ML20078S833

From kanterella
Jump to navigation Jump to search
Submits Revised Response to NOV Re Insp Repts 50-269/93-25, 50-270/93-25 & 50-287/93-25,informing That Analysis of Two Phase Conditions Downstream of Rbcus Will Not Be Completed by 950103 & Requests Extension Until 950213
ML20078S833
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 12/21/1994
From: Hampton J
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412290238
Download: ML20078S833 (1)


Text

ll l

  • Duke Power Company J. W.H e :w Oconee NuclearSite bice President P.O. Bat H19 (803)&G3499 Olhce Seneca, SC729 (801)&G3S64 Fat DUKEPOWER December 21, 1994 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Oconee Nucl. ear Station, Units 1, 2 and 3 Docket Nos. 50-269, -270, -287 Inspection Report 50-269, -270, -287/93-25 Revised Response to Notice of Violation By letter dated February 11, 1994, the NRC issued a Notice of Violation as described in the subject Inspection Report. Our response was submitted in a letter dated May 12, 1994.

In our response to violation 'A', we committed to providing a schedule for the completion of the analysis of the two phase conditions downstream of the RBCUs for Oconee. This schedule was provided in a letter dated November 2, 1994 and indicated a completion date of 1/3/95 for Oconee Units 1 and 2.

Preliminary results from the analysis have been obtained and are being verified. However, this process will not be completed by 1/3/95. Therefore, the completion date needs to be extended to 2/13/95. This is the first extension of the commitment date.

If you have any questions, please contact Michael Bailey at (803) 885-4390.