ML20065D984

From kanterella
Jump to navigation Jump to search
Corrected Page Entitled, Refueling Info Request of Monthly Operating Rept for Feb 1994 for Millstone Unit 2
ML20065D984
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1994
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20065D981 List:
References
NUDOCS 9404070314
Download: ML20065D984 (1)


Text

_

6 i l

REFUELING INFORMATION REQUEST

1. Name of the facility: Millstone Unit 2
2. Scheduled date for next refueling outage: Juiv 1994
3. Scheduled date for restart following refueling: October 1994
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes. License amendment chanaes are beina souaht for Enainneeed Safety Actuation System chanaes to take advantane of Batterv Charaer flexabilitv.

Boron Dilution Accident Analvsis assumotion chanaes, and Generic Letter 90-06.

5. Scheduled date(s) for submitting licensing action and supporting information:

Aoril 1994.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
  • Same fuel sucolier. imoroved new fuel assembiv desian oursuant to 10CFR50.59.
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core: (a) 212 in Spent Fuel Pool: (b) 2fL4 RQIE: These numbers reoresent the total Fuel Assemblies and Consolidated Fuel Storage Boxes (3 total containina the fuel rods from 6 fuel assemblies) in these two (2) Item Control Areas.

8. The present licensed spant fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

A license ammendment has been recentiv aco'oved by the NRC to increase

, e scent fuel oool storaae caoacity to 1306 storaae locations.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:
  • 200Q. Scent Fuel Pool Full, Core offload caoacity is reached.
  • 2004. Core Full Soent Fuel Pool Full.
  • Corrected Information 9404070314 940329 PDR ADOCK 05000336 R PDR