. AINCIPAL STAFF TORREY PINES TECHNOLOGY V RA

, Et1F R L(/.

CJ Po. Box 85008 San Diego, Catfornia 92138 D/RA4 VRA v$C76M$

-PAD V h

Telephone: (619) 455 2654 A oms.on of GA Technologies Inc. oq.AA RC DRMSP August 9, 1983 oe- ~

Project 2474 st TPT:CG&E-021 o. -neg 247 bb-0bb Mr. W. H. Dickhonor President and Chief Executive Officer Cincinnati Gas and Electric Company 139 East Fourth Street Cincinnati, Ohio 45202

Dear Mr. Dickhonor:

Enclosed is the biweekly status report on our Independent Review of ZIMMER Project Management, covering the period July 16, through July 29, 1983 Copies of this report are being sent to the U.S. Nuclear Regulatory Commission in accordance with the " Protocol Governing Communications between CG&E and Independent Organizations Conducting Reviews or Audits under the Commission's Order," Docket No. 50-358.

If you have any questions regarding the contents of this report, please call me.

Sincerely,

/ . = .

. A. J. Neylan Project Manager Enclosure ,

Copies w/ Encl.

[J. G. Koppler (NRC)

J. Lieberman (NRC)

J. H. Sniezek (NRC)

J. C. Stone (NRC) DESIGNATED ORIGINAU W. J. Ward (NRC)

J. Williams, Jr. (CG&E) tept3r! 3 E7Mfp wC&bA n.a Director, Office of Special Cases (NRC)

Zimmer Project Inspector (NRC)

Zimmer Section Chief (NRC)

Zimmer Sr. Resident Inspector (NRC) l 8308180340 830809 N' g g) Ir DR ADOCK 05000

INDEPENDENT REVIEW OF ZIMMEH Pl!OJECT MANAGEMENT l

BIWEEKLY STATUS REPORT NO. 7 FOR THE PERIOD ENDING JULY 29, 1983 The status report below is in reference to the Torrey Pines Technology Program Plan, document number GA-C17044, Revision A,

" Independent Review of ZIMMER Project Management," dated May, 1983 Work was concentrated on the evaluation of alternative organi-zations including the recent input from CG&E and the review of the Bechtel draft report referenced in;the last report.

During this period, G. Wessman and A. Neylan of Torrey Pines Technology met with the following:

NRC - J. Keppler, B. Davis, R. Warnick, E. Schweibinz (Region III) and J. Stone (Bethesda)

C0&E - W. Dickhoner and J. Williams CEAC - D. Altman, B. Suits, and M. Freemont AEP -

W. White, J. Dolan, and J. Dobbs GAP - T. Devine Udall Congressional - H. Myers, P. Parshley Staff The purpose of the meetings was to provide the status of the report and describe, in summary, sixteen alternative organizations TPT was evaluating. Feedback was requested on any additional alternative (s) which, from the perspective of other organizations, was considereo~ pertinent, or to identify particular aspects of the sixteen which TPT should ensure be considered. No recommendation or conclusions on the report were provided at any meeting.

Biweekly Status Report No. 7 for the Period Ending July 29, 1983 -

Page Two At the meeting with Devine, GAP, ' /T received additional documen-tatien for consideration concern $ng MVPP/ GAP's petition to NRC to re-open licensing hearings on Zic.mer, which included additional affidavits from whistleblowers.

As of July 29, 9050 manhours have been expended on this review of the Zimmer Project Management. The volume of documents for review and the number of outside personnel to be interviewed have been greater than anticipated; the project was approximately three weeks behind the Project Schedule given in the revised Program Plan.

4