Monthly Operating Repts for May 1994 for Jm Farley Nuclear Plant,Units 1 & 2
ML20069K182
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/31/1994
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9406150297
Download: ML20069K182 (9)


Text

..

  • Southern Nuclear Operating Company Post OEce Box 1295 [

Birmmgham. Atacama 35201

, Te'ephone (205) BE8-5131 L

Dave Morey Southern Nudear Operating Company -

%ce Pres: cent Faney Proyect the sou:nern elecinc systern June 8,1994 Docket Nos. 50-348 l

50-364 U. S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Data Report Gentlemen:

f Attached are the May 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, (l '/ 2.n > /

Dave Morey I

RWC:jgp(mor)

Attachments C

ec: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross W$n y ,b

~=i*,

,: '~h 9406150297 940531 / dj ed PDR f4 DOCK 05000348 R PDR \

l 1

Josepli M. Farley Nuclear Plant Unit ]

Narrative Summary of Operations MAY 1994 The unit was ramped down to 15 percent power on 5/27/94 to allow for steam generator contaminant cleanup. The unit retumed to 100 percent power at 0710 on 5/30/94.

The following major safety related maintenance was performed during the month:

1. Performed miscellaneous corrective and preventive maintenance on the diesel generators.
2. Removed flexible service water lines and installed blind flanges on one out of twelve sections on the ID containment cooler.

~

OPERATING DATA REPORT DOCKET NO. 50-348 DATE June 6,1994 CON 1PLETED IlY R. D. liill TELEPIIONE (205) 899-5156 OPERATING _ STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: _

May 1994 I) Cumulative data since 12-01-77, date j

3. Licensed Thermal Power (MWt): 2,652 of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
9. Power Level To Which Restricted, if Any (Net MWe N/A
10. Reasons For Restrictions,if Any: N/A This Alonth Yr.to Date Cumulative i 1. Ilours in Reporting Period 744.0 3,623.0 144,623.0
12. Number Of flours Reactor Was Critical 744.0 2,455.9 114,119.8
13. Reactor Reserve Shutdown llours _

0.0 0.0 3,650.0

14. Ilours Generator On-line 744.0 2,410.3 112,316.9
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 1,840,449.0 6,077,429.8 288,569,835.0
17. Gross Electrical Energy Generated (MWH) 598,172.0 1,973,846.0 92,988,892.0
18. Net Electrical Energy Generated (MWil) 566,068.0 1,856,022.0 87,796,176.0 19, Unit Service Factor 100.0 66.5 77.7 1
20. Unit Availabilty Factor 100.0 66.5 77.7
21. Unit Capacity Factor (Using MDC Net) 93.7 63.1 73.9
22. Unit Capacity Factor (Using DER Net) 91.8 61.8 73.2
23. Unit Forced Outage Rate 0.0 0.0 6.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A __  ;

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 0&O6H2 0&0291 initial Electricity 08/2092 08!1 & 22 Commercial Operation 12/01U2 12!Q1/12 1

1

nocxtr so. 50-348 Usrr 1 DATE June 6,1994 c0%1PLETED By R. D. Hill TELEPil0NE_(205) 899-5156 l MONTli May i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) l l

1 1 817 17 823 i

2 822 18 826 3 818 19 829 ,

l 4 822 20 831 5 826 21 830 6 826 22 829 l

7 825 23 825 1

8 821 24 824 9 825 25 822 10 820 26 822 l

822 27 444 11

)

12 818 28 15 13 817 29 169 14 _

808 30 761 15 _

818 31 818 16 817 INSTRUCTIONS On this fonnat, list the average daily unit power level in MWe-Net for each day in the  ;

reporting period. Compute to the nearest whole megawatt. l

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 -

UNIT NAME J. M. Farley - Unit 1 DATE June 6.1994 -

COMPLETED BY R. D. Hill REPORT MONTil MAY TELEPIIONE (205) 899-5156 I

METilOD OF LICENSEE CAUSE AND CORRECTIVE il

!} DURATION SIIUITING EVENT SYSTEM COMPONENT ACTION TO NO DATE , TYPE (1). llOURS REASON (2) DOWN REACTOR Q)1 REPORT # CODE (4) CODE (5) PREVENT RECURRENCE

] 002 05/27/94 S 68.32 B N/A N/A N/A N/A At 1051 on 5/27/94, operators began ramping the unit down to i approximately 15 percent power to allow for steam generator contaminant cleanup. The unit was returned to 100 percent l

power at 0710 on 5/30/94.

