MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error HL-2231, Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....'1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....' HL-1946, Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-091992-02-20020 February 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-09 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J9351997-10-0606 October 1997 Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20137N1751997-04-0404 April 1997 Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20059E6831993-10-21021 October 1993 Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively, Relocating Procedural Details Contained in Radiological Effluent Ts,Incorporating New Part 20 & Revising Frequency of Reporting Radiological Effluent Releases HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error 1999-07-29
[Table view] |
Text
- - - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . - - . _
j C earga hw Cnany l ,
- 33) P eteu Awna
{ .. At % ucq a W ;;
bcpt(.ed',4';[ u e M i g AJJT e t O i xic; .u (e ter rn 6.,y IP.!(,9 cp b w 1;t Dam
'c vc+ 'nAscc R R Mcdonald to u ,e v s e n. 4 ,*
O i(D 002358 June 13. 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Room Washington, D.C. 20555 Pl. ANT HATCH - UNITS 1 AND 2 NRC DOCKETS 50-321 AND 50-366 OPERATING LICENSES DPR-57 AND NPF-5 REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL POOL WATER DEPTH AB0VE 1RRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR CAllBRATION FRE0VENCY Gentlemen:
In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59 (c)(1), Georgia Power Company (GPC) hereby proposes changes to the Plant Hatch Units 1 and 2 Technical Specifications, Appendix A to Operating Licenses DPR-57 and NPF-5.
The first proposed change involves revisions to Plant Hatch Units 1 and 2 Technical Specificattor.s to modify the minimum required water depth covering irradiated fuel assemblies seated in the fuel storage racks. This change is necessary because the available depth of water over the fuel assemblies has been reduced by the installation of the high density fuel storage r' .ks and a determination that the spent fuel pool depth requirement will be measured from the top of the stored assembly upper tie plate. In addition, this change will make the surveillance requirements for assessing the spent fuel pool water level and the associated Bases the same for the two units. This proposed change will also correct typographical errors in two Unit 2 tables.
Specifically, the Hatch-1 and Hatch-2 Technical Specifications will require at least 21 feet of water be maintained above irradiated fuel assemblies seated in the storage racks. The Bases will define the top of fuel assemblies as the top of the upper tie plates and will discuss the fraction of iodine removed by the pool coolant following a fuel handling accident in the spent fuel pool. The Unit 1 surveillance interval for determining the spent fuel pool water level will be increased from once per day to once per week, consistent with Unit 2 and the BWR-4 Standard Technical Specifications. This change will also correct typographical errors that occurred when the pages for Amendment 109 for Unit 2 were printed.
91061e0300 910613 PDR ADOCK 0500034'1 p FDR g
'/ <
U.S. Nuclear Regulatory Commission Page 2 June 13. 1991 The second proposed change involves revisions to Plant Hatch Unit 1 Technical Specifications related to the calibration frequency associated with the post-LOCA radiation monitors. The Hatch-1 Technical Specifications presently require that the post-LOCA radiatior, monitors be calibrated at least once every 6 months. This calibration interval is requested to be revised to at least once every 18 months which will maintain consistency with the Hatch-2 Technical Specifications and the BWR-4 Standard Technical Specifications for radiation monitors of a similar function and type. This proposed change will also clarify Hatch-1 Technical Specifications Table 3.2-11 footnote (c) concerning LC0 actions.
Enclosure 1 provides a detailed description of the proposed changes and the circumstances necessitating the change request.
Enclosure 2 details the bases for our determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 provides page change instructions for incorporating the proposed changes. The proposed changed Technical Specifications pages for Units 1 and 2, including markups, follow Enclosure 3.
To allow time for procedure revisions and orderly incorporation into copies of the Technical Specifications, GPC requests the proposed amendment, once approved by the NRC, be issued with an effective date to be no later than 60 days from the date of issuance of the amendment.
