period 720.0 8 016.0 78 528.0
12. Number Of Hours Reactor Was Critical 720.0' 7 744.7 55 965.9

- - ~

, 13. Reactor Reserve Shutdown Hours

14. Hours Generator On.Line 720.0 7 695.4 54 838.6
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 843 970 19 532 474 133 581 535 17 Gross Electrical Energy Generated (MWH) 638 860 , _ ,

6 753 550 46 151 364

15. Net Electrical Energy Generated (MWH)- .

612 181 6 463 350 43 931 451 100.0 96.0 69.8

19. Unit Service Factor
20. Unit Availability Factor 100.0 96.0 69.8
21. Unit Capacity Factor iUsing MDC Net) 98 9 43 8 64.9
22. Unit Capacity FactorIUsing DER Net) 06 n 41 .0 63.1
23. Unit Forced Ourage Rate 0.0 1.7 15.4
24. Shutdowns Scheduled Over Next 6 Months (Type Date,and Duration of Each1:
Refueling - March, 1984 - 10 Weeks

-25. If Shut Down At End Of Report Period. Estimated Date of ',tartup:

26. Units in Test Status Prior to Commercial Operations: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION tm- ;

, AVERAGE D AILY LNIT ?owER LEVIL 50-287 DCCKIT NO.

g

. .;7 Oconee 3 DATE 12-15-83 COMPLEHD BY J. A. Reavis s

TELEPHONE 704-373-7567 November, 1983 MONE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mhe-Nets i.\lwe-Net s 851 g7 852

( 2 850 g3 854 3 851 gg 855 4 852 855 20 g 852 g 854 853 853 6 n 7 852 853 3

8 51 854 3

4 9 849 855 10 850 856 23 g 852 -- 855 12 770 856
3 t- 854 855

[ 29 14 853 30 856 15 853 3; 16 853

!NSTRL'CTICNS Cn th:s fermat. list :ne v.er:ge 2::!y 2..it r.er :e et :n '.twe Net f. r ces ::. -

.a ...e-..,2. . n; , . , .. . , . ,

.e cesrnt uncie me;:w:::

..-i

. _ - . - _ - _ _ = _ _ . .-

DOCKET NO. 50-287

  • UNITSilUTDOWNS AND POWElt RED.UCTIONS Uconee 3 UNIT NA%IE DATE 12/15/83.

COMPLETED BY J.A. Reavis ItEPOILT MONTil November. 1983 TELEPIIONE 704-373-7567 a.

w I

c e, 5 u, : ,. g Ei ensee . g7, cause & co,rective y, , -

  • n,n# ~i> .

5.

3 s ec E

T!3

.E ;; ce f

I: vent fit t; T c. T Aci;on in

$b N ti Report c $'0 0 Prevent Recurrence .j 6

15-P 83-11-12 S --

B -

CC VALVEX Turbine valve movement test.

l l

I l

I 2 1 1 F: Foiced Reamn: Method: Eshibii G - Instructions S: Schetluted A.!h i uipment Failure (laptain) l Manual to: Picp.uat.or ot n.u.i l

II. Maintenance of Test 2 Manual Scram. lintry Sheets for Licemee C. Refueling 1 Automatic Sciam. lisent Repor (I.ER) Fife (NUllEG-D. Regulatory Restiiction l Other (lixplain) 0161)

E. Ope.ator Training & License lixamination F.Administ ratire 5 G Opciational 1:rror (lisplain) Exhiba 1 - Same Sousee t'J/77) Il Other (!!xplain)

DOCKET N0: 50-287 UNIT:, Oconee 3 DATE: 12/15/83 NARRATIVE

SUMMARY

Month: November,1983 Oconee unit 3 ran well the entire month of November. Power was reduce'd on the-12th for monthly valve testing.

man. m.m. n

MONTHLY REFUELING INFORMATION REQUEST

1. Facility.name: .0conee Unit 3 ,
2. Scheduled next refueling shutdown: March, 1984 ,
3. Scheduled restart following refueling: May, 1984 ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

-If yes, what will these be? Technical Specification Revision

. If no, has reload design and core configuration been reviewad by Safety Review Committee tegarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A _
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

177

.7. Number of fuel assemblies (a) in the core: ,

(b) in the spent fuel pool: 0 .

i

8. Present licensed fuel pool capacity: 825 .

Size of requested or planned increase: .

'9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: December 15, 1983 ,

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

OCONEE NUCLEAR STATION Operating Status Report

1. . Personnel Exposure For the month of October,15 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 2.200 rem, which represents approximately 18.3% of that person's allowable annual

' limit.

2. The total station liquid release for October has been compared with the Technical Specifications annual value of 15 curies; the total release for October was less than 10 percent of this limit.

The total station gaseous release for October has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for October was less-than 10 percent of this limit.

L --

- DUKE PowEn Gonem P.O. HOX 03180 01tAnLorrat, N.O. 28242 HALB. TUCKER TELEPHONE vna r.ensommt (704) 373-4tKit

=mu. ..omvio. December 15, 1983 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of November, 1983.

Very truly yours, g <&

Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Mr. J. F. Suermann, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia 30303 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C. 20555 Atlanta, Georgia 30339 Senior Resident Inspector Oconee Nuclear Station e I i