I l

b i

lL__ _ ___. _ _ _ _ .

1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G- Instructions for Exhibit 1 - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry II - Maintenance or Test 2 - Manual Scram Sheets for 1.icensee Ewnt C - Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restrictam 4 - Other (Explam)

E - Operator Trammg & License Exammation F- Admmistrative G - Operational Error (Explam) 11 - Other (Explam)

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations MAY 1994 There were no unit shutdowns or major power reductions during the month of May.

The following major safety related maintenance was performed during the month:

1. Performed miscellaneous corrective and preventive maintenance on the diesel generators.

l j

r OPERATING DATA REPORT DOCKET NO. 50-364

. DATE June 6,1994 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: May 1994 1) Cumulative data since 07-30-81, date
3. Licensed Thermal Power (MWt): 2,652 of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
9. Poe.cr Level To Which Restricted, if Any (Net MWe N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
11. Ifours in Reporting Period 744.0 3,623.0 112,536.0
12. Number OfIlours Reactor Was Critical 744.0 3,623.0 96,576.7
13. Reactor Reserve Shutdown ilours 0.0 0.0 138.0
14. Ifours Generator On-line 744.0 3,623.0 95.184.8
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWII) 1,963,755.1 9,545,434.8 2 9 w 787.6
17. Gross Electrical Energy Generated (MWil) 644,903.0 3,157,714.0 D//07,175.0 l
18. Net Electrical Energy Generated (MWH) 614,263 0_ 3,008,832.0 75,583,921.0
19. Unit Service Factor 100.0 100.0 84.6 j
20. Unit Availabilty Factor 100.0 100.0 84.6 '
21. Unit Capacity Factor (Using MDC Net) 100.4 101.0 81.9
22. Unit Capacity Factor (Using DER N~t) 99.6 100.2 81.0
23. Unit Forced Outage Rate 0.0 0.0 4.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A j l

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A )
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved I Initial Critic;lity OSDM81 05!D8!M Initial Electricity 05!24!M 051251H Commercial Operation OS!Dllu 07!3D!M l

nocxtrso. 50-364-usir 2 ,

nrTE June 6,1994 -

courtrito av R. D. Ilill Tournost (205) 899-5156 MONTil M ay__ _ ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 __._

822 17 827 2 _ _ _ _ _ . _

828 18 830 3 858 19 833 4 _ , _ _

828 _

20 835 5 832 21 834 6 _

831 22 832 7 823 23 828 8 819 24 826 9 829 _

25 825 10 ___

823 26 825 825 27 824 l 11 12 821.._ 28 827 13 .

821 29 823 14 818 30 823 15 821 31 821 16 820 ,

INSTRUCIlONS

< On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE June 6,1994

- COMPLETED IlY R. D. Ilill REPORT MONTil MAY TELEPilONE (205) 899-5156 I

METilOD OF LICENSEE CAUSE AND CORRECTIVE I DURATION SillTFTING EVENT SYSTEh! COMPONENT ACTION TO

.M L _.__DATE ,TUEg[ llOURS REASON (2) DOWN REACTOR _(3L RFPORT # CODE 14) CODE (5) PREVENT RECURRENCE j There were no shutdow ns or power reductions during the month of May.

I t

I!

- - _ ~ a a -~- I-._. _ . _ - _ - _ . - - - - . ~ - _ . - - - -

1: 2. 3: 4. S-F: Forced Reason Method Exhibit G- Instructans for Exhibit 1 - Same Source S: Scheduled A - Equipment Fas!ure t Esplam) 1 - Manual Preparations of Date Entry B - Mamtenance or Test 2 - Manual Scram Sheets for Licensee Esent C - Refuebng 3 - Automatic Scram Report (L ER) File (NU REG 4)l61)

D - Regulatory Restnetmn 4 - Other (Explami E - Operator Tratnmg & License Exammaten F - Admtmstrame G - Operatwnal Error (Esplam) 11 - Other t Explam) e