In accordance with the requirements of 10 CFR 50.91, the designated state official will be sent a copy of this letter and all applicable enclosures.
Mr. R. P. Mcdonald states that he is executive vice president and is duly authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
GEORGIA POWER COMPANY ,
) /
I 1
,- f *, o
,i . y [ ]
BY L ..
L
. A & La
~ R. P. Mcdonald Sworn to and subscribed before me this /3 day of r/ -- 1991.
Q Cs gotary Public uv enugTON DFiRES JMrJI,RY 17.1993 RPM:JMG/ gps
U.S. Nuclear Regulatory Commission Page 3 June 13, 1991
Enclosures:
- 1. Basis for Change Request
- 2. 10 CFR 50.92 Evaluation
- 3. Page Change Instructions cc: Georoia Power Company Mr. J. T. Beckham, Jr., Vice President Mr. H. L. Sumner, Jr., General Manager-Plant Hatch Mr. J. D. Heidt, Manager, Engineering and Licensing - Plant Hatch NORMS V.S. Nuclear Regulatory Commission. Washinaton. D.C.
Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion L1 Mr. S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch State of Georaia Mr. J. D. Tanner, Commissioner - Department of Natural Resources HL-1685 002358
l ..
ENCLOSURE 1 PLANT HATCH-UNITS 1 AND 2 NRC 00CKETS 50-321 AND 50-366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL P0OL WATER DEPTH AB0VE 1RRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR CAllBRATION FRE0VENCY BASIS FOR CHANGE REQUEST PROPOSED CHANGE 1:
This proposed change will:
- 1) Revise Hatch-1 Technical Specification 3.10.D and the associated Bases to require at least 21 feet of water above irradiated fuel assemblies seated in the spent fuel pool (SFP) fuel storage racks. A similar change to the Hatch-2 Technical Specification 3/4.9.10 and the associated Bases is also proposed. The change to the Unit I and 2 Bases will define the top of the fuel assembly as the top of the upper tie plate and delineate the fraction of iodine removed in the SFP coolant following a postulated fuel handling accident.
- 2) Modify Hatch-1 Technical Specification 4.10.0 to require surveillance of the SFP water level every 7 days, consistent with the Hatch-2 Technical Specifications and the BWR-4 Standard Technical Specifications requirements.
- 3) Correct editorial errors in Hatch 2 Tables 3.3.2-1 and 3.8.2.6-1.
BASIS FOR PROPOSED CHANGE 1:
The SFP system and high density fuel storage racks do not support the current 23 foot depth requirement in the Hatch-2 Technical Specifications, if the depth requirement is measured from the top of the stored bundle upper tie plate to the low level SFP alarm. Therefore, GPC has evaluated the relevant accident analyses to support a change to 21 feet. One of the assumptions in the calculation of the radiological consequences of a postulated fuel handling accident in the spent fuel pool is the amount of radioactive iodine removed by the SFP coolant following the accident. The acceptance criteria established in the NRC Standard Review Plan 15.7.4 for the radiological consequences for this event is a thyroid dose of 75 rem and a whole-body dose of 6 rem at the exclusion area and low population zone boundaries. As described in NRC Regulatory Guide (RG) 1.25, a water HL-1685 002358 El-1
ENCLOSURE 1 (Continued) 4 REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL P0OL WATER DEPTH ABOVE IRRADIATED FUEL.
