Monthly Operating Rept for Nov 1983
ML20082R513
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/01/1983
From: Buiter G, Giesler C
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
CON-NRC-83-220 NUDOCS 8312130197
Download: ML20082R513 (5)


Text

.

.O e

DOCKET 50-305 KEEAUNEE NUCLEAR POSEE PLANI SUSEAPY CF OPEEATING EXEERIENCE NOVEMBER, 1963 CPERATIONS: Cn November 20, unit load was reduced for the performance of the monthly Tuttine Stop Valve test. The unit was returned to full power the same day.

hAINTENANCE: Replaced a test button in a Beactor Control and Protection circuit.

Sepaired a signal convertor in a Reactor Coclant wide range temperature circuit.

Sepaired a shorted relay in a Steam Exclusion circuit.

Beplaced both Diesel Generator tachometers.

Bepaired a Doric Acid Ecat Tracing tesperature control circuit.

Sepaired a Charging Purp discharge pipe leak.

Pepaired a broken bracket for auxiliary contacts in a Eafety Injection pump breaker.

Febuilt a Service Water pump.

8312130197 832201 -

DR ADOCK 05000305 F PDR

  • AY ZB AGE DAILY UNIT POW EE IIYEL CCCNET NO- 50-305 UNIT- KEWAUNEE COMPLETED SY- G. H. EDITER TELEPHONE- 414-388-2560 1225 EEECET ECN1H NOVEEEEE, 1983 AVIE&GE CAILY DAY PCEEE IEVEL (BEE-NET) 1 512 2 52C 3 516 4 516 5 516 6 520 7 5 16 8 516 9 516 10 516 11 516 12 516 13 520 14 516 15 516 16 516 17 516 18 520 19 5 16 20 491

, 21 5 12 l 22 516

! 23 5 16 l 24 516

! 25 516 I

26 52C 27 517 28 517 29 517 l 30 517 i

l l

l l

l l

i

. , , , - - . - ,,n.- - -,, - --,-.

J .

L .

. j.

UNIT 5HUTDCW 55 &5 t POE E8 B EDDCTION5 V

ECCBET 30: 50-3C5 '

J' UNIT BA5E: Renaunce CATE: Decester 1, 1983 CC5PLETED Bf: G. H. Bulter s)

TELEPHONE: 414-Je8-256C x225 w

O FEPORT HCE1E - 50VEEBEd, 1983

  • i NO. l' DATE lTIPE)DDRATIONlBEA505h!TUCDl1EE EDEBES )STSj CC E f r35!uf l CC55EE15 l .J

&  :  : I e  :  : 4 t I  ;

4 I I I I I I I I I i

' I I l i I I I I J I so shutdowns or power reductions in Ecvester. I J l i I i 1 I I I i 1 I I I I I I I I I I I I

  • I I I I i  ! I, I i i l- J l i I I I 1 I I i 1 I I i 1 1 1 I I I I I I

' I i I I I 1 1 1 1 I I J l I 1 1 1 1 I I I I I

' ! 1 I I I I i 1 1 I i i 1 1 I I I I I i l l J l

I i

i i

i i i I i

I i

I i

I i

I i

1 I.

  • I I I I i 1 I I I I I I D 1 1 1 1 1 1 I I i i i i I i i  ! l I J l i I
  • I I I I I i 1 1 1 1 I O I i 1 1 I I i 1 1 I I I I I I I i 1 I I I I -

I I I I I I I I I I -

, t O I I I I i 1 I i l I l 4 I I I i 1 I i 1 I i 1 .

1 I I I I I I I I I I J l i I I I I I I I I I I I I I I I I I I I l I I i 1 1 I i 1 1 I I J l 8 I I I I I I I l . I I I I I I I I I I I

~

l 1 1 1 I I I I I I I I J l 3 I I 1 1 1 1 1 1 - 1 v

1 1 1 I I. I. J. l. l I I i . . .

