Monthly Operating Rept for Feb 1995 for Waterford 3 Ses.W/
ML20081C052
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/28/1995
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0042, W3F1-95-42, NUDOCS 9503170093
Download: ML20081C052 (7)


Text

_ . . .-- -- - - - - - - - - . - - - - - - -

4- ,

., .[ 'e cz'ENTERGY .-

ET"B Kilkm LA 70066 -

To! 504 739 6774 R. F. Burski Ometor, hear Cafety Wrerterd 3 i

W3F1-95-0042-A4.05 I PR March 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report ,

Gentlemen:

Attached is the subject monthly report which covers the operating  :

statistics for the month of February, 1995. This report is submitted per  ;

Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.  ;

Very truly yours,

, , p R.F. Burski .

Director  ;

Nuclear Safety  ;

RFB/DFL/ssf i

Attachment cc: L.J. Callan (NRC Region IV)

C.P. Patel, NRC-NRR  !

R.B. McGehee  ;

N.S. Reynolds F. Yost (Utility Data Institute, Inc.) i J.T. Wheelock (INP0 Records Center) f NRC Resident. Inspectors Office l

i 9503170093 950228 }\

PDR R

ADOCK 05000382 \ -

5 PDR w - - .,.-,c.- ,

+ a9 -

  • b i

.i NRC MONTHLY OPERATING REPORT ,

SUMMARY

OF OPERATIONS  ;

WATERFORD 3

~. : FEBRUARY 1995 l The unit operated at an average reactor power of 99.8%'and experienced no shutdowns or s!gnificant power reductions during the period.

3

-t b

i 5

i n

4 j l

a .

s l'

a PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3.

During the month of February 1995, there were no pressurizer safety valve failures'or challenges.

a

7 j

i OPERATING DATA REPORT

, DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 .

COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 OPERATING STATUS

1. Reporting Period: February,1995 >

Gross Hours in Reporting Period: _Ql2.

2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Numbe. of Hours Reactor was Critical 672.0 1,416 70,138.8
6. Reactor Reserve Shutdown Hours ' 0-
7. Hours Generator was On-line 672.0 1,416 69,260.3
8. Unit Reserve Shutdown Hours 9. Gross Thermal Energy Generated (MWH) 2,273,361 4,791,298 229,120,907
10. Gross Electrical Energy Generated (MWH) 757,490 1,595,970 76,330,430 i
11. Net Electrical Energy l Generated (MWH) 726,479 1,530,792 72,773,158 l
12. Reactor Service Factor .

100.0 100.0 84.8

13. Reactor Availability Factor 100.0 100.0 84.8 I
14. Unit Service Factor 100.0 100.0 83.8
15. Unit Availability Factor 100.0 100.0 83.8
16. Unit Capacity Factor (using MDC) 100.6 100.6 81.9
17. Unit Capacity Factor (Using DER) 97.9 ..

97.9 79.7

18. Unit Forced Outage Rate 0.0 0.0 3.1

I OPERATING DATA REPORT

, DOCKET NUMBER: 50-382 .

UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY: T.S. BECKER -

TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Cont

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A

20. If Shutdown at end of report period, estimated date of startup:
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 672.0 1,416 82.681.0
23. Unit Forced Outage Hours 0.0 0.0 2.210.2
24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (ltems Number 2 and 24) Since Last Report, Give Reasons: N/A i

i i

t

r- ,

AVERAGE DAILY UNIT POWER LEVEL

~

' DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY: T.S. BECKER .

TELEPHONE: 504-739-6683  ;

MONTH FEBRUARY.1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL  :

(MWe-NET) (MWe-NET) 1 1080 17 1081 2 1082 18 1082 3 1082 19 1082 4 1082 20 1082 5 1082 21 1082 ,

6 1082 22 1083 7 1081 23 1081 i 8 1082 24 1084 9 1081 25 1085 10 1081 26 1090 11 1039 27 1088  ;

12 1079 28 1090 l 13 1081 29 N/A i

14 1082 30 N/A '

15 1082 31 N/A i

16 1082 i l

l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

..1 x

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 - '

UNIT NAME: WATERFORD 3 -

DATE OF REPORT: MARCH,1995 COMPLETED BY: T.S. BECKER -

TELEPHONE. 504-7394683 '

REPORT FOR FEBRUARY.1995 Type Method of Shutting F = Fotted Duration Down the Reactor or Cause, Comments and .

Number Qat.e S = Scheduled (Hours) Reason (1) . Reducina Power (2) Corrective Actions NONE A

l (1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= . Refueling 3= Automatic Scram D= Regulatory Restriction 4= Continuation fmm Previous Period E= OperatorTraining and 5= Power Reduction Liccpse Examination 6= Other(explain)

F= Aoministrative G= Operational Error (explain)

H= Other (explain) '

i