MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error 05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER1999-07-12012 July 1999 Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20209D9781999-07-0808 July 1999 Forwards Addl Info to Support EA of Proposed 990212 License Application ECR 98-01675,correcting Minor Administrative Errors in TS Figure Showing Site & Exclusion Areas Boundaries & Two TS SRs ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209C1201999-06-30030 June 1999 Informs of Util Intent to Request Renewed License for PBAPS, Units 2 & 3,IAW 10CFR54.Licensee Anticipates That License Renewal Application Will Be Submitted in Second Half of 2001 1999-09-09
[Table view] |
Text
,
. StLti:n tupp:rt Diputmint ,
e u- 10CFR50.54
,- - C -- ,
I)ECO ENERGY =gg;;;;;_,, -
965 Chos.1mbrook Doulevard Wayne, PA 19007 5691 March 31,1994 Docket Nos. 50-277 50-278 )
50-352
> 50-353 ~
Ucense Nos. DPR-44
. DPR-55__
NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Centrol Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 I Umerick Generating Station, Units 1 and 2 ,
Request for Approval to Change the Quality Assurance Program Description by Transferring Organizational Responsibility for the Receipt _.
1 Inspection Function
Dear Sir:
This letter is being submitted in accordance with 10CFR50.54(a)(3), which requires
~
prior Nuclear Regulatory Commission (NRC) approval for changes to the Quality Assurance Program _ description that reduce the commitments contained therein.1 The-
- Quality Assurance Program, as described in PBAPS UFSAR Appendix D, Section 17.2 ,
(7/93) and LGS UFSAR Section 17.2 (11/93),' commit PECO Energy Company (PECO '
Energy) to perform Receipt inspection activities using ANSI N45.2.6 - 1978' certified .
Ouality Verification (OV) personnel from the Nuclear Quality Assurance _(OA)'
Department. Quality Support (OS) personnel also perform some receipt inspection -
activities. PECO Energy is proposing that both OV and OS receipt ins'pections be transferred to the Materials Management Section at each station, and that the NRC
- review and approve this change. This reduction in commitment does not reduce the ,
PECO Energy commitment to quality, nor.to compliance'with 10CFR50, Appendix B.
Receipt inspection performed either by OV or Materials Management personnel is
. organizationally independent of both the vendor producing the items inspected and of-t5e user group. Thus, we do not consider'this to be a peer inspection initiative, a_nd Criteria Vil, Control of Purchased Material, Equipment and Services, and X, inspection,'.
of 10CFR50 Appendix B are satisfied. ;
[fg' g M 9404130067:94o331 r -
/J PDR .ADoCK;O5 coo 277 0 '
1 P
..w ~PDR j *i I
March 31,1994
, Page 2 This change in commitment is consistent with receipt inspection program changes approved by Region 1 for Baltimore Gas & Electric at Calvert Cliffs.
PECO Energy has developed a transition program to ensure that the receipt inspection process applied to quality assured items will remain at or above the currently provided level of quality. This transition program will involve evaluating, training, qualifying and certifying Materials Management personnel as Receipt inspectors per the requirements of ANSI N45.2.6-1978 and Regulatory Guide 1.58.
Materials Management personnel will be evaluated for Level I and ll Receipt inspection Certification. Following the successful completion of a one-week training program, eligible Materials Management personnel will undergo an On-the-Job Training (OJT)
Program, in which they will examine incoming items under the cognizance of currently qualified OV Receipt inspectors, who will continue to perform Receipt inspection for product acceptance. The OJT will continue until the Level lli Examiner (currently assigned from NOA during the transition) has verified and certified the Materials Management personnets' competence to perform Receipt inspections independently.
This transition period is expected to last from three to six months.
Station Materials Management will use performance indicators during and following the transition, to compare levels of product quality-related receipt inspection deficiencies against historical baseline data. Performance indicators will be reported periodically to senior management. NOA will assess this transition via surveillance activity and will continue to include receipt inspection in the scope of quality audits.
Based on this data, adjustments will be made as required to ensure the continued high quality of receipt inspections during and after the transition period.
PECO Energy recognizes that the transfer of the Receipt inspection function from NOA to the line organizations is a significant change, and chose this strategy after extensive research and planning. This proposed change in the PECO Energy OA Program will provide greater effectiveness in the Receipt inspection function because of the following:
. Integration of Receipt inspection with commercial receiving activities will aid in Material Management self-identification and implementation of material handling enhancement opportunities.
. Receipt inspection by Materials Management will expedite notification of Procurement Engineering of incoming product quality problems. Currently, such problems are identified by OV personnel, then routed to Engineering via Mat 9 rials Management.
The additional proposed changes to the OA Program descriptions in the PBAPS UFSAR Appendix D, Rev. 11, 07/93, and the LGS UFSAR, Chapter 17.2, Rev. 3, 11/93, are provided in attachments 1 and 2 respectively.
i
- March 31,1994
, Page 3 i l
Preliminary training of Materials Management personnelin Receipt inspection principles and techniques has already begun. However, elimination of receipt inspections by QA personnel for product acceptance will not occur without NRC 1 approval; therefore, we are requesting your prompt review and approval.-
If you have any questions or need additional information, please contact George J. Siefert (610) 640-6768 of my staff.