. g TYPE 1E1505 EZIHCD SYSTED 5 C05P03EhT CCDES J

F: Forced 'A-Equipment Failure IExplain) 1-Eanual Frcs BUBEG-0161 S: Scheduled E-saintenance or Test 2-eanual Scras C-Sefueling 3-Automatic Scras U E-sequiatory Bestriction 4-Continuations E-CFerator Training & License Izaminatica 5-Load Beductions 2-Administrative 9-Cther O G-Cperational Irtor I!zplain) y L-Cther IExplaina

' %5 OPEB ATI N C D AT A

  • _)

B EPOBT

' A-ECC3ET NO- 50-305 iJ CCEPLETED DT- G. H. BUITIS OPEBATING ST&TUS T E L E P BO N E- 414-388-2560 1225 ss J

1 DNIT NA5E REWAUNEE **********************************************

b +

2 JEPOETING PEBICD NOVE5BER, 1983

  • O
  • NCTES
  • b-3 LICIBSID THEB5AL POWEB (5ET) 1650 Norsal full power operation continued
  • UD
  • through this reporting period. *

. s, 4 N35EPLATE BATING (GBCSS BEE) 560 *

  • 5 DESIGN ELECIBIClL BATING (WET 5WE) 535

()

  • e

- \< 529 6 EAZIBUM DEPENCAELE CAPACITT (GBOSS EWE) * * -)

  • s
%- 7 54115U5 DEPENDARLE CAPACITY INET EWE) 503 **********************************************

8 IF CHANGES CCCUE IN CAPACITY BATINGS (ITE55 305EER 3 TBFCUGE 7) SINCE LAST BEPOBT, GITE BEISONS J

Note t

\"

J

' u 9 POWEB LEVEL 10 kHICH BESTRICTfD, IF ANY [ NET B E E) None 10 BEASCNS FOR EESTBICTIONS, IF ANY J

.v J

THIS 50 NTH YB-TC-DATE CUBUIATIVE

  • 11 BCUBS IN SEECETING PIBICD 720 8016 82921 12 NUMEER OF H0085 BEACTOR EAS CBITICAL 720.0 6f84.4 70436.0 I) 13 BEAC105 BESEBVE SHUTE 0VN HCUBS 0.0 0. 0 2330.5 14 HOUBS GENERATCB 05-LINE 720.0 6591.7 69068.3 15 UNIT BESEBVI SUTDOWN HOUBS 0.0 0.0 10.0 /

w 16 GBOSS THEB5&L EEERGY GEN! BATED (5NH) 1183857 10646580 101746581

,.)

17 GEOSS ELECTBICAL ENEBGY GENEBATED (BEU) 389700 3487900 35455500 18 NET ELECTSICAL ENERGY GENEBATED (RWB) 371360 3322404 33747512 J 19 UNIT SEBVICE FACTCB 100.0 82.2 83.3 s J 20 UNIT AVAILABILITY FACTOB 100.0 82.2 83.3 21 UNIT CAPACITY FACTGB (USING EDC NET) 102.5 80.9 78.1 d) 22 UNIT CAPACITY FACTCB (USING CEB NET) 96.4 77.5 76.1

! 23 UNIT FCBCED CUT AGE B ATE 0.0 0.5 4.0 24 SHUTDCWNS SCHEDULIC CVEB NEIT 6 EONTBS (TYPE, CATE, AND CUBATICN CF EACH) II Fef ueling outage of 8-week duration scheduled to start March 18, 1983.

I 25 IF SHUT CCNN AT END CF BIPCBT PEBICE, ISTIBATEC DATE CE STAETUP - N/A e II

'I

j NRC-83-220 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 December 9, 1983 Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for November 1983 are enclosed.

Very truly yours,

$ )

C. W. Giesler Vice President - Nuclear Power JGT/js Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Ted Cintula US NRC - Maryland National Bank Bldg Washington, D.C. 20555 Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div. of Licensing INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, l Atlanta, GA 30339

'//