ML20071Q096

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1982
ML20071Q096
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/01/1982
From: Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML20071Q076 List:
References
NUDOCS 8212290216
Download: ML20071Q096 (4)


Text

,

I DOCKET 50-305 I KEW AUNEE NUCLEAR POWER PLA NT

SUMMARY

OF OPERATING EXPERIENCE October, 1982 OPER ATIONS: On October 10, unit generation was- reduced to 75%

for the nonthly Turbl6e Stop Valve Test.

M AINT EN A NCE: Replaced a defective Radiation Monitor paper drive motor.

Replaced a defective Radiation Monitor detector.

Replaced a broken diesel stack temperature switch.

Replaced a Control Room A/C fan motor.

Rebuilt a Charging Pump.

8212290216 821109 PDR ADOCK 05000305 R PDR

. l AVER AGE DAILY UN IT POV ER LEVEL DOC KET NO- 50-305 UNIT- KEWAUNEE COMPLETED DY- G. H. RUITER l TELEPHONE- 414-388-2560 X225 j REPOET MONTH OCTOPER, 1982 AVERAGE DAILY DAY POWER LEVEL (MW E-N ET) 1 508 2 512 3 500 4 503 5 ,, - 508, 6 512' 7 508 8 508 9 512 10 471 11 487 12 503 13 499 14 512 15 508 16 512 17 508 18 508 19 512 20 508 ,

21 508 22 512 23 508 24 508 25 508 ~

26 512 27 512 l 28 508

29 512 30 512 31 506 1

. 4 A . . . .

4 9

. 6.

UN IT SHUTDOW WS A ND POV ER REDDCTIONS m

DOCKET NO: 50-305 UNIT NAME: Kewaunee DATE: November 1, 1982 m COMPLETED BY: G. H. Puiter TEL EPl!ON E: 41 f4- 38 8- 2560 r225 6

REPORT MONTH - OCTOBER, 1982 9

. . . . . . . . . . . 9 1 NO. I DATE ITYPE IDURATIONIREASONIMETHODI LER NDMBER ISYS I COPPONENT l COMMENTS I I F  : + l l l l l l 1 1 I I I I I I I i i i 9 I I i l l l 1 1 I I No shutdowns or load reductions during i i I i i i I I I i 1 October. I I I I I I I I I I I I 9 I I i 1 1 I I I I I I I I 1 l l I I I I I I I I I I I I I I I I l 9 I I I I I I i 1 1 I I I I I I I I I I I I I I I I I I I I 1 I i 1 9 1 1 I I I I I l i I ( l l I I I I I I I I i 1 1 I I i i 1 l I I i 1 I 9 I I I i i I I I I I i 1 I I I I i i I I I I I I I I I I I I I I 1 9 I I I i 1 I I I I I I I I I I I I I I I i i I e I I I i I i I i 1 I 9 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l 9 I I I I i 1 I i l 1 I i I i i l I I i I I 1 I i i I I I i I I I I 9 I I I I I I I I I I I i 1 1 I I I I I I i *1 1 1 I I I I I I I I I 9 I I I I I I I I I I I I I I I I I I I I I I

.I I

. .I I. I. I. I.

I i 1 1 9 TYPE RE ASON METHOD SYSTEN & CdMPONENT CODES "%

F: Forced A-Equipment Failure (Explain) 1-Manual From NnPEG-0161 S: S ch ed::l ed B-Maintenance or Test 2-Manus 1 Scras ~\

C-Refueling 3-Automatic Scras D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination 5-Load Peductions ^

F- Ad ministra t i ve 9-Other G-Operat ional Error (Explain) ^

H-Other (Explain) 2 .--.

?

a . .a. a

. -g OPER ATIN G D ATA REPO RT

  • DOCKET No- 50-305 COMPLETED BY- G. H. RUITER O PER AT ING STATUS TELEPH3NE- 414-388-2560 I225 "%

1 UNIT NAME KEWAUNEE ********************************************** -%

2 REPORTING PERIOD OCTOBER, 1982

  • NOTES
  • 3 LICENSED THERMAL POW ER (MWT) 1650
  • As of the end of this reporting period *
  • the unit has been continuously on line
  • 4 NAMEPLATE RATING (GROSS MWE) 560
  • f or 16 0 corsecutive days. * '%

5 DESIGN ELECTRICAL RATINC (NET MWE) 535 * *

  • * -3 6 MAXIM 1M DEPENDABLE CAPACITY (GROSS MWE) 538 *
  • 7 MAEIMUM DEPENDABLE CAPACITY (NET MW E) 511 ********************************************** ,

8 IF C!l ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPOPT, GIVE REASONS Updated M DC ( Ne t) and MDC (Gross) based on capacity test for the forth quarter  %

performed on October 27, 1982.

9 POW ER LEVEL TO bHICH RESTRICTED, IF ANY (NET MWE) None "%

13 R E ASONS FOR RES13ICTIONS, IF ANY -

9 THIS MONTH YR-TO-DATE CpMULATIVE s 11 HOURS IN REPORTING PERIOD 745 7296 73441 9

12 NUMSER OF HOURS REACTOR WAS CRITICAL 745.0 6296.4 62298.3 13 REACTOR R ES ER V E S!!UT DOU M HOURS 0.0 0.0 .- 2330.5 s 14 HOURS GENERATOR ON-LINE 745.0 6239.5 61046.3 15 UhIT RESERVE SU1DOWN HOURS 0.0 0. 0 10.0 16 GROSS THERM AL ENERGY G2NERATED (MWH) 1214805 10037309 94844243 17 GROSS ELECTRICAL EN ERGY GENERATED (MWH) 396400 3278200 31230600 -

l 18 NET ELECTRIC AL EN ER GY GEN ER ATED (MWH) 377319 3123066 29723343 1

19 UNIT SERVICE FACTOR 100.0 85.5 83.1 20 UNIT AVAILABILITY FACf0R -

100.0 85.5 83.1 21 UNIT CAPACITY FACTOR (USING MDC NET) 99.1 83.2 77.5 22 UNIT CAPACITY FACTOR (USING DER N ET) 94.7 80.0 75.6 23 UNIT FORCED OUTAGE R ATE 0.0 0.1 4. 4 24 SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, D AT E, AND DURATION OF E AClf) befueling shutdown of 8-veek duration scheduled to start March 20, 1983.

25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIM ATED DATE OF STARTUP - N/A

, n

  • - me g