CORRECTION OF ADMINISTRATIVE ERRORS, AND l POST-LOCA RADIATION MONITOR CALIBRATION FRE00ENCY BASIS FOR CHANGE REQUEST depth of 23 feet over the fuel rods would remove 99% of the iodine assumed to be released from the ruptured rods; however, it alsa acknowledged that a smaller decontamination factor may be used if justified by a conservative calculation. Using the methodology prescribed in RG 1.25, a calculation )
l has been performed, and it was concluded that a water level of 21 feet I
above the top of the upper tio plates would result in an iodine reduction of 98.6%. The resultant calculated inhalation (thyroid) exposures at the exclusion area and low population zone boundaries were .358 rem and .370 rem, respectively. Because whole-body exposures are primarily due to the noble gases which are not removed by the pool coolant, the original whole-body exposure determination is not affected by these changes. Thus, the radiological consequences of a fuel handling accident in the SFP would remain far below the 75 rem thyroid and 6 rem whole-body acceptance limits contained in Standard Review Plan 15.7.4. At the minimum pool level (low level alarm), the top of the upper tie plates of fuel assemblies are more than 21 feet below the coolant surface.
The Hatch-1 and Hatch-2 Bases sections will explicitly recognize that the NRC has interpreted the top of a fuel assembly to mean the top of the upper l tie plate for purposes of fuel storage.
The current Hatch-1 Technical Specifications require the SFP water level be determined daily when irradiated fuel is stored in the pool; however, the surveillance interval is only once per week for Hatch-2 and in the BWR-4 Standard Technical Specifications.
Footnote (i) in Table 3.3.2-1 refers to the suppression pool area temperature time relays used for valve isolation (item 4 9 of the table).
During the printing of the amended Technical Specifications page for Amendment 109, footnote (i) was inadvertently moved to 4.h. This footnote l
should not have been moved, nor did the NRC approve this change when
, Amendment 109 was issued. Similarly, items f.16 and f.17 of Table
- 3.8.2.6-1 were inadvertently retained during the printing of Amendment 109, l but should have been deleted. The NRC approved the relocation of these two
" magnetic only" (mo) drywell cooling breakers as items f.14 and f.15 of that table when Amendment 109 was issued.
HL-1685 002358 El-2 l
l
ENCLOSURE 1 (Continued)
REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL POOL WATER DEPTH AB0VE IRRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR Call 8 RAT 10N FRE0VENG1 BASIS FOR CHANGE REQUEST l
PROPOSED CHANGE 2:
1 This proposed change will:
- 1) Revise the Hatch-1 Technical Specification Table 4.2-11 to require that the post-LOCA radiation monitors be calibrated at least once every 18 l months.
- 2) Revise footnote (c) of Table 3.2-11 concerning LC0 actions, l
BASIS FOR PROPOSED CHANGE 2:
The Hatch-1 Technical Specifications presently require that the post-LOCA radiation monitor be calibrated at least once every 6 months, These monitors are considered a passive portion of radiation control because they do not actively handle or control radiation hazards but only provide alarm capability. This calibration interval is requested to be revised to at least once every 18 months which will maintain consistency with the Hatch-2 Technical Specifications and the BWR-4 Standard Technical Specifications for radiation monitors of a similar function and type. Identical type and manufacture instruments are installed as post-LOCA monitors in Hatch-2.
The Hatch-2 Technical Specification calibration interval for these instruments is at least once every refueling outage, which is defined in both units as 18 months. Field data of the Hatch-1 post-LOCA monitors was reviewed for two successive 18 month source calibrations. The instruments were found to be within the acceptance criteria. These instruments did not drift outside their acceptance range over the 36 month period; therefore, it can be concluded that there is sufficient stability in the monitor to allow calibration on 18 month intervals rather than 6 month intervals.
The LC0 action stated in Hatch-1 Technical Specifications Table 3.2-11 note (c) is being clarified by substituting the comparable Hatch-2 Technical Specifications ACTION. This revision will provide consistency between the actions of both unit's technical specifications.
HL-1685 002358 El-3 i
ENCLOSURE 2 PLANT HATCH UNITS 1 AND 2 NRC DOCFETS 50-321 AND 50 365 REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL P0OL WATER DEPTH AB0VE 1RRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR CALIBRATION FRE0VENCY 10 CFR 50.92 EVALUATION l
The Commission has provided standards in 10 CFR 50.92(c) for determining l whether a significant hazards consideration exists. The bases for this l determination are as follows: !
