Resubmits Listed TS Pages,Affected by Licensing Amends That Resulted in Changes to TS Pages Contained in 940110 Submittal of TS Change Request 93-16-0 to Relocate Seismic Monitoring Instrumentation Lco,Srs & Associated Tables
ML20070J619
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/20/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070J623 List:
References
NUDOCS 9407250223
Download: ML20070J619 (3)


Text

Stction Support Dipzrtmint p

PECO ENERGY " o "* c~~ '

numr oraun neadquaners 4

%S Ch"stmbrock Doukward Wayne, PA n0H7-5691 July 20,1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request 93-16-0 Revised Technical Specifications Pages Gentlemen:

By letter dated January 10,1994, PECO Energy Company submitted Technical Specifications (TS) Change Request No.93-164 for Umerick Generating Station (LGS), Units 1 and 2, requesting changes to relocate the seismic monitoring instrumentation Limiting Condition for Operation, Surveillance Requirements, and associated tables and TS Bases to the Updated Final Safety Analysis Report.

Since this request was submitted, the NRC has approved and issued LGS, Unit 1 and Unit 2, licensing amendments that resulted in changes to several TS pages which were contained in the January 10,1994 submittal. Therefore, all the submitted TS pages accompanying Change Request No.93-164 do not reflect current LGS TS pages. To rectify this condition, prior to NRC issuance of TS Change Request No.93-164, the following LGS TS pages, which were affected by subsequent amendments, are being re-submitted.

LGS Unit 1 LGS Unit 2 TS Paaes TS Paaes xix xix B 3/4 3-5 B 3/4 3-5 I. 4e i o uy 9407250223 noDac 9407]e* gas -

gor gg,

f~

July 20,1994 Page 2 Attachment 1 to this letter contains the revised TS pages for Change Request No. 93-16-0. All other pages previously submitted by letter dated January 10,1994 are correct and are proposed as submitted. This information is being submitted under affirmation, and the required affidavit is enclosed.

If you have any questions, please do not hesitate to contact us.

Very truly yours, G. A. Hunger, v Jr., f e Director - Licensing Attachment Enclosure cc: T. T. Ma rtin, Administrator, Region I, USNRC (w/ attachment and enclosure)

N. S. Pei:v. USNRC Senior Resident inspector, LGS (w/ attachment and enclosure)

R. R. Janati, PA Bureau of Radiological Protection (w/ attachment and enclosure) l I

l l

COMMONWEALTH OF PENNSYLVANIA .

ss.

COUNTY OF CHESTER .

W. H. Smith, Ill, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the revised information for Technical Specifications Change Request No. 93-16-0 to facilitate a change in the Limerick Generating Station, Unit 1 and Unit 2 Ucense Nos. NPF-39 and NPF-85, to relocate the seismic monitoring instrumentation Umiting Condition for Operation, Surveillance Requirements, and associated tables and TS Bases to the Updated Final Safety Analysis Report, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

1 1

s~ 1 Vice President V

Subscribed and sworn to

  1. d before me this // day of ' 1994.

!/, ll 'Q, ,

r C

s_. xaulSJ j ,ljAw, -

7-NotarfPublic Natan3 Sod 5

i _

Wca$m5?N?C$C@gg5 mesm Emresq .

u l

l

!