ML20082H851

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 95-02 to Cover Sheet & Table of Contents,Change 0 to RP/0/B/1000/25,Chemistry Manual 5.1 & Chemistry Manual 5.2
ML20082H851
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 03/16/1995
From: Hampton J
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082H855 List:
References
NUDOCS 9504170386
Download: ML20082H851 (1)


Text

'

l i

"s  ; l

' DukeIbwerCompany J W.HA wros

! , OconeeNuclearSite Dce President PD. Box H39 (803)&SS3499 Office Senece SC29679 -

(803)8853564 Fax DUKEPOWER l March 16, 1995 I

l l

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 i

Subject:

Oconee Nuclear Station '

Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual l Volume B, Revision 95-02 i l  :

Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:

Volume B Revision 95-02 March 16, 1995 This revision is being submitted in accordance with 10 CFR 50-54 (q) and does not decrease the effectiveness of the Emergency Plan or j the Emergency Plan Implementing Procedures.

Please delete privacy material in the form of personal telephone numbers prior to placing in the Public Document Room.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.

Ver truly yo rs,

. W. Ha pton VP, Oconee Nuclear Site xc: (w/2 copies of attachments)

Mr. Stewart D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 At.lanta, Georgia 30323 (w/o Attachments, Occnee Nuclear Station)

NRC Resident Inspector C. C. Jennings, Manager, Emergency Planning" 9504170386 950326 a- hDR ADDCK 05000269 f I

PDR '

w on wwmoaw l \