DESCRIPTION OF PROPOSED CHANGE 1:
- 1) Revise Hatch-1 Technical Specification 3.10.0 and the associated Bases to require at least 21 feet of water above irradiated fuel assemblies seated in the spent fuel pool (SFP) fuel storage racks. A similar change is proposed for Hatch-2 Technical Specification 3/4.9.10 and the associated Bases.
- 2) Modify Hatch-1 Technical Specification 4.10.0 to require surveillance of the SFP water level every 7 days, consistent with the Hatch 2 Technical Specifications and the BWR-4 Standard Technical Specifications requirements.
- 3) Correct editorial errors in Hatch 2 Tables 3.3.2-1 and 3.8.2.6-1.
BASIS FOR PROPOSED CHANGE 1 NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION:
l The change does not involve a significant hazards consideration for the i following reasons:
- 1. The 3roposed amendment does not involve a significant increase in the proba)flity or consequences of an accident previously evaluated.
The proposed changes to the Hatch-1 and Hatch-2 Technical l Specifications concerning minimum water depth, including surveillance requirements, above irradiated fuel do not involve any changes in plant HL-1685 l
002358 E2-1 l
ENCLOSURE 2 (Continued)
REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL POOL WATER DEPTH AB0ve IRRADIATED FUEL, CORRECTION OF ADMINISTRATlh .:RRORS, AND POST-LOCA RADI ATION MONITOR Ct' IBRATION FRE00ENCY 10 CFR 50.92 EVALUATION equipment or operation, including setpoint changes for spent fuel pool water level; therefore, they do not result in a significant increase in the probability of an accident previously evaluated in the FSARs.
Calculations of the radiological consequences of the proposed minimum water depth covering irradiated fuel during storage (21 feet over the top of the upper tie plates) have shown that exposures at the exclusion area and low population zone boundaries are significantly below the acceptance criteria for a postulated fuel handling accident in the spent fuel pool. Thus, these changes will not result in a significant increase in the consequences of an accident previously evaluated in the Hatch FSARs.
The correction of errors in final, printed Technical Specifications pages is administrative only and does m t result-in any changes to ,
plant systems, components, or plant ot' rations; thus, it does not significantly increase the probability or ,onsequences of an accident previously evaluated in the FSARs.
l 2. The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed Technical Specifications changes do not create the possibility of an accident of a different type than any previously evaluated in the Hatch FSARs because they do not change the physical configuration of the plant or r the mode of operation or setpoints of any equipment in the plant.
- 3. The proposed amendment does not involve a significant reduction in the margin of safety.
A calculation of exposures at the exclusion area and low population zone boundaries determined that the thyroid doses would be .358 and
.370 rem, respectively, when 21 feet of water covers the top of the
- upper tie plates of irradiated fuel seated in the SFP storage racks, l'
This compares to .256 and .264 rem, respectively, when the water depth HL-1685 002358 E2-2
i I
l ENCLOSURE 2 (Continued)
REQUEST TO REVICE TECHNICAL SPECIFICATIONS SPENT FUEL POOL WATER DEPTH AB0VE IRRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR CAL 1BRATION FRE0VENCY 10 CFR 50.92 EVALUATION is 23 feet. The difference in these exposures is due to the reduced iodine removed by the SFP coolant when the depth is 21 feet instead of 23 feet. Thus, there is only a slight increase in the calculated I radiological consequences of the fuel handling accident. However, l these exposures are still far below the Standard Review Plan acceptance l criteria for thyroid dose of 75 rom. Whole-body exposures are primarily due to the noble gases which are not removed by the SFP '
coolant; the original determination of whole body exposures is not i affected by these changes. Since the change in water depth covering j irradiated fuel in the SFP storage racks and the resultant fraction of iodine removed by the coolant following a postulated fuel handling 1
accident in the spent fuel pool will not result in the acceptance limit being exceeded, there is no significant decrease in the margin of safety as a result of this change.