Ve truly yours,
, H.
George A. Hunger, Jr., Dire [ctor Licensing Section Attachments cc: T. T. Martin, Adminictrator, Region I, USNRC, w/ attachments W. L Schmidt, USNRC Senior Resident in.spector, PBAPS, w/ attachments N. S. Perry, USNRC Senior Resident inspector, LGS, w/ attachments !
M. C. Modes, USNRC Region I, w/ attachments l
l 1
-i I
l
a
. i
.,, i 1
. PBAPS j I
a
~1 10. -Direct the scheduling, planning, and performance of ,
.~l_ technical monitoring. In the areas of operations, <j l health. physics,- radioactive waste, chemistry,-
- 1. security,- post-maintenance / modification testing,- ;
-I surveillance testing, maintenance, fire. protection,' 1 i plant' modifications, and emergency planning. j
'l
] 11. Development and approval'of Monitoring-Guidelines.
'l I 12. Interface with station management to . provide-I feedback and obtain corrective action to identified l problems.
17.2.1.2.3.1.2 Quality Verification Section '
The Quality Verification Section is under the direction l of a Superintendent, who reports to the site Quality-Division Manager.
The Superintendent has the following responsibiliti_es:
- 1. Provide administrative _ supervision and technical #
1 direction of the activities of the NQA Quality i Verification (QV) personnel.
- 2. Oversee the inspection _ activities in the areas of receipt incpcction; radwaste/radmaterial packaging, handling, and shipment; maintenance and modifi-cation activities performed on safe.ty-related-equipment.
l 3. Consult with the Assessment Superintendent,-Quality Support- Superintendent, .and .the site Quality-Division Manager when significant problems affecting quality are identified.
.I 4. Overview of the QV Section activities, schedules,:
and results.
- 5. Identify -the need for the preparation .of NQA-procedure supplements relating to;QV activities.
- 6. Ensure; that -the~ personnel- involved in the implementation of the QV InspectiontActivities~are-trained, qualified, and certified to perform-assigned activities.
D.11-6 Rev. 11, 07/93
PBAPS
'l 7. Ensure that verification results are documented in accordance with NQA procedures, and unacceptable results are identified and rescheduled in inspections, as appropriate. .
- 8. Review of work requests for inclusion of QA Plan i requirements and QV activities. J
- 9. Document conditions adverse to quality resulting from QV activities and verify corrective action.
- 10. Provide independent verifications in mechanical, electrical, I&C and welding disciplines.
- 11. Provide visual, liquid penetrant, magnetic particle
, and ultrasonic inspections.
l
- 12. Coordinate NDE activities with appropriate plant technical and craft supervision personnel. -1 l
17.2.1.2.3.1.3 Quality suppoct Section The Quality Support Section is under the supervision of a Superintendent, who reports to the site . Quality Division Manager. The Superintendent has the following responsibilities:
- 1. Provide administrative supervision and technical direction of the activities of the Quality Support Section.
- 2. Consult with the Quality- Verification Superin-I tendent, Assessment Superintendent, and the Site i Quality Division Manager on significant problems affecting quality. .
j 3. Ensure that personnel involved in performing NQA l Quality support activities are trained and l
- qualified.
- 4. Review and coordinate revision of NGA Procedures. I
- 5. Review of selected Station Administrative Procedures and implementing procedures.
- 6. Review and approval of procurement documents and technica4-rhptr-i-nepeot-lon-documentes for safety-related items and servicas.
D.ll-7 Rev. 11, 07/93 J
PBAPS 17.2.7.1.3 Evaluation of vendor, supplier, or contractor capabilities are based on records of previous supply or performance and review of quality assurance programs or audit of supplier facilities, practices, or a combination thereof.
17.2.7.144 Review of vendor, supplier or contractor qualifications shall. be assessed at periodic intervals by -NQA -
commeneurate with the importance, complexity, quantity of the product or services being purchased.
17.2.7.1.5 Vendors that are on the " Evaluated Vendors List" are audited triennially by NQA commensurate with the importance, complexity, quantity of the product or services being purchased.
17.2.7.2 Requisitions for Safety-Related items shall contain a phrase that clearly indicates the quality status of such items.
17.2.7.2.1 Procurement documents shall include the identification of nonconformances that require approval by PEco for disposition.
17.2.7.3 Documentary evidence that material and equipment conform to the procurement requirements shall be available at the site prior to installa'.lon or use of such material, in .
accordance with PBAPS Administrative Procedures. j Mahr6ak Mon 6fjVMT %pTidA j.
17.2.7.4 Receipt inspection is the responsibility of the^NGA Gile 0"ality Di"icica and shall be performed in accordance with the3 NO.'. Preceduras .
Procat emtn4~ ProceNa ch and GuldeWnd 17.2.7.4.1 Receipt inspections are performed to verify that received materials, components or parts conform to the purchase order requirements.
17.2.7.4.2 Receipt inspection includes, as appropriate, visual examination of physical properties, determination and identification of marking or labeling, review and inspection of quality assurance documentation to verify conformance with the purchase order specifications and requirements.