Changing the Unit I surveillance requirement for determining the SFP water level from daily to week 1v will not reduce the margin of safety because the radiological conseqs'nces of a fuel handling accident in
, the SP will not exceed the acceptance limit for that event even when I the Hat 0-1 and Hatch-2 pool levels are as low as their low level alarms.
Correcting typographical errors does not significantly reduce the margin of safety since it is only editorial in nature. Safety analysis assumptions and equipment performance are not changed in any way.
PROPOSED CHANGE 2:
This proposed change will:
- 1) Revise the Hatch-1 Technical Specification Table 4.2-11 to require that the post-LOCA radiation monitor be calibrated at least once every 18 months.
- 2) Revise Hatch-1 Technical Specification Table 3.2-11 footnote (c) concerning LCO actions.
HL-1685 002358 E2-3
.. - -_ .- _=
ENCLOSURE 2 (Continued) i REQUEST TO REVISE TECHNICAL SPECIFICATIONS SPENT FUEL POOL WATER DEPTH ABOVE IRRADIATED FUEL, CORRECTION OF ADMINISTRATIVE ERRORS, AND POST-LOCA RADIATION MONITOR CAllBRATION FRE0VENCY 10 CFR 50.92 EVALVATION BASIS FOR PROPOSED CHANGE 2 NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION:
The change does not involve a significant hazards consideration for the following reasons: !
- 1. The proposed am9ndment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
, The Hatch-1 Technical Specifications presently require that the l post-LOCA radiation monitor be calibrated at least once every 6 months.
These monitors are considered a passive portion of radiation control because they do not actively handle or control radiation hazards but only provide alarm capability. This calibration interval is requested to be revised to at least once every 18 months which will maintain consistency with the Hatch-2 Technical Specifications and the BWR-4 l Standard Technical Specifications for radiation monitors of a similar function and type. Identical type and manufacture instruments are installed as post-LOCA monitors in Hatch-2. The Hatch-2 Technical Specification calibration interval for these instruments is at least once every refueling outage, which is defined in both units as 18 months. Field data of the post-LOCA monitors was reviewed for two successive 18 month source calibrations. In each instance, the instruments were found to be within the acceptance criteria. These instruments did not drift outside their acceptance range over the 36 month period; therefore, it can be concluded that there is sufficient stability in the monitor to allow calibration on 18 month intervals
! rather than 6 month intervals.
i The LC0 action stated in Hatch-1 Technical Specifications Table 3.2-11 note (c) are being clarified by substituting the comparable Hatch-2 ACTION statement which has been found acceptable by the NRC acceptance of the Hatch-2 Technical Specifications. This revision will provide consistency t2 tween the actions of both unit's technical specifications. Thus, these changes will not result in a significant increase in the probability of an accident previously evaluated in the FSARs.
HL-1685 002358 E2-4
ENCLOSURE 2 (Continued)
REQUEST TO REVISE TECHit! CAL SPEClflCAT10!1S SPENT FVEL POOL WATER DEPTH ABOVE IRRADIA1ED FUEL, CORRECTION Of ADMINISTRATIVE ERRORS, AllD POST LOCA RADIATION HON 110R CAllBRnTION FRE0VENCY 10 CFR 50.92 EVALVATION
- 2. The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The pror.osed Technica'; Specifications changes do not create the possibility of an accident of a diffe:ent type than any previously ;
evaluated in the Hatch FSAR$ because they do not change the physical configuration of the )lant or alter the mode of operation or setpoints of any equipment in tie plant.
- 3. The proposed amendment does not involve a significant reduction in the margin of safety.
Changing the surveillance nterval of the )ost-LOCA radiation monitors and revising a note in a tabia to make bot 1 consistent with the present Hatch 2 Technical Specifications will not involve a reduction in the ,
margin of safety.
HL-1685 002358 E2-5