D.11-26 Rev. 11, 07/93
. . /
LGS UFSAR
- f. Ensure that items requiring corrective action. are' properly identified and documented in accordance with NQA procedures.
- g. Ensure that personnel involved in performing-NQA audits, .
surveillance, and technical monitoring are trained, qualified and certified.
- h. Assure timely follow-up of committed corrective action.
- 1. Assure that corrective action performed in response _to' previously identified conditions adverse to quality,.is adequate and effective to preclude. repetition,
- j. Direct the scheduling, planning,' and ' performance of technical monitoring in the areas of operations, health.
physics, radioactive waste, chemistry, security, postmaintenance/ modification testing, surveillance testing, maintenance, fire protection, plant modifications, and emergency planning.
- k. Development and approval of Monitoring Guidelines.
- 1. Interface with station management to provide feedback and obtain corrective action to identified problems.
17.2.1.2.3.1.2 Quality Verification Section The Quality Verification Section is under the direction _ of -a Superintendent who reports to the site. Quality Division Manager. )
The Superintendent has the following responsibilities:
- a. Provide administrative supervision and technical- ,
direction of the. activities )f the 'NQA Quality verification (QV) personnel.
- b. Oversee the inspection activities.in the areas of-receipt l inepection;- radwaste/radmaterial packaging, handling, and shipment; maintenance and modification activities performed on safety-related equipment. ;
i
- c. Consult with' the Assessment Superintendent, Quality H Support Superintendent, and site' Quality Division. I Manager, when significant prublems af fecting quality' are
H identified. R
- d. Overview of the QV section activities, schedules,-and results.
1
- e. Identify the need for the preparation of NQA-procedure a supplements relating to QV activities.
17.2-9 Rev. 3 July /93- .;
'l u
LGS UFSAR
.f <
- g. Encuro that verification' results aro documnnted ' in accordance with NQA procedures, and unacceptable results are identified and rescheduled in inspections, as appropriate.
- h. Review of work requests for inclusion of QA Plan requirements.and QV activities.
- 1. Document conditions adverse to quality resulting from QV activities and verify corrective action.
- j. Provide independent verifications in mechanical, electrical, I&C and welding disciplines,
- k. Provide visual, liquid penetrant, magnetic particle, and ultrasonic inspections.
- 1. Coordinate NDE activities with appropriate plant technical and craft supervision personnel.
17.2.1.2.3.1.3 Quality Support Section The Quality Support Section is under the supervision of a Superintendent who reports to the site Quality Division Manager.
The Superintendent has the following responsibilities:
- a. Provide administrative supervision and technical direction of the activities of the Quality Support Section.
- b. Consult with the Quality Verification Superintendent, Assessment Superintendent, and the site Quality Division Manager, on significant problems affecting quality.
- c. Ensure that personnel involved in performing NQA Quality Support activities are trained and qualified.
- d. Review and coordinate revision of NQA Procedures.
- e. Review of selected Station Administrative Procedures and Implementing Procedures.
- f. Review and approval of procurement documents and-teshnical roccipt incpection documento for safety related items and services. .
- g. Review NCRs for conditions adverse to quality.
- h. Tracking and trend analysis of Verification and Monitoring Activity reports and CARS.
- 1. Document conditions adverse to quality identified during 1 Quality Support activities. l l
i l
17.2-10 Rev. 3 July /93
. PBAPS 13.3.5.2 Quality Assuranca R3ceipt Inspection Personnel Training V See belc4
'a % uclear N Operations Quality Assurance Division Pr yodurd QAD - 00, titled " Training, Qualifying and rtTfication of Nuclea rations Quality Contr sonnel", defines the qualificat o r pe n in this group.
- b. Periodic rea fication of P AN(SI 74 receipt inspection o[el in accordance with 2.6-1973 is required by Procedure QADP-100.
13.3.5.3 Reactor Engineering Personnel Training
- a. Each reactor engineer is involved in sufficient startups to insure that he retains his proficiency in reactor engineering startup activities. This provides on-the-job experience and reinforcement of previous training.
- b. Before any unit startup, discussions are held as appropriate to review new procedures or methods which may be pertinent to reactor engineering startup activities.
Unusual conditions and potential problems are discussed to insure a clear understanding of the startup procedure.
- c. Non-licensed reactor engineers participate in training programs covering BWR systems and technology including automatic depressurization, emergency core cooling, fuel and core configuration, instrumentation, radiation monitoring, and other major systems.
13.3.5.4 Results Engineering Personnel Training
- a. Test engineers normally participate in training programs covering BWR systems and technology.
- b. A meeting is held each normal workday morning to' discuss plant status and job assignments. Any special problems and possible solutions are discussed.
13.3.5.5 Health Physics and Chemistry Personnel Training
- a. PECO health physics technicians can progress through four levels of qualification based on training and plant experier.ce. Progression from
)( Mahrirds baMjcNienh pg rSonne f Wjlf bc evAf a .,
tres t /W I M N C QCCorbo V MI 2 ~
13.3-14 Rev. 